Cost Estimate For Construction of Cross Drainage Works Road:-Devari To Kalkoti Road Chainage: - Slab Culvert of Size 8.00 X 5.00 No of Span 5 Slab Thickness 600
RCC I:1.5:3 ROOF SLAB
1500—F
210
HAND Ra
13 21
BRICK WORK CM 1:8
2.6 14:8 ~ 100 TK
ot 8g0 RIVER SAND FILLING
* — = Fy EARTH FILLING.
FRONT ELEVATION 386
+—— 3000 —_~ SECTION "AA"
858086] RIVER SAND FILLING
Beeeee| 78 TK
Seese|_ BRICK ELLY
form SZE
Tqinseesnon SOAK PIT SECTION
1500| SEPTIC TANK
URINAL 0
re 3360
1. ECONOMICAL FOUNDATION MAY BE ADOPTED. DEPTH OF FOUNDATION
SHOULD BE BASED ON THE SOIL CONDITION AT SITE
2, FLOORING SHOULD SE DONE USING ANTI SKID TILES
FOR TOILETS ONLY.
wr ene 3. SUGHT SLOPE SHOULD BE GIVEN FOR ROOF SLAB
D i 4 HANDRAILS SHOULD GE PROVIDED INSIDE THE TOILET AND AT THE
PLAN RAMP PORTION FOR DIFFERENTLY ABLED STUDENTS.
HAND Ra, 5, SURFACE OF THE RAMP SHOULD BE GROOVED.
1351 66. 000R (FOR DA TOILET) SHOULD BE PROVIDED WITH HANORALL
“¢~—____6000 [19'-8"}
PLINTH ARRA: 17.03 sq.m / 183.2 sq.ft F450
DRAWING NO:t—J6/SERD/D1.03.09.11
DIRECTORATE OF RURAL DEVELOPMENT AND PANCHAYAT RAJ
SCHEDULE OF JOINERY
= | Seate 1100] oar ALL DMENSIONS ARE WV
won [va ° [aor sez] 108 nose orawnc Noss
° yo | se00 | - snot | 7
| [rT
* me jm | SNe ‘TYPE DESIGN FOR SCHOOL TOILET (BOYS)
ta be = LANELEVATION AND” SECTION
Cost Estimate For Construction of Cross Drainage Works Road:-Devari To Kalkoti Road Chainage: - Slab Culvert of Size 8.00 X 5.00 No of Span 5 Slab Thickness 600