Amir Arsalan Ali Khan Resume

You might also like

Download as pdf or txt
Download as pdf or txt
You are on page 1of 4

Amir Arsalan Ali Khan

Project Director

MSc (Construction Management), BSc (Civil),


Chartered Engineer Australia; Professional Engineer (PEC),
GRADE A Engineer (Qatar)

Email: abdy08@hotmail.com
Present Location: Islamabad, Pakistan
Contact No: 0322-5126962

Languages
Professional History - English
- Urdu
- Jan 2019 – Till Date
Company – Sukh Chayn Valley Career Highlights
Position –Director Projects
I have more than 13 Years of result-oriented diversified
experience in the construction industry with multi-national
- April 2015 – Dec 2018 project management & consulting organizations. It includes
Company – AECOM Middle East, Qatar cost management, construction supervision, facility
Position –Resident Engineer management, project planning, contract administration as per
FIDIC document and interaction with all stake holders of the
- Aug 2014 – March 2015 project team. I have strong understanding of construction
Company – NESPAK Qatar methodologies, construction sequencing and logistics. A good
Position –Resident Engineer Team Player, highly motivated whilst remaining committed
and focused on achieving results within time and budget.
- Dec 2007 – Jul 2014  Director Projects on following assignments
Company – NESPAK, Pakistan
Position – Assistant Resident Engineer - Construction of 17 Storey Residential
Apartments, Islamabad, Pakistan
- September 2007 – November 2007
Company – Progressive Engineering, Pakistan - Construction of EPS manufacturing facility,
Position – Site Engineer Faisalabad, Pakistan

Academic Details  Senior Civil Engineer at Construction of Doha Oasis,


- Project Management Professional (PMP) Certified Mixed Use Development Project, Doha, Qatar
Training, Chicago Institue (2018)
- MSc Construction/Engineering Management, NUST,  Resident Engineer at MKM Complex, Doha, Qatar
Pakistan (2011)
- BSc Civil Engineering, UET Taxila, Pakistan (2007)  Resident Engineer at Construction of Al-Wajba
Palace, Doha , Qatar
Affiliations
- Chartered Engineer, CPEng, Engineer Australia  Assistant Resident Engineer at Construction of
- Professional Engineer (Civil) GRADE “A”, MMUP Judicial Complex, Islamabad, Pakistan
Qatar
- Member of Institute of Civil Engineers, United  Assistant Resident Engineer at Emigration
Kingdom (ICE) department compound, Islamabad, Pakistan
- Professional Engineer, Pakistan Engineering
Council (Civil)  Senior Engineer at Stock Exchange Complex,
- Member (Expert), Pakistan Engineering Council Islamabad, Pakistan

Country Experience  Site Engineer at Construction of DHA Housing


- Pakistan Society
- Qatar
- Australia Skills/ Core Competencies

Nationality  Competency in construction supervision, commercial works,


- Pakistan / Australia (Residency) Cost Management, facility management, Contract
Administration (Financial and Contractual Matters, Project
Delays, Time Extension Cases, Project Claims)
Résumé
Amir Arsalan Ali Khan

 Strong understanding of International codes,


Construction Methodologies, Construction Contract Value: 10 Million (US Dollar)
Sequencing, Logistics, and Quality Management Covered Area: 100,000 Sq.Ft
Systems.
Duties and Responsibilities
 Compilation of reports and analysis of results (Project
physical and financial reports)  Independently leading 02 projects having team of 50
employees directly reporting to me.
 Excellent technical report writing and analysis(Project  Managing and controlling the execution, technical
progress reports, technical correspondence) and commercial aspects of Project.
 Software Competence  Prequalification of contractors and consultants
- Primavera, MS Project, AutoCAD and MS Office  Contract administration in accordance with FIDIC
and other contract documents including contractual
 Time and construction activity management at site matters, financial issues, time extension cases,
project claims, project delays, change orders,
variation items etc.
Recognitions
 Managing Project budget and oversee updates to the
 Awarded Letter of Appreciation for working diligently Site Budget arising from revised designs and costs.
during the period 2016-2017 while working with
AECOM  Monitoring of project costs during the construction
stages of work.
 Awarded special Honorarium for best efforts in the
successful inauguration of Islamabad Stock Exchange  Awards of Contracts, hiring of resources along with
Towers, Pakistan while working with NESPAK their allocation.
 Awarded Letter of Appreciation for working diligently  Evaluation of change orders/variation items of the
during the period 2011-2012 while working with
project.
NESPAK
 Implementation of Quality Control as per Codes and
 Awarded Honorarium for best performance during the
Standards mentioned in QCS 2014
Period 2008/2009 and 2012/2013 while working with
NESPAK
April 2015 – Dec 2018
AECOM Qatar
Detailed Experience Resident Engineer
Jan 2019 – Till to Date
Sukh Chayn Valley Pvt Ltd Doha Oasis Mixed Use Project which includes
- Standalone 7 Star Hotel High Rise Tower
Director Projects
- Retail Areas/Mall
- Residential Apartments
Project includes
- Theme and Amusement Park
(a) 02 High Rise Residential Apartments Tower
Contract Value: 1 Billion (US Dollar)
Covered Area: 4,914,803 Sq.FT
Contract Value: 100 Million (US Dollar)
Covered Area: 785,000 Sq.FT
Duties and Responsibilities
(b) EPS manufacturing Facility
 Managing and controlling the execution, technical
and commercial aspects of Project.
- Pre Engineering Building
- Office Building (G +3)
 Contract administration in accordance with FIDIC
- Workers Amenity Block (G+3) and other contract documents including contractual
- Electrical & Mechanical Works matters, financial issues, time extension cases,
- External Area Development

