towards Garhwa and at Dehri-on-Sone Yard from Km. 3.16 to Km. 5.

38 in connection with Eastern Dedicated Freight Corridor in the state of


in India.
Client : Dedicated Freight Corridor Corporation of India Ltd.
Contractor : M/S ATEPL & MGCPL (JV)
PMC : RODIC Consultant Pvt Ltd.

BBS for 450 KL WATER TANK (700mm dia bored pile 20


Location:
mtr. Depth from cutoff level )

Cutting Total
Dia.of Spacing No. of Wt/m in
S No Bar no. Profile of bar 'mm' length length
bar 'mm' bars 'Kg.'
'mm' 'mm'

11850
150 20 8 11940 95520 2.470
1 Cage 1

10650
150 20 8 10740 85920 2.470
2 Cage 1

6000
3 cage 2 20 8 6000 48000 2.470

6000
4 cage 2 20 8 6000 48000 2.470

8890
3 cage 2 20 8 8890 71120 2.470

10090
3 cage 2 20 8 10090 80720 2.470

1595
7 spiral 8 167 1595 266429 0.395

2393
7 lap 8 23 2393 55039 0.395

Total
Total for 8 mm
10 mm
12 mm
16 mm
20 mm
25 mm
32 mm

Grand total =

Grand total in MT =
ed Freight Corridor in the state of Bihar

BRIDGE NO
524
1WT/450/SK0
01/0
Total wt
Remarks
in 'Kg.'

cutoff
235.934 level of
pile -
+GL-1.5
M
founding
212.222 level-
+GL-
26.5 M

118.560

118.560

175.666

199.378

105.239

1.5 turn
21.740 at end of
spiral

1187.299
126.979
0.000
0.000
0.000
1060.320
0.000
0.000

###

###
basis from Howrah end approach of DFCC Sone bridge to Chirapathu station of IR towards Howrah & to New Sonenagar station towards
and at Dehri-on-Sone Yard from Km. 3.16 to Km. 5.38 in connection with Eastern Dedicated Freight Corridor in the state of Bihar in India.
Client : Dedicated Freight Corridor Corporation of India Ltd.
Contractor : M/S ATEPL & MGCPL (JV)
PMC : RODIC Consultant Pvt Ltd.

BBS for 450 KL WATER TANK (700mm dia bored pile 20


Location:
mtr. Depth from cutoff level )

Cutting Total
Dia.of Spacing No. of Wt/m in
S No Bar no. Profile of bar 'mm' length length
bar 'mm' bars 'Kg.'
'mm' 'mm'

11800
200 20 8 11940 95520 2.470
1 Cage 1

10600
2 Cage 1 200 20 8 10740 85920 2.470

10520
3 cage 2 200 20 8 10660 85280 2.470

11720
4 cage 2 200 20 8 11860 94880 2.470

1859
7 spiral 8 143 1859 265901 0.395

2788
7 lap 8 24 2788 66912 0.395

Total
Total for 8 mm
10 mm
12 mm
16 mm
20 mm
25 mm
32 mm

Grand total =

Grand total in MT =
New Sonenagar station towards Garhwa
r in the state of Bihar in India.

BRIDGE NO 524

1WT/450/SK00
1/0
Total wt in
Remarks
'Kg.'

cutoff
level of
235.934
pile
-104.94
9
founding
212.222 level-
84.949
ground
210.642 level-
106.449

234.354

105.031

1.5 turn
26.430 at end of
spiral

1024.613
131.461
0.000
0.000
0.000
893.152
0.000
0.000

1024.613

1.025 MT
Name of Work: Design and construction of Formation in Embankment/Cutting Including Blanketing, Viaducts, Rail Flyover, Bridges (Major,
Minor & RUBs) Supply and Spreading of ballast and other related infrastructural works for double track electrified railway line on Design Build Lump
Sum basis from Howrah end approach of DFCC Sone bridge to Chirapathu station of IR towards Howrah & to New Sonenagar station towards
Garhwa and at Dehri-on-Sone Yard from Km. 3.16 to Km. 5.38 in connection with Eastern Dedicated Freight Corridor in the state of Bihar in India.
Client : Dedicated Freight Corridor Corporation of India Ltd.
Contractor : M/S ATEPL & MGCPL (JV)
PMC : RODIC Consultant Pvt Ltd.

