SAPMT/Contractor JSA Form - AB-4 rpoject

JOB SAFETY ANALYSIS WORK SHEET


BAHRAIN SAUDI ONSHORE NEW a Contractor : AL-ROBAYA HOLDING CO.
JSA # 03-53 DATE 25-Jan-17
PIPELINE PROJECT REV'N. BI: 25-00044

JSA Funtion Name Badge # Job Title


Contractor Project Manager Vener Capunitan 40615 Project Manager

Contractor Safety Manager Ramji Bojja 10905 Safety Manager

SAPMT Representative Shahid Khan Lead Project Engineer

SAPMT Representative Chris Obree OCPD Safety Advisor

Proponent Rep. (P/L)


( Optional )

DESCRIPTION OF TASK : Manual Excavation for Pipe Expose 56" UBTG-3 Pipeline

WORK LOCATION : Bahrain Pipeline Project @ km 5+865

Prepared by : Confirmed by: Reviewed by: Reviewed by: Reviewed by: Approved by:
Al-Robaya Holding Co. Al-Robaya Holding Co. SAUDI ARAMCO PMT SAUDI ARAMCO PMT CG/SAPD SAUDI ARAMCO

Ramji Bojja Vener Capunitan Shahid Khan Chris Obree OE & CG Southern Area Najeeb M. Al Ghamdi
Safety Manager Project Manager Lead Project Engineer Safety Advisor Pipelines SAPD P/L Operation Supervisor
Mobile # 0550814097 Mobile # 0555862512 Mobile # 0539086645 Mobile # 0539086344 Mobile #0504809752
SAPMT/Contractor JSA Form - AB-4 rpoject

Reference:
Work Permit System G.I. 2.100; Waste Management, GI 430.001; Work Permit System G.I. 2.100; Saudi Aramco Construction Safety Manual; Traffic and Vehicle Safety G.I. 6.030,Street and Road Closure; Excavations,
Reinstatement and Traffic Controls G.I. 1021.000, Fire Fighting Training Company Personnel G.I. 1783.001, Safety Spectacles G.I. 8.002, Protective (Safety) Footwear G.I. 8.005, Environmental Conservation Policy
Implementation G.I. 2.714. Near Miss Reporting Process. G.I. 6.004.

Saudi Aramco Standard Safety Equipment / PPE (Dust Mask, FRC, Steel toed Shoes, Safety Glass and Safety helmet.

S/N SEQUENCE OF BASIC STEPS POTENTIAL HAZARD/S HAZARD/S CONTROL/S ACTION BY


Follow Saudi Aramco Work Permit System (GI 2.100).
Contractor and Proponent shall assign person to be responsible for specific job.
Obtain work permit and Approval
from the concern proponent/s. Conduct joint site inspection, check tools Sub-contrctor Surveyor/Safety
Miss-communication / miss-
1 understanding
Officer / Permit Receiver /
Task Conduct Safety Toolbox Talk regarding Pipe expose activties Foreman
Preparation
Install barricades & warning sign boards
JSA, HIP, CSSP, ERP and other safety concerns should be communicated or imparted to all
people on site.
Struck U/G facilities, pipelines by hand
Use metal / cable detector prior to any excavation.
tools
Determine the soil classification for proper shoring and sloping.

Potential Excavation collapse Where excavation exceeds 1.2m, shoring or other collapse prevention to be installed.

Spoiled soil must be 3 feet away from the edge of the excavation.
Take breaks if feeling faint or overexerted
Consume adequate food/beverages (water, sports drinks)
Provide prope training, tool box talks regardinng heat stress.
Heat Stress
Provide temporary shelter
Provide Hygrometer for continuous monitoring of temperatue and humidity
If possible, adjust work schedule based on heat index eruirements.
Exposure to Dust Wear approved Industrial dust respiratory protection. Safety Officer / Permit
2 Manual Excavation for Pipe Expose Back Injury Use correct manual handling technique Receiver / Constrcution
Foreman / Supervisor
Potential toxic gas release Prior to entry do gas testing using portable gas detectors
Inspect work areas when arrive at site to identify hazard(s)

Biological Hazards ( i.e Insects bites , Use insect repellant if observe mosquitoes/gnats
Snake bites.) Survey site for presence of biological hazards and maintain safe distance
Wear appropriate PPE including leather gloves, long sleeves and pants, and snake chaps as
warranted by site conditions
Notify attendant or site owner/manager of work activities and location

Use cones, signs, flags or other traffic control devices as outlined in the Traffic Control Plan
Traffic (including pedestrian)
Set up exclusion zone surrounding work area using cones, signs, flags or other traffic control
devices
Wear appropriate PPE including high visibility clothing such as reflective vest
Post No Smoking signs around work area
Fire/Explosion Provide fire extinguisher and fire watchman. Isolate the area, secure the existing facilities.
Stop work if hazardous conditions (explosive atmosphere) are identified
SAPMT/Contractor JSA Form - AB-4 rpoject

Reference:
Work Permit System G.I. 2.100; Waste Management, GI 430.001; Work Permit System G.I. 2.100; Saudi Aramco Construction Safety Manual; Traffic and Vehicle Safety G.I. 6.030,Street and Road Closure; Excavations,
Reinstatement and Traffic Controls G.I. 1021.000, Fire Fighting Training Company Personnel G.I. 1783.001, Safety Spectacles G.I. 8.002, Protective (Safety) Footwear G.I. 8.005, Environmental Conservation Policy
Implementation G.I. 2.714. Near Miss Reporting Process. G.I. 6.004.

Saudi Aramco Standard Safety Equipment / PPE (Dust Mask, FRC, Steel toed Shoes, Safety Glass and Safety helmet.

S/N SEQUENCE OF BASIC STEPS POTENTIAL HAZARD/S HAZARD/S CONTROL/S ACTION BY


Presence of H2S / Lack of Oxygen Obtain CSE permit and Prior to entry do gas testing using portable gas detectors
3
Excavate deeper than 4 feet (1.2 Personnel falling into excavated Provide proper access and egress
meter) trench.
Potential Excavation collapse Where excavation exceeds 1.2m, shoring or other collapse prevention to be installed.

Exposure to Dust Wear approved Industrial dust respiratory protection.

Back Injury Use correct manual handling technique

Wear Fire Resistant Cloth

Take breaks if feeling faint or overexerted


Safety Officer / Permit
Receiver / Constrcution
Consume adequate food/beverages (water, sports drinks), rotation of work must be implemented Foreman / Supervisor
Exposure to heat based on heat index requirements.
4 Back filling of excavation
If possible, adjust work schedule based on heat index eruirements.

If possible, adjust work schedule to avoid temperature extremes

Use proper PPE's (i.e. Safety Helmet, Safety Glass)


Eye / Head injury
Stay clear of operating equipment and rig when moving

Provide competent spotter and flag man.


Struck of equipment
Working area must be barricaded and appropriate signs must be installed.

No. Recommendations / Notes Assigned to Position

Conduct tool box safety meeting prior to commence of work activities every
1 day Al Robaya Safety Personnel Safety Officers

2 Explain to the key workers the purpose of this JSA and enforce Al Robaya Safety Personnel Safety Officers
implementation of content

3 Use the JSA to identify the hazards and list the precautions on the work Al Robaya Safety Personnel Safety Officers

If an injury or nearmiss occurs, Stop the job immediately , conduct a toolbox


4 talk, and inform management and SAPMT HSE Advisor. Secure the incident Ramji Bojja Safety Manager
scene to preserve evidence.

Note: In case of an emergency call 013-5720110 from mobile phone or "110" from landline