PD 1096 – Philippine National Building Code. Adopting National SIZES AND DIMENSIONS OF ROOMS (sec. 806)
Bldg. Code of the Philippines, Revising R.A. 6541 -Human habitation: 6.0 sqm. with least dim. of 2.0 meters 2.0x3.0
R.A. 6541 – An Act to Ordain and Institute a National Building Code of -Kitchen : 3.0 sqm with least dim. of 1.5 meters. 1.5x2.0
the Philippines. -T&B : 1.20 sqm with least dim. of .90 meters .90 x 1.30
- Does not confirm with the developmental goals and infastracture AIR SPACE REQUIREMENTS IN DETERMINING THE SIZE
program of government. OF THE ROOM
- Does not Adequately provide all technological requirements of Minimum air space:
building or structure, in terms of up to date design and construction -classroom - 3.0 cu.m w/ 1.0 sqm of flr area per person
standard criteria. -workshop, factory, offices – 12.0 cu.m. of airspace per person
- Purpose of PD 1096 is to provide and regulate bldg. structures to -habitable room – 14cu.m per person.
reach the minimum standards requirements and to control the location, WINDOW OPENINGS (sec. 808)
site design and quality of materials, construction use occupancy and -For Natural Ventilation 10% of total floor area of the room
maintenance. VENT SHAFT (sec 809)
PD 1096 must apply to design, location, siting , construction, -Unobstructed cross sectional area not less then .30 sqm. With a
alteration, repair, conversion, use occupancy, maintenance , moving, minimum dimension of 300mm.
demolition, addition to public and private building and structure except - Air duct intakes minimum of 300 mm
traditional indigenous houses. ARTIFICIAL VENTILLATION (sec 811)
- Building and structures constructed before the approval on this code -Above grade room like offices, restaurant, market, factory, workshop –
shall not be affected. Except it will apply when some portions will be Not less than 3 Air change per hour.
altered, added, converted or repair. -Bakery, hotels, restaurant kitchen, boiler room – 10 Air change per
TYPES OF CONSTRUCTIONS hour.
Type 1 – Buildings shall be wood construction. -Assembly Area - .30 cu/m per minute supply for every person.
Type 2 – Buildings shall be wood construction with protective fire -Wards and Institutional – Not less than .45 cu/m per minute supply for
resistant materials and with one hour fire resistively. Except for non- each person.
bearing partitions. WALKWAY (sec.1105)
Type 3 - Building shall be masonry and wood construction. It shall - During construction temporary walkway should not less than 1.20 mts.
have 1 hour fire resistive through out. Exterior wall shall be fire -Pedestrian Protection : Railings1.0 mts. high, Fences: 2.40 mts,
resistive construction. Canopy: 2.40 clear height above the railways.
Type 4 - Building shall be steel iron concrete or masonry construction. GEN. DESIGN AND CONSTRUCTION REQUIREMENTS
Permanent walls and partitions shall be fire in combustion. Except -Distance between sprinkler should not exceed 1.80 meters center to
permanent non-bearing partition of 1 hour fire resistive construction, center.
may use fire retardant treated wood for framing. STAIR, EXIT, OCCUPANT LOAD (sec.1207)
Type 5 – Building shall be fire resistive, structural shall be steel. Iron , -1ST Storey - occupant load more than 10 shall have 2 exits.
concrete and masonry construction. -Mezzanine of storage area greater than 185 sqm. Or 18.00 meters in
CLASSIFICATION OF BLDG. OCCUPANCY any length have at lease 2 stairways at adjacent floor.
(Chapter 7 sec. 701 occupancy classified) -Every floor having an occupant load of 500 - 999 shall have 3 exits.
Group A – Residential Dwellings -Having occupant load 1000 or more must have 4 exits.
Group B – Residential, Hotels. and Apartment PERMITS AND APPLICATION (chapter 3)
Group C – Educational and Recreational Sec 302 Application of Permit – 5 Corresponding Plans and
Group D – Institutional Specifications signed by license architect and engineers.