BBS for TEST PILE A1 & A2 Location: BRIDGE NO 524

Dia.of Cutting Total


Spacing No. of Wt/m in Total wt in
S No Bar no. Profile of bar bar 'mm'
length length Remarks
bars 'Kg.' 'Kg.'
'mm' 'mm' 'mm'

11700 cutoff
level of
1 Cage 1 300 32 13 11904 154752 6.321 978.187
pile
-100.998
9700
founding
2 Cage 1 300 32 13 9904 128752 6.321 813.841 level-
75.948

7696
ground
3 cage 2 32 13 7696 100048 6.321 632.403 level-
102.5

7696

4 cage 2 32 13 7696 100048 6.321 632.403

10000

5 cage 3 32 13 10000 130000 6.321 821.730

12000

6 cage 3 32 13 12000 156000 6.321 986.076

2695
1.5 turn
7 spiral 8 150 C/C 177 2695 477015 0.395 188.421 at end of
spiral

4043

7 lap 8 42 4043 169806 0.395 67.073

Total 5120.134

Contractor's Representative Consultant's Representative


Dia.of Cutting Total
Spacing No. of Wt/m in Total wt in
S No Bar no. Profile of bar bar length length Remarks
'mm' bars 'Kg.' 'Kg.'
'mm' 'mm' 'mm'
Total for 8 mm 255.494
10 mm 0.000
12 mm 0.000
16 mm 0.000
20 mm 0.000
25 mm 0.000
32 mm 4864.640

Grand total = 5120.134

Grand total in MT = 5.120 MT

Contractor's Representative Consultant's Representative


Name of Work: Design and construction of Formation in Embankment/Cutting Including Blanketing, Viaducts, Rail Flyover, Bridges (Major,
Minor & RUBs) Supply and Spreading of ballast and other related infrastructural works for double track electrified railway line on Design Build Lump
Sum basis from Howrah end approach of DFCC Sone bridge to Chirapathu station of IR towards Howrah & to New Sonenagar station towards
Garhwa and at Dehri-on-Sone Yard from Km. 3.16 to Km. 5.38 in connection with Eastern Dedicated Freight Corridor in the state of Bihar in India.
Client : Dedicated Freight Corridor Corporation of India Ltd.
Contractor : M/S ATEPL & MGCPL (JV)
PMC : RODIC Consultant Pvt Ltd.

BBS for TEST PILE P1 Location: BRIDGE NO 524

Dia.of Cutting Total


Spacing No. of Wt/m in Total wt in
S No Bar no. Profile of bar bar 'mm'
length length Remarks
bars 'Kg.' 'Kg.'
'mm' 'mm' 'mm'

11700 cutoff
level of
1 Cage 1 300 25 13 11925 155025 3.858 598.086
pile
-97.520
10200
founding
2 Cage 1 300 25 100 13 10425 135525 3.858 522.855 level-
70.470

7850
ground
3 cage 2 25 13 7850 102050 3.858 393.709
level-92.5

7850

4 cage 2 25 100 13 7850 102050 3.858 393.709

5325

5 cage 3 25 13 5275 68575 3.858 264.562

5325

6 cage 3 25 100 13 5275 68575 3.858 264.562

10500

6 cage 4 25 100 13 10450 135850 3.858 524.109

12000

6 cage 4 25 100 13 11950 155350 3.858 599.340

2709
1.5 turn
7 spiral 8 213 2709 577017 0.395 227.922 at end of
spiral

3968

7 lap 8 54 3968 214272 0.395 84.637

Contractor's Representative Consultant's Representative


Dia.of Cutting Total
Spacing No. of Wt/m in Total wt in
S No Bar no. Profile of bar bar length length Remarks
'mm' bars 'Kg.' 'Kg.'
'mm' 'mm' 'mm'

Total 3873.491
Total for 8 mm 312.559
10 mm 0.000
12 mm 0.000
16 mm 0.000
20 mm 0.000
25 mm 3560.932
32 mm 0.000

