Download as pdf or txt
Download as pdf or txt
You are on page 1of 1

CROSS SECTION OF PBELKUND DIVERSION PROJECT

6.0 M
T.B.L.- 396.00 m
2.50
Hearting Top 394.00 m 1 D/S SIDE
2.5
F.S.L.- 394.00 m 2.00
1 1
U/S SIDE

PITCHING/RIP RAP 10.5

CASING CASING

HEARTING ROCKTOE

C.O.T. 1 L-DRAIN, CROSS DRAINS


0.25

2.5

MAXIMUM CROSS SECTION

You might also like