The VOLVO APQP process is described in detail in the GPI 57 for VOLVO and on the Supplier Portal for Suppliers
PRELIMINARY NOTES :
1/ This APQP excel sheet should be used for any new component purchased for use on serial production - MANDATORY for Key Components
2/ Multiple components can be covered in the same APQP file if the design and processes are very similar. In that case all the part numbers
considered need to be mentioned in the "Co-signed Time plan" sheet
3/ There is a difference made between development suppliers and non-development suppliers.
Secure you are using the right APQP Reviews Status Xcel document.
SUPPLIER RESPONSIBILITY :
The co-signed time plan has to be shared at the Kick Off review and in case of deviations to original targets, it will have to be shared again
with a new commitment . The traceability of the original agreement must be kept inserting a line with the new objectives.
HOW TO PRACTICALLY USE THE FILE
1 - Fill out the top part of the cover sheet: component identification
3 - Fill out the co-signed time plan sheet. The project milestones dates are given by Volvo
The co-signed time plan shall be reviewed and updated at each APQP review and each time there is a change to be agreed on.
4 - Fill out the APQP review sheet, starting with the APQP kick off requirements, the related issues , comments and the status Y/G
1 APQP REVIEWS & MANAGEMENT SUPPORT APQP REVIEWS & MANAGEMENT SUPPORT
1.1 The contact directory is completed. N/A
Supplier personnel identified for all APQP activities.
List of requirement, for Write the issue/comment/ risk Rate Green/yellow Put a Yes in case
each APQP review and for the given requirement or Red of Roadblock
APQP activity
In this column requirements for In this column requirements for Update Comment/issue/risks Rating based on Rating based on Auto-rating of the
APQP kick off review APQP product design review based on the new requirement kick off product design actual status (take
requirement review the worst)
requirement
The prefixes "KO: ", "PD: ", "PR: ", "I: ", and "L: " standing for Kick-off, Product review, Process review, indus review and Launch review can
be used to keep the history of comments, when moving from 1 revew to the next.
Update
Enter the overall status of the APQP (and update at the end of each review)
G Activity on track or completed
? Overall status Y Risk for delay - Activities on critical line must be accomplished in time with OK result
R Roadblock - Project milestones will be missed - Escalation needed
KPI's are automatically calculated and reported on the cover page
? Overall status
Support:
Planning:
Status per category of activity Product design:
Process design:
Product validation:
Process validation:
3/ Overall conclusion of the team
TEAMS INFORMATION
VOLVO SUPPLIER
Team Members Company / Role Tel No. Email Team Members Company / Role Tel No. Email
SQE Engineer
PD Production
Buyer
../
CO-SIGNED TIME PLAN
Review date 2020-07-30 Supplier & component name usk International - Drag link
Project code P6700 Leading part number 23626616
Process
First Off Tool parts (C Industrialization Top Graining* PSW Date Launch
Kick off review B release B prototype Design C release P release Significant Production Run P start SOP
parts) Review (when applicable) (PPAP Approval) Run @ Rate Review
Part description Part number review
Due date Due date Due date QTY Due Date Due date Due date QTY Due Date Due date Due date Date QTY Date Due Date QTY Date QTY Date Due Date
Project date
(given by Volvo)
Agreed at Kick Off
1
updated if necessary
updated if necessary
Project date
(given by Volvo)
Agreed at Kick Off
2
updated if necessary
updated if necessary
Project date
(given by Volvo)
Agreed at Kick Off
3
updated if necessary
updated if necessary
Project date
(given by Volvo)
Agreed at Kick Off
4
updated if necessary
updated if necessary
* Top graining refers to the graining of the mould , mainly for plastic parts (e.g. door panel, dashborad,…)
Comments:
Required Signatures
Signature: Design Engineer Date Signature: Buyer/Purchasing Date Additional Signatures
Name: Title: Date:
Review date 2020-07-30 Supplier & component name Drag link - 44042
Project code P6700 Leading part number 23626616
1 APQP REVIEWS & MANAGEMENT SUPPORT APQP REVIEWS & MANAGEMENT SUPPORT
1.1 The contact directory is completed. N/A
Supplier personnel identified for all APQP activities.
1.2 N/A N/A
2 APQP PLAN & TIMING CHART APQP PLAN & TIMING CHART
2.1 The main Volvo project milestones are communicated to N/A
the supplier (drawing releases/ APQP reviews/ Prototype
builds/tooling release/PPAP/ SOP).
2.3 For all timing issues there is an associated action plan. If N/A
not it is escalated to the appropriate level.
3 CUSTOMER INPUT CUSTOMER INPUT
3.1 The supplier has got all needed technical documentation N/A N/A
from Volvo at the latest issue (e.g. PVR, CAD model,
Technical Requirements, Functional Specifications,
Drawing etc.).
3.2 The Volvo APQP expectations are understood. The N/A N/A N/A N/A
supplier has access to supplier portal and has reviewed the
APQP documentation.
3.3 The forecast of P-builds, ramp-up and serial production N/A N/A
volume is shared.
3.4 All necessary customer input is received by the supplier N/A N/A
(technical, agreements, administrative, supply location,
etc.).
4 BENCHMARK DATA BENCHMARK DATA
4.1 The supplier has used its experience and lessons learned N/A N/A N/A N/A
from previous projects. Evidences are shown.
5 PRODUCT RELIABILITY STUDIES PRODUCT RELIABILITY STUDIES
& QUALITY RELIABILITY GOALS & QUALITY RELIABILITY GOALS
5.1 The supplier has a robust plan to achieve the PPM target N/A
agreement or ZERO defects for VPT.
5.2 The supplier has a robust plan to achieve the Fault N/A
Frequency target agreement.
6 TRAINING TRAINING
6.1 For each APQP activity, the supplier has identified the N/A N/A
trained personnel or the personnel to be trained with the
appropriate deadline.
7.2 APQP planning contains detailed equipment and tooling N/A N/A N/A
activities.
8 TIER 2 MANAGEMENT (tier 2 APQP status) TIER 2 MANAGEMENT (tier 2 APQP status)
8.1 The BOM (Bill Of Material) for subcontracted parts is N/A N/A N/A
completed
8.2 The supplier has complete list of potential tier 2 suppliers N/A N/A N/A
compliant with at least ISO 9001.
Page 7 de 12
APQP reviews sheet
8.3 The supplier has skills to validate the special processes at N/A N/A N/A N/A
supplier Tier 2: Painting, Forging, Casting, Rubber, Surface
treatment, Safety etc.
8.4 The Tier 2 special processes are identified and validation is N/A N/A N/A
planned.
9 DFMEA DFMEA
9.1 The results of VOLVO DFMEA and safety customer effect N/A
have been communicated. Or at least failure modes are
communicated.
10 SPECIAL CHARACTERISTICS SPECIAL CHARACTERISTICS
10.1 The preliminary list of special characteristics is available. It N/A N/A
includes the critical characteristics and the regulatory
requirements (COP).
10.2 Supplier has a traceability process for special characteristic N/A N/A N/A N/A
(according to ISO TS 7.3.2.1).
10.3 N/A N/A N/A
11 DESIGN REVIEW FOR MANUFACTURABILITY & DESIGN REVIEW FOR MANUFACTURABILITY & ASSEMBLY
ASSEMBLY
11.1 The supplier has a process to secure their design in order N/A N/A N/A N/A
to manufacture and assemble easily at his own facilities.
11.2 The results of manufacturing and assembly review have N/A N/A
been taken into account to update the investment and
capacity plan if needed.
11.3 N/A N/A N/A
14.1 The supplier signed the "Volvo CAD data agreement" or N/A N/A
CAD data is acceptable for VOLVO system. Supplier can
access to Edi/web EDI/Waft/Exter.
16.2 The supplier has a traceability system for the components N/A N/A N/A N/A
and materials.
16.3 N/A N/A N/A N/A
Page 8 de 12
APQP reviews sheet
18 DESIGN VERIFICATION PLAN & REPORT DESIGN VERIFICATION PLAN & REPORT
18.1 All Design Verifications in the Volvo TR and supplier- N/A N/A N/A
identified additional verifications are included in the APQP
plan. Lead-time for reviewing and approval (including legal
certification) is taken into account.
18.2 N/A N/A N/A
18.5 Supplier is able to perform all verification or able to N/A N/A N/A
outsource it to certified laboratories.
18.6 The supplier has transmitted their requirements to VOLVO N/A N/A N/A
for testing in the complete engine or vehicle environment.
19 PROTOTYPES PROTOTYPES
19.1 The prototype supply plan has been communicated by N/A N/A N/A
VOLVO PD for all the different releases and software. It is
determined by the supplier if there is a need for a specific
prototype supplier.
19.2 The prototype plan is communicated to Tier 2 suppliers. N/A N/A N/A N/A
19.3 All machines/ technics/ tooling are available to produce the N/A N/A N/A N/A
prototypes B build.
19.4 N/A N/A N/A N/A
Page 9 de 12
APQP reviews sheet
23 PFMEA PFMEA
23.1 The supplier has a standard for process FMEA consistent N/A N/A N/A N/A
with AIAG guidelines or Volvo standard (STD 105-0005) or
equivalent.
23.2 N/A N/A
23.3 The PFMEA is initiated with the similar part PFMEAs, N/A N/A N/A
including warranty, historical campaign and plant problems
information.