Group E – Business and Mercantile Sec 309 Certificate of Occupancy – shall issue by building official
Group F – Industrial within 30 days after the final inspection and submittal of certificate of
Group G – Storage and Hazardous completion.
Group H – Assembly other than Group 1 STAIRWAY WIDTH
Group I – Assembly Occupant load 1000 or more - Occupant more than 50, minimum of 1.10 meters wide
Group H – Accessory - 50 or less minimum of .90 meters wide
MIN. REQMTS. FOR GROUP. A DUELLINGS - Private stairways less than 10 have .75 meters wide.
- Shall not occupy more than 90% of a corner lot and 80% of inside lot. - Vertical distance between landing not morethan 3.60 meters.
Easement of light and view shall be at lease 2mts from property line. - Minimum Thread = .20 meters Maximum riser = .25 meters
- Footings shall be 250 mm thk. And 600 mm below the surface of the HANDRAILS
ground. - 3.0 meters width of stairs – provide not less than 2 handrails.
- Live load at GF shall be 200kg/sq.mts. for 2 nd flr. At lease - 1.10 meters or less – serving Group A and B have 1 handrails
150kg/sq.mts. - Intermediate railings is not less than 80 mm and not more than 90 mm.
- Wind load for roof shall be at lease 120kg/sq. for vertical projection. - stairways not more than 4 risers don’t need railings.
- Stairs shall be at lease 750 mm clear widths, with rise of 200mm and - Handrail distance to wall – minimum of 38mm.
200mm min. for run. - Handrails – .80 meters to 1.20 meters high.
- At lease 1 entrance and 1 exit. - Handrails diameters are 30mm – 50mm diameter
LIGHT AND VENTILLATION (sec.804 size and dimension of court) INTERIOR WET STAND PIPE – 38mm diameter in every storey
- Minimum horizontal dimension of court shall not be less than 2.o 1.20 meters above the floor.
meters. 1 wet standpipe for more than 1000 persons for assembly building
- Minimum of passageway is 1.20 meters. 15 meters high is known as a high rise building
CEILING HEIGHTS Fire hose – required 38mm diameter
-Habitable room with artificial ventilation is 2.40 meters from floor to Down feed water distribution = 132 lit./min.
ceiling. RA 7920 –New Electrical Engineering Law
-Ground floor: 2.70 mts. 2nd floor: 2.40 mts. Floor to ceiling Electrical installations for more than 20 outlets and more than 4KW
-Succeeding floors not less than 2.10 mts. Above finish floor line. voltage shall sign and seal by professional electrical engineer.
-For natural ventilation: not less than 2.70 meters PLASTICS (chapter 16)
-Mezzanine is not more than 1.80 meters. Approve plastics are 225 fire spread ratings.
BUILDING LAWS DSC2007
PD 1096 (January 1, 1979) – The National Building Code of the TYPES OF OCCUPANCY
Philippines. Category l - Residential
Construction – All site work done from site preparation, Category ll – Commercial and industrial
(excavation, foundation, assembly, and installation of utilities in the Category lll – Social, educational, institutional
buildings. Category lV – Agricultural
Erection – installation in place of components of building. Category V – Ancillary
Addition – any new construction (increase the height or area of FLOOR TO FLOOR HEIGHT – min of 3.0 meters for structures
existing structures. finish floor to finish floor.
Alteration – changes in material used, partitioning, location or size LOWRISE – From 1 storey to 5 store’s in height from 3.0 meters –
of opening, structural parts and utilities, but does not increase the max of 15.00 meters high.
overall area. MEDIUM RISE – From 6 storey to 15 storey’s in height.( 18.0 meters
Renovation – Any physical change made on the building to increase – 45.0 meters)
its value (ex. improve aesthetics) HIGH RISE – 16 storey above ( 48.0 meters above)
Conversion – Change in the use of occupancy in any portion of the REQUIREMENTS FOR OTHER GROUP OCCUPANCIES
structure. ROW SEATING - 0.84 meters measures back to back of chair.
Repair – Remedial work done on any damage portions to restore its BLEACHERS – Riser = .40 meters Run = .60 meters Width of
original condition. person .45-.48 meters.
Moving – Transfer of any structure from its original loc. Or position AISLES – 1st = 1.10 meters, 2nd .80 meters, 3rd 1.0 meters.
to another, either in same lot or another. DEFINITION OF TERMS:
Demolition – dismantling the whole part of the structure. ABUTMENT – Semi–permanent/permanent structure constructed
Ancillary Building Structure – Secondary building located within along property line. Ex. Firewall.
the same premises. INCREMENTAL – Hor. setback along outermost part of a bldg..
DEFINITION OF TERMS: For rear or side property line 0.30mm setback per storey starting second
BLDG OFFICIAL – Charge of duties of issuing bldg permit. floor. For front yard 1.17 meters setback starting at 9 th flr.
BLDG PERMIT – Written authorization granted by bldg official to FRONT YARD – Part of total open space created by setbacks along
applicant to proceed with the construction. road right of way (RROW).
AGENCY OF THE GOVERNMENT – Refers to any various units of VENT WELL – Minimal opening along the portion of firewall.
governments. Min. clear width of 3.0 meters, and min. depth of 1.5 meters.
APPALICANT/PERMITTEE – Any character applying for an FIRE ZONE – Bldg. Permitted to construct base to their occupancy
issuance of permits and certificate. type of construction and resistance to fire.
NATIONAL GOVERNMENT – Entire machinery of central FIRE RESISTANCE RATING – Degree of material can stand the
government. fire.
PERMIT PRINCIPAL – Ancillary permit pertaining to building FIRE RESISTIVE TIME PERIOD RATING – Length of time
structures. material can stand when burned
EXCEMPTIONS FOR BUILDING PERMITS: FIRE RESISTIVE STANDARDS – Classification of construction
Shed, outhouses not exceeding 6.0sqm according to fire retardant or flame spread rating.
Garden pools max. of 500mm depth BUILDING STRUCTURE – 3 dimensional physical developments
Garden walls max. 1.80 meters high within a lot.
Indigenous family dwellings DEVELOPMENT CONTROL – Physical utilization of the lot. Can
Public buildings determine the carrying capacity of the lot.
Government own housing units FIREWALL – Reinforce concrete separator with appropriate fire
Construction by civic org. and charitable inst. Donated to government resistive rating, position between dwelling units.Permitted vent well for
Blgd. Owned by electrical cooperatives firewall is 400mm – 1000 mm vertical
BUILDING PERMITS REQUIREMENTS; LOT – Physical setting of any structure/building.
Application Form DEVELOPMENT LEVEL OF LOT;
5 sets of working drawings sign by engineer and architect Grade – Above surface Lot
For lot owners; Below Grade - Below surface lot / excavations and backfills
TCT Above Grade - Above the surface of the lot up to the air.
Tax declaration BUILDING HEIGHT;
Current real property tax receipt BASEMENT – Below natural and finish grade.
For not lot owners: BASEMENT FOOTPRINT – Actual land area occupied by the
Deed of absolute sales basement, measured by its outer wall.
Contract lease BUILDING HEIGHT LIMIT – Max. height to be allowed for the
Contract sale building.
NOT REQUIRED FOR PLANS AND SPECIFICATIONS: ESTABLISH GRADE ELEVATION – Highest adjoining natural
Traditional indigenous family dwellings using native materials. Cost grade.
not exceeding P15,000. FLOOR TO FLOOR HEIGHT – Max. distance of 3.0 meters . A
Single detached dwellings not more than 20sq.m. perpendicular distance between 2 upper floor levels.
