Soakpit&Septic Tank Details: General Notes
Soakpit&Septic Tank Details: General Notes
Soakpit&Septic Tank Details: General Notes
COMPARTMENT BAFFLE
255
340
510
230 CONCRETE BLOCK
WALL PLASTERED
100dia INLET PIPE
INTERNALLY
FROM SEPTIC TANK
2210
100dia
INLET PIPE SCUM
a
CLEAR SPACE C C
150 CONCRETE BED 255
b
255
6120
NOTES :
2567
1530
8 No 100 PVC
200 THK MASS DRAINAGE PIPES
CONCRETE BED 20 MPa CONCRETE TO
FOUNDATIONS AND SLABS
GRAVEL/STONE
4228 2113 400 400
255391 1360 4590 391
849
425
SECTION A - A
BACKFILLING AROUND
340
rev. date
SCALE 1:20 WALLS TO COMMENCE
14 DAYS AFTER CESS 1190 1190 REVISIONS
PIT HAS BEEN COMPLETED
SECTION B - B
SCALE 1:20
Consultant
391 391
A 450x450 COVER
AND FRAME TO
A
1547
765
MANHOLE
200 THK R.C. COVER SLAB
391 391
Client
SEPTIC TANK Mr KENETH NEMBUKA ,
PLAN 100 PVC DRAINAGE
P.O.BOX ..............,
SCALE 1:20 PIPES DAR ES SALAAM.
SIZE OF SEPTIC TANK PLAN AREAS OF SOAKAGE TRENCHES FOR SUBSURFACE SOAK AWAY DIAMETERS
SOIL WASTES
TYPE
ALL WASTES
(METERS) ALL WASTES PERCOLATION FACTORS Job stage and description
NO. OF USERS ONLY DRAINAGE IN SQUARE METRES PERCOLATION FACTORS
W=WIDTH NO. OF USERS
L=LENGH D=DEPTH NO. OF USERS
0.16 0.35 0.63 0.99 1.42 1.93 0.16 0.35 0.63 1.20 1.42 1.93 DIG A HOLE 300x300mm TO REQUIRED DEPTH
OF TRENCH AND POUR IN WATER TO A ARCHITECTURAL WORKING DRG
A 7 2.20 0.95 1.70 15 4.18 6.22 8.27 10.22 12.17 14.49 7
MEASURED DEPTH MIN. 150mm ACCURATELY.
B 15 3.34 1.20 1.80 30 6.22 9.38 12.17 15.51 19.14 21.46 1.45 1.60 1.80 2.20 2.35 2.50 15
TIME PERIOD FOR WATER TO SOAK AWAY
C 30 4.30 1.40 1.80 45 7.15 10.78 14.30 17.93 21.40 25.08 30
D 45 4.90 1.60 1.80 60 8.73 13.10 17.47 21.83 26.10 30.56
1.80 2.00 2.30 2.70 3.00 3.40 40
DEVIDE THIS PERIOD IN MINUTES BY DEPTH
OF WATER IN mm AND THE ANSWER IS THE
CESS PIT Drawing Tittle
50 PERCOLATION FACTOR
E 60 5.50 1.80 1.80 75 10.13 15.32 20.25 25.26 32.11 35.39
1.80 2.20 2.50 2.80 3.20 3.50
SECTION C - C SEPTIC&SOAKPIT DETAILS
60 e.g. IF 200mm OF WATER TAKE 72 MINUTES SCALE 1:20
TO SOAK, THEN: P.F. = 72 = 0.35
200 Drawing no.
KN-01