23.4 N/A N/A N/A N/A
24 PACKAGING PACKAGING
24.1 The supplier has received VOLVO packaging Standards for N/A N/A N/A
serial production and for aftermarket.
24.2 N/A N/A
24.3 The responsibility split between Supplier and Volvo is N/A N/A N/A N/A
defined (design, test, approval, damages, cleaning, etc.)
and secures that parts will be delivered free from damage,
rust and dirt.
24.4 The supplier knows the potential customer locations, and N/A N/A N/A N/A
possible transportation and storage conditions at each site.
24.5 The supplier has defined packaging for the B parts when N/A N/A N/A
required, including transport, storage conditions and
unpackaging conditions.
24.6 N/A N/A N/A
24.9 An agreement has been made with Volvo Parts for spare N/A
parts packaging (aftermarket demand) , accoring to Volvo
TR (only VPT applicable)
24.10 The supplier has planned actions to develop the N/A N/A N/A N/A
Aftermarket packaging for the Crelease if required
(transport/storage conditions, unpackaging conditions )
(only VPT applicable)
25 PHR PHR
25.1 The supplier is aware of the PHR process (including pre- N/A
PHR) and the need of PHR is confirmed or not.
Page 10 de 12
APQP reviews sheet
29.2 The process capability for the intended serial production N/A N/A
process is forecasted
30 PRODUCTION VALIDATION TESTING PRODUCTION VALIDATION TESTING
30.1 The production validation testing is included in the APQP N/A N/A
planning (validation will be made prior to PPAP).
31.2 The PPAP planned date meets Volvo expectations. N/A N/A
34.2 Volvo got all information needed from the supplier. N/A N/A
34.3 There is no major APQP roadblock that will create N/A N/A
unmanageable risk.
34.4 The APQP roadblocks are communicated to Volvo and N/A N/A
supplier Project Management Teams
34.5 N/A N/A
Page 11 de 12
Review date 2020-07-30 Supplier & component name usk International - Drag link
Project code P6700 Leading part number 23626616
Process Process
Kick-off Indus Launch Kick-off Indus Launch
design design
1 APQP REVIEWS & MANAGEMENT SUPPORT N/A N/A N/A N/A A Support
2 APQP PLAN & TIMING CHART N/A N/A N/A N/A B Planning
3 CUSTOMER INPUT N/A N/A N/A N/A C Product design
4 BENCHMARK DATA N/A N/A N/A N/A D Process design
5 & QUALITY RELIABILITY GOALS N/A N/A N/A N/A E Product validation
6 TRAINING N/A N/A N/A N/A F Process validation
7 INVESTMENT & CAPACITY PLAN N/A N/A N/A N/A
8 TIER 2 MANAGEMENT (tier 2 APQP status) N/A N/A N/A N/A
9 DFMEA N/A N/A N/A N/A
10 SPECIAL CHARACTERISTICS N/A N/A N/A N/A
11 DESIGN REVIEW FOR MANUFACTURABILITY & ASSEMBLY N/A N/A N/A N/A
12 DESIGN REVIEWS N/A N/A N/A N/A
13 RTS N/A N/A N/A N/A
14 ENGINEERING DRAWINGS (including math data) N/A N/A N/A N/A
15 DESIGN/PROCESS CHANGES & TRACEABILITY N/A N/A N/A N/A
16 ENGINEERING & MATERIAL SPECIFICATIONS N/A N/A N/A N/A
17 CONTROL PLAN N/A N/A N/A N/A
18 DESIGN VERIFICATION PLAN & REPORT N/A N/A N/A N/A
19 PROTOTYPES N/A N/A N/A N/A
20 FLOOR PLAN LAYOUT N/A N/A N/A N/A
21 PROCESS FLOW CHART N/A N/A N/A N/A
22 PROCESS INSTRUCTION N/A N/A N/A N/A
23 PFMEA N/A N/A N/A N/A
24 PACKAGING N/A N/A N/A N/A
25 PHR N/A N/A N/A N/A
26 MEASUREMENT SYSTEM ANALYSIS N/A N/A N/A N/A
27 PROCESS AUDIT N/A N/A N/A N/A
28 SIGNIFICANT PRODUCTION RUN N/A N/A N/A N/A
29 PROCESS CAPABILITY N/A N/A N/A N/A
30 PRODUCTION VALIDATION TESTING N/A N/A N/A N/A
31 PRODUCTION PART APPROVAL N/A N/A N/A N/A
32 RUN @ RATE N/A N/A N/A N/A
33 LESSON LEARNED N/A N/A N/A N/A
34 CONCLUSION OF APQP Review N/A N/A N/A N/A