Download as pdf or txt
Download as pdf or txt
You are on page 1of 15

Tunnel Main Sump Scope Diagram

PMCS REMOTE I/O


OUTSIDE PANEL SICE
PLANTROOM

MCIE CONTROL CENTRE 690V MOTOR CONTROL SWITCHBOARD OMCS 400 V LOW VOLTAGE SWITCHBOARD
FIRE WATER

PLANTROOM
DAMPER
CONTROL
PANEL A
SCIE INTRINSICALLY SAFE SUMP INSTRUMENTATION & CONTROLS
BARRIER CABINET MARSHALLING CABINET
DAMPER
CONTROL
PANEL B

HEAT EACH SAF AND


DETECTORS EAF ISOLATOR
JUNCTION BOX

MVAC
HYDROCARBON
SENSOR

FOAM
SUPPRESSION
SKID

AIR
HYDROCARBON COMPRESSOR
SENSORS STORMWATER STORMWATER STORMWATER STORMWATER GROUNDWATER GROUNDWATER
GROUND WATER PUMP PANEL PUMP PANEL PUMP PANEL PUMP PANEL PUMP PANEL PUMP PANEL
x2
STORM WATER TO WTP
QUALITY
VESSEL

pH LEVEL FLOAT
SENSORS SENSORS SWITCHES

x2 x6 x4

SUMP 168kW 168kW 168kW 168kW 37kW 37kW PENSTOCK x2

Legend:
Package #607
By others
Contractor
Control M4E-PR-FRM-PWD-00555-B-
Power Form 2 - Scope of Work -
Equipment Appendix 5 Page 1 of 15
Piping
Interface 17/02/2017
LOW LEVEL OUTPUT FROM FIRE SERVICES
HYDROCARBON SUCTION POINT AND VAPOUR NOTES:
CONTROL PANEL TO SHUT THE SLUICE
RETURN LINE TERMINATE EXTERNAL TO
GATES IN THE EVENT OF A FOAM DUMP 1. FOR FIRE SERVICES SCHEMATIC REFER TO
Supply cabling by others, terminated by others PLANTROOM WITH CAPPED DN80 CAMLOK
DRAWING No. M4E-NDY-DG-60-460-220093.
FITTINGS. ALL HYDROCARBON SUCTION AND
VAPOUR RETURN PIPES 316 STAINLESS STEEL
Legend 2. TANK IS LOCATED WITHIN EASTBOUND
PLANTROOM BREAKDOWN LANE, AT CHAINAGE 4800.
Contractor scope
Ground Water Supply cabling by others, terminated by others MONORAIL FOR REMOVAL OF PUMPS. REFER 3. TANK SHOWN IS SERVING EASTBOUND AND
BL TO DESIGN LOT 10-340-335 FOR DETAILS WESTBOUND TUNNELS.

STORMWATER PUMP

STORMWATER PUMP

STORMWATER PUMP

STORMWATER PUMP
Storm Water
4. PH SENSORS LOCATED IN PIPEWORK MOUNTED

CONTROL PANEL

CONTROL PANEL

CONTROL PANEL

CONTROL PANEL
GROUNDWATER
PUMP CONTROL

GROUNDWATER
PUMP CONTROL
TO TANK WALLS.
Hydrocarbon

PANEL

PANEL
5. FOR DETAILS ON POWER SUPPLY AND LOCATION
INSTRUMENT POWER PMCS R I/O OF I/O REFER TO LV PACKAGE 60-06.
AND IS PANEL PANEL
6. TRANSDUCERS FOR PH SENSORS AND LEVEL
SENSORS LOCATED IN ELECTRICAL CONTROLS

UST11001
UST11003
PHT11001
BOARDS.

UST11004

PHT11002

UST11005

UST11006
UST11002

AIR RELIEF VALVE AIR RELIEF VALVE


PDL140 PDL355
CKV11005 GWV11001

GWV11002

GWV11003

CKV11006 GWV11004

CKV11001 SWV11001

CKV11002 SWV11002

SWV11003

CKV11003 SWV11004

SWV11005

CKV11004 SWV11006
PSV11001

PSV11002

PSV11003

PSV11004
S S S S
PDL140

DN110

OPEN ENDED DN110 PIPE FOR PUMP PACKAGE AIR

VR100
DISCHARGE LINE DRAIN DOWN. COMPRESSOR
GWV110005 NORMALLY LOCKED CLOSED RECEIVER DRYER
PAC11001
BL AP AP AP AP AP AP AP AP AP AP AP AP
PUMP RISING MAIN CONTINUED
ON DESIGN LOT 10-360-400 LVT LVT LVT LVT LVT LVT ULTRASONIC LEVEL SENSOR

PDL355
A

DN110
Rising mains by others By contractor including USL11001 USL11002 USL11003 USL11004 USL11005 USL11006
final flange makeup OPEN ENDED DN110 PIPE FOR PUMP
PENSTOCK ACTUATOR DISCHARGE LINE DRAIN DOWN.
PSA11001 SWV110005 NORMALLY LOCKED CLOSED
PUMP RISING MAIN CONTINUED
ON DESIGN LOT 10-360-400

STORMWATER INLET FROM CIVIL PENSTOCK ACTUATOR


INFRASTRUCTURE. REFER TO PSA11002
21.7 L/s

21.7 L/s

100 L/s

100 L/s

100 L/s

100 L/s
DESIGN LOT 10-360-400 FOR DETAILS
STORAGE 50,000L
HYDROCARBON

GROUND WATER INLET FROM CIVIL


INFRASTRUCTURE. EMERGENCY OVERFLOW PIPES 4 x DN450.
REFER TO DESIGN LOT 10-360-400
PDL110

PDL110

PDL200

PDL200

PDL200

PDL200
REFER TO CIVIL DRAWING
SU100

FOR DETAILS M4E-AEH-DG-10-360-400620 FOR DETAILS

IO CABLING FROM PUMP TO


CONTROL PANEL BY
VENDOR, TYPICAL ALL
PUMPS
80

PHS11001 PHS11002
GWP11001

GWP11002

SWP11001

SWP11002

SWP11003

SWP11004
GROUND WATER DISCHARGE PUMPS
DUTY / STAND-BY
C:\Windows\system32\config\systemprofile\Documents\M4E-NDY-MD-60-000-MHF_SCHEMATICS_gevorgm.rvt

STORMWATER PUMPOUT/STORAGE
70

HYDROCARBON
CHAMBER FOR FIRE DELUGE/RAINWATER INGRESS.
FOR DETAIL REFER TO DESIGN LOT 10-360-400

GROUND WATER PENSTOCK PH SENSOR PENSTOCK STORMWATER DISCHARGE PUMPS


60

CHAMBER PSG11001 PSG11002 DUTY / ASSIST / ASSIST / STANDBY


(SWP11001, SWP11002, SWP11003,
TRASH SCREEN FOR TRASH SCREEN FOR SWP11004)
50

PROTECTION OF PENSTOCK
PTS11001
PROTECTION OF PENSTOCK
PTS11002 M4E-PR-FRM-PWD-00555-B-
Form 2 - Scope of Work -
40

Appendix 5 Page 2 of 15
30

SCALES AT A3 SIZE DRAWING CLIENT: STATUS:


SUBSTANTIAL DETAILED DESIGN WESTCONNEX M4 EAST
NOT TO BE ISSUED FOR CONSTRUCTION
20

ORIGINAL SIZE: DRAWN BY:


MECHANICAL AND ELECTRICAL
A3 GM
CO-ORDINATE SYSTEM: DESIGNED BY:
HYDRAULIC SERVICES DESIGN
MGA ZONE 56 MM PUMP SYSTEMS
10

CHECKED BY:
C_00 ISSUED FOR SUBSTANTIAL DETAILED DESIGN 16/12/2016 DB
HEIGHT DATUM:
TUNNEL SUMP HYDRAULIC SCHEMATIC
A3 ORIGINAL

A.H.D. BC
REV AMENDMENT / REVISION DESCRIPTION DATE APPROVAL NOT TO SCALE CLIENT DRAWING NO.:
PROJECT COMPANY DOCUMENT ZONE DISCIPLINE LOT NO. DOC No. REV

THIS DRAWING MAY BE PREPARED USING COLOUR AND MAY BE INCOMPLETE IF COPIED M4E NDY DG 60 400 120 022 C_00
0

DATE PRINTED: 15-12-16 4:50:49 PM NDY PROJECT No. S30776-011 S


Legend
Contractor scope GPCP UST UST PHT GPCP UST UST PHT SPCP UST SPCP UST
11001 11003 11001 11002 11004 11002 11005 11006
Ground Water

Storm Water PTAOIP PTAOIP PTAOIP PTAOIP PTAOIP


PTAOIP

Hydrocarbon

DN140-PE100-PN16 DN355-PE100-PN16

SWV11001

SWV11002

SWV11003

SWV11004

SWV11005

SWV11006
GWV11001

GWV11002

GWV11003

GWV11004

PSV11001

PSV11002

PSV11003

PSV11004
S

S
CKV11005

CKV11001
CKV11006

CKV11002

CKV11003

CKV11004
DN140-PE100-PN16

DN110-PE100-PN16

DN355-PE100-PN16

DN110-PE100-PN16
PAC SU VR
11001

DRAIN DOWN

DRAIN DOWN
DN100-S/S-316L-SCH40
Rising mains by others BL LVTUSL LVTUSL
LVTUSL LVTUSL LVTUSL LVTUSL
11005 11006
11001 11002 11003 11004
TREATMENT PLANT
PSA PSA
By contractor including 11001 11002
final flange makeup
QUALITY POND

DN100-S/S-316L-SCH40
PUMP 3 START

DN200-PE100-PN16

DN200-PE100-PN16

DN200-PE100-PN16

DN200-PE100-PN16
RL -40.18
DN110-PE100-PN16

DN110-PE100-PN16

STORM WATER DRAINAGE


PUMP 2 START
RL -41.18
EMERGENCY OVERFLOW
GROUND WATER DRAINAGE
PUMP 1 START
RL -44.18
PUMP 1 START
RL -44.18
HYDROCARBON CHAMBER

GROUND WATER CHAMBER STORMWATER CHAMBER


PTS11001

PTS11002
PSG11001

PSG11002
PHS PHS
80

11001 11002 PUMP STOP


PUMP 1 STOP RL -44.58
RL -44.58
C:\Windows\system32\config\systemprofile\Documents\M4E-NDY-MD-60-000-MHF_SCHEMATICS_gevorgm.rvt

70
60
50

GWP11001 GWP11002 SWP11001 SWP11002 SWP11003 SWP11004


M4E-PR-FRM-PWD-00555-B-
Form 2 - Scope of Work -
40

Appendix 5 Page 3 of 15
30

SCALES AT A3 SIZE DRAWING CLIENT: STATUS:


SUBSTANTIAL DETAILED DESIGN WESTCONNEX M4 EAST
NOT TO BE ISSUED FOR CONSTRUCTION
20

ORIGINAL SIZE: DRAWN BY:


MECHANICAL AND ELECTRICAL
A3 GM
CO-ORDINATE SYSTEM: DESIGNED BY:
HYDRAULIC SERVICES DESIGN
MGA ZONE 56 MM SUMP P AND ID
10

HEIGHT DATUM: CHECKED BY:


C_00 ISSUED FOR SUBSTANTIAL DETAILED DESIGN 16/12/2016 DB
A3 ORIGINAL

A.H.D. BC
REV AMENDMENT / REVISION DESCRIPTION DATE APPROVAL NOT TO SCALE CLIENT DRAWING NO.:
PROJECT COMPANY DOCUMENT ZONE DISCIPLINE LOT NO. DOC No. REV

THIS DRAWING MAY BE PREPARED USING COLOUR AND MAY BE INCOMPLETE IF COPIED M4E NDY DG 60 400 120 023 C_00
0

DATE PRINTED: 15-12-16 4:50:52 PM NDY PROJECT No. S30776-011 S


Legend
Contractor scope
Ground Water

GPCP UST UST GPCP


11011 11012

PTAOIP PTAOIP
By contractor including
final flange makeup BL Rising mains by others

DN65-PE100-PN16 1 L/s GROUND WATER DRAINAGE

MAIN LINE

GWV11009 GWV11010

CKV11011 CKV11012

USL USL

1 L/s

1 L/s
11011 11012

GROUND WATER DRAINAGE PUMP START


RL -22.4

DN65-PE100-PN16

DN65-PE100-PN16
80

PUMP STOP
RL -23.4
C:\Windows\system32\config\systemprofile\Documents\M4E-NDY-MD-60-000-MHF_SCHEMATICS_gevorgm.rvt

70
60

GWP11007 GWP11008
SUMP BASE
RL -23.9
50

M4E-PR-FRM-PWD-00555-B-Form 2
- Scope of Work - Appendix 5
40

Page 4 of 15
30

SCALES AT A3 SIZE DRAWING CLIENT: STATUS:


SUBSTANTIAL DETAILED DESIGN WESTCONNEX M4 EAST
NOT TO BE ISSUED FOR CONSTRUCTION
20

ORIGINAL SIZE: DRAWN BY:


MECHANICAL AND ELECTRICAL
A3 GM
CO-ORDINATE SYSTEM: DESIGNED BY:
HYDRAULIC SERVICES DESIGN
MGA ZONE 56 MM M4S STAGE 3 PUMP STATION
10

CHECKED BY:
C_00 ISSUED FOR SUBSTANTIAL DETAILED DESIGN 16/12/2016 DB
HEIGHT DATUM:
P AND ID
A3 ORIGINAL

A.H.D. BC
REV AMENDMENT / REVISION DESCRIPTION DATE APPROVAL NOT TO SCALE CLIENT DRAWING NO.:
PROJECT COMPANY DOCUMENT ZONE DISCIPLINE LOT NO. DOC No. REV

THIS DRAWING MAY BE PREPARED USING COLOUR AND MAY BE INCOMPLETE IF COPIED M4E NDY DG 60 400 120 024 C_00
0

DATE PRINTED: 15-12-16 4:50:54 PM NDY PROJECT No. S30776-011 S


Legend
Contractor scope
Ground Water

GPCP UST UST GPCP


11007 11008

PTAOIP PTAOIP
By contractor including
final flange makeup BL Rising mains by others

DN65-PE100-PN16 1 L/s GROUND WATER DRAINAGE

MAIN LINE

GWV11005 GWV11006

CKV11003 CKV11004

USL USL

1 L/s

1 L/s
11007 11008

GROUND WATER DRAINAGE PUMP START


RL -40.2

DN65-PE100-PN16

DN65-PE100-PN16
80

PUMP STOP
RL -41.2
C:\Windows\system32\config\systemprofile\Documents\M4E-NDY-MD-60-000-MHF_SCHEMATICS_gevorgm.rvt

70
60

GWP11003 GWP11004
SUMP BASE
RL -41.7
50

M4E-PR-FRM-PWD-00555-B-Form 2
- Scope of Work - Appendix 5
40

Page 5 of 15
30

SCALES AT A3 SIZE DRAWING CLIENT: STATUS:


SUBSTANTIAL DETAILED DESIGN WESTCONNEX M4 EAST
NOT TO BE ISSUED FOR CONSTRUCTION
20

ORIGINAL SIZE: DRAWN BY:


MECHANICAL AND ELECTRICAL
A3 GM
CO-ORDINATE SYSTEM: DESIGNED BY:
HYDRAULIC SERVICES DESIGN
MGA ZONE 56 MM M4E VENT FACILITY PUMP STATION 10
10

CHECKED BY:
C_00 ISSUED FOR SUBSTANTIAL DETAILED DESIGN 16/12/2016 DB
HEIGHT DATUM:
P AND ID
A3 ORIGINAL

A.H.D. BC
REV AMENDMENT / REVISION DESCRIPTION DATE APPROVAL NOT TO SCALE CLIENT DRAWING NO.:
PROJECT COMPANY DOCUMENT ZONE DISCIPLINE LOT NO. DOC No. REV

THIS DRAWING MAY BE PREPARED USING COLOUR AND MAY BE INCOMPLETE IF COPIED M4E NDY DG 60 400 120 025 C_00
0

DATE PRINTED: 15-12-16 4:50:56 PM NDY PROJECT No. S30776-011 S


Legend
Contractor scope
Ground Water

GPCP UST UST GPCP


11010 11009

PTAOIP PTAOIP
By contractor including
final flange makeup BL Rising mains by others

DN65-PE100-PN16 1 L/s GROUND WATER DRAINAGE

MAIN LINE

GWV11010 GWV11009

CKV11010 CKV11009

USL USL

1 L/s

1 L/s
11010 11009

GROUND WATER DRAINAGE PUMP START


RL -42.2

DN65-PE100-PN16

DN65-PE100-PN16
80

PUMP STOP
RL -43.2
C:\Windows\system32\config\systemprofile\Documents\M4E-NDY-MD-60-000-MHF_SCHEMATICS_gevorgm.rvt

70
60

GWP11006 GWP11005
SUMP BASE
RL -43.7
50

M4E-PR-FRM-PWD-00555-B-Form 2
- Scope of Work - Appendix 5
40

Page 6 of 15
30

SCALES AT A3 SIZE DRAWING CLIENT: STATUS:


SUBSTANTIAL DETAILED DESIGN WESTCONNEX M4 EAST
NOT TO BE ISSUED FOR CONSTRUCTION
20

ORIGINAL SIZE: DRAWN BY:


MECHANICAL AND ELECTRICAL
A3 GM
CO-ORDINATE SYSTEM: DESIGNED BY:
HYDRAULIC SERVICES DESIGN
MGA ZONE 56 MM M4S VENT FACILITY TEMPORARY PUMP STATION 04
10

CHECKED BY:
C_00 ISSUED FOR SUBSTANTIAL DETAILED DESIGN 16/12/2016 DB
HEIGHT DATUM:
P AND ID
A3 ORIGINAL

A.H.D. BC
REV AMENDMENT / REVISION DESCRIPTION DATE APPROVAL NOT TO SCALE CLIENT DRAWING NO.:
PROJECT COMPANY DOCUMENT ZONE DISCIPLINE LOT NO. DOC No. REV

THIS DRAWING MAY BE PREPARED USING COLOUR AND MAY BE INCOMPLETE IF COPIED M4E NDY DG 60 400 120 026 C_00
0

DATE PRINTED: 15-12-16 4:50:59 PM NDY PROJECT No. S30776-011 S


Legend
Contractor scope
Ground Water

GPCP UST UST GPCP


11013 11014

PTAOIP PTAOIP
By contractor including
final flange makeup BL Rising mains by others

DN65-PE100-PN16 1 L/s GROUND WATER DRAINAGE

MAIN LINE

GWV11011 GWV11012

CKV11013 CKV11014

USL USL

1 L/s

1 L/s
11013 11014

GROUND WATER DRAINAGE PUMP START


RL -6.6

DN65-PE100-PN16

DN65-PE100-PN16
80

PUMP STOP
RL -7.6
C:\Windows\system32\config\systemprofile\Documents\M4E-NDY-MD-60-000-MHF_SCHEMATICS_gevorgm.rvt

70
60

GWP11009 GWP11010
SUMP BASE
RL -8.1
50

M4E-PR-FRM-PWD-00555-B-Form 2
- Scope of Work - Appendix 5
40

Page 7 of 15
30

SCALES AT A3 SIZE DRAWING CLIENT: STATUS:


SUBSTANTIAL DETAILED DESIGN WESTCONNEX M4 EAST
NOT TO BE ISSUED FOR CONSTRUCTION
20

ORIGINAL SIZE: DRAWN BY:


MECHANICAL AND ELECTRICAL
A3 GM
CO-ORDINATE SYSTEM: DESIGNED BY:
HYDRAULIC SERVICES DESIGN
MGA ZONE 56 MM WATTLE STREET ENTRY RAMP EASTBOUND PUMP STATION
10

CHECKED BY:
C_00 ISSUED FOR SUBSTANTIAL DETAILED DESIGN 16/12/2016 DB
HEIGHT DATUM:
P AND ID
A3 ORIGINAL

A.H.D. BC
REV AMENDMENT / REVISION DESCRIPTION DATE APPROVAL NOT TO SCALE CLIENT DRAWING NO.:
PROJECT COMPANY DOCUMENT ZONE DISCIPLINE LOT NO. DOC No. REV

THIS DRAWING MAY BE PREPARED USING COLOUR AND MAY BE INCOMPLETE IF COPIED M4E NDY DG 60 400 120 027 C_00
0

DATE PRINTED: 15-12-16 4:51:01 PM NDY PROJECT No. S30776-011 S


Legend
Contractor scope
Ground Water

GPCP UST UST GPCP


11011 11012

PTAOIP PTAOIP
By contractor including
final flange makeup BL Rising mains by others

DN65-PE100-PN16 1 L/s GROUND WATER DRAINAGE

MAIN LINE

GWV11014 GWV11013

CKV11016 CKV11015

USL USL

1 L/s

1 L/s
11016 11015

GROUND WATER DRAINAGE PUMP START


RL -5.7

DN65-PE100-PN16

DN65-PE100-PN16
80

PUMP STOP
RL -6.7
C:\Windows\system32\config\systemprofile\Documents\M4E-NDY-MD-60-000-MHF_SCHEMATICS_gevorgm.rvt

70
60

GWP11012 GWP11011
SUMP BASE
RL -7.2
50

M4E-PR-FRM-PWD-00555-B-Form 2
- Scope of Work - Appendix 5
40

Page 8 of 15
30

SCALES AT A3 SIZE DRAWING CLIENT: STATUS:


SUBSTANTIAL DETAILED DESIGN WESTCONNEX M4 EAST
NOT TO BE ISSUED FOR CONSTRUCTION
20

ORIGINAL SIZE: DRAWN BY:


MECHANICAL AND ELECTRICAL
A3 GM
CO-ORDINATE SYSTEM: DESIGNED BY:
HYDRAULIC SERVICES DESIGN
MGA ZONE 56 MM WATTLE STREET ENTRY RAMP WESTBOUND PUMP STATION
10

CHECKED BY:
C_00 ISSUED FOR SUBSTANTIAL DETAILED DESIGN 16/12/2016 DB
HEIGHT DATUM:
P AND ID
A3 ORIGINAL

A.H.D. BC
REV AMENDMENT / REVISION DESCRIPTION DATE APPROVAL NOT TO SCALE CLIENT DRAWING NO.:
PROJECT COMPANY DOCUMENT ZONE DISCIPLINE LOT NO. DOC No. REV