2
Résumé Amir Arsalan Ali Khan
Résumé
Amir Arsalan Ali Khan

project claims, project delays, change orders,


variation items etc.  Verification of Contractors interim payment
certificates and ensure the timely payments to the
 Managing Project budget and oversee updates to the contracting parties.
Site Budget arising from revised designs and costs.
 Attend quality review meetings with the Client and the
 Monitoring of project costs during the construction Contractors.
stages of work.
 Coordination with Design Engineers regarding the
 Calculation and estimation of quantities. technical aspects of construction activities.

 Preparation of project financial reports.  Maintain proper coordination at site among all the
stake holders in their respective construction
 Evaluation of change orders/variation items of the activities to avoid hindrance in the critical activities.
project.
 Review quality of all materials on-site and ensure
 Verification of Contractors interim payment compliance to all project specifications, standards
certificates and ensure the timely payments to the and collaborate with department for all material
contracting parties. procurement and maintain quality of materials.

 Liaison with QA/QC Engineers to ensure compliance  Supervise effective implementation of all tests and
with PQP and collaborate with contractor to maintain inspection schedules.
quality of all construction activities at site.
 Ensure strict adherence to all procedures and
 Implementation of Quality Control as per Codes and coordinate with varying teams to perform quality
Standards mentioned in QCS 2014 audits on processes.

 Generate Non-conformance Reports to activities not  Monitoring the progress and effectiveness of the
conforming to project specifications and monitor project quality management system and recommend
detailed action plans for close-out. and implement improvements when required.

 Ensure all resources including materials, tools, plants  Developing appropriate quality and safety
and equipment used, comply with the defined procedures and processes based on accepted best
specifications and approved standards. practice and international standards.
 Preparation of weekly and monthly progress reports.
December 2007 – Jul 2014
NESPAK, Pakistan
August 2014 – March 2015 Assistant Resident Engineer
NESPAK Qatar
Resident Engineer - Stock Exchange Complex, Islamabad
Contract Value: 20 Million (US Dollar)
- MKM Complex, Doha
Contract Value: 10 Million (US Dollar) - Emigration Department Compound, Islamabad
Contract Value: 15 Million (US Dollar)
- Al-Wajba Palace, Doha
- Federal Judicial Complex, Islamabad
Duties and Responsibilities Contract Value: 20 Million (US Dollar)

 Detailed site supervision of all construction activities


to ensure strict adherence to the approved Duties and Responsibilities
construction drawings and technical specifications.
 Leading the technical team of Engineers and
inspectors of varying fields (Civil, Architectural,
 Preparation of Bill of quantities from tender drawings. Mechanical & Electrical) with respect to their work
and provide safe working environments to all the
 Calculating the Engineer’s estimate for the projects. team members.

 Managing Project budget and oversee updates to the


Site Budget arising from revised designs and costs.

3
Résumé Amir Arsalan Ali Khan
Résumé
Amir Arsalan Ali Khan

 Detailed site supervision of all construction activities  Preparation of bill of quantities.


to ensure strict adherence to the approved
construction drawings and technical specifications.  Preparation of payment certificates for sub-
contractors
 Implementation of Quality Control as per Codes and
Standards mentioned in Technical specifications.

 Preparation, monitoring, controlling and analyzing


the project schedules using Primavera, and MS
Project. It also includes Extracting, analyzing and
comparing critical paths on daily basis.

 Calculation and loading resources on Construction


Schedules and generating resource and cost
histograms using Primavera P-6 and MS Project.

 Reviewing & approving Contractor work programs


submissions.

 Generate bar charts for the requirement of materials


and resources deputed for the construction work as
per construction schedule

 Overseeing and providing planning advice with


regard to critical activities.

 Generate Non-conformance Reports for activities not


conforming to project specifications and monitor
detailed action plans for close-out.

 Properly arrange materials documentation


requirements including their periodic inspections,
testing, analysis and results.
 Ensure tools, plants and equipment used are
properly calibrated from approved departments.

 Attend progress review meetings with the Client and


the Contractors.

 Preparation of physical and financial progress reports


on weekly and monthly basis.

September 2007 – November 2007


Progressive Engineering Services, Pakistan
Site Engineer

- Residential society
Duties and Responsibilities

 Preparation of bar bending schedules, daily


manpower and activity report.

 Ensure all resources and plant at project site as per


requirement of construction activities.

 Estimation of quantities

4
Résumé Amir Arsalan Ali Khan

You might also like