Distribution List

Recipient No. of copies


PVN 2
PVEP 1
MOECO 1
PTTEP 1
Chevron Vietnam 1

Table of Contents

General Well Data Summary 2


Final Rig Positioning Report 4
Daily Drilling Report 7
Bit Record 26
Casing & Cementing Summary 28
Directional Drilling Recap 38
Drilling Fluids Recap and Solid Control report 54
Abandonment Schematic 66
Time vs Depth, and Cost Summaries 68
Non Productive Time Summaries 70

Page 1
General Well Data

Well: B-Kim Su-1X


Well Description: Exploration Well
Well Status: Plugged and Abandoned

Days on Location: 15.67 days Cost: US$ 5,079,507


Date on Location: 21-Jan-2008 Date off Location: 6-Feb-2008
MD: 3,520 m TVD: 2,818.7 m

Final Location:
Latitude Longitude Northing Easting
8 34’ 30.882”N 102 58’ 32.201”E 948405.43 m 277223.51 m

Datum: Indian 1975 Projection: UTM


Ellipsoid: Everest 1830 UTM Zone: 48

Rig: Vicksburg
Drilling Contractor: Atwood
Rig Type: Jack Up
RT-MSL: 34.3 m
Water Depth: 62.6 m

Hole size Hole MD Hole TVD Casing size Casing MD Casing TVD
12” 310 m 310 m 9-5/8” 310 m 310 m
8-1/2” 1228 m 1056.63 m 7” 1225 m
6-1/8” 3520 m 2818.70 m

Evaluation Data Obtained Top Bottom

Mud log: Geoservices


Sample collected 10 m interval 310 m 1500 m
Sample collected 5 m interval 1500 m 3520 m

Electric logs: Halliburton


Run # 1: Quad Combo 1225 m 3520 m
Run # 2: Check Shot Survey (50m interval) 350 m 3520 m
Run # 3: Side Wall Core 1408 m 3521 m
(42 shots: 29 good, 5 misfired, 6 empty & 2 lih)

MWD Surveys: Sperry Sun (HAL) 9-5/8” shoe TD

Page 2
AFE depths vs Actual depths Measured Depth True Vertical Depth
12” AFE 305 m 305 m
12” Actual 310 m 310 m
Reason for difference Drill to casing tally

8-1/2” AFE 1222 m 1056 m


8-1/2” Actual 1228 m 1056.6 m
Reason for difference

6-1/8” AFE 3468 m 2816 m


6-1/8” Actual 3520 m 2818.7 m
Reason for difference

Notes
1 Kim Su-1X is the first exploration well in 2008 campaign.

The well design is a slim hole type, with the first section riser-less drilling 9-
5/8” casing.

2 Drilling rig Vicksburg (Atwood) was towed from Thailand to Vietnam, on-hire
to Chevron Vietnam on 14:00 21-Jan-2008. Towing distance to KS-1X
location is 80 NM (148.2 km)

Page 3
Final Positioning Report

Page 4
Daily Drilling Reports

Page 7
Drilling Morning Report

Well Name : KS-1X


Date: 1/21/2008
Rig : Vicksburg

Total AFE Amount Target Depth (mKB) Target TVD (mKB)


4,852,535.10 3,520.00 2,818.00
Daily Operations
Report Start Date Report End Date
1/21/2008 14:00 1/22/2008 00:00
Daily Cost Total Cum Cost To Date
127,854.73 127,854.73
Cum Time Log Days From Spud (days) Cum Time Log Days (days)
0.42
Ops Supervisors
Wellsite Personnel
Leo Mclean
Randy Ryals
Time Log
Start Time End Time Comment
14:00 00:00 On tow to Vietnam location. Well KS 1X.

Location at 1830 hrs, Latitude 8deg 37' .14"N, Longitude 101deg 51' 02"E , Average speed 3.9 knots Miles traveled = 13,
miles to go = 67, seas .3 meters, winds NE @ 10 knots.ETA to location 1230 hrs on 22 January 2008.

Location at 0000 Latitude 8deg 37' .04"N, Longitude 102deg 11' 50"E , Avg speed 3.6, Miles traveled = 33.7, miles to go =
46.3, seas .3 meters winds NE @ 11 knots.ETA to location 1300 hrs on 22 January 2008.

Perform preventive maintenance on rig.