THIS DRAWING MAY BE PREPARED USING COLOUR AND MAY BE INCOMPLETE IF COPIED M4E NDY DG 60 400 120 028 C_00
0

DATE PRINTED: 15-12-16 4:51:04 PM NDY PROJECT No. S30776-011 S


990 2500 2500 2500 1550 700 2500 2500 2500 1880

Legend
Contractor scope
Gas detection & foam suppression

Ø32 Ø40

1620
1280
Ø50 Ø50 Ø50 Ø40 Ø32

FOAM TEST DRAIN DISCHARGE FROM ABOVE. FOAM SYSTEM FROM ABOVE. FOR CONTINUATION REFER TO SUMP PLANT ROOM
FOR CONTINUATION REFER TO SUMP PLANT ROOM FIRE SUPPRESSION SYSTEM LAYOUT
FIRE SUPPRESSION SYSTEM DETAIL
SUMP FIRE SUPPRESSION SYSTEM
SCALE : 1 : 100

Ø1000 x 1820H FOAM 500 x 600 x 600 FOAM


CONCENTRATE TANK. CONCENTRATE PUMP.

DUPLICATED
HYDROCARBON
SENSORS MOUNTED IN 600 x 600 x 600 DELUGE
DUCTWORK. VALVE ASSEMBLY.

500 x 600 x 600 FOAM Ø65 FOAM TEST DRAIN TO DROP


CONCENTRATE PUMP. INTO SUMP. Ø25
1510 550 500 1240

Ø65

250
Ø25 CONDUIT MOUNTED ON
PLANTROOM ROOF
80

SCIE
1
220091 1300 x 1300 x 250H PLINTH. 250H PLINTH PROVIDED
70

FOR PUMP MOUNTING. FOAM TEST DRAIN DISCHARGE.


C:\Windows\system32\config\systemprofile\Documents\M4E-NDY-MD-60-400-100451-UG SUBB_jakep.rvt

60

Ø1000 x 1820H FOAM


CONCENTRATE TANK.
50

By contractor including
Ø65 INCOMING WATER
SUPPLY AT L/L. PIPEWORK TO final coupling makeup
600 x 600 x 600 DELUGE VALVE
ASSEMBLY.
Ø65 FOAM SYSTEM TO DROP INTO SUMP.
FOR CONTINUATION REFER TO SUMP FIRE
SECTION 1 M4E-PR-FRM-PWD-00555-B-
RISE TO PLANTROOM LEVEL SUPRESSION SYSTEM SCALE : 1 : 50 220091
Form 2 - Scope of Work -
40

THROUGH THE SLAB. BL SUMP PLANT ROOM FIRE SUPPRESSION SYSTEM


Deluge supply by others
SCALE : 1 : 50
Appendix 5 Page 9 of 15
30

SCALES AT A3 SIZE DRAWING CLIENT: STATUS:


SUBSTANTIAL DETAILED DESIGN WESTCONNEX M4 EAST
NOT TO BE ISSUED FOR CONSTRUCTION
20

ORIGINAL SIZE: DRAWN BY:


MECHANICAL AND ELECTRICAL
A3 MG
0.25 0 0.5 1m
CO-ORDINATE SYSTEM: DESIGNED BY:
FIRE ENGINEERING DESIGN
MGA ZONE 56 DS DRAINAGE SUMP
10

1:50 FULL SIZE AT A3


C_00 ISSUED FOR SUBSTANTIAL DETAILED DESIGN 01/07/2016 GL 0.5 0 1 2m
HEIGHT DATUM: CHECKED BY:
FIRE PROTECTION LAYOUT
A3 ORIGINAL

A.H.D. JD
REV AMENDMENT / REVISION DESCRIPTION DATE APPROVAL PROJECT COMPANY DOCUMENT ZONE DISCIPLINE LOT NO. DOC No. REV
CLIENT DRAWING NO.:
THIS DRAWING MAY BE PREPARED USING COLOUR AND MAY BE INCOMPLETE IF COPIED 1:100 FULL SIZE AT A3 M4E NDY DG 60 460 220 091 C_00
0

DATE PRINTED: 1/07/2016 9:12:00 AM NDY PROJECT No. s30776 S


NOTES
STORM WATER PUMP
690 VAC CONTROL AND
1. REFER TO PROCUREMENT SCOPE
MCS11x71 STARTER PANEL M4E-NDY-SP-60-400-120001 FOR DETAILED SUMP
CONTROL PANEL CONSTRUCTION REQUIREMENTS.
R W B E
FOR REQUIRED PLANT MONITORING AND CONTROL
001 EARTH BAR SYSTEM INTERFACE SIGNALS REFER TO THE INPUT /
OUTPUT SCHEDULE IN APPENDIX 3.
2. ALL INSTRUMENTS AND FLOAT SWITCHES LOCATED
002 MQFxxxxx
WITHIN THE SUMP ARE REQUIRED TO BE
X1 INTRINSICALLY SAFE
1
003 24VDC POWER SUPPLY SUPPLY HEALTHY 3. REFER TO DESIGN LOT 60_06 FOR DETAILED
SUPPLIED FROM IS AND K005
X1 K005 INFORMATION OF POINT OF SUPPLY.
INSTRUMENT 2
004 Q006 MARSHALLING PANEL
NO NC 4. STORM WATER PUMP CONTROL AND STARTER PANEL
6A/C 040
SUPPLIED FROM SUBSTATION ESS11070 MOTOR
10kA S007 CONTROL SWITCHBOARD.
R OFF
005 TRIP
MAN AUTO LOW LEVEL SWITCH RUN RELAY 5. 24 VOLT DC POWER SUPPLIED TO BE SUPPLIED FROM
K018 K007
START STOP X35 X35 K007 S007 THE INTRINSICALLY SAFE BARRIERS AND
W 1 2 NO NC NO NC
006 008 006 INSTRUMENT MARSHALLING PANEL
015 046 6. PLANT AND MONITORING CONTROL SYSTEM
B NOTE 1 INTERFACE POINT TERMINALS TO BE COORDINATED
007
WITH DESIGN LOT 60-540-416
K007
S008 LIVE LINE INDICATORS
008

009 PMCS RUN


K060
010

K011
011 500A SS MAIN CONT. MAIN CONTACTOR
K011
K017 E-STOP K011
RESET NO NC
012 010
K028
021

013 SEMI CON. FUSES


F014C
F014A

F014B

K015
TBC

TBC

TBC

014 RUN RESET SEAL FAILURE SEAL FAIL. RELAY


K028 K016
K007 K015 K016
NO NC
015 017
INTRINSICALLY SAFE
K017 TEMP & SEAL FAILURE RELAY K015
016 NO NC SEAL FAIL. TRIP TRIP RELAY
015 K018
K016 K018
NO NC
017 042 006
START STOP RESET

018 SOFT STARTER


INTERNALLY BYPASSED
K017 PMCS INTERFACE SS TRIP
6 STARTS PER HOUR NO NC ETHERNET K017
019 012
023 MODBUS / By Contractor By Others (includes supply cabling)
019 ETHERNET IP TEST H022
FIELD BUS
020
K011 H022
FAULT

Battery limit
021 INDICATOR LAMP
KEYPAD (IP54) TEST H024
DOOR MOUNTED EARTH BAR A
022 SS RUNNING
K017 H024
RUNNING
023 JBXxxxxx
INDICATOR LAMP
JUNCTION BOX
R
024 RUNNING RELAY
V1 U2 K026 K026
NO NC
025 044
6

8
W1 V2
1

5
X23

JUNCTION BOX EARTH BAR


RESET RELAY
026 U1
W2 K028 K028
RESET NO NC
027 013 015
LOCATION: W:\S307xx\S30776\011\E-\07_Drawings\60_06 Electrical LV\001 - Clone Drawings\M4E-NDY-DG-60-500-270271_C_01.dwg

K062
THERMAL

MOISTURE SWITCH

028 SUMP AREA


TERMINAL LEGEND
80

PE1

PE2
W1

W2
U1

U2
V1

V2

029 POWER LOCAL TERMINAL


TERMINAL
BOX
DRAWING DEFINED TERMINAL
030
70

DEVICE TERMINAL
WATER IN OIL SENSOR

031
FIELD MARSHALLING
60

M4E-PR-FRM-PWD-00555-B-Form 2 -
RTD

032 PTC PMCS MARSHALLING TERMINAL

Scope of Work - Appendix 5 FIELD TERMINAL


50

033
SWPxxxxx

034
168kW
FLC 172A Page 10 of 15 DISCONNECT TERMINAL

FUSE TERMINAL
40

CHECK PRINT
30

CLIENT: BACKDRAFTING REQUIRED


SCALES AT A3 SIZE DRAWING CHECK PRINT STATUS:
FINAL DESIGN
READY TO ISSUE INITIAL DATE
NOT TO BE ISSUED FOR CONSTRUCTION
WESTCONNEX M4 EAST
ION ESS
SELF CHECK
LOGIN NAME: MATTHEW STEEL

20

V IS DISCIPLINE
ORIGINAL SIZE: DRAWN BY:
MECHANICAL AND ELECTRICAL
RE ROGR
A3 MH
DISCIPLINE
CO-ORDINATE SYSTEM: DESIGNED BY:
ELECTRICAL DESIGN
IN P TYPICAL STORMWATER PUMP SOFT STARTER
DISCIPLINE
MGA ZONE 56 MH
10
A3 ORIGINAL

C_01 ISSUED FOR PROCUREMENT 09/02/2017 MS DISCIPLINE

C_00 ISSUED FOR SUBSTANTIAL DETAIL DESIGN 10/08/2016 GL NOT TO SCALE DISCIPLINE
HEIGHT DATUM: CHECKED BY: SCHEMATIC DIAGRAM - SHEET 01
A.H.D. MS
DATE APPROVAL BACKDRAFTED/CORRECTED PROJECT COMPANY DOCUMENT ZONE DISCIPLINE LOT NO. DOC. No. REV
REV AMENDMENT / REVISION DESCRIPTION
CLIENT DRAWING NO. :
THIS SHEET MAY BE PREPARED USING COLOUR AND MAY BE INCOMPLETE IF COPIED DO NOT SCALE FROM THIS DRAWING CONFIRMED M4E NDY DG 60 500 270 271 C_00
0

DATE PRINTED: 17 Feb 2017 - 07:19AM NDY PROJECT No. S30776-011


NOTES
1. REFER TO PROCUREMENT SCOPE
M4E-NDY-SP-60-400-120001 FOR DETAILED SUMP
035 CONTROL PANEL CONSTRUCTION REQUIREMENTS.
FOR REQUIRED PLANT MONITORING AND CONTROL
PMCSxxxxx SYSTEM INTERFACE SIGNALS REFER TO THE INPUT /
036 LOCATION TBC OUTPUT SCHEDULE IN APPENDIX 3.
REFER TO PMCS DESIGN LOT 60-540-416 2. ALL INSTRUMENTS AND FLOAT SWITCHES LOCATED
037 WITHIN THE SUMP ARE REQUIRED TO BE
INTRINSICALLY SAFE
By Contractor X5 X29
038 By Others 1 1 24V-IO 3. REFER TO DESIGN LOT 60_06 FOR DETAILED
(includes INFORMATION OF POINT OF SUPPLY.
supply cabling) 4. STORM WATER PUMP CONTROL AND STARTER PANEL
039 SUPPLIED FROM SUBSTATION ESS11070 MOTOR

Battery limit
K005 X31 CONTROL SWITCHBOARD.
2 1 DI-xx:yy/zz p PLCxxxxx SWPxxxxx
040 xx:yy/zz PUMP PANEL 5. 24 VOLT DC POWER SUPPLIED TO BE SUPPLIED FROM
SUPPLY HEALTHY THE INTRINSICALLY SAFE BARRIERS AND
INSTRUMENT MARSHALLING PANEL
041 6. PLANT AND MONITORING CONTROL SYSTEM
K018 INTERFACE POINT TERMINALS TO BE COORDINATED
3 2 DI-xx:yy/zz p PLCxxxxx SWPxxxxx
042 xx:yy/zz PUMP PANEL WITH DESIGN LOT 60-540-416
PROTECTION TRIP

043
K026
4 3 DI-xx:yy/zz p PLCxxxxx SWPxxxxx
044 xx:yy/zz PUMP
RUNNING
S007
045 OFF
MAN AUTO

046

5 4 DI-xx:yy/zz p PLCxxxxx SWPxxxxx


047 xx:yy/zz PUMP PANEL
AUTO MODE

048

049

050

051

052

053

054

055

056

057 PMCSxxxxx
LOCATION TBC
X30 X6
REFER TO PMCS DESIGN LOT 60-540-416 1 1
0V-IO
058

059 PMCS RUN RELAY


K060
X32 X5 K060
PLCxxxxx SWPxxxxx p DI-xx:yy/zz 5 8 NO NC
060 xx:yy/zz PUMP
011
RUN

Battery limit
061 RESET RELAY
K062
X32 X5 K062
PLCxxxxx SWPxxxxx p DI-xx:yy/zz 6 9 NO NC
062 xx:yy/zz PUMP PANEL
LOCATION: W:\S307xx\S30776\011\E-\07_Drawings\60_06 Electrical LV\001 - Clone Drawings\M4E-NDY-DG-60-500-270272_C_01.dwg

RESET 029

063 TERMINAL LEGEND


By Contractor By Others (includes supply cabling)
80

LOCAL TERMINAL
064
DRAWING DEFINED TERMINAL
70

065
DEVICE TERMINAL

066 FIELD MARSHALLING


60

PMCS MARSHALLING TERMINAL


067
M4E-PR-FRM-PWD-00555-B-Form 2 - FIELD TERMINAL
50

068
Scope of Work - Appendix 5 DISCONNECT TERMINAL

Page 11 of 15 FUSE TERMINAL


40

CHECK PRINT
30

CLIENT: BACKDRAFTING REQUIRED


SCALES AT A3 SIZE DRAWING CHECK PRINT STATUS:
FINAL DESIGN
READY TO ISSUE INITIAL DATE
NOT TO BE ISSUED FOR CONSTRUCTION
WESTCONNEX M4 EAST
ION ESS
SELF CHECK
LOGIN NAME: MATTHEW STEEL

20

V IS DISCIPLINE
ORIGINAL SIZE: DRAWN BY:
MECHANICAL AND ELECTRICAL
RE ROGR
A3 MH
DISCIPLINE
CO-ORDINATE SYSTEM: DESIGNED BY:
ELECTRICAL DESIGN
IN P TYPICAL STORMWATER PUMP SOFT STARTER
DISCIPLINE
MGA ZONE 56 MH
10
A3 ORIGINAL

