Download as pdf or txt
Download as pdf or txt
You are on page 1of 1

A A A A A

F A A A A A

F F F F F

SWING TYPE GLASS DOOR W/ UPVC JAMB & FRAME AWNING TYPE GLASS WINDOW W/ UPVC JAMB & FRAME

1 3 SCHEDULE OF DOORS & WINDOWS


FLOOR PLAN
A-01
A-01

A A A A A A A A A A

F A A A A A

F F F F F

2 SIDE ELEVATION 4 REAR ELEVATION


A-01
A-01

FROM THE OFFICE OF: PRC: SEAL PROJECT TITLE : PREPARED BY: DRAWN BY: NOTED BY: RECOMMENDING APPROVAL: APPROVED BY: SHEET NO :

DATE: RANDOLPH E. GARING BEINVENIDO L. BALAME


CONTINUATION OF THE
A-1
BiPSU- EGSO DRAFTSMAN CHAIRMAN, ARCHITECTURAL DESIGN
PTR:
CIVIL / STRUCTURAL ENG'R CHECKED BY: CHECKED BY:
CONSTRUCTION OF STUDENT CENTER CARLITO S. ORAIS, REE, D.M. NISA T. LUMBAB, D.M. VICTOR C. CAÑEZO, Jr. Ed.D.
DATE:
RALPH ESPREGANTE, RCE BEINVENIDO N. BALAN, JR. RCE
ADDRESS: TIN: LOCATION : BILIRAN PROVINCE STATE UNIVERSITY- MAIN CAMPUS BiPSU- CIVIL ENGINEER CHAIRMAN, CIVIL DESIGN AND WORKS DIRECTOR, ENGINEERING AND GENERAL SERVICES VICE PRESIDENT FOR ADMINISTRATION UNIVERSITY PRESIDENT III 01 06

You might also like