00:00 00:00
00:00 00:00
Mud Checks
Mud / Brine Type Mud Density (lb/gal) pH Water Phase Chlorides (ppm)

Funnel Viscosity (s/qt) PV Calc (cp) YP Calc (lbf/100ft²) HTHP Filtrate (mL/30min)

Drilling Parameters
Depth Start (mKB) TVD Start (mKB) Depth End (mKB) TVD End (mKB) IADC Drilling Time (hrs) Interval ROP (m/hr)

Survey Data
Date MD (mKB) Incl (°) Azm (°) TVD (mKB) VS (m) NS (m) EW (m) DLS (°/30m)

Page 1/1 Report Printed : 3/20/2008


Drilling Morning Report

Well Name : KS-1X


Date: 1/22/2008
Rig : Vicksburg

Total AFE Amount Target Depth (mKB) Target TVD (mKB)


4,852,535.10 3,520.00 2,818.00
Daily Operations
Report Start Date Report End Date
1/22/2008 00:00 1/23/2008 00:00
Daily Cost Total Cum Cost To Date
247,651.34 375,506.07
Cum Time Log Days From Spud (days) Cum Time Log Days (days)
1.42
Ops Supervisors
Wellsite Personnel
Leo Mclean
Randy Ryals
Time Log
Start Time End Time Comment
00:00 15:30 On tow to Vietnam location. Well KS 1X.

Location at 0000 Latitude 8deg 37' .04"N, Longitude 102deg 11' 50"E , Avg speed 3.6, Miles traveled = 33.7, miles to go =
46.3, seas .3 meters winds NE @ 11 knots.ETA to location 1300 hrs on 22 January 2008.

Location at 0600 hrs, Latitude 8deg 37' .02"N, Longitude 102deg 31' 02"E , Average speed 3.1 knots Miles traveled = 52.7,
miles to go = 27.3, seas .3 meters, winds NE @ 10 knots.ETA to location 1400 HRS on 22 January 2008.

Location at 1200 Latitude 8deg 35' .28"N, Longitude 102deg 49' 40"E , Avg speed .3 knots, Miles traveled = 71.2, miles to go
= 12, seas .3 meters winds ESE @ 11 knots.
Slowing down at 1100 hrs, shorten tow line and prepare to lower legs. Heading changed and speed adjusted for Helicopter
with immigration officials.

15:30 20:30 Commence lowering legs prior to final appproach. Adjust final approach and soft pin Vicksburg at 20:30 hrs.
20:30 23:30 Raise hull to 0 ft draft. Initial penetration port = 63', stbd = 63', bow = 61.5' . Remove seacaps and prepare to start preloading.
Jack hull to 5ft air gap.
23:30 00:00 Laying out 10" flex hoses on deck for preload pumps.
Mud Checks
Mud / Brine Type Mud Density (lb/gal) pH Water Phase Chlorides (ppm)

Funnel Viscosity (s/qt) PV Calc (cp) YP Calc (lbf/100ft²) HTHP Filtrate (mL/30min)

Drilling Parameters
Depth Start (mKB) TVD Start (mKB) Depth End (mKB) TVD End (mKB) IADC Drilling Time (hrs) Interval ROP (m/hr)

Survey Data
Date MD (mKB) Incl (°) Azm (°) TVD (mKB) VS (m) NS (m) EW (m) DLS (°/30m)

Page 1/1 Report Printed : 3/20/2008


Drilling Morning Report

Well Name : KS-1X


Date: 1/23/2008
Rig : Vicksburg

Total AFE Amount Target Depth (mKB) Target TVD (mKB)


4,852,535.10 3,520.00 2,818.00
Daily Operations
Report Start Date Report End Date
1/23/2008 00:00 1/24/2008 00:00
Daily Cost Total Cum Cost To Date
247,651.34 623,157.41
Cum Time Log Days From Spud (days) Cum Time Log Days (days)
2.42
Ops Supervisors
Wellsite Personnel
Leo Mclean
Randy Ryals
Time Log
Start Time End Time Comment
00:00 03:30 Attempted to install 10" preloading pump in port leg well, having difficulty in trying to connect the 10 " hoses to the pump,
discharge hoses were not adequate, having to reach between handrails to connect the hose with wave action pushing the
pump back and forth it was not safe to continue, SWA was called for a time out decision was made to continue this
preloading operation with the rigs deepwell pump.

03:30 05:00 Held jsa and start preloading, Had 24% preload on board rig was settling and wave action hitting bottom of hull, dump cycle #
1, Raise hull to 5' air gap. Penetration Bow = 68', stbd = 67.5', port 67.5'.
05:00 08:00 Start taking on preload. Had 49% preload on board rig settling and wave action hitting bottom of hull, dump cycle # 2, Raise
hull to 5' air gap. Penetration Bow =72', stbd =71', port 71.5'.
08:00 10:00 Crew change helicopter arrived 0840 hrs made crew change helicopter departed at 0900 hrs, offloaded comms equipment
from heritage service.
10:00 14:00 Start taking on preload, Had 74% preload on board rig settling and wave action hitting bottom of hull, dump cycle # 3, Raise
hull to 5' air gap. Penetration Bow =76', stbd =71', port 75.5'.100% on board at 1830 hrs.
14:00 18:30 Start taking on preload # 4, Had 100% preload on board. Penetration Bow =77', stbd =71', port 77'.100% on board at 1830
hrs.
18:30 00:00 Holding 100% preload.
Mud Checks
Mud / Brine Type Mud Density (lb/gal) pH Water Phase Chlorides (ppm)

