General features
Name of the Project Detailed Survey and Design of Electrifiedrailway Line
Inaruwa – Kakarvitta section of Mechi Mahakali Railway
Line and Butwal - Bhairahawa (Lumbini) Link
Feasibility Study 2010 [Association of
RITES Ltd. (India) and SILT (Nepal) Consultants]
DPR Study 2017 [Dohwa Engineering Co. Ltd., Korea in joint venture
with Korea Rail Network Authority, Soosung Engineering
Co. Ltd., Korea, SILT Consultant P. Ltd. in association with
Environment and Resource Management Consultant (P.)
Ltd. and Material Test P. Ltd., Nepal.]
Province 1
Zone Mechi and Koshi
Districts Sunsari, Morang and Jhapa
Municipality / VDCs Municipalities
Sunsari: Inaruwa Municipality, Itahari Sub Metropolitan
City, Duhabi Municipality (3)
Morang: Biratnagar Metropolitan City, Sundarharicha
Municipality, Belbari Municipality Patharisanishchare
Municipality, Urlabari Municipality (5 Nos)
Jhapa: Damak Municipality, Shivasatashi Municipality,
Kankai Municipality, Birtamod Municipality, Mechinagar
Municipality (5 Nos)
Rural muncipality
Sunsari: Bhokaha Rural Municipalities, (1 nos.)
Morang: Budhiganga Rural Municipality, Gramthan Rural
Municipality, Katahari Rural Municipality, Kanepokhari
Rural Municipality, (4 nos.)
Jhapa: Kamal Rural Municipality
1
Mechi – Mahakali Electrified Railway Line
2. Inaruwa – Bardibas
General features
Name of the Project Detailed Survey and Design of Electrifiedrailway Line
Bardibas ~ Inaruwa section of Mechi Mahakali Railway Line
Feasibility Study 2010 [Association of
RITES Ltd. (India) and SILT (Nepal) Consultants]
DPR Study 2017 [Yooshin Engineering Corporation (YOOSHIN),
Korea in JV with Korea Rail Network Authority (KRNA),
Balaji Railway System Limited (BARSYL) India, Korea
2
Mechi – Mahakali Electrified Railway Line
3
Mechi – Mahakali Electrified Railway Line
General features
Name of the Project Detailed Survey and Design of Electrified railway Line of
Bardibas ~ Simara section of Mechi Mahakali Railway Line
and Simara – Birgunj Link line
Feasibility Study 2010 [Association of
RITES Ltd. (India) and SILT (Nepal) Consultants]
DPR Study 2013 [Chungsuk Engineering Co. Ltd. In association with
Korea Railway Network Authority, Kunhwa Consulting &
Engineering Co. Ltd. Korea, Intercontinental Consultant and
Technocrats Pvt. Ltd., India, Shah Consult Pvt. Ltd. And
Full Bright Consultancy Pvt. Ltd, Nepal]
Province 2
Districts Mahottari, Sarlahi, Rauthat, Bara and Parsa
Total length 136.4 Km (28.4+108)
4
Mechi – Mahakali Electrified Railway Line
4. Simara – Tamsariya
General features
Name of the Project Detailed Survey and Design of Electrifiedrailway Line
Bardibas ~ Inaruwa section of Mechi Mahakali Railway Line
Feasibility Study 2010 [Association of
RITES Ltd. (India) and SILT (Nepal) Consultants]
DPR Study 2014 [SOOSUNG Engineering Co. Ltd. Korea in JV with
Kunhwa Consulting & Engineering Co. Ltd. Korea, Korea
Rail Network Authority (KRNA),Korea transport Institute,
Korea, Intercontinental consultant and Technocrats Pvt. Ltd.
India Full Bright Consultancy Pvt. Ltd. Nepal]
Province 2,3, Gandaki, 5
Districts Parsa, Chitwan, Nawalpur and Parasi
Total length 127.09 Km
5
Mechi – Mahakali Electrified Railway Line
Design Standards
Gauge Standard Gauge : 1,435 mm
Cant 160 mm (Max.)
Horizontal Curve Minimum Curve Radius : 1000 m
Vertical Curve Minimum Radius of Vertical Curve : 14,000 m
Track Slope 1/100(Max.)
Formation Level Width 7.3 m
Track Ballast Main Line 350 mm
Structure Thickness
Sleeper P.C sleeper
Rail Weight Main : 60 kg/m , Side : 52 kg/m
Railway Crossing Highway : Multilevel Crossing Facilities
Facilities
Size of Platform Width : 10 m , Length : 600 m
(Passenger)
Tunnels 3nos(2880m, 710m, 130m)
No. of Bridges 51 nos
Type of Bridges i) P.S.C I Girder:47
ii) I.P.C Girder:4
Numbers of Stations Total: 10 nos. + 3 Signal Station
Name of Stations Junction Station 1. Amarapuri
Intermediate Station 1.Tamsariya 2.Pithauli 3.Shukranagar 4.
Basantapur 5.Bsantapur 6. Ayodhyapuri 7. Amuwa
8.Narabasti 9.Kanchanpur 10. Bagabanna
Signal Station: 1. Bhuwanbasti 2. Aireni 3.Gadi
Signaling and Train Signaling : LED Type , Multi Aspect Signal
Control Train Control System : Absolute block System
System
Electrical System Simple Catenary System
Land Requirements
Private land 395 ha
Forest area 209 ha
No of houses 350
Land & Associated and 6,967,800,000
Environmental mitigation
Shifting / Relocation of 791,385,000
Services
Total cost of the Project NRs. 108,265,158,480
Cost per Km NRs. 851,877,870.00
* A new DPR is being prepared for the section of Nijgadh- Hetauda – Bharatpur since
old DPR passed through Chitwan National Park so new modification is being made to
bypass Chitwan National Park.
6
Mechi – Mahakali Electrified Railway Line
General features
Name of the Project Detailed Survey and Design of Electrifiedrailway Line
Tamsariya – Butwal section of Mechi Mahakali Railway
Line and Butwal - Bhairahawa (Lumbini) Link
Feasibility Study 2010 [Association of
RITES Ltd. (India) and SILT (Nepal) Consultants]
DPR Study 2014 [Metro Development Projectand Dohwa
Engineering Co., Ltd., Korea in joint venture with Kunhwa
Consulting & Engineering Co., Ltd.,
Korea, Korea Rail Network Authority, Korea,
Intercontinental Consultants and Technocrats Pvt.
Ltd., India and Full Bright Consultancy (Pvt.) Ltd., Nepal]
Province 5
Zone Lumbini
Districts Nawalparasi and Rupandehi
Municipality / VDCs Municipalities
Ramgarm Municipality and Butwal Municipality (2 nos.)
VDCs
Nawalparasi:Narayani, Tamsariya, Prasauni,
NayaBelahani, Dumkibas, Dawannedevi, Makar,
Panchanagar, Tilakpur, Ramnagar, Swathi and Sunwal (12
nos.)
Rupandehi:Devadaha, Makrahar, Shankarnagar, Karahiya,
Gangoliya, Madhawaliya, Hatipharsatikar, Padasari,
Chilhiya, Mainahiya, Kamahariya, Khudabagar,
Dhamauli,Ekala and
Tenuhawa (15 nos.)
Total length 107.824 Km including Y-Connection of Tamsariya-
Butwal-Bhairahawa (Lumbini) Section
Segment length 63.385Km Tamsariya - Butwal section and
41.831 KM Butwal – Lumbini Link and
2.608 Km Y- Connection
Design Speed 160km/h
Right of Way 50 m
Design Standards
Gauge Standard Gauge : 1435mm
Track Spacing 5.3 m
Cant 165 mm (Max.)
Horizontal Curve Minimum Curve Radius : 1,500 m
Vertical Curve Minimum Radius of Vertical Curve : 9,000 m
Track Slope 10/1,000(Max.)
Transition Curve Cubic parabola
Formation Level Width 7.3 m
7
Mechi – Mahakali Electrified Railway Line
8
Mechi – Mahakali Electrified Railway Line
6. Butwal – Lamahi
General features
Name of the Project Detailed Survey and Design of Electrified railway Line for
Lamahi ~ Kohalpur section of Mechi Mahakali Railway Line
and Kohalpur – Nepalgunj Link line
Feasibility Study 2010 [Association of
RITES Ltd. (India) and SILT (Nepal) Consultants]
DPR Study 2018 [China Railway Survey and design Group SIYUANCo.
