BQ Boiler 52-B-101

You might also like

Download as xls, pdf, or txt
Download as xls, pdf, or txt
You are on page 1of 2

BILL OF QUANTITY

PEKERJAAN OVERHAUL BOILER 52-B-101


KILANG PERTAMINA RU-VI BALONGAN
PT. PATRA BADAK ARUN SOLUSI

NO DETAIL WORK DESCRIPTION QTY U/I HARGA BOBOT (%)

I PEKERJAAN PERSIAPAN
1 Site Survey 1 Ls
2 Persiapan Manpower, Pengurusan Badge, HSE Paspor, MCU, Pembuatan TRA, dll 1 Ls
SUB TOTAL I
II PELAKSANAAN PEKERJAAN
A Pekerjaan Engineering 430,771,100
1 Arrangement Drawing 1 Ls
2 Manufacturing Drawing 1 Ls
3 Constractor Drawing 1 Ls
4 Constractability Study meliputi; 1 Ls
- Boiler Furnace Tube
- Superheater Tube
- Lower and Upper Superheater Header termasuk support
- Bank Tube
- Economiser
- Burner Front Refractory
- Furnace Foor Brick
- Castable ( Division wall to drum corner )
- Castable ( Boiler Corner )
- Insulation
- Inner Casing
- Outter Casing

5 Welding Procedure Spesification ( WPS ) 1 Ls

6 Pembuatan ITP ( Inspection and Test Plan ) 1 Ls

7 Dokumen lain yang dibutuhkan namun tidak terbatas pada : 1 Ls


- Bending Procedure
- Expand Procedure
- NDT Procedure
- Hydrotest Procedure
- Heating up/dry out Procedure
- Soda Boiling Procedure
- Monitoring Progress Procedure
- As Built drawing 1.875

8 Prosedur Kerja Pembongkaran dan Pemasangan 1 Ls


1 - Furnace Side Wall Tube
2 - Furnace Rear Wall Tube
3 - Screen Tube
4 - Furnace Bake Tube
5 - Bank Side Wall Tube
6 - Bank Rear Wall Tube
7 - Superheater Tube
8 - Lower and Upper Superheater Header termasuk support
9 - Bank Tube
10 - Economiser
11 - Burner front refractory (Refractory installation, dry out dan cooling down)
12 - Pekerjaan Hydro testing
13 - Pekerjaan Air leak test (smoke leak test)
14 - Pekerjaan first firing
15 - Pekerjaan Steam Blowing

9 Refractory Dryout Procedure 1 Ls


10 Sertifikasi Boiler 1 Ls

B Pekerjaan Fabrikasi
1 Boiler Furnace tube meliputi; 1 Ls
- Bank Rear Wall Tube
- Bank Side Wall Tube
- Furnace Baffle Tube
- Furnace Rear Wall Tube
- Furnace Side Wall Tube
- Screen Tube

2 Fin Bar meliputi; 1 Ls


- Fin Bar untuk Furnace Side Wall Tube
- Fin Bar untuk Furnace Rear Wall Tube
- Fin Bar untuk Screen Tube
- Fin Bar untuk Furnace Baffle Tube
- Fin Bar untuk Bank Side Wall Tube
- Fin Bar untuk Bank Rear Wall Tube