Grand total = 3873.491

Grand total in MT = 3.873 MT

Contractor's Representative Consultant's Representative


Name of Work: Design and construction of Formation in Embankment/Cutting Including Blanketing, Viaducts, Rail Flyover, Bridges
Minor & RUBs) Supply and Spreading of ballast and other related infrastructural works for double track electrified railway line on Design Build
Sum basis from Howrah end approach of DFCC Sone bridge to Chirapathu station of IR towards Howrah & to New Sonenagar station t
Garhwa and at Dehri-on-Sone Yard from Km. 3.16 to Km. 5.38 in connection with Eastern Dedicated Freight Corridor in the state of Bihar in In
Client : Dedicated Freight Corridor Corporation of India Ltd.
Contractor : M/S ATEPL & MGCPL (JV)

PMC : RODIC Consultant Pvt Ltd.

BBS for TEST PILE A1 & A2 Location:

Cutting Total
Dia.of Spacing No. of Wt/m in
S No Bar no. Profile of bar 'mm' length length
bar 'mm' bars 'Kg.'
'mm' 'mm'

11700
300 32 13 11904 154752 6.321
1 Cage 1

9700
2 Cage 1 300 32 13 9904 128752 6.321

7662
3 cage 2 32 13 7662 99606 6.321

7662
4 cage 2 32 13 7662 99606 6.321

10000
5 cage 3 32 13 10000 130000 6.321

12000
6 cage 3 32 13 12000 156000 6.321

2695
7 spiral 8 150 C/C 177 2695 477079 0.395

4043
7 lap 8 42 4043 169806 0.395

Total
Total for 8 mm
10 mm
12 mm
16 mm
20 mm
25 mm
32 mm

Grand total =

Grand total in MT =
Viaducts, Rail Flyover, Bridges (Major,
trified railway line on Design Build Lump
h & to New Sonenagar station towards
t Corridor in the state of Bihar in India.

RFO

Total wt in
Remarks
'Kg.'

cutoff
978.187 level of
pile
-104.55
0
founding
813.841 level-
76.357
ground
629.610 level-
102.875

629.610

821.730

986.076

1.5 turn
188.446 at end of
spiral

67.073

5114.573
255.519
0.000
0.000
0.000
0.000
0.000
4859.054

5114.573

5.115 MT
Name of Work: Design and construction of Formation in Embankment/Cutting Including Blanketing, Viaducts, Rail Flyover, Bridges (Majo
& RUBs) Supply and Spreading of ballast and other related infrastructural works for double track electrified railway line on Design Build Lu
basis from Howrah end approach of DFCC Sone bridge to Chirapathu station of IR towards Howrah & to New Sonenagar station towards
and at Dehri-on-Sone Yard from Km. 3.16 to Km. 5.38 in connection with Eastern Dedicated Freight Corridor in the state of Bihar in India.
Client : Dedicated Freight Corridor Corporation of India Ltd.
Contractor : M/S ATEPL & MGCPL (JV)
PMC : RODIC Consultant Pvt Ltd.

BBS for PILE A2 Location:

Cutting Total
Dia.of Spacing No. of Wt/m in
S No Bar no. Profile of bar 'mm' length length
bar 'mm' bars 'Kg.'
'mm' 'mm'

15037
Cage 1 160 16 13 15165 197145 1.580
1
a1b

13537
Cage 1 160 12 13 13673 177749 0.888
2
a1c

11800
cage 2
3 250 25 13 12000 156000 3.858
a1a
13300
cage 2
4 250 25 13 13500 175500 3.858
a1
11800
cage 2
3 25 13 11800 153400 3.858
a4
2720
spiral
7 16 90 c/c 121 2720 329248 1.580
a2
2702
spiral
7 10 150 c/c 93 2702 251366 0.617
a3

Total
Total for 8 mm
10 mm
12 mm
16 mm
20 mm
25 mm
32 mm

Grand total =

Grand total in MT =
ducts, Rail Flyover, Bridges (Major, Minor
d railway line on Design Build Lump Sum
New Sonenagar station towards Garhwa
r in the state of Bihar in India.

