CURRICULAM-VITAE

RITESH PANDEY (Manager, H&M)


Solu Hydropower Pvt. Ltd (Essel Group)
From November, 2017 to till now

Career Objective:
To seek challenging avenues where my educational potential and experience
matches the organizations needs with betterment of my career prospects and
enriching myself with excellent technical and professional skills.

Present Experience:

Currently working with Solu Hydropower Pvt. Ltd. (Essel Group)

Main Technical Qualifications


MOBILE:
Mechanical Engineer having a Hydro field experience of 16+ years in several
+91-9419246785, areas of hydro-electric projects managing H&M activities with control & bar
+977-9816761236, +91-
charts, small schedules (activity wise) , Planning & control of progress ,site
9654984656( BROTHER)
inspections/ quality assurance, responsible for independent measurements &
quality controls to release for concreting /civil works.
E Mail: Site erections, of penstocks up to 6.00 meter and Gates, types – Radial, fixed
c4ritesh@gmail.com wheel, stop log up to 19X17.5 m.
EDUCATION: Performing and witness of NDT methods like UT, RT,MPT,DPT etc. and stress
relieving (PWHT) of welded joints .also have the certificate of Level II in the
Diploma in Mechanical NDT method ultra sonic process .
Engineering 2002. A thoroughly aware of PQR, WPS, WQP processes of fabrication processes and
PROJECTS SERVED: standards, computer proficiency with most used software - AutoCAD.
 Solu Hydropower Detailed Professional Experience
Pvt. Ltd , Nepal
Project: Solu Hydro Power Pvt. Ltd (82 MW), Nepal Role as a Deputy Manager
 Maithon
(Hydro Mechanical)
Multipurpose Dam
DVC Jharkhand  Daily coordination meeting with Contractor about project schedule and
progress.
(62MW)  Developed Workshop for development and production of ferrules and gates at
 Baglihar H.E Project site with limited and controlled Re- sources.
 Material clearance with all transportation policies between India and Nepal
Stae II (450 MW)
border and have proper loop to trace material at site for achieve the project
 Karcham Wangtoo schedule on the time.
H.E Project (1000
 Maintain all Quality measures with proper coordination Design in between
Contractor and client Engineer to avoid any interference and smooth run of the
MW) activities.
 Baglihar H.E Project  Have attend lender’s visit with all proper technical and EHS aspects.
Stage I (450 MW)
PROFICIENCY:
Project Techno & commercial
management.
Project: Maithon dam Damodar Valley Corporation (62 MW) Greyhound Engineers India pvt. Ltd., l Role as a
Project Manager (Hydro Mechanical)

 Coordination with various Agencies Like as – Client, CWC, World Bank regarding project progress and status.
 Material management and planning for the activities as Procurement, Erection, Quality etc.
 Local Liaising work with different agencies on the behalf of company.
 Billing work and Preparation and further claim’s towards the extra work with the client.
 Developed Workshop for development and production work at site with limited and controlled Re- sources.
 Material clearance with all transportation policies between state borders
 Maintain all Quality measures with proper coordination Design in between Contractor and client Engineer to avoid
any interference and smooth run of the activities.
 Have attend lender’s visit with all proper technical and EHS aspects.

Project: Baglihar Hydro Electric Project Stage 2nd 450 MW Role as Sr Field Engineer (Hydro Mechanical) Since-
May, 2012 to April, 2017.
.
Fabrication of Penstock Ferules & Appurtenances
 Fabrication of Penstock Ferrules Dia.5500mm using ASTM 537 (Class – 1) and ASTM 517 Grade F
plates.
 Fabrication of Transition Pipes, Bends, Manholes & Reducers.
 Development of Bends, Reducer and Transition Pipes using AutoCAD.
 Familiar with welding procedures & Welder Performance Qualification test (WPQ) according to
ASME Boiler & Pressure Vessel Code, Section IX.
 Hydro testing.
Welding Inspections & Erection of Penstock Liners at Site
 Responsible for the erection of Penstock Liners at Pressure Shaft.
 Joint fit-up controls that include checking of proper root gaps, bevel angles and cleanliness of joints.
 Controls of joint pre-heating temperatures.
 Controls of joint pre- heating, interpass and post –heating temperature for ASTM517 Grade F.
 Execution of DP-Tests of roots after welding root runs.
 Interpass inspections of welds.
 Control of proper interpass temperatures.
 Final inspections of welds after completion.

2nd Stage EP’s Erection Inspections of all Hydro-Mechanical Works


 Erection of Bonneted Slide Emergency Gate with Flap Gate.
 Erection of Vertical and Radial Gates.
 Engaged in Quality Assurance / Inspections of components 0f 2nd Stage Embedded Parts (EP’s) of
all Stop logs at Dam Site and Power House.
 Erection of Surge Shaft Fixed Wheel Gate and its hoisting structure.
 Inspection of 1st Stage EP’s at Power House.
 Responsible for making all Measurement Sheets and Approvals.
 Regular interaction with Lahmeyer International GmbH, Germany, Engineer in Charge of the project.
 Erection of 30 tons 50 tons Gantry Cranes.
 Erection Radial Gate.
Structural Fabrication and Erection
 Fabrication, Erection, operation and maintenance of Slip form for Surge Shaft, Gate Operating Gallery
 Fabrication, Erection , operation and maintenance of various Shutter gantries for concrete lining of
Tunnels
Previous Experiences and Companies
 BAGLIHAR HYDRO ELECTRIC PROJECT STAGE 1ST (450 M W) Ramban, Doda, J & K. with Ruby Engineering
Works as Junior Engineer (Sub -Contractor of Jaiprakash Associates Ltd), From Sep, 2002 to Dec, 2004.

 BAGLIHAR HYDRO ELECTRIC PROJECT STAGE 1ST (450 M W) Ramban, Doda, J & K. with Jaiprakash
Associates Ltd, as Junior Engineer, From Dec, 2004 to May, 2009.
.
 KARCHAM WANGTOO HYDRO ELECTRIC PROJECT (1000 M W) Karcham, Kinnour,H. P. with Jaiprakash
Associates Ltd, as Field Engineer, May, 2009 to May, 2012.
 BAGLIHAR HYDRO ELECTRIC PROJECT STAGE 2nd (450 M W) Ramban, Doda, J & K. with Jaiprakash
Associates Ltd, as Resident Engineer, From May 2012 to April, 2017.
 Maithon dam , Jharkhand ( 62 MW ) with Greyhound Engineers India Pvt. Ltd , as Project Manager ,
From April 2017 to November 2017

Strengths:
A practically strong, quick learner, competent person who adjusts quickly to changing priorities with focus
on punctuality and Quick start up.

Personal Details:

Father’s Name Shri Rakesh Mauli Pandey


Permanent Address Saroj Kunj, Behind CMG School,
Lodhan, Chandmari,
PO: Shivpur, Varanasi-221003
UTTAR PRADESH
Date of Birth 20 April, 1978
Marital Status Married
Gender Male
Nationality Indian
Languages Known English, Hindi.
Passport R4946853

Declaration:
I do hereby declare that all the above given details are true and confidential according to my Knowledge.

(RITESH PANDEY)