C_01 ISSUED FOR PROCUREMENT 09/02/2017 MS DISCIPLINE

C_00 ISSUED FOR SUBSTANTIAL DETAIL DESIGN 10/08/2016 GL NOT TO SCALE DISCIPLINE
HEIGHT DATUM: CHECKED BY: SCHEMATIC DIAGRAM - SHEET 02
A.H.D. MS
DATE APPROVAL BACKDRAFTED/CORRECTED PROJECT COMPANY DOCUMENT ZONE DISCIPLINE LOT NO. DOC. No. REV
REV AMENDMENT / REVISION DESCRIPTION
CLIENT DRAWING NO. :
THIS SHEET MAY BE PREPARED USING COLOUR AND MAY BE INCOMPLETE IF COPIED DO NOT SCALE FROM THIS DRAWING CONFIRMED M4E NDY DG 60 500 270 272 C_00
0

DATE PRINTED: 17 Feb 2017 - 07:19AM NDY PROJECT No. S30776-011


NOTES
AUX SUPPLY CUBICLE. REFER
400VAC 1. REFER TO PROCUREMENT SCOPE
LVSxxxxx M4E-NDY-SP-60-400-120001 FOR DETAILED SUMP
REFER TO DESIGN LOT CONTROL PANEL CONSTRUCTION REQUIREMENTS.
60_06 LOT 60-500-300 FOR R W B E X8 X6
0V-AUX 24VDC POWER SUPPLY 1 FOR REQUIRED PLANT MONITORING AND CONTROL
001 POINT OF SUPPLY
K005
INFORMATION SUPPLIED FROM IS AND JBXxxxxx S002 JBXxxxxx JBXxxxxx HEALTHY RELAY SYSTEM INTERFACE SIGNALS REFER TO THE INPUT /
X7 INSTRUMENT X5 X3 S009 K005 OUTPUT SCHEDULE IN APPENDIX 3.
+24V-AUX 1 7 4 5 6 9 NO NC
002 MARSHALLING PANEL 041 2. ALL INSTRUMENTS AND FLOAT SWITCHES LOCATED
Qxx 2A
LOW LEVEL S007 004 WITHIN THE SUMP ARE REQUIRED TO BE
SWITCH
003 TRIP OFF INTRINSICALLY SAFE
MAN AUTO K012 MAIN CONTACTOR
K015 3. REFER TO DESIGN LOT 60_06 FOR DETAILED
X3 X3 START STOP K005 K012
10 11 NO NC INFORMATION ON THE POINT OF SUPPLY. GROUND
004 LOCAL CONTROL STATION
EARTH BAR 004 WATER LOCAL CONTROL STATION TO BE POSITION
CONTACTOR 006 LOCAL TO THE PUMPING EQUIPMENT.
K012
005 xxxA
4. 24 VOLT DC POWER SUPPLIED TO BE SUPPLIED FROM
K012 S007 THE INTRINSICALLY SAFE BARRIERS AND
NO NC INSTRUMENT MARSHALLING PANEL
006 PMCS RUN 004 5. PLANT AND MONITORING CONTROL SYSTEM
K015 K057 048
NO NC
INTERFACE POINT TERMINALS TO BE COORDINATED
007 012 004 WITH DESIGN LOT 60-540-416
043
045
008
H013 TEST
009 TEMP TRIP
K009 H013
S009
010 MPR HEALTHY LAMP
SEAL FAILURE
K009 H015 TEST
011 FWD.
K015 H015
FWD. RUNNING LAMP
012
K013 K014
NO NC
013 ELECTRONIC MOTOR K014 019
PROTECTION RELAY RESET
PUMP MONITOR RESET
014
K055
015

016 PMCS INTERFACE


ETHERNET
MODBUS /
017 ETHERNET IP
FIELD BUS
RESET
018 K014

019 K009 K009


NO NC
020 010
011

021 INTRINSICALLY SAFE


TEMP & SEAL FAILURE RELAY

022 By Contractor By Others (includes supply cabling)

023
V1 U2

Battery limit
024
W1 V2
1

025
U1
W2
EARTH BAR M4E-PR-FRM-PWD-00555-B-Form 2 -
026
Scope of Work - Appendix 5
027
Page 12 of 15
LOCATION: W:\S307xx\S30776\011\E-\07_Drawings\60_06 Electrical LV\001 - Clone Drawings\M4E-NDY-DG-60-500-270273_C_01.dwg

SUMP AREA
MOISTURE SWITCH
THERMAL

028
PE1

PE2
W1

W2
U1

U2
V1

V2

POWER TERMINAL LEGEND


80

TERMINAL
029 BOX LOCAL TERMINAL

DRAWING DEFINED TERMINAL


030
70

DEVICE TERMINAL
WATER IN OIL SENSOR

031
FIELD MARSHALLING
60

PTC
032 PMCS MARSHALLING TERMINAL

GWPxxxxx FIELD TERMINAL


37kW
50

033
EX
DISCONNECT TERMINAL

034
FUSE TERMINAL
40

CHECK PRINT
30

CLIENT: BACKDRAFTING REQUIRED


SCALES AT A3 SIZE DRAWING CHECK PRINT STATUS:
FINAL DESIGN
READY TO ISSUE INITIAL DATE
NOT TO BE ISSUED FOR CONSTRUCTION
WESTCONNEX M4 EAST
ION ESS
SELF CHECK
LOGIN NAME: MATTHEW STEEL

20

V IS DISCIPLINE
ORIGINAL SIZE: DRAWN BY:
MECHANICAL AND ELECTRICAL
RE ROGR
A3 MH
DISCIPLINE
CO-ORDINATE SYSTEM: DESIGNED BY:
ELECTRICAL DESIGN
IN P TYPICAL MAIN SUMP GROUNDWATER PUMP DOL
DISCIPLINE
MGA ZONE 56 MH
10
A3 ORIGINAL

C_01 ISSUED FOR PROCUREMENT 10/08/2016 GL DISCIPLINE

C_00 ISSUED FOR SUBSTANTIAL DETAIL DESIGN 10/08/2016 GL NOT TO SCALE DISCIPLINE
HEIGHT DATUM: CHECKED BY: SCHEMATIC DIAGRAM - SHEET 01
A.H.D. MS
DATE APPROVAL BACKDRAFTED/CORRECTED PROJECT COMPANY DOCUMENT ZONE DISCIPLINE LOT NO. DOC. No. REV
REV AMENDMENT / REVISION DESCRIPTION
CLIENT DRAWING NO. :
THIS SHEET MAY BE PREPARED USING COLOUR AND MAY BE INCOMPLETE IF COPIED DO NOT SCALE FROM THIS DRAWING CONFIRMED M4E NDY DG 60 500 270 273 C_00
0

DATE PRINTED: 17 Feb 2017 - 07:51AM NDY PROJECT No. S30776-011


NOTES
1. REFER TO PROCUREMENT SCOPE
M4E-NDY-SP-60-400-120001 FOR DETAILED SUMP
035 CONTROL PANEL CONSTRUCTION REQUIREMENTS.
FOR REQUIRED PLANT MONITORING AND CONTROL
036 SYSTEM INTERFACE SIGNALS REFER TO THE INPUT /
OUTPUT SCHEDULE IN APPENDIX 3.
PMCSxxxxx 2. ALL INSTRUMENTS AND FLOAT SWITCHES LOCATED
037 LOCATION: TBC
WITHIN THE SUMP ARE REQUIRED TO BE
REFER TO PMCS DESIGN LOT 60-540-416
INTRINSICALLY SAFE
038
By Contractor
By Others 3. REFER TO DESIGN LOT 60_06 FOR DETAILED
(includes INFORMATION ON THE POINT OF SUPPLY.
X5 X29 4. GROUND WATER LOCAL CONTROL STATION TO BE
039 supply cabling) 1 1 +24V-IO
POSITION LOCAL TO THE PUMPING EQUIPMENT

