PROJECT KEY PLAN:

PLOT LIMIT
N

NOTES:
1. ALL DIMENSIONS ARE IN MILLIMETERS (MM)
2. ALL WORKS SHALL BE CARRIED OUT IN ACCORDANCE WITH AADC
SPECIFICATIONS
3. ALL REINFORCEMENT SHALL BE OF MIN YEILD STRENGTH FY

CONCRETE & ANCHORAGE COVER TO REINFORCEMENT FACES IN


CONTACT WITH SOIL INCLUDING BLINDING CONCRETE -75MM, ALL
OTHER FACES -40MM
4.

5. ALL EXPOSED EDGE OF CONCRETE WILL HAVE 25MM CHAMFER.


6. ALL STRUCTURAL STEEL SHOULD BE GRADE ASTM A36
CONFORMING TO AISC.
7. BOLTS & NUTS SHOULD CONFORM TO ASTM A307 GRADE C OR
EQUIVALENT.
8. ALL STRUCTURAL STEEL AND GRATING SHALL BE HOT-DIP
GALVANIZED AS PER SPECIFICATION
9. TOP OF GRAVEL SHOULD BE +0.00LVL .
10. GATE LEVEL 0.00 CORRESPONDS TO +243.22 NADD.

ABBREVATIONS: LEGEND:
TOC - TOP OF CONCRETE - RC WALL, COLUMNS &
TOW - TOP OF WALL STIFFENERS
TYP - TYPICAL - BOUNDARY FENCE - PROPOSED,
LVL - LEVEL H=3.0 Meter

SSL - STRUCTURAL SLAB - BOUNDARY FENCE FOR


CAPACITOR BANK & REACTOR
THK - THICKNESS
COS - CENTER OF SLEEVE - INDICATES FRONT DIRECTION
OF PANEL
MN - MANHOLE
uPVC SLEEVES

REFERENCE DRAWINGS:- - GRAVEL

DRAWING NO TITLE
60020-00SIT-AL-ENG-CIV-SPD-0012 OVERALL EQUIPMENT LAYOUT
60020-00SIT-AL-ENG-ARC-SPD-0001 OVERALL SITE PLAN
60020-00SIT-AL-ENG-ARC-SPD-0003 GROUND FLOOR PLAN
60020-00SIT-AL-ENG-ARC-SPD-0004 ROOF PLAN
60020-00SIT-AL-ENG-ARC-SPD-0005 SECTION -A
60020-00SIT-AL-ENG-ARC-SPD-0006 SECTION -B
60020-00SIT-AL-ENG-ARC-SPD-0007 ELEVATION 1 & 2
60020-00SIT-AL-ENG-ARC-SPD-0008 ELEVATION 3 & 4
DRAWING STATUS:
SHOP DRAWING

00 05-05-2020 FOR APPROVAL


REV DATE REVISION DETAILS A BC D
SITE SUPERVISION AL AIN ZOO

A B C D
Approved Approved with Revise and Re- Rejected
Comments Submit

DATE REVIEWED: REVIEWED BY:

CONTRACT No.
DESIGN & BUILD OF TWO PACKAGE UNITS
33/11kV AT AL AIN ZOO
CONTRACT NO:
PD/CA/BPS/HA/R390/P249-2016-60020/19/193

CLIENT:

EMPLOYER:

AUTHORITY:

CONSULTANT:

CONTRACTOR

P.O.Box 52239,Abu Dhabi,U.A.E


Tel: +971 2 650 7044 Fax: +971 2 671 8803 www.engsol.ae
DWG. TITLE:

DRAWN BY: CHECKED BY: APPROVED BY:


SVN EMN JPZ
DATE: SHEET SCALE
05-05-2020 01 OF 01 A1 1:120 A1
DRAWING NO: REV.

S:\02. Sivan\A14861_packageunit\ENGSOL\ENGSOL_ARCHITECTURAL DRAWING (2)\60020-00SIT-AL-ENG-ARC-SPD-0009_EXCAVATION PLAN.dwg EXCAVATION PLAN Plot : May 06, 2020 - 10:04am Ponnu thurai