3 Superheater Tube 1 Ls
4 Lower and Upper Superheater Header termasuk support 1 Ls
5 Bank Tube 1 Ls
6 Economiser 1 Ls

C Pekerjaan Blind System Valve dan Fabrikasi temporary structure


1 Pekerjaan Blind System Valve 1 Ls
2 Fabrikasi temporary structure 1 Ls

D Pekerjaan Pembongkaran Material Eksisting meliputi; 1 Ls


-Pembongkaran Boiler Clading
-Pembongkaran Casing
-Pembongkaran Insulation
-Pembongkaran Burner Front Refractory
-Pembongkaran Floor Brick
-Pembongkaran Castable (division wall & boiler corner)
-Pemasangan temporary material untuk drum support
-Pembongkaran D Furnace tubes
-Pembongkaran Bank Side Wall tub8s
-Pembongkaran Furnace Baffle tubes
-Pembongkaran Screen tubes
-Pembongkaran Bank Rear Wall tubes
-Pembongkaran Superheater tubes
-Pembongkaran Bank tubes
-Pembongkaran Economizer Assembly
-Pembongkaran Burner Assembly
-Pembongkaran lnstrumentasi & electrical
-Pembongkaran accessories, internal part dan piping system
-Pekerjaan Cleaning dan Resseting burner
- Pembongkaran Refractori dan Fire Brick
- Pembongkaran Insulation

E Pekerjaan Pemasangan material baru/existing serta repair work meliputi; 1 Ls


1 Pemasangan Boiler Proper meliputi;
- Furnace Side Wall Tube
- Furnace Rear Wall Tube
- Screen Tube
- Furnace Baffle Tube
- Bank Side Wall Tube
- Bank Rear Wall Tube

2 Pemasangan Lower and Upper Superheater Header termasuk superheater tube dan header support.
3 Pemasangan Bank Tube
4 Pemasangan Economiser
5 Pekerjaan Hydro testing
6 Pekerjaan Air leak test (smoke leak test)
7 Pekerjaan Oil degreasing - soda boiling out.
8 Pemasangan Non-Pressure Part meliputi;
- Burner front refractory
- Furnace floor brick
- Division wall to drum corner (castable)
- Boiler comer castable
- lnsulattion
- Inner Casing
- Outter Casing
- Buckstay
- Burner Assembly
- Pembukaan blind flange

9 Pekerjaan repair terhadap accessories, internal pan dan piping system


10 Pemasangan Instrumentasi & electrical
11 Pemasangan burner
12 Pemasangan Refractori dan Fire Brick
13 Pemasangan Insulation

F INDIRECT MAN POWER


1 Mechanical Engineer 192 MDS
2 Instrument Engineer 74 MDS
3 Electrical Engineer 74 MDS
4 Construction Engineer 107 MDS
5 Commisioning Engineer 48 MDS
6 Procurement Staff 156 MDS
7 Drafter 60 MDS
8 Project admin 301 MDS
9 QC Staff 287 MDS
10 Project Manager 256 MDS
11 Procurement Supervisor 60 MDS
12 QC Supervisor 50 MDS
13 Project Control Staff 62 MDS
14 Safetyman 561 MDS
15 Workshop General Manager 45 MDS
16 Workshop superintedent 45 MDS
17 Procurement Manager 45 MDS
18 Service Manager 45 MDS
19 Project Control Supervisor 45 MDS
20 Site Manager 7 MDS
21 Construction Manager 69 MDS
22 Safety Officer 146 MDS
23 Boiler Supervisor 77 MDS
24 Refractory Supervisor 10 MDS
SUB TOTAL II
III PENGADAAN MATERIAL
A Pengadaan Material Utama
1 Boiler Furnace tube
- Furnace Rear Wall Tube 46 Pcs
- Furnace Side Wall Tube 98 Pcs
- Furnace Baffle Tube 103 Pcs
- Bank Side Wall Tube 113 Pcs
- Bank Rear Wall Tube 15 Pcs
- Screen Tube 16 Pcs

2 Fin Plate (Fin Bar)


- Fin Furnace Side Wall Tube 1177 KG
- Fin Furnace Rear Wall Tube 552 KG
- Fin Screen Tube 192 KG
- Fin Furnace Baffle Tube 544 KG
- Fin Bank Side Wall Tube 626 KG
- Fin Bank Rear Wall Tube 79 KG

3 Super Heater
- Tube SH 1 20 Pcs
- Tube SH 2 20 Pcs
- Tube SH 3 20 Pcs
- Tube SH 4 20 Pcs
- Tube SH 5 20 Pcs
- Tube SH 6 20 Pcs

4 Superheater Header Upper and Lower 7.38 MTR


5 Generating Bank Tube
- Bank Tube 1088 Pcs
- Bank Tube SB Part 17 Pcs

6 Economiser
- Economiser Tube 24403 KG
- Economiser Casing 5647 KG

Material Steel Structure Support Drum 10000 KG


7
H beam 250 x 250 x LG 14 mtr

8 Material Insulation
- Rockwool blanket BD .80 kg /M3 (50 x 600 x 5000) 81 Roll
- Rockwool blanket BD .80 kg /M3 (50 x 600 x 5000) 81 Roll
- Rockwool blanket BD .80 kg /M3 (50 x 600 x 5000) 81 Roll
- Rockwool wire blanket BD .80 kg /M3 (50 x 600 x 5000) 81 Roll
- Covering Aluminium Sheet (D,6 x 600 x 50000 mm) 5 Roll
- Accessories ( Silicon, Sealent, Screw, & Pin Wire ) 1 Lot

Material Refractory
- Calde Flow LF 63 A 9625 KG
- Calde Cast LF 47 A 2975 KG
- Calde Plast B 72 B 21700 KG
- Plastic Ref PL-80 ALBS 975 KG
- FC Brick SK 34 IP 230 x 114 x 65 mm 2612 Pcs
- Mortar M-34 675 KG
- CF Paper 1260-3mm 20.000 x 610 2 Roll
- SS Anchor SUS 310 Y Weld Dia 8 x 710 mm x Cap 698 Pcs
- SS Anchor SUS 310 YS Dia 8 x 275 mm x Cap 29 Pcs
- SS Anchor SUS 310 Y Weld Dia 8 x 300 mm x Cap 258 Pcs

Material Boiler Casing


- Inner Casing A36 - Steel Plate 3.3mm = 230 SQM ( 5750 KG ) 1 Lot
- Boiler Casing Galvanize 1.27 (DECK) - DENS 10 KG/M (2021 KG) 1 Lot

B Pengadaan Material Consumable


- Electricity 108000 kwh
- Ceramic Nozle for GMAW 50 Pcs
- Cutting Disc 4" 220 Pcs
- Cutting Disc 7" 70 Pcs
- Cup Brush (Carbon) Union 4" 100 Pcs
- Cotton Rug (majun) 1 ply 26 Karung
- Dusk Masker 3M (N95) 30 Box
- Drill Bit 20 Set
- Face Shield 40 Pcs
- Flash Back Arrestor Oxygen 40 Pcs
- Flash Back Arrestor Acitylin 40 Pcs
- Welding Helmet 40 Ea
- Marker (White & Gold) 130 Pcs
- Hand Gloves (combination) 40 Set
- Gas Argon 100 Bottle
- Gas Acytiline 66 Bottle
- Gas Oxygen 36 Bottle
- Electrode (Kawat las) ER-70S 113 Box
- TIG Cutting Torch 30 Set
- Plasma Cutting Torch 30 Pcs
- Kapur Besi 70 Box
- Router Bit 28 Pcs
- Penetran Test 1 Lot
- Tube Leak Test 300 Lot
- Painting 1 Lot
- Packing 2500 Kg
- Blue Sheet 10 Pcs
- Collet Weld Craft 8 Pcs
- Ceramic Argon 20 Pcs
- Grinding Disc 4" 240 Pcs
- Dusk Masker BSA 30 Dus
- Drill Bit Titanium various size 20 Pcs
- Karung Goni 100 Lembar
- Nylon Rope 6 Pcs
- NDT - Magnum Spotcheck Penetran test 839 Kaleng
SUB TOTAL III
IV PERALATAN KERJA & SAFETY
A Peralatan Kerja
1 Overhead Travelling Crane 50 Ton 1 Unit
2 Overhead Travelling Crane 5 Ton 1 Unit
3 CNC Drilling machine for Plate 1 Unit
4 CNC Plasma and Flame Plate Cutting 1 Unit
5 Horizontal Lathe Machine 1 Unit
6 Tube Bending Machine for downcorner 1 Unit
7 Fin Polishing Machine decoiler 1 Unit
8 Fin Polishing Machine decoiler roller 1 Unit
9 Membrane Bending Machine 1 Unit
10 Geng Bender CNC Machine 1 Unit
11 Hydro Test Pump 1 Unit
12 Electrical Distribution System 1 Unit
13 DIESEL POWER 500 KVA 1 Unit
14 Air Screw Compressor 1 Unit
15 Chain Block 3 Ton 9 Pcs
16 Chain Block 5 Ton 8 Pcs
17 Scarffing Machine 6 Unit
18 Cable Power 10 Roll
19 Distribution panel 22 Pcs
20 Lampu Sorot 8 Pcs
21 Grinding Machine 4" 8 Pcs
22 Grinding Machine 7" 8 Unit
23 Portable TIG Welding Machine 7 Unit
24 Portable MIG Welding Machine 5 Pcs
25 Jasa X Ray 10 Hari
26 Sewa Workshop 1 Lot
27 Welding Cable (50mm) butuh 50 meter 2 Roll
28 Ground Clamp 4 Pcs
29 Electrode Dryer (2 KG) 2 Pcs

30 Welding Hose
- Argon (OD 10mm Thk 4mm) @50 mtr 4 Roll
- Oxygen @28 mtr 4 Roll
- Acetylene @28 mtr 4 Roll

31 Gas Regulator
- Argon 4 Pcs
- Oxygen 4 Pcs
- Acetylene 4 Pcs

32 Welding Glove 10 Pcs


33 Welding Appron 10 Pcs

34 Lifting Equipment
- Sling Belt (3 Ton X 5 mtr) 10 Pcs
- Wire Sling (16mm X 15 mtr ) 200 Roll
- Shackle "U" (3 Ton) 6 Pcs

35 Others
- Cable Power @25 mtr 10 Roll
- Measuring Tape @5 mtr 10 Pcs
- Hammer Kuningan 3 Kg 10 Pcs
- Combination Wrench Set (8mm - 32mm) 4 Set
- Ratchet Set 24 Pcs (8mm - 32mm) 4 Set

36 Refractory Equiment
- Sand Ramming 4 Pcs
- Travo Las 3 Pcs
- Vibrator 2 Pcs
- General Tools 4 Pcs
- Mixer 2 Pcs

37 Insulation Tools 1 Lot

38 Scaffolding
- Pipa 6 meter 100 Pcs
- Pipa 3 meter 50 Pcs
- Double Coupler 100 Pcs
- Swivle Coupler 50 Pcs
- Jack Base 20 Pcs
- Catwalk 20 Pcs

39 Rent Equipment
- Rent Crane 25 Ton per bulan 2 Bulan
- Forklift 5 ton 1 Bulan
- Genset 100 KVA 2 Unit
- Kompressor 400 cpm 30 Unit
- Hydrotest Pump, Press 500 KG/cm2 c/w accessories 2 Unit

40 Thrid Party Equipment


- Jasa NDT Test (Phase Ray) 1 Lot
- Hydraulic Tube Expander 1 Lot
- PWHT (Superheater Header) 1 Lot

41 Chemical cleaning scope by pertamina 1 Lot


42 Silincer Steam Blowing Equipment 1 Lot
43 Target Plate 1 Lot
44 Sertifikasi Boiler Depnaker 1 Lot

B Peralatan Safety
PPE (Personal Protective Equipment)
1 Coverall 153 Set
2 Safety Shoes 153 Pcs
3 Safety Glass 153 Pcs
4 Safety Helmet 153 Pcs
5 Earplug 252 Pcs
6 Safety Line 10 Roll
7 PPE & Insurance Refractory 1 Lot
8 PPE & Insurance Insulation 1 Lot