Funnel Viscosity (s/qt) PV Calc (cp) YP Calc (lbf/100ft²) HTHP Filtrate (mL/30min)

Drilling Parameters
Depth Start (mKB) TVD Start (mKB) Depth End (mKB) TVD End (mKB) IADC Drilling Time (hrs) Interval ROP (m/hr)

Survey Data
Date MD (mKB) Incl (°) Azm (°) TVD (mKB) VS (m) NS (m) EW (m) DLS (°/30m)

Page 1/1 Report Printed : 3/20/2008


Drilling Morning Report

Well Name : KS-1X


Date: 1/24/2008
Rig : Vicksburg
Depth End (mKB): 623.00 TVD End (mKB): 595.68

Total AFE Amount Target Depth (mKB) Target TVD (mKB)


4,852,535.10 3,520.00 2,818.00
Daily Operations
Report Start Date Report End Date
1/24/2008 00:00 1/25/2008 00:00
Daily Cost Total Cum Cost To Date
268,388.91 891,546.33
Cum Time Log Days From Spud (days) Cum Time Log Days (days)
0.04 3.42
Ops Supervisors
Wellsite Personnel
Randy Ryals
Time Log
Start Time End Time Comment
00:00 02:30 Holding 100% preload on board,Tested choke manifold and standpipe with B.J. 250/5000 psi while holding preload. Final
penetration Bow = 77', Port = 77', Stbd 71'.
02:30 04:00 Dump preload, release dea chancellor @ 0320 hrs, installed leg loops & mooring lines.,Installed communications dish on top
of control tower.
04:00 05:00 Held pjsm, Jackup to 47' air gap, close motor covers & secure leg walkways.
05:00 06:00 Held pjsm, skid cantilever out lowering tension deck simultaneously.
06:00 09:30 Installed handrails, icon tensioner system, service lines, lower casing valves & clamp to tensioner deck, untie deckload and
rearrange decks, install cuttings dryer.
09:30 11:00 Offload heritage service, prepare rig floor & pipe rack for picking up 5" drill pipe, installed mouse hole.
11:00 13:00 Held pjsm, pickup 5" drill pipe from rack and stand in derrick {36 jts}, Off loading and clearing main deck.
13:00 13:30 Held abandon rig drill.
13:30 17:30 Held pjsm, pickup 5" drill pipe from rack and stand in derrick, Total of 144 jt 5" & 15 jts 5" HWDP, Deck crews off loading
supply boats and clearing main deck.
17:30 18:00 Makeup baker 9 5/8" casing spear & torque connections.
18:00 19:00 Makeup KOP 9" wellhead & running tool to 5" drill pipe, stand same in derrick.
19:00 19:30 Service & inspect TDS, crown and rig floor equipment.
19:30 21:00 Held jsa, Rig up B.J.T. casing handling equipment while strapping and drifting 9 5/8" casing on pipe rack.
21:00 22:30 Held jsa, pickup and M/up 12" BBL, Drill shoe TFA 0.75 = 3x18 jets, S/N 16687003-1 & float collar, ,run in hole with 9 5/8",
N80, 40# casing to 96 meters {Mud line} makeup casing spear to TDS, Held riserless drilling meeting.
22:30 23:00 Picked up and M/up joint of casing, Damaged packer element to spear while stabbing into string, L/out jt, change out element
on casing spear.
23:00 00:00 Wash to to firm formation @ 99 meters, drill with 9 5/8" casing to 123 meters with 9.2 ppg wbm.
Mud Checks
Mud / Brine Type Mud Density (lb/gal) pH Water Phase Chlorides (ppm)

Funnel Viscosity (s/qt) PV Calc (cp) YP Calc (lbf/100ft²) HTHP Filtrate (mL/30min)

Drilling Parameters
Depth Start (mKB) TVD Start (mKB) Depth End (mKB) TVD End (mKB) IADC Drilling Time (hrs) Interval ROP (m/hr)
99.00 99.00 305.00 305.00 1.00 206.0
Survey Data
Date MD (mKB) Incl (°) Azm (°) TVD (mKB) VS (m) NS (m) EW (m) DLS (°/30m)

Page 1/1 Report Printed : 3/20/2008


Drilling Morning Report

Well Name : KS-1X


Date: 1/25/2008
Rig : Vicksburg
Depth End (mKB): 623.00 TVD End (mKB): 595.68

Total AFE Amount Target Depth (mKB) Target TVD (mKB)