BRIDGE NO 524,
DRAWING NO.
1/MJB/524/000
7/0/D

Total wt in
Remarks
'Kg.'
15037
cutoff
311.489 level of
pile
-100.61
0 13537
founding
157.841 level-
75.948

601.848

677.079

591.817

520.212

1.5 turn
155.093 at end of
spiral

3015.379
0.000
155.093
157.841
831.701
0.000
1870.744
0.000

3015.379

3.015 MT

13.562501
Name of Work: Design and construction of Formation in Embankment/Cutting Including Blanketing, Viaducts, Rail Flyover, Bridges (M
Minor & RUBs) Supply and Spreading of ballast and other related infrastructural works for double track electrified railway line on Design
Lump Sum basis from Howrah end approach of DFCC Sone bridge to Chirapathu station of IR towards Howrah & to New Sonenagar s
towards Garhwa and at Dehri-on-Sone Yard from Km. 3.16 to Km. 5.38 in connection with Eastern Dedicated Freight Corridor in the state of
in India.
Client : Dedicated Freight Corridor Corporation of India Ltd.
Contractor : M/S ATEPL & MGCPL (JV)
PMC : RODIC Consultant Pvt Ltd.

BBS for PILE A2 Location:

Cutting Total
Dia.of Spacing No. of Wt/m in
S No Bar no. Profile of bar 'mm'
length length
bar 'mm' bars 'Kg.'
'mm' 'mm'

15825
Cage 1 160 16 13 15953 207389 1.580
1
a1b

14325
Cage 1 160 12 13 14461 187993 0.888
2
a1c

11800
cage 2 250 25 13 12000 156000 3.858
3
a1a

13300
cage 2 250 25 13 13500 175500 3.858
4
a1

11800
cage 2
3 25 13 11800 153400 3.858
a4

2720
spiral 16 90 c/c 121 2720 329248 1.580
7
a2

2702
spiral 10 150 c/c 99 2702 267578 0.617
7
a3

Total
Total for 8 mm
10 mm
12 mm
16 mm
20 mm
25 mm
32 mm

Grand total =

Grand total in MT =
Viaducts, Rail Flyover, Bridges (Major,
electrified railway line on Design Build
Howrah & to New Sonenagar station
ed Freight Corridor in the state of Bihar

BRIDGE NO
524,
DRAWING NO.
1/MJB/524/0
004/0/D

Total wt in
Remarks
'Kg.'

cutoff
level of
327.675
pile
-100.99
8
founding
166.938 level-
75.948

601.848

677.079

591.817

315648 26.304

520.212 46 D
27.43733
1.5 turn
165.096
at end of
spiral
22.29817

3050.665
0.000
165.096
166.938
847.887
0.000
1870.744
0.000

3050.665

3.051 MT

13.562501
Name of Work: Design and construction of Formation in Embankment/Cutting Including Blanketing, Viaducts, Rail Flyover, Bridges (Major,
Minor & RUBs) Supply and Spreading of ballast and other related infrastructural works for double track electrified railway line on Design Build Lump
Sum basis from Howrah end approach of DFCC Sone bridge to Chirapathu station of IR towards Howrah & to New Sonenagar station towards
Garhwa and at Dehri-on-Sone Yard from Km. 3.16 to Km. 5.38 in connection with Eastern Dedicated Freight Corridor in the state of Bihar in India.
Client : Dedicated Freight Corridor Corporation of India Ltd.
Contractor : M/S ATEPL & MGCPL (JV)
PMC : RODIC Consultant Pvt Ltd.
BRIDGE NO 524,
DRAWING NO.
BBS for PILE P1 Location:
1/MJB/524/0003
/0/D
Dia.of Cutting Total
Spacing No. of Wt/m in Total wt in
S No Bar no. Profile of bar bar 'mm'
length length Remarks
bars 'Kg.' 'Kg.'
'mm' 'mm' 'mm'

17425 cutoff
Cage 1 level of
1 160 16 13 17553 228189 1.580 360.539
a1b pile
-97.520
15925
founding
Cage 1
2 160 12 13 16061 208793 0.888 185.408 level-
a1c
70.470

11800
cage 2
3 250 25 13 12000 156000 3.858 601.848
a1a

13300
cage 2
4 250 25 13 13500 175500 3.858 677.079
a1

2720

7 spiral a2 16 90 c/c 121 2720 329248 1.580 520.212 lap 46*D

2702
1.5 turn
7 spiral a3 10 150 c/c 109 2702 294598 0.617 181.767 at end of
spiral

