Jsa Insulation R1
Jsa Insulation R1
RESPONSIBLE
SEQUENCE OF BASIC JOB STEPS POTENTIAL ACCIDENT OF HAZARDS RISK LEVEL ( TINGKAT RESIKO ) RECOMMENDED SAFE JOB PROCEDURES
PERSONAL
(POTENSI DAPAT TERJADI KECELAKAAN/ (PENANGGUNG
(URUTAN LANGKAH DASAR PEKERJAAN) SEV PROB EXPOSURE (REKOMENDASI PROSEDUR KERJA SECARA AMAN)
MENIMBULKAN BAHAYA) JAWAB)
b. Make sure all manpower TBM. And brified reading work planning
Foreman, Supervisor/
c. Briefing sebelum bekerja membahas tentang komunikasi dalam bekerja Construction Team, HSE
3 4 H Team
d. All employee shall be get safety induction and commissioning training
1 of 5
RESPONSIBLE
SEQUENCE OF BASIC JOB STEPS POTENTIAL ACCIDENT OF HAZARDS RISK LEVEL ( TINGKAT RESIKO ) RECOMMENDED SAFE JOB PROCEDURES
PERSONAL
(POTENSI DAPAT TERJADI KECELAKAAN/ (PENANGGUNG
(URUTAN LANGKAH DASAR PEKERJAAN) SEV PROB EXPOSURE (REKOMENDASI PROSEDUR KERJA SECARA AMAN)
MENIMBULKAN BAHAYA) JAWAB)
2 of 5
RESPONSIBLE
SEQUENCE OF BASIC JOB STEPS POTENTIAL ACCIDENT OF HAZARDS RISK LEVEL ( TINGKAT RESIKO ) RECOMMENDED SAFE JOB PROCEDURES
PERSONAL
(POTENSI DAPAT TERJADI KECELAKAAN/ (PENANGGUNG
(URUTAN LANGKAH DASAR PEKERJAAN) SEV PROB EXPOSURE (REKOMENDASI PROSEDUR KERJA SECARA AMAN)
MENIMBULKAN BAHAYA) JAWAB)
3 of 5
RESPONSIBLE
SEQUENCE OF BASIC JOB STEPS POTENTIAL ACCIDENT OF HAZARDS RISK LEVEL ( TINGKAT RESIKO ) RECOMMENDED SAFE JOB PROCEDURES
PERSONAL
(POTENSI DAPAT TERJADI KECELAKAAN/ (PENANGGUNG
(URUTAN LANGKAH DASAR PEKERJAAN) SEV PROB EXPOSURE (REKOMENDASI PROSEDUR KERJA SECARA AMAN)
MENIMBULKAN BAHAYA) JAWAB)
h. Provide MSDS
Electric source
a. LOTO System shall be apply
4 of 5
RESPONSIBLE
SEQUENCE OF BASIC JOB STEPS POTENTIAL ACCIDENT OF HAZARDS RISK LEVEL ( TINGKAT RESIKO ) RECOMMENDED SAFE JOB PROCEDURES
PERSONAL
(POTENSI DAPAT TERJADI KECELAKAAN/ (PENANGGUNG
(URUTAN LANGKAH DASAR PEKERJAAN) SEV PROB EXPOSURE (REKOMENDASI PROSEDUR KERJA SECARA AMAN)
MENIMBULKAN BAHAYA) JAWAB)
a. Make sure that all the work activity that proper using fire blanket, water
Fire fire extinguisher and fire watcher
b. Make sure working area fully cover with fire blanket to prevent spark fall
Foreman, Supervisor/
4 2 M c. Makesure that flammable material already remove around the area or Construction Team, HSE
proper cover. Team
d, Fire wacther must check the condition of around area and when activity
in process
Hand Injury f. Brief the employes for proper drill machine / tools system to prevent
hand injury
Foreman, Supervisor/
4 1 M g. Brief the employes for proper sharp cutting / tools system to prevent Construction Team, HSE
hand injury Team
h. Brief the employee before start working
3. CLEANING a. Provide sign and waste bin three color Foreman, Supervisor/
2 1 L Construction Team, HSE
b. Remove general waste daily Team
( ) ( ) ( ) ( ) ( )
Supervisor Construction Manager Project HSE Manager Konsultan Supervisi Owner
KONSORSIUM DOOSAN - HUTAMA KARYA