4,852,535.10 3,520.00 2,818.00
Daily Operations
Report Start Date Report End Date
1/25/2008 00:00 1/26/2008 00:00
Daily Cost Total Cum Cost To Date
352,409.12 1,243,955.45
Cum Time Log Days From Spud (days) Cum Time Log Days (days)
1.04 4.42
Ops Supervisors
Wellsite Personnel
Darren Geitz
Randy Ryals
Time Log
Start Time End Time Comment
00:00 03:30 Drill with 9 5/8" casing from 123m to 305m, circulate 3 b/ups.
03:30 05:00 Rig up cement manifold and cement 9 5/8" casing, cement in place at 0420 hrs, floats holding, R/down cement manifold,
Landing jts & running tool.
05:00 09:00 Held pjsm, Installed wellhead adapter spool & casing valves. N/up 13 5/8" Bop's, bell nipple, flowline, pollution pans and
witches hat. Fill Bop stack with seawater, test bop connection to 250/5000 psi, M/U test asssy. Test annular 250/3500 psi.
09:00 09:30 L/D test assy. Install wear bushing.
09:30 11:00 Held pjsm, P/up 8 1/2" motor assy, Bit, scribe same.
11:00 11:30 Tes 9 5/8" Casing to 800 psi.(ok)
11:30 12:00 Clean and clear rig floor for safety.
12:00 12:30 Service TDS.
12:30 14:00 M/up 8 1/2" bit, Installed MWD probe, run in hole to 260m. Note: Off loaded geo services unit from M/V Highland Legend and
rig up same.
14:00 15:00 Wash down to top of cement at 276m. Drill cement F/C, F/S @ 310m, drill 1.5m new hole from 310m to 311.5m, circulate
B/up sample, 60% clay stone, 30% cement, 10% sand. Perform LOT @ 310m using 8.6 ppg sea water to 230 psi. {EQV mud
weight 12.9 ppg}.

15:00 22:30 Waiting on geo services to connect electrical cables and equipment.
22:30 00:00 Drill Slide & survey from 311.5m {MD} to 623m {MD}, 595.6 {TVD}.
Mud Checks
Mud / Brine Type Mud Density (lb/gal) pH Water Phase Chlorides (ppm)
Sea Water 8.60
Funnel Viscosity (s/qt) PV Calc (cp) YP Calc (lbf/100ft²) HTHP Filtrate (mL/30min)

Drilling Parameters
Depth Start (mKB) TVD Start (mKB) Depth End (mKB) TVD End (mKB) IADC Drilling Time (hrs) Interval ROP (m/hr)
305.00 305.00 623.00 595.68 1.50 212.0
Survey Data
Date MD (mKB) Incl (°) Azm (°) TVD (mKB) VS (m) NS (m) EW (m) DLS (°/30m)
1/25/2008 316.00 0.50 223.80 316.00 1.14 -1.00 -0.95 0.05
1/25/2008 345.00 0.50 239.80 344.99 1.37 -1.15 -1.15 0.14
1/25/2008 374.00 4.50 263.90 373.96 2.62 -1.33 -2.39 4.19
1/25/2008 403.00 10.10 263.10 402.72 6.28 -1.76 -6.05 5.79
1/25/2008 432.00 14.00 264.10 431.07 12.31 -2.43 -12.07 4.04
1/25/2008 461.00 18.20 263.80 458.93 20.31 -3.28 -20.06 4.35
1/25/2008 490.00 22.80 260.90 486.08 30.43 -4.66 -30.12 4.87
1/25/2008 519.00 29.30 259.50 512.12 43.15 -6.84 -42.66 6.75
1/25/2008 548.00 35.30 259.00 536.63 58.63 -9.74 -57.87 6.21
1/25/2008 606.00 39.90 258.80 582.57 94.01 -16.55 -92.59 2.38
Casing
Casing Description OD (in) Set Depth (mKB) Run Date
Surface 9 5/8 310.27 1/25/2008

Page 1/1 Report Printed : 3/20/2008


Drilling Morning Report

Well Name : KS-1X


Date: 1/26/2008
Rig : Vicksburg
Depth End (mKB): 1,228.00 TVD End (mKB): 1,058.83

Total AFE Amount Target Depth (mKB) Target TVD (mKB)


4,852,535.10 3,520.00 2,818.00
Daily Operations
Report Start Date Report End Date
1/26/2008 00:00 1/27/2008 00:00
Daily Cost Total Cum Cost To Date
261,416.42 1,505,371.87
Cum Time Log Days From Spud (days) Cum Time Log Days (days)
2.04 5.42
Ops Supervisors
Wellsite Personnel
Darren Geitz
Randy Ryals
Time Log
Start Time End Time Comment
00:00 01:00 Drill & Slide from 623m to 767m.
01:00 08:00 # 2 Mud pump leