Professional Documents
Culture Documents
Flowchart Checklist R2 v1
Flowchart Checklist R2 v1
credentials
Google Login Medical Health Record
Email
Pwd (check)
Forget Pwd
Doctor Appointment
Health Diagnostic
Health
Profile (Check)
Symptoms (Check)
Interview (Check)
Result (Check) Return to Home
Return to Online Consultation
Return to Doctor Appointment
Notification More
Confirmation Notice
Return to Notification
Welcome
Body
Temperature
Medical Health (c) (Check)
Home
Record
Weight (kg)
(Check)
Online
Consultation Heart Rate
(bpm) (Check)
Health
Consultant
Available List
(Check)
Doctor
Appointment
Doctor
Appointment
Doctor
Available List
(Check)
Profile (Check)
Health
Diagnostic
Symptoms (Check)
Interview (Check)
Language
More Support Results (Check)
Guide
Close APP
, Pwd
k)
Forgot Pwd Login Succeful Home
(Check)
T-domain
, Pwd
k)
Health
No/ Red
(Check) Return to Home
ultant
able List
k) Yes/ Green
(Check) Online Text
Chatting
Yes/ Green
ctor (Check)
ilable List Pick (Check)
eck)
No/ Red
(Check)
Return to Home
ts (Check)
Return to
Home Enter Doctor
Appointment
Home
Daily Record
Return to
Home
Clinic Record
Doctor
Available List
(Check)
LOOP
Enter Online
Consultation
Enter Doctor
Appointment
Yes/ Green
(Check)
Confirmation Enter
Notice Notification
Return to Home
Function/Task Sub (if has defined) Time Spent
Google Login
Forgot Pwd
Fill Temperature
Medical Health
Record Fill Weight
Answer Symptoms
Health Diagnostic
Answer Interview
View Results
Expected Time Difference
Strongly Strongly
Item Question Disagree Agree
1 2 3 4 5
AVERAGE 30 2.5 75
SUS Score Letter Grade Adjective Rating
Above 80.3 A Exellect
Between 68 and 80.3 B Good
68 C OK
Between 51 and 67 D Poor
Below 51 F Awful
Conclusion:
1. Final Score (average) of 11 respondents is 75.
2. The grade is B.
3. The adjective rating is Good.
Date Major Activity/Topic
2020/3/13 Team Recruiting
3/19 Kickoff, Define the Topic
3/25 Define Scope, SOW, JD, and RM
4/1 Define WP, WBS, and OBS
4/8 Estimate Time/Schedule, and Cost
4/10 First Report
4/14 Approval from the CEO
4/28 Logo Design, User Story
5/6 Gantt Chart, DB Diagram
5/13 Risk Assessment
5/15 Second Report
5/18 Comment and Confirmation from the CEO
5/20 Testing Plan, Flowchart
6/3 Black-box testing, SUS Report
6/10 Discussion of Lesson Learned
6/12 Third Report
6/19 Project Formal Close
Milestone Versioning
Team is built
Project Confirmed 0.1
0.2
0.3
0.4
Proposal Submit / I+P 0.5
Project Recognition 1.0
1.1
1.2
1.3
Midterm Status of Progress / E+M 1.4
Project Engement 2.0
2.1
Team Building 2.2
2.3
Evaluation of Project Performance / C 2.4
3.0