No.

Main Activities

1 Depot Site Work

1.1 Concrete casting for post belt in Tank-3 (150m3)

1.2 Cocrete casting for guardrail of RBC-2 (22m3)

1.3 Check the water leak test for wall of oily drum pit NA-21-V-04

1.4 Sampling of gravel (600m3), sand (148m3) in Silver Star Batch plant

1.5 Continue in the rebar work for Tank-7

1.6 Continue in the rebar work for Relief tank-2

1.7 Check the rebar and mold of 22 pcs of T-wall

1.8 Compaction test for the second layer of soil around NA-05-TK-07

1.9

1.10

1.11

0
Remarks
1.1 Concrete casting for post belt in Tank-3 (150m3) 1.2 Cocrete casting for guardrail of RBC-2

1.3 Check the water leak test for wall of oily drum pit NA-21-V-04
1.5 Continue in the rebar work for Tank-7

1.7 Check the rebar and mold of 22 pcs of T-wall


1.2 Cocrete casting for guardrail of RBC-2 (22m3)

1.4 Sampling of gravel (600m3), sand (148m3) in Silver Star Batch plant
1.6 Continue in the rebar work for Relief tank-2

1.8 Compaction test for the second layer of soil around NA-05-TK-07