1 Depot Site Work

1.1 Concrete casting for pile cap part-5 in Tank-4 (480 M3)

1.2 Concrete casting for RBC-8 wall and roof (135m3)

1.3 Sampling of gravel (1050m3) in CPP batch plant

1.4 Check the survey setting for custody meter station building

1.5 Core-test samples for asphalt layer in Tank-2

1.6 Rebar work in Tank-7

1.7

1.8

1.9

1.10

1.11

0
Remarks
1.1 Concrete casting for pile cap part-5 in Tank-4 (480 M3) 1.2 Concrete casting for RBC-8 wal

1.3 Sampling of gravel (1050m3) in CPP batch plant


1.5 Core-test samples for asphalt layer in Tank-2
1.2 Concrete casting for RBC-8 wall and roof (135m3)

1.4 Check the survey setting for custody meter station building
1.6 Rebar work in Tank-7