VALIDITY OF BUILDING PERMIT: GRADE – 1.50 meters horizontal distance between fin. Surface of
1 year from date of issue. the ground to exterior wall/property line.
No longer valid after suspension and abandoned of construction for HEIGHT OF THE STRUCTURE – Vert. clearance from fin.
120 days. Grade line from the highest point of couping.
COMPUTING BLDG. PERMIT FEES; PODIUM – Full enclosed part of the building. First of typical floors
Type of occupancy of the building.
Height and area RESULTANT HEIGHT – Vertical measurement of propose
Cost of construction building.
STOREY – Upper floor to floor finish building.
BUILDING LAWS DSC2007
TOWER – Fully enclosed component of the building, Not more than - Sign distance from electrical post – 1.0 meters minimum.
5 times the height of the podium. - Distance from property line 2.0 meters minimum.
ALLOWABLE MAX. BUILDING FOOTPRINT – Max. pportion - Sign to sign distance form adjacent building – 4.0 meters.
of lot that occupied by building . measure at the outermost part wall of PARKING REQUIREMENTS:
the building. Low cost housing – 1:10 minimum
FRONT YARD – Created by setbacks along RROW. Transition area Condominiums – less than 50 ( 1: 8 ) 50-100 (1:4) morethan 100 1:1
between sidewalk and other similar portion of RROW. Hotels – 1:10 (10 room 1 parking slot)
FRONT LOT – Side opf the lot which the main pedestrian and Residential Hotels and Apartells – 1:5
vehicular access in the property shall be situated. Offices – 1:125 ( 1 slot for every 125 gross floor area)
COURT – An occupied space between the faces of the building Schools – High School 1:10 College and University 1:5
lines. Hospital – 1 slot for 25 beds
INNER COURT – Court bounded on all sides Bowling area – 1 slot for every 4 alleys
---------------------------------------------------------------------------------
OPEN COURT – Bounded on 3 sides by building lines.
Masonry Min size of columns - .30 x .20 meters
THROUGH COURT – Bounded on 2 opposite side by building
Masonry Min. circular columns - .25 meters diameter.
lines.
Planting strip - .80 meters
COURT YARD – A portion of a yard had limit on hardscaping not
Side walk – 1:6 ROW
exceeding 50% of yard area. Smallest size of road: 6.0 meters
VENT WELL – Permitted opening along vertical portion of Open space requirements is 30%
firewall. Max. width of 3.0 mts. And min depth of 1.50 mts. Masonry Footing : Max depth is .45 mts.
ROAD RIGHT OF WAY (RROW) – Public open space for Distance Between roof and canopy : .75 meters
continuous flow of pedestrian and vehicular traffic. Min. Eaves Length : 1.2 mts.
PHYSICAL LEVEL OF RROW RAMPS:
RROW ABOVE GRADE – From finish surface of roadway, Class A: 8-10% slope Class B: 10-17% slope
sidewalk, and arcade way up to air. Max. Curb: .20 mts.
RROW AT GRADE – Natural gradeline up to the unfinish surface Ideal Ramp : 1:20
of the road SIZES OF LOT:
RROW BELOW GRADE – From finish surface of the roadway Economic : 72 Sqm. Duplex Single Detached : 48 Sqm.
down to the ground. RAW HOUSING:
--------------------------------------------------------------------------------------- Economic : 36 Sqm. Socialize 32 Sqm.
EASEMENT – Public open space define under water code Maximum Cluster : 20 Frontage: 3.0 mts
Min. easement for urban areas 3.0 meters Maximum Block: 100 mts.
Min. court width 2.o mts. WINDOW REQUIREMENTS:
Min. walkway is 1.20 mts. 1:10 of room floor area.