Ltd. In association with ERMC Pvt. Ltd.Nepal]
Province 5
Districts Rupandehi, Kapilbastu, Arghakhanchi, Dang
Total length 105Km
9
Mechi – Mahakali Electrified Railway Line
General features
Name of the Project Detailed Survey and Design of Electrified railway Line for
Lamahi ~ Kohalpur section of Mechi Mahakali Railway Line
and Kohalpur – Nepalgunj Link line
Feasibility Study 2010 [Association of
RITES Ltd. (India) and SILT (Nepal) Consultants]
DPR Study 2018 [China Railway First servey and design Group Co. Ltd.
(FSDI) China in JV with Pyunghwa Engineering Consultant
Ltd., (PEC, Kores), Dong Myeong Engineering Consultant
Co., Ltd (DMEC, Korea), Silt Consultant Pvt. Ltd. (SILT,
Nepal)]
Province 5
Districts Dang and Banke
Municipality / VDCs 1 Sub metropolitan city - Nepalgunj
2 Muncipalities – Lamahi and Kohalpur
5 Rural Muncipalities – Khajura, Baijnath, Duduwa,
Janaki, Rapti
Total length 99.3km + 14.4km = 113.742Km
10
Mechi – Mahakali Electrified Railway Line
Design Standards
Gauge Standard Gauge : 1,435 mm
Horizontal Curve Minimum Curve Radius :
General : 2500 m Difficult Terrain: 2000m Link line: 1000m
Vertical Curve Minimum Radius of Vertical Curve : 14,000 m
Track Slope 125/100(Max.)
Transition Curve Cubic parabola
Formation Level Width 7.8 m
Track Ballast Main Line 350 mm
Structure Thickness
Sleeper P.C sleeper
Rail Weight Main : 60 kg/m , Side : 52 kg/m
Railway Crossing Highway : Multilevel Crossing Facilities
Facilities
Size of Platform Width : 10 m , Length : 600 m
(Passenger)
No. of Bridges 64 nos
Numbers of Stations Total: 3 nos. + 5 Signal Station + 4 future
Name of Stations Passenger: 1. Kohalpur 2.Rangital 3.Chhapargaruri
Signal Station: 1. jharkatti 2. Mathebas 3. Gabar 4.
Ramnagar 5. Chahati Bangurasi
Type of Stations Double Track
Signaling and Train Signaling : LED Type , Multi Aspect Signal
Control Train Control System : Absolute block System
System
Electrical System Simple Catenary System
Land Requirements
Private land 176 ha
Forest area 390.3 ha
Other 5 ha
Total 571.3 ha
No of houses 104
Land & Associated and 7,002,854,119
Environmental mitigation
Shifting / Relocation of 121,704,800
Services
Total cost of the Project NRs. 84,341,333,113.11
Cost per Km NRs. 741,514,419.59
8. Kohalpur – Sukkhad
General features
Name of the Project Detailed Survey and Design of Electrified railway Line for
Lamahi ~ Kohalpur section of Mechi Mahakali Railway Line
11
Mechi – Mahakali Electrified Railway Line
12
Mechi – Mahakali Electrified Railway Line
9. Sukkhad – Gaddhachowki
General features
Name of the Project Detailed Survey and Design of Electrified railway Line for
Lamahi ~ Kohalpur section of Mechi Mahakali Railway Line
and Kohalpur – Nepalgunj Link line
Feasibility Study 2010 [Association of
RITES Ltd. (India) and SILT (Nepal) Consultants]
DPR Study 2018 [China Railway First servey and design Group Co. Ltd.
(FSDI) China in JV with Pyunghwa Engineering Consultant
Ltd., (PEC, Kores), Dong Myeong Engineering Consultant
Co., Ltd (DMEC, Korea), Silt Consultant Pvt. Ltd. (SILT,
Nepal)ERMC Pvt. Ltd.Nepal]
Province Sudurpaschim
Districts Kailali and Kanchanpur
Municipality / VDCs Muncipalities –Godawari, Gauriganga, Ghodaghodi, Lamki
chauha, Bhimdutta, Bedkot, Suklaphanta, Krishnapur
Total length 89.082Km
13
Mechi – Mahakali Electrified Railway Line
14
Overall Cost of Mechi – Mahakali Railway Line
3 Bardibas – Simara and Simara - Birgunj Link 136.4 (108+28.4) 61,458,552,447.00 2013