Total 2526.853
Total for 8 mm 0.000
10 mm 181.767
12 mm 185.408
16 mm 880.751
20 mm 0.000
25 mm 1278.927
32 mm 0.000

Grand total = 2526.853

Grand total in MT = 2.527 MT

Contractor's Representative Consultant's Representative


Name of Work: Design and construction of Formation in Embankment/Cutting Including Blanketing, Viaducts, Rail Flyover, Bridges (Major,
Minor & RUBs) Supply and Spreading of ballast and other related infrastructural works for double track electrified railway line on Design Build Lump
Sum basis from Howrah end approach of DFCC Sone bridge to Chirapathu station of IR towards Howrah & to New Sonenagar station towards
Garhwa and at Dehri-on-Sone Yard from Km. 3.16 to Km. 5.38 in connection with Eastern Dedicated Freight Corridor in the state of Bihar in India.
Client : Dedicated Freight Corridor Corporation of India Ltd.
Contractor : M/S ATEPL & MGCPL (JV)
PMC : RODIC Consultant Pvt Ltd.
RFO, DRAWING NO.
BBS for PILE LP1& RP1 (RFO) Location:
1/RFO/G2/0004/0/D
Dia.of Cutting Total
Spacing No. of Wt/m in Total wt in
S No Bar no. Profile of bar bar 'mm'
length length Remarks
bars 'Kg.' 'Kg.'
'mm' 'mm' 'mm'

18068
Cage 1
1 160 16 13 18196 236548 1.580 373.746
a1b

16568
Cage 1
2 160 12 13 16704 217152 0.888 192.831
a1c

11800
cage 2
3 250 25 13 12000 156000 3.858 601.848
a1a

13300
cage 2
4 250 25 13 13500 175500 3.858 677.079
a1

2720

5 spiral a2 16 90 c/c 121 2720 329248 1.580 520.212 lap 46*D

2702
1.5 turn
6 spiral a3 10 150 c/c 115 2702 310810 0.617 191.770 at end of
spiral

Total 2557.486
Total for 8 mm 0.000
10 mm 191.770
12 mm 192.831
16 mm 893.958
20 mm 0.000
25 mm 1278.927
32 mm 0.000

Grand total = 2557.486

Grand total in MT = 2.557 MT

Contractor's Representative Consultant's Representative


Name of Work: Design and construction of Formation in Embankment/Cutting Including Blanketing, Viaducts, Rail Flyover, Bridges (Major,
Minor & RUBs) Supply and Spreading of ballast and other related infrastructural works for double track electrified railway line on Design Build Lump
Sum basis from Howrah end approach of DFCC Sone bridge to Chirapathu station of IR towards Howrah & to New Sonenagar station towards
Garhwa and at Dehri-on-Sone Yard from Km. 3.16 to Km. 5.38 in connection with Eastern Dedicated Freight Corridor in the state of Bihar in India.
Client : Dedicated Freight Corridor Corporation of India Ltd.
Contractor : M/S ATEPL & MGCPL (JV)
PMC : RODIC Consultant Pvt Ltd.
RFO, DRAWING NO.
BBS for PILE LP2& RP2 (RFO) Location:
1/RFO/G2/0003/0/D
Dia.of Cutting Total
Spacing No. of Wt/m in Total wt in
S No Bar no. Profile of bar bar length length Remarks
'mm' bars 'Kg.' 'Kg.'
'mm' 'mm' 'mm'

18568
Cage 1
1 160 16 13 18696 243048 1.580 384.016
a1b

17068
Cage 1
2 160 12 13 17204 223652 0.888 198.603
a1c

11800
cage 2
3 250 25 13 12000 156000 3.858 601.848
a1a

13300
cage 2
4 250 25 13 13500 175500 3.858 677.079
a1

2720

5 spiral a2 16 90 c/c 121 2720 329248 1.580 520.212 lap 46*D

2702
1.5 turn
6 spiral a3 10 150 c/c 118 2702 318916 0.617 196.771 at end of
spiral

Total 2578.529
Total for 8 mm 0.000
10 mm 196.771
12 mm 198.603
16 mm 904.228
20 mm 0.000
25 mm 1278.927
32 mm 0.000

Grand total = 2578.529

Grand total in MT = 2.579 MT