OPEN SPACES FOR LOT: 1:20 or 5% of toilet floor area
INTERIOR LOT – ABCD & J – 50% EFGHI – 20 TO 25% BATAS PAMBANSA BLG.344 ( BP344 ) – The law to enhance
INSIDE LOT - ABCD & J – 20% EFGHI – 15% mobility of disable person, by requiring certain building, institution,
CORNER LOT - ABCD & J – 10% EFGHI – 5% establishment and public utitlities to install facilities and other device.
THROUGH LOT ABCD & J – 10% EFGHI –5% ANTROPOMETRICS:
CORNER THROUGH LOT - 5% ALL Length of wheel chair : 1.0 – 1.30 mts.
CORNER LOT ABUTTING 3 OR MORE STREET – 5% ALL Width of wheel chair: .60 - .75 meters
PROJECTIONS OVER STREETS: Turning Radius: 1.50 meters
Arcade and Balcony – 3.0 meters high Comfortable Reach : .70 – 1.20 meters from the floor.
Canopies 3.0 high Room Corner Reach: .40 meters
Awning 2.40 meters high Clearance of leg under the table: .75 meters
PROTECTION ON PEDESTRIAN DURING CONSTRUCTION SPACE FOR DISABLE ( ASSEMBLY AREAS)
AND DEMOLITION: 4 – 50 seating 2 wheelchair space
1.20 meters wide temporary walkway 51 – 300 4
1.0 meters high railings 301 – 500 6
2.40 meters high fence If the capacity exceed 500, additional space required every 100
--------------------------------------------------------------------------------------- seating increase.
.60 meters footing extension from property line (national road and RA7277 sec. 46 – MAGNACARTA FOR DISABLE PERSON
public highways --------------------------------------------------------------------------------------
.30 meters for public sidewalk Outside and Around the Building:
SIGNS: Drop Curb: min. width of .90 meters Lowest dropped Curb .25 mts
ADVERTISING SIGN – Off-premises sign Ramp: max of 1:12 Slope of Curb: 1:20 to prevent water collecting
BILLBOARD – Panel for posting bills or posters Curb Cut-Out: Min width of .90 meters Slope 1:12
DISPLAY SIGN – On premises sign --------------------------------------------------------------------------------------
Tapping Rail – .30 meters
GROUND SIGN – Resting on the ground
- Maximun height of 6.0 meters on sign dimension Walkways – 1.20 meters min
PROJECTING SIGN – Suspended form the building. Perpendicular Min. Walkway Headroom: 2.0 meters
to the angle of the surface of the wall. Max. cross gradient: 1:100
- Non Arcaded – min. of 3.0 mts high - max 1.50 mts from bldg. line HANDRAILS
- Arcaded – min of 5.0 meters high - max 1.0 mts from wall line Handrail Above the Step of Ramp: .90 meters - .70 meters high
ROOF SIGN – Parallel to wall surface Handrail Height: 1.0meters - 1.06 meters
TEMPORARY SIGN – On light and combustible material. Handrail Extension: .30 meters for both ramp end
Full Grip Handrail: .30 meters - .50 meters
Min. Clearance to the wall: ..50 meters Ledge: .40 meters
BUILDING LAWS DSC2007
Selling Price
Open Market: P 2,000.00 Above
Medium Cost: P 500,000 – 2,000,000
LOTS
Single-Detached Units
Min. lot areas
Open Market: 120 sq.m
Medium Cost: 100 sq.m
Minimum frontage
Corner lot: 12 meters
Regular lot: 10 meters
Irregular lot: 6.0 meters
Interior lot: 3.0 meters
Duplex / Single-Attached
Min. lot areas
Open Market: 96 sq.m
Medium Cost: 80 sq.m
Minimum frontage 8.0 meters
RowHouse
Min. lot areas
Open Market: 60 sq.m
Medium Cost: 50 sq.m
Minimum frontage 4.0 meters
HOUSES
Min. Floor areas
Open Market: 42 sq.m
Medium Cost: 30 sq.m
Min. Setbacks
Front: 3.0 meters
Side: 2.0 meters
Rear: 2.0 meters