6 STB-Model PDF

You might also like

Download as pdf
Download as pdf
You are on page 1of 1
RCC I:1.5:3 ROOF SLAB 1500—F 210 HAND Ra 13 21 BRICK WORK CM 1:8 2.6 14:8 ~ 100 TK ot 8g0 RIVER SAND FILLING * — = Fy EARTH FILLING. FRONT ELEVATION 386 +—— 3000 —_~ SECTION "AA" 858086] RIVER SAND FILLING Beeeee| 78 TK Seese|_ BRICK ELLY form SZE Tqinseesnon SOAK PIT SECTION 1500| SEPTIC TANK URINAL 0 re 3360 1. ECONOMICAL FOUNDATION MAY BE ADOPTED. DEPTH OF FOUNDATION SHOULD BE BASED ON THE SOIL CONDITION AT SITE 2, FLOORING SHOULD SE DONE USING ANTI SKID TILES FOR TOILETS ONLY. wr ene 3. SUGHT SLOPE SHOULD BE GIVEN FOR ROOF SLAB D i 4 HANDRAILS SHOULD GE PROVIDED INSIDE THE TOILET AND AT THE PLAN RAMP PORTION FOR DIFFERENTLY ABLED STUDENTS. HAND Ra, 5, SURFACE OF THE RAMP SHOULD BE GROOVED. 1351 66. 000R (FOR DA TOILET) SHOULD BE PROVIDED WITH HANORALL “¢~—____6000 [19'-8"} PLINTH ARRA: 17.03 sq.m / 183.2 sq.ft F450 DRAWING NO:t—J6/SERD/D1.03.09.11 DIRECTORATE OF RURAL DEVELOPMENT AND PANCHAYAT RAJ SCHEDULE OF JOINERY = | Seate 1100] oar ALL DMENSIONS ARE WV won [va ° [aor sez] 108 nose orawnc Noss ° yo | se00 | - snot | 7 | [rT * me jm | SNe ‘TYPE DESIGN FOR SCHOOL TOILET (BOYS) ta be = LANELEVATION AND” SECTION

You might also like