NAME: Nirpa Raj Karki

Field: Surveyor

Works accomplished till this date:


Surveyor at Hydro-Consult
Project: Mistri Khola Hydropower Project (42 MW)
Date: 10/2018-till this date
Scope of work includes:
Field surveying for all hydro power components (Civil, hydro-mechanical) including
surveying for erection of earth mats, Vertical Pelton turbine manifold and housings and
machine alignment.
Surveyor at Solu Hydropower Pvt.Ltd.
Project: Lower Solu Hydropower Project (82 MW)
Date: 04/2017-10/2018
Scope of work includes:
Field surveying for all hydro power components (Civil, hydro-mechanical) including
surveying for erection of earth mats, Vertical Pelton turbine manifold and housings unit
of 41 MW.
Surveyor at SMEC Consultant
Projects: Upper Sanjen Hydropower Pvt.Ltd. (14.8 MW), Sanjen Hydropower Pvt.Ltd. (42.5
MW) Date:04/2015-04/2017
Scope of work includes:
Field surveying for all hydro power components (Civil, hydro-mechanical) including
surveying for erection of earth mats, draft tubes, Horizontal Francis spiral case , Vertical
Pelton turbine manifold and housings.