Rent Equipment
- Jasa Blind System Valve for Preparation hanya hitungan man power dan gasket 1 Lot
SUB TOTAL IV
V MOBILISASI / DEMOBILISASI & TRANSPORTASI
MOB - DEMOB
- Mob Demob Material JKT - Balongan 51291 KG
- Loading unloading 51291 KG
- Mob Demob Manpower Indirect 26 Person
- Mob Demob Map Power Insulation ( Incl. Tools, Safety Induction, Management Trip, MCU ) 1 Lot
- Mob Demob Main Equipment Boiler ( Truck Low Bed panjang 12 Meter ) 5 Trip
- Mob Demob Main Office Container Tools ( Truck Trailer ) 5 Trip
- Mob Demob of Equipment Refractory 1 Ls
- Mob Demob Man Power Refractory 1 Ls

AKOMODASI
Site Acoomodation Expenses
- Mobil Kijang Innova 87 Hari
- Mobil Pick Up 87 Hari
- Living Facilities for Direct Man Power / Sewa Rumah 2 Unit
- Living Facilities for Indirect Man Power 1 Lot
- Temporary Office & Tools Consumable ( Container ) 87 Hari
- Harga Stationery & copies 1 Lot
- Computer Inc: Software, Printing and Documentation 1 Lot
- Communication ( Tlp, Fax & Internet ) 1 Lot

Man Power Expenses


- Drinking Water 12 Galon
- Meal 691 Bungkus

SUB TOTAL V
TOTAL (Sub Total I+II+III+IV+V)
KEUNTUNGAN & RESIKO
JAMSOSTEK (2,04 % Thd Sub Total I+II) :
TOTAL NILAI KONTRAK
PEMBULATAN
BILL OF QUANTITY
PEKERJAAN OVERHAUL BOILER 52-B-101
KILANG PERTAMINA RU-VI BALONGAN
PT. PATRA BADAK ARUN SOLUSI

NO DETAIL WORK DESCRIPTION QTY U/I MAN POWER BOBOT


8,476,084,167.41
I PEKERJAAN PERSIAPAN
1 Site Survey 1 Ls
2 Persiapan Manpower, Pengurusan Badge, HSE Paspor, MCU, Pembuatan TRA, dll 1 Ls
II PELAKSANAAN PEKERJAAN
A Pekerjaan Engineering 500,965,743.55
1 Arrangement Drawing 1 Ls ON GOING
2 Manufacturing Drawing 1 Ls ON GOING
3 Constractor Drawing 1 Ls
4 Constractability Study 1 Ls
5 Welding Procedure Spesification ( WPS ) 1 Ls
6 Pembuatan ITP ( Inspection and Test Plan ) 1 Ls
7 Dokumen lain yang dibutuhkan. 1 Ls
8 Prosedur Kerja Pembongkaran dan Pemasangan 1 Ls
9 Refractory Dryout Procedure 1 Ls
10 Sertifikasi Boiler 1 Ls
III PENGADAAN MATERIAL
A Pengadaan Material Utama 7,975,118,423.86
1 Boiler Furnace tube
- Furnace Side Wall Tube 98 Pcs 3,081,545.00 301,991,410.00
- Furnace Rear Wall Tube 46 Pcs 3,081,545.00 141,751,070.00
- Furnace Baffle Tube 103 Pcs 3,081,545.00 317,399,135.00
- Bank Side Wall Tube 113 Pcs 3,081,545.00 348,214,585.00
- Bank Rear Wall Tube 15 Pcs 3,081,545.00 46,223,175.00
- Screen Tube 16 Pcs 3,081,545.00 49,304,720.00

2 Fin Plate (Fin Bar)


- Fin Furnace Side Wall Tube 1177 KG 33,250.00 39,135,250.00
- Fin Furnace Rear Wall Tube 552 KG 33,250.00 18,354,000.00
- Fin Screen Tube 192 KG 33,250.00 6,384,000.00
- Fin Furnace Baffle Tube 544 KG 33,250.00 18,088,000.00
- Fin Bank Side Wall Tube 626 KG 33,250.00 20,814,500.00
- Fin Bank Rear Wall Tube 79 KG 33,250.00 2,626,750.00

3 Super Heater
- Tube SH 1 20 Pcs 3,773,928.00 75,478,560.00
- Tube SH 2 20 Pcs 3,773,928.00 75,478,560.00
- Tube SH 3 20 Pcs 3,773,928.00 75,478,560.00
- Tube SH 4 20 Pcs 3,773,928.00 75,478,560.00
- Tube SH 5 20 Pcs 3,773,928.00 75,478,560.00
- Tube SH 6 20 Pcs 3,773,928.00 75,478,560.00

4 Superheater Header Upper and Lower 7.38 MTR 47,245,528.00 348,671,996.64


5 Generating Bank Tube
- Bank Tube 1088 Pcs 3,081,545.00 3,352,720,960.00
- Bank Tube SB Part 17 Pcs 3,081,545.00 52,386,265.00

6 Economiser
- Economiser Tube 24403 KG 93,036.09 2,270,359,753.08
- Economiser Casing 5647 KG 33,260.40 187,821,494.15

Material Steel Structure Support Drum 10000 KG -


7
H beam 250 x 250 x LG 14 mtr

8 Material Insulation
- Rockwool blanket BD .80 kg /M3 (50 x 600 x 5000) 81 Roll -
- Rockwool blanket BD .80 kg /M3 (50 x 600 x 5000) 81 Roll -
- Rockwool blanket BD .80 kg /M3 (50 x 600 x 5000) 81 Roll -
- Rockwool wire blanket BD .80 kg /M3 (50 x 600 x 5000) 81 Roll -
- Covering Aluminium Sheet (D,6 x 600 x 50000 mm) 5 Roll -
- Accessories ( Silicon, Sealent, Screw, & Pin Wire ) 1 Lot -

Material Refractory
- Calde Flow LF 63 A 9625 KG -
- Calde Cast LF 47 A 2975 KG -
- Calde Plast B 72 B 21700 KG -
- Plastic Ref PL-80 ALBS 975 KG -
- FC Brick SK 34 IP 230 x 114 x 65 mm 2612 Pcs -
- Mortar M-34 675 KG -
- CF Paper 1260-3mm 20.000 x 610 2 Roll -
- SS Anchor SUS 310 Y Weld Dia 8 x 710 mm x Cap 698 Pcs -
- SS Anchor SUS 310 YS Dia 8 x 275 mm x Cap 29 Pcs -
- SS Anchor SUS 310 Y Weld Dia 8 x 300 mm x Cap 258 Pcs -

Material Boiler Casing


- Inner Casing A36 - Steel Plate 3.3mm = 230 SQM ( 5750 KG ) 1 Lot -
- Boiler Casing Galvanize 1.27 (DECK) - DENS 10 KG/M (2021 KG) 1 Lot -

B Pengadaan Material Consumable


- Electricity 108000 kwh
- Ceramic Nozle for GMAW 50 Pcs
- Cutting Disc 4" 220 Pcs
- Cutting Disc 7" 70 Pcs
- Cup Brush (Carbon) Union 4" 100 Pcs
- Cotton Rug (majun) 1 ply 26 Karung
- Dusk Masker 3M (N95) 30 Box
- Drill Bit 20 Set
- Face Shield 40 Pcs
- Flash Back Arrestor Oxygen 40 Pcs
- Flash Back Arrestor Acitylin 40 Pcs
- Welding Helmet 40 Ea
- Marker (White & Gold) 130 Pcs
- Hand Gloves (combination) 40 Set
- Gas Argon 100 Bottle
- Gas Acytiline 66 Bottle
- Gas Oxygen 36 Bottle
- Electrode (Kawat las) ER-70S 113 Box
- TIG Cutting Torch 30 Set
- Plasma Cutting Torch 30 Pcs
- Kapur Besi 70 Box
- Router Bit 28 Pcs
- Penetran Test 1 Lot
- Tube Leak Test 300 Lot
- Painting 1 Lot
- Packing 2500 Kg
- Blue Sheet 10 Pcs
- Collet Weld Craft 8 Pcs
- Ceramic Argon 20 Pcs
- Grinding Disc 4" 240 Pcs
- Dusk Masker BSA 30 Dus
- Drill Bit Titanium various size 20 Pcs
- Karung Goni 100 Lembar
- Nylon Rope 6 Pcs
- NDT - Magnum Spotcheck Penetran test 839 Kaleng
B Pekerjaan Fabrikasi
1 Boiler Furnace tube 1 Ls
- Bank Rear Wall Tube
- Bank Side Wall Tube
- Furnace Baffle Tube
- Furnace Rear Wall Tube
- Furnace Side Wall Tube
- Screen Tube
2 Fin Bar 1 Ls
- Fin Bar untuk Furnace Side Wall Tube
- Fin Bar untuk Furnace Rear Wall Tube
- Fin Bar untuk Screen Tube
- Fin Bar untuk Furnace Baffle Tube
- Fin Bar untuk Bank Side Wall Tube
- Fin Bar untuk Bank Rear Wall Tube
3 Superheater Tube 1 Ls
4 Lower and Upper Superheater Header termasuk support 1 Ls
5 Bank Tube 1 Ls
6 Economiser 1 Ls
C Pekerjaan Blind System Valve dan Fabrikasi temporary structure
1 Pekerjaan Blind System Valve 1 Ls
2 Fabrikasi temporary structure 1 Ls

D Pekerjaan Pembongkaran Material Eksisting 1 Ls


1 Pembongkaran Boiler Clading
2 Pembongkaran Casing
3 Pembongkaran Insulation
4 Pembongkaran Burner Front Refractory
5 Pembongkaran Floor Brick
6 Pembongkaran Castable (division wall & boiler corner)
7 Pemasangan temporary material untuk drum support
8 Pembongkaran D Furnace tubes
9 Pembongkaran Bank Side Wall tub8s
10 Pembongkaran Furnace Baffle tubes
11 Pembongkaran Screen tubes
12 Pembongkaran Bank Rear Wall tubes
13 Pembongkaran Superheater tubes
14 Pembongkaran Bank tubes
15 Pembongkaran Economizer Assembly
16 Pembongkaran Burner Assembly
17 Pembongkaran lnstrumentasi & electrical
18 Pembongkaran accessories, internal part dan piping system
19 Pekerjaan Cleaning dan Resseting burner
20 Pembongkaran Refractori dan Fire Brick
21 Pembongkaran Insulation
E Pekerjaan Pemasangan material baru/existing serta repair work meliputi; 1 Ls
1 Pemasangan Boiler Proper:
- Furnace Side Wall Tube
- Furnace Rear Wall Tube
- Screen Tube
- Furnace Baffle Tube
- Bank Side Wall Tube
- Bank Rear Wall Tube
2 Pemasangan Lower and Upper Superheater Header termasuk superheater tube dan header support.
3 Pemasangan Bank Tube
4 Pemasangan Economiser
5 Pekerjaan Hydro testing
6 Pekerjaan Air leak test (smoke leak test)
7 Pekerjaan Oil degreasing - soda boiling out.
8 Pemasangan Non-Pressure Part
9 Pekerjaan repair terhadap accessories, internal pan dan piping system
10 Pemasangan Instrumentasi & electrical
11 Pemasangan burner
12 Pemasangan Refractori dan Fire Brick
13 Pemasangan Insulation

You might also like