Battery limit
5. 24 VOLT DC POWER SUPPLIED TO BE SUPPLIED FROM
040 THE INTRINSICALLY SAFE BARRIERS AND
INSTRUMENT MARSHALLING PANEL
K005 X31
041 2 1 DI-xx:yy/zz p PLCxxxxx GWPxxxxx 6. PLANT AND MONITORING CONTROL SYSTEM
xx:yy/zz AUX SUPPLY
HEALTHY INTERFACE POINT TERMINALS TO BE COORDINATED
042 WITH DESIGN LOT 60-540-416
RUNNING
K015
043 3 2 DI-xx:yy/zz p PLCxxxxx GWPxxxxx
xx:yy/zz PUMP
RUNNING

044
TRIP
K015
045 4 3 DI-xx:yy/zz p PLCxxxxx GWPxxxxx
xx:yy/zz MPR
TRIPPED
046

S007
047 OFF
MAN AUTO

048

049 5 4 DI-xx:yy/zz p PLCxxxxx GWPxxxxx


xx:yy/zz AUTO MODE
ENABLED
050

051

052

053
PMCSxxxxx
LOCATION: TBC
054 REFER TO PMCS DESIGN LOT 60-540-416 K055
X32 X6
PLCxxxxx SWPxxxxx p 1
055 xx:yy/zz PUMP PANEL PMCS SEAL FAILURE RESET
RESET K055
NO NC
015
056
K057 PMCS RUN RELAY
X32
PLCxxxxx GWPxxxxx p 1 2 K057

Battery limit
057 xx:yy/zz PUMP NO NC
RUN
010

058
X30 X6
0V-IO 1 3
059

060
By Contractor By Others (includes supply cabling)

061

062
LOCATION: W:\S307xx\S30776\011\E-\07_Drawings\60_06 Electrical LV\001 - Clone Drawings\M4E-NDY-DG-60-500-270274_C_01.dwg

063
TERMINAL LEGEND
80

064 LOCAL TERMINAL

DRAWING DEFINED TERMINAL


065
70

DEVICE TERMINAL
066
FIELD MARSHALLING
60

067
M4E-PR-FRM-PWD-00555-B-Form 2 - PMCS MARSHALLING TERMINAL

FIELD TERMINAL
50

068
Scope of Work - Appendix 5 DISCONNECT TERMINAL

Page 13 of 15 FUSE TERMINAL


40

CHECK PRINT
30

CLIENT: BACKDRAFTING REQUIRED


SCALES AT A3 SIZE DRAWING CHECK PRINT STATUS:
FINAL DESIGN
READY TO ISSUE INITIAL DATE WESTCONNEX M4 EAST
LOGIN NAME: MUHAMMAD HAFEEZ

NOT TO BE ISSUED FOR CONSTRUCTION

ION ESS
SELF CHECK
20

V IS DISCIPLINE
ORIGINAL SIZE: DRAWN BY:
MECHANICAL AND ELECTRICAL
RE ROGR
A3 MH
DISCIPLINE
CO-ORDINATE SYSTEM: DESIGNED BY:
ELECTRICAL DESIGN
IN P TYPICAL MAIN SUMP GROUNDWATER PUMP DOL
DISCIPLINE
MGA ZONE 56 MH
10
A3 ORIGINAL

C_01 ISSUED FOR PROCUREMENT 10/08/2016 GL DISCIPLINE

C_00 ISSUED FOR SUBSTANTIAL DETAIL DESIGN 10/08/2016 GL NOT TO SCALE DISCIPLINE
HEIGHT DATUM: CHECKED BY: SCHEMATIC DIAGRAM - SHEET 02
A.H.D. MS
DATE APPROVAL BACKDRAFTED/CORRECTED PROJECT COMPANY DOCUMENT ZONE DISCIPLINE LOT NO. DOC. No. REV
REV AMENDMENT / REVISION DESCRIPTION
CLIENT DRAWING NO. :
THIS SHEET MAY BE PREPARED USING COLOUR AND MAY BE INCOMPLETE IF COPIED DO NOT SCALE FROM THIS DRAWING CONFIRMED M4E NDY DG 60 500 270 274 C_00
0

DATE PRINTED: 17 Feb 2017 - 03:31PM NDY PROJECT No. S30776-011


NOTES
400VAC 1. REFER TO PROCUREMENT SCOPE
GDBxxxxx M4E-NDY-SP-60-400-120001 FOR DETAILED SUMP
CONTROL PANEL CONSTRUCTION REQUIREMENTS.
REFER TO DESIGN LOT
60_06 LOT 60-500-300 FOR R W B N E FOR REQUIRED PLANT MONITORING AND CONTROL
001 POINT OF SUPPLY SYSTEM INTERFACE SIGNALS REFER TO THE INPUT /
INFORMATION OUTPUT SCHEDULE IN APPENDIX 3.
L003 NOTINSTRUMENTS
2. ALL USED. AND FLOAT SWITCHES LOCATED
002 K005
Qxx WITHIN THE SUMP ARE REQUIRED TO BE
Q005
HEALTHY RELAY INTRINSICALLY SAFE
003 K005 3. REFER TO DESIGN LOT 60_06 FOR DETAILED
NO NC INFORMATION ON THE POINT OF SUPPLY.
S007 041
6A/C OFF 4. GROUND WATER LOCAL CONTROL STATION TO BE
004 TRIP 005
EARTH BAR 10kA MAN AUTO K012
LOCAL CONTROL STATION K015 MAIN CONTACTOR POSITION LOCAL TO THE PUMPING EQUIPMENT
START STOP K005
K012 5. NOT USED.
24 VOLT DC POWER SUPPLIED TO BE SUPPLIED FROM
005 NO NC THE INTRINSICALLY SAFE BARRIERS AND
011
006 INSTRUMENT MARSHALLING PANEL
S008
006 6. PLANT AND MONITORING CONTROL SYSTEM
K012 S007 INTERFACE POINT TERMINALS TO BE COORDINATED
007
NO NC WITH DESIGN LOT 60-540-416
PMCS RUN 048 7. ALL PUMPING SYSTEM INSTRUMENTS TO BE WIRED
K057 LOCALLY TO EITHER A COMMON MARSHALLING BOX
008 OR TO THE LOCAL CONTROL STATION

009
H013 TEST
010
H013
011 CONTACTOR MPR HEALTHY LAMP
K012 H015 TEST
xxxA
012 FWD.
RESET K015 H015
S013 FWD. RUNNING LAMP
013

014 K015
K015 ELECTRONIC MOTOR
NO NC PROTECTION RELAY
015 013 005
045
043
016

017
PMCS INTERFACE
ETHERNET
1

018
/022

/022

/022
MODBUS /
X3
1

3
/019

/019

/022

/022

EARTH BAR
X1

ETHERNET IP
FIELD BUS
019

020 By Contractor By Others (includes supply cabling)

021

Battery limit
022

023

024 GROUNDWATER
PUMP
GWPxxxxx
025
M4E-PR-FRM-PWD-00555-B-Form 2 -
026
Scope of Work - Appendix 5
027
Page 14 of 15
LOCATION: W:\S307xx\S30776\011\E-\07_Drawings\60_06 Electrical LV\001 - Clone Drawings\M4E-NDY-DG-60-500-300610_C_00.dwg

