QC Form No (Final)
S/N QC Form Name
Identification Discipline S/N Rev
13 51Q BU 0014 0 Piping, Plumbing Fixture, Fittings, Devices Installation Check List
24 51Q CI 0008 2 Insp report fot sand bedding & tiling works
44 51Q EI 0001 1 Check List for Tray and UPVC Conduit Installation
50 51Q EL 0003 2 Checklist for Installation of Junction Box and Test Point
58 51Q EL 0011 2 Test Report for Resistance Measurement (Before Concrete Pour)
59 51Q EL 0012 2 Test Report for Resistance Measurement (After Concrete Pour)
60 51Q EL 0013 2 Test Report for Insulation Resistance Test for CP Cable
62 51Q EL 0016 2 Test Report for Reference Electrode Function Test (Before Encapsulation)
63 51Q EL 0017 2 Test Report for Reference Electrode Function Test (After Encapsulation)
67 51Q EL 0021 2 Test Report for Transformer Rectifier (UnderTank Bottom External)
70 51Q EL 0024 3 PRE-COMMISSIONING CHECKLIST FOR TANK BOTTOM EXTERNAL ,INTERNAL AND REBAR CP
78 51Q EL 0035 2 Check List for Installation of Electrical Fixtures(Lighting Switch and Socket)
79 51Q EL 0036 1 Test Report for Insulation Resistance Test of Electrical Fixtures (Lighting Switch and Socket)
80 51Q EL 0037 1 Test Report for Function Test of Electrical Fixtures (Lighting Detector and Photocell)
94 51Q EL 0054 2 Test Report for Insulation Resistance of Electrical Cable(HV/MV/LV/Control Cable)
95 51Q EL 0056 2 Check List for Installation of Heat Tracing System (Cables and Accessories)
96 51Q EL 0057 2 Check List for Installation of Heat Tracing System (Panel Board)
QC Form No (Final)
S/N QC Form Name
Identification Discipline S/N Rev
100 51Q EL 0064 2 Check List for Installation of Misc. Tag Equipement(LCS JB etc)
101 51Q EL 0065 1 Test Report for Misc. Tag Equipement(LCS JB etc)
102 51Q EL 0066 3 Check List for Installation of Panels and Dist. Board
103 51Q EL 0067 2 Test Report for Panels and Dist. Board
104 51Q EL 0068 2 Check List for Installation of Street Flood Lights and Poles
105 51Q EL 0069 1 Test Report for Insulation Resistance Test of Street Flood Lights and Poles
109 51Q EL 0073 2 General Check List for Pre-Startup Safety Review
110 51Q EL 0074 1 Check List for Pre-Startup Safety Review for Substation
112 51Q EL 0077 3 Test Report for 33/11kV Transformer and 11kV HV SWGR
113 51Q EL 0078 3 Test Report for 11/6.6kV Transformer and 6.6kV HV SWGR
116 51Q EL 0081 2 Test Report for Hi-Potential & Insulation Resistance Test (HV Cable)
117 51Q EL 0082 1 Check List for receiving electrical items at site
120 51Q EL 0086 0 Test Report for DC Sheath Integrity Test for UG HV Cables
121 51Q EL 0087 3 Test Report for 11/0.4kV Transformer and 400V HV SWGR
123 51Q EL 0089 0 TEST REPORT FOR REF DIFFERENTIAL – STABILITY & SENSITIVITY TEST (87NL)
124 51Q EL 0090 0 TEST REPORT FOR TRANSFORMER DIFFERENTIAL – STABILITY & SENSITIVITY TEST (87T)
125 51Q EL 0091 0 TEST REPORT FOR LINE DIFFERENTIAL – STABILITY & SENSITIVITY TEST (87L)
126 51Q EL 0092 0 CHECK LIST FOR TRANSFORMER STABILITY AND SENSITIVITY TEST
147 51Q GE 0026 2 Request for Approval of Material (Civil / Arch / Elct / Inst)
168 51Q HV 0008 0 Testing, Adjusting and Air Balancing Record for HVAC
179 51Q IN 0012 2 Check List for Installation of instrument control panel board etc
182 51Q IN 0018 2 Check List for Instrument Piping & Tube installation
183 51Q IN 0019 2 Check List for Fire alarm & Gas detection system
185 51Q IN 0021 2 Check List for Telephone and Data network system
186 51Q IN 0022 2 CHECK LIST FOR PERSONNNEL ACCESS CONTROL (PAC) SYSTEM
187 51Q IN 0023 2 CHECK LIST FOR PUBLIC ADDRESS (PA PCS PEAS) SYSTEM
190 51Q IN 0026 2 Inspection Test Report for Attenuation (F.O Cable)
191 51Q IN 0027 2 Inspection Test Report for OTDR Connection Loss & Optical Length (F.O Cable)
192 51Q IN 0028 1 Inspection Test Report for Instrument Piping/Tubing Air Leak Test
193 51Q IN 0029 1 Inspection Test Report for Fire Alarm Cable
194 51Q IN 0030 1 Inspection Test Report for Telecom Cable(Tel_Data Network, PA, CCTV & PAC)
202 51Q IN 0040 1 Loop Test Summary Sheet for New Plant
206 51Q IN 0044 1 Loop Test Summary Sheet for Existing Plant
QC Form No (Final)
S/N QC Form Name
Identification Discipline S/N Rev
208 51Q IN 0046 0 TDR test for CAT5 / CAT 6 cables Inspection Report
232 51Q ME 0017 0 Sprinkler Water Spray Indoor Hydrant Piping Installation for Fire fighting System
233 51Q ME 0018 0 Fire Extinguisher Installation for Fire Fighting System
234 51Q ME 0019 0 Clean Agent Piping Installtion for Fire Fighting System
235 51Q ME 0020 0 Clean Agent Nozzle Installation for Fire Fighting System
236 51Q ME 0021 0 Clean Agent Cylinder Installation for Fire Fighting System
239 51Q ME 0024 1 Piping/Equipment Drying and Preservation Checklist for Existing Plant
240 51Q ME 0025 0 Movable Fire Fighting and Safety Equipment Checklist
256 51Q PI 0007 1 Matl receiving insp CL-Pipe & fittings- KNPC Free issue materials
257 51Q PI 0008 2 Matl receiving insp CL-Pipe & fittings-Contractor procured materials
259 51Q PI 0010 1 Thickness survey report for Piping & Fittings
304 51Q TA 0018 0 Tank Air Leak Test Report for Reinforcing Pad
316 52P PC 0008 0 Pre-Commissioning Visual Inspection - Flanges / Gaskets & Bolting
QC Form No (Final)
S/N QC Form Name
Identification Discipline S/N Rev
326 52P PC 0018 0 AIR BLOWER FAN TEST RUN CHECK LIST
328 52P PC 0020 0 PRE-COMMISSIONING- VISUAL INSPECTION OF FLANGES, GASKETS, AND BOLTS
329 52P PC 0021 0 PRE-COMMISSIONING- VISUAL INSPECTION OF FLANGES, GASKETS, AND BOLTS (Re-instatement)
330 52P PC 0022 0 PIPING INSULATION CHECK LIST (PTOP Re-instatement) (Applicable Subsystem)
1 A1 51Q-BU-0009 BU-0009 BUILDING INSPECTION & TEST CHECKLIST Architectural Critical Track Track This QVD is to use for fi
2 A1 51Q-BU-0014 BU-0014 PIPING/PLUMBING FIXTURE/FITTINGS/DEVICES INSTALLATION CHECK SHEET Architectural Critical
3 A1 51Q-CI-0025 CI-0025 MECHANICAL COMPLETION CHECKLIST FOR CIVIL Civil Critical Track Track A1 for Drainage Pipe Insta
4 A1 51Q-EL-0014 EL-0014 TEST REPORT FOR TRANSFORMER RECTIFIER FOR CP Electrical Critical Track Track 07-May-16
5 A1 51Q-EL-0031 EL-0031 TEST REPORT FOR GROUNDING SYSTEM Electrical Critical Track Track Changed category : B1 ‐> A1
6 A1 51Q-EL-0054 EL-0054 TEST REPORT FOR INSULATION RESISTANCE OF HV/MV/LV CONTROL CABLE Electrical Critical Track
7 A1 51Q-EL-0080 EL-0080 TEST REPORT HV/LV MOTOR Electrical Critical Track Track Changed Form Title 30-May-16
8 A1 51Q-EL-0081 EL-0081 TEST REPORT FOR HI-POTENTIAL & INSULATION RESISTANCE TEST (HV CABLE) Electrical Critical Tra
9 A1 51Q-HV-0006 HV-0006 HVAC SYSTEM FINAL INSTALLATION CHECKLIST HVAC Critical Track Track Changed Form Title 23-M
10 A1 51Q-IN-0026 IN-0026 INSPECTION / TEST REPORT FOR ATTENUATION (F.O. CABLE) Instrument Critical Track Track Adde
11 A1 51Q-IN-0027 IN-0027 INSPECTION / TEST REPORT FOR OTDR CONNECTION LOSS & OPTICAL LENGTH (F.O. CABLE) Instru
12 A1 51Q-IN-0040 IN-0040 LOOP TEST SUMMARY SHEET FOR NEW PLANT Instrument Critical Track Track Changed Form Title
13 A1 51Q-IN-0044 IN-0044 LOOP TEST SUMMARY SHEET FOR EXISTING PLANT Instrument Critical Track Track Changed Form
14 A1 51Q-ME-0001 ME-0001 MECHANICAL EQUIPMENT INSTALLATION INSPECTION REPORT Mechanical Critical Track Track C
15 A1 51Q-ME-0002 ME-0002 ROTATING EQUIPMENT INSTALLATION INSPECTION REPORT Mechanical Critical Track Track Cha
16 A1 51Q-ME-0005 ME-0005 RECIPROCATING COMPRESSOR INSPECTION CHECKLIST Mechanical Critical Track Track Changed
17 A1 51Q-ME-0009 ME-0009 TRAY INSTALLATION INSPECTION RECORD Mechanical Critical Track Track 23-Mar-16
18 A1 51Q-ME-0010 ME-0010 DRAW OFF TRAY LEAK TEST REPORT Mechanical Critical Track Track Changed category : A2 ‐> B
19 A1 51Q-ME-0014 ME-0014 SHELL & TUBE EXCHANGER INSPECTION RECORD Mechanical Critical Track Track Changed categ
20 A1 51Q-TA-0020 TA-0020 TANK HYDROSTATIC & PNEUMATIC TEST REPORT Mechanical Critical Track Track Changed catego
21 A1 51Q-TA-0021 TA-0021 TANK SETTLEMENT CHECK REPORT Mechanical Critical Track Track Changed category : A1 ‐> B1 2
22 A1 51Q-PI-0002 PI-0002 PRESSURE TEST REPORT Piping Critical Track Track Changed category : B2 ‐> B1 29-Mar-16
23 A1 51Q-PI-0028 PI-0028 GOLDEN WELD CONTROL RECORD Piping Critical Track Track Added Initial to Cover Area 01 06-Dec
24 A1 51Q-ST-0004 ST-0004 FINAL INSPECTION FOR STEEL STRUCTURE Structural Critical Track Track Changed category : A2 ‐>
25 A1 or A2 51Q-CI-0003 CI-0003 DRAINAGE & WATER LINE PIPE CHECKLIST Civil Critical Track Track Changed category : B2 ‐>
26 A1 or A2 51Q-GE-0001 GE-0001 VISUAL INSPECTION REPORT General Critical Track Track 03-Apr-16
27 A1 or A2 51Q-IN-0011 IN-0011 CHECKLIST FOR FIELD INSTRUMENT INSTALLATION Instrument Critical Track Track Changed
28 B1 51Q-EL-0018 EL-0018 TEST REPORT FOR REFERENCE ELECTRODE POTENTIAL TEST Electrical Critical Track Track 03-Apr-1
29 B1 51Q-EL-0019 EL-0019 TEST REPORT FOR MONITORING TUBE POTENTIAL TEST Electrical Critical Track Track 03-Apr-16
30 B1 51Q-EL-0021 EL-0021 TEST REPORT FOR TRANSFORMER RECTIFIER (UNDER TANK BOTTOM EXTERNAL) Electrical Critical
31 B1 51Q-EL-0022 EL-0022 TEST REPORT FOR OUTPUT CURRENT MEASUREMENT Electrical Critical Track Track 03-Apr-16
32 B1 51Q-EL-0025 EL-0025 TEST REPORT FOR NATURAL POTENTIAL MEASUREMENT Electrical Critical Track Track 03-Apr-16
33 B1 51Q-EL-0026 EL-0026 TEST REPORT FOR INSTANT ON/OFF POTENTIAL MEASUREMENT Electrical Critical Track Track 03-A
34 B1 51Q-EL-0029 EL-0029 TEST REPORT FOR BUS DUCT Electrical Critical Track Track 30-May-16
35 B1 51Q-EL-0038 EL-0038 TEST REPORT FOR ILLUMINATION LEVEL TEST Electrical Critical Track Track 30-May-16
36 B1 51Q-EL-0043 EL-0043 TEST REPORT FOR POWER CAPACITOR BANK Electrical Critical Track Track 30-May-16
37 B1 51Q-EL-0046 EL-0046 TEST REPORT FOR POWER TRANSFORMERS Electrical Critical Track Track Added 28-Apr-16
38 B1 51Q-EL-0047 EL-0047 TEST REPORT FOR NEUTRAL EARTHING RESISTOR Electrical Critical Track Track Added 30-May-16
39 B1 51Q-EL-0050 EL-0050 TEST REPORT FOR UPS Electrical Critical Track Track A1 for Water Tightness Test 30-May-16
40 B1 51Q-EL-0051 EL-0051 TESTE REPORT FOR BATTERY Electrical Critical Track Track Changed category : A2 ‐> A1C hanged F
41 B1 51Q-EL-0058 EL-0058 TEST REPORT FOR HEAT TRACING SYSTEM Electrical Critical Track Track Changed category : A2 ‐>
42 B1 51Q-EL-0063 EL-0063 TEST REPORT FOR MCC (MOTOR CONTROL CENTER) Electrical Critical Track Track Changed catego
43 B1 51Q-EL-0067 EL-0067 TEST REPORT FOR PANELS & DISTRIBUTATION BOARDS Electrical Critical Track Track A1 for Mecha
44 B1 51Q-EL-0071 EL-0071 TEST REPORT FOR HV SWITCHGEAR Electrical Critical Track Track Hold due to Duplicated with 52P
45 B1 51Q-EL-0072 EL-0072 TEST REPORT FOR LV SWITCHGEAR Electrical Critical Track Track Added, For New Plant 01-Jun-16
46 B1 51Q-EL-0076 EL-0076 READY FOR COMMISSIONING (RFC) CERTIFICATE FOR SUBSTATION Electrical Critical Track Track 2
47 B1 51Q-EL-0077 EL-0077 TEST REPORT FOR 33/11KV TRANSFORMER & 11KV HV SWGR Electrical Critical Track Track Change
48 B1 51Q-EL-0078 EL-0078 TEST REPORT FOR 11/6KV TRANSFORMER & 6.6KV HV SWGR Electrical Critical Track Track 05-Jan-
49 B1 51Q-EL-0079 EL-0079 TEST REPORT FOR EMERGENCY DIESEL GENERATOR Electrical Critical Track Track 24-Mar-16
50 B1 51Q-EL-0084 EL-0084 TEST REPORT FOR ENMC SYSTEM Electrical Critical Track Track 21-Aug-16
51 B1 51Q-EL-0085 EL-0085 TEST REPORT FOR VSD Electrical Critical Track Track For installation, ME‐002 will be used. 21-Aug-
52 B1 51Q-EL-0087 EL-0087 TEST REPORT FOR 11/0.4KV TRANSFORMER & 400V LV SWGR Electrical Critical Track Track 05-Jan
53 B1 51Q-HV-0007 HV-0007 HVAC PRE-COMMISSIONING CHECKLIST HVAC Critical Track Track 24-Mar-16
54 B1 51Q-HV-0008 HV-0008 TESTING / ADJUSTING & AIR BALANCING RECORD FOR HVAC HVAC Critical Track Track Includes a
55 B1 51Q-IN-0020 IN-0020 CHECKLIST FOR CCTV SYSTEM Instrument Critical Track Track ADDED 21-Jan-17
56 B1 51Q-IN-0021 IN-0021 CHECKLIST FOR TELEPHONE & DATA NETWORK SYSTEM Instrument Critical Track Track ADDED 19
57 B1 51Q-IN-0022 IN-0022 CHECKLIST FOR PERSONNEL ACCESS CONTROL (PAC) SYSTEM Instrument Critical Track Track ADDE
58 B1 51Q-IN-0023 IN-0023 CHECKLIST FOR PUBLIC ADDRESS (PA) SYSTEM Instrument Critical Track Track ADDED 19-Jan-17
59 B1 51Q-IN-0024 IN-0024 CHECKLIST FOR TELECOMMUNICATION SYSTEM Instrument Critical Track Track ADDED 19-Jan-17
60 B1 51Q-IN-0036 IN-0036 CHECKLIST FOR FIRE & GAS SYSTEM Instrument Critical Track Track Added back from (A2 or B2) fo
61 B1 51Q-ME-0003 ME-0003 MECHANICAL EQUIPMENT ALIGNMENT INSPECTION REPORT Mechanical Critical Track Track Ad
62 B1 51Q-ME-0011 ME-0011 INSPECTION RECORD FOR AIR COOLER Mechanical Critical Track Track 24-Mar-16
63 B1 51Q-ME-0022 ME-0022 MECHANICAL COMPLETION CHECKLIST FOR PACKAGE EQUIPMENT Mechanical Critical Track Tra
64 B1 51Q-ME-0025 ME-0025 MOVABLE FIRE FIGHTING & SAFETY EQUIPMENT CHECKLIST Mechanical Critical Track Track 15-N
65 B1 51Q-PI-0013 PI-0013 PIPING CLEANING INSPECTION CHECKLIST Piping Critical Track Track 29-Mar-16
66 B1 51Q-PI-0017 PI-0017 PIPING RE-IINSTATEMENT CHECKLIST Piping Critical Track Track 29-Mar-16
67 C1 51Q-EL-0041 PC-EL-0041 TEST REPORT FOR MOTOR SOLO RUN Pre-Comm/Elect Critical Track Track IN MCP MOVED FRO
68 C1 51Q-IN-0045 PC-IN-0045 CALIBRATION OF PRESSURE RELIEF VALVE Pre-Comm/Instr Critical Track Track IN MCP MOVED
69 C1 51Q-ME-0015 PC-ME-0015 FINAL CLOSING AUTHORIZATION (BOX-UP) RECORD Pre-Comm/Mech Critical Track Track IN
70 C1 51Q-ME-0023 PC-ME-0023 LOAD TEST REPORT FOR CRANE Pre-Comm/Mech Critical Track Track IN MCP MOVED FROM
71 C1 51Q-ME-0024 PC-ME-0024 PIPING/EQUIPMENT DRYING PRESERVATION CHECKLIST FOR EXISTING PLANT Pre-Comm/Me
72 C1 52P-PC-0001 PC-0001 GROSS LEAK TEST CHECKLIST Pre-Commissioning Critical Track Track 24-Mar-16
73 C1 52P-PC-0002 PC-0002 SYSTEM DRYING CHECKLIST Pre-Commissioning Critical Track Track 24-Mar-16
74 C1 52P-PC-0003 PC-0003 PUMP TEST RUN (CENTRIFUGAL/POSITIVE DISPLACEMENT) CHECKLIST Pre-Commissioning Critical
75 C1 52P-PC-0004 PC-0004 COMPRESSOR TEST RUN (CENTRIFUGAL/RECIPROCATING) CHECKLIST Pre-Commissioning Critical
76 C1 52P-PC-0005 PC-0005 SYSTEM INERTING CHECKLIST Pre-Commissioning Critical Track Track 24-Mar-16
77 C1 52P-PC-0006 PC-0006 FULL (LOOP) FUNCTION TEST SUMMARY SHEET Pre-Commissioning Critical Track Track 24-Aug-16
78 C1 52P-PC-0007 PC-0007 POST PRE-COMMISSIONING RE-INSTATEMENT CHECKLIST Pre-Commissioning Critical Track Track
79 C1 52P-PC-0008 PC-0008 PRE-COMMISSIONING VISUAL INSPECTION - FLANGES / GASKETS & BOLTING Pre-Commissioning C
80 C1 52P-PC-0009 PC-0009 REFRACTORY DRY-OUT CHECKLIST Pre-Commissioning Critical Track Track NEW PRE ‐COMMISSION
81 C1 52P-PC-0010 PC-0010 FIRST FILL CHECKLIST (CATALYST/CHEMICAL/LUBRICANTS/FUEL/ETC.) Pre-Commissioning Critical
82 C1 52P-PC-0011 PC-0011 PRE-COMMISSIONING PIPE CLEANING INSPECTION CHECKLIST Pre-Commissioning Critical Track T
k Track This QVD is to use for final building inspction. 23-Mar-16
CK SHEET Architectural Critical Track Track Changed category : A2 ‐> A1 30-Mar-16
ack A1 for Drainage Pipe Installation ‐ RCP & GRP 29-Mar-16
l Track Track 07-May-16
Changed category : B1 ‐> A1 30-May-16
CABLE Electrical Critical Track Track Changed Form Title 28-Apr-16
orm Title 30-May-16
V CABLE) Electrical Critical Track Track Changed Form Title 03-Apr-16
Track Changed Form Title 23-Mar-16
ment Critical Track Track Added 15-Jan-17
AL LENGTH (F.O. CABLE) Instrument Critical Track Track Added 17-Jan-17
rack Track Changed Form Title 09-Aug-16
cal Track Track Changed Form Title 23-Aug-16
echanical Critical Track Track Changed category : A1 ‐> B1 23-Mar-16
hanical Critical Track Track Changed category : B2 ‐> A1 23-Mar-16
al Critical Track Track Changed category : B2 ‐> B1 23-Mar-16
ck Track 23-Mar-16
ck Changed category : A2 ‐> B1 30-May-16
cal Track Track Changed category : B2 ‐> B1 23-Mar-16
al Track Track Changed category : B2 ‐> B1 23-Mar-16
Changed category : A1 ‐> B1 23-Mar-16
y : B2 ‐> B1 29-Mar-16
nitial to Cover Area 01 06-Dec-16
rack Changed category : A2 ‐> A1C hanged Form Title 21-Nov-16
ack Changed category : B2 ‐> B1 30-May-16
k Track 30-May-16
Track 30-May-16
rack Added 28-Apr-16
rack Track Added 30-May-16
ghtness Test 30-May-16
category : A2 ‐> A1C hanged Form Title 30-May-16
ack Changed category : A2 ‐> B1 Changed Form Title 30-May-16
al Track Track Changed category : A2 ‐> B1 Changed Form Title 30-May-16
tical Track Track A1 for Mechanical devices only like as TG / LG / PG 30-May-16
ld due to Duplicated with 52P ‐PC‐0006 30-May-16
ded, For New Plant 01-Jun-16
Electrical Critical Track Track 24-Mar-16
ical Critical Track Track Changed category : A1 & B1 ‐> B1 05-Jan-17
cal Critical Track Track 05-Jan-17
l Track Track 24-Mar-16
ack Track IN MCP MOVED FROM B1 TO C1 NO CHANGE TO WORK PROCESS // Changed category : A2 ‐> A1 30-May-16
al Track Track IN MCP MOVED FROM B1 TO C1 NO CHANGE TO WORK PROCESS // 09-Aug-16
m/Mech Critical Track Track IN MCP MOVED FROM B1 TO C1 NO CHANGE TO WORK PROCESS // 24-Mar-16
k Track IN MCP MOVED FROM B1 TO C1 NO CHANGE TO WORK PROCESS // 09-Aug-16
XISTING PLANT Pre-Comm/Mech Critical Track Track IN MCP MOVED FROM B1 TO C1 NO CHANGE TO WORK PROCESS // 13-Nov-16
k 24-Mar-16