028
TERMINAL LEGEND
80

029 LOCAL TERMINAL

POWER
1

DRAWING DEFINED TERMINAL


/030

/030

/030

/030

/030

/030

/030
X21

X23

030 TERMINAL BOX


70

DEVICE TERMINAL
031
PE
W

FIELD MARSHALLING
U

V
60

032 MOISTURE SWITCH PMCS MARSHALLING TERMINAL


THERMAL SW
GWPxxxxx FIELD TERMINAL
50

033 1.8 - 3.7kW M


FLC: xxA 3 THERMAL SW DISCONNECT TERMINAL
xxx SUMP
034
FUSE TERMINAL
40

CHECK PRINT
30

CLIENT: BACKDRAFTING REQUIRED


SCALES AT A3 SIZE DRAWING CHECK PRINT STATUS:
FINAL DESIGN
READY TO ISSUE INITIAL DATE
NOT TO BE ISSUED FOR CONSTRUCTION
WESTCONNEX M4 EAST
ION ESS
SELF CHECK
LOGIN NAME: MATTHEW STEEL

20

V IS DISCIPLINE
ORIGINAL SIZE: DRAWN BY:
MECHANICAL AND ELECTRICAL
RE ROGR
A3 MH
DISCIPLINE
CO-ORDINATE SYSTEM: DESIGNED BY:
ELECTRICAL DESIGN
IN P TYPICAL AUX SUMP GROUNDWATER PUMP DOL
DISCIPLINE
MGA ZONE 56 MH
10
A3 ORIGINAL

DISCIPLINE

C_00 ISSUED FOR PROCUREMENT 10/08/2016 GL NOT TO SCALE DISCIPLINE


HEIGHT DATUM: CHECKED BY: SCHEMATIC DIAGRAM - SHEET 01
A.H.D. MS
DATE APPROVAL BACKDRAFTED/CORRECTED PROJECT COMPANY DOCUMENT ZONE DISCIPLINE LOT NO. DOC. No. REV
REV AMENDMENT / REVISION DESCRIPTION
CLIENT DRAWING NO. :
THIS SHEET MAY BE PREPARED USING COLOUR AND MAY BE INCOMPLETE IF COPIED DO NOT SCALE FROM THIS DRAWING CONFIRMED M4E NDY DG 60 500 300 610 C_00
0

DATE PRINTED: 17 Feb 2017 - 07:58AM NDY PROJECT No. S30776-011


NOTES
1. REFER TO PROCUREMENT SCOPE
M4E-NDY-SP-60-400-120001 FOR DETAILED SUMP
035 CONTROL PANEL CONSTRUCTION REQUIREMENTS.
FOR REQUIRED PLANT MONITORING AND CONTROL
SYSTEM INTERFACE SIGNALS REFER TO THE INPUT /
036 OUTPUT SCHEDULE IN APPENDIX 3.
PMCSxxxxx NOTINSTRUMENTS
2. ALL USED. AND FLOAT SWITCHES LOCATED
LOCATION: TBC
037 WITHIN THE SUMP ARE REQUIRED TO BE
REFER TO PMCS DESIGN LOT 60-540-416
INTRINSICALLY SAFE
By Contractor
038 By Others 3. REFER TO DESIGN LOT 60_06 FOR DETAILED
(includes INFORMATION ON THE POINT OF SUPPLY.
X5 X29 4. GROUND WATER LOCAL CONTROL STATION TO BE
039
supply cabling) 1 1 +24V-IO
POSITION LOCAL TO THE PUMPING EQUIPMENT

Battery limit
5. NOT USED.
24 VOLT DC POWER SUPPLIED TO BE SUPPLIED FROM
040 THE INTRINSICALLY SAFE BARRIERS AND
INSTRUMENT MARSHALLING PANEL
K005 X31
2 1 DI-xx:yy/zz p PLCxxxxx GWPxxxxx 6. PLANT AND MONITORING CONTROL SYSTEM
041 xx:yy/zz AUX SUPPLY
HEALTHY INTERFACE POINT TERMINALS TO BE COORDINATED
WITH DESIGN LOT 60-540-416
042 RUNNING 7. ALL PUMPING SYSTEM INSTRUMENTS TO BE WIRED
K015 LOCALLY TO EITHER A COMMON MARSHALLING BOX
3 2 DI-xx:yy/zz p PLCxxxxx GWPxxxxx
043 xx:yy/zz PUMP OR TO THE LOCAL CONTROL STATION
RUNNING

044 TRIP
K015
4 3 DI-xx:yy/zz p PLCxxxxx GWPxxxxx
045 xx:yy/zz MPR
TRIPPED

046
S007
047 OFF
MAN AUTO

048

5 4 DI-xx:yy/zz p PLCxxxxx GWPxxxxx


049 xx:yy/zz AUTO MODE
ENABLED

050

051

052

053

054 PMCSxxxxx
LOCATION: TBC
055 REFER TO PMCS DESIGN LOT 60-540-416

056
K057 PMCS RUN RELAY

Battery limit
X32
PLCxxxxx GWPxxxxx p 1 9 K057
057 xx:yy/zz PUMP NO NC
RUN
010

058
X30 X6
0V-IO 1 1
059
By Contractor By Others (includes supply cabling)
060

061

062
LOCATION: W:\S307xx\S30776\011\E-\07_Drawings\60_06 Electrical LV\001 - Clone Drawings\M4E-NDY-DG-60-500-300611_C_00.dwg

063 TERMINAL LEGEND


80

LOCAL TERMINAL
064
DRAWING DEFINED TERMINAL
70

065
DEVICE TERMINAL

066 FIELD MARSHALLING


60

067 M4E-PR-FRM-PWD-00555-B-Form 2 - PMCS MARSHALLING TERMINAL

FIELD TERMINAL
50

068 Scope of Work - Appendix 5 DISCONNECT TERMINAL

Page 15 of 15 FUSE TERMINAL


40

CHECK PRINT
30

CLIENT: BACKDRAFTING REQUIRED


SCALES AT A3 SIZE DRAWING CHECK PRINT STATUS:
FINAL DESIGN
READY TO ISSUE INITIAL DATE
NOT TO BE ISSUED FOR CONSTRUCTION
WESTCONNEX M4 EAST
ION ESS
SELF CHECK
LOGIN NAME: MATTHEW STEEL

20

V IS DISCIPLINE
ORIGINAL SIZE: DRAWN BY:
MECHANICAL AND ELECTRICAL
RE ROGR
A3 MH
DISCIPLINE
CO-ORDINATE SYSTEM: DESIGNED BY:
ELECTRICAL DESIGN
IN P TYPICAL AUX SUMP GROUNDWATER PUMP DOL
DISCIPLINE
MGA ZONE 56 MH
10
A3 ORIGINAL

DISCIPLINE

C_00 ISSUED FOR PROCUREMENT 10/08/2016 GL NOT TO SCALE DISCIPLINE


HEIGHT DATUM: CHECKED BY: SCHEMATIC DIAGRAM - SHEET 02
A.H.D. MS
DATE APPROVAL BACKDRAFTED/CORRECTED PROJECT COMPANY DOCUMENT ZONE DISCIPLINE LOT NO. DOC. No. REV
REV AMENDMENT / REVISION DESCRIPTION
CLIENT DRAWING NO. :
THIS SHEET MAY BE PREPARED USING COLOUR AND MAY BE INCOMPLETE IF COPIED DO NOT SCALE FROM THIS DRAWING CONFIRMED M4E NDY DG 60 500 300 611 C_00
0

DATE PRINTED: 17 Feb 2017 - 07:56AM NDY PROJECT No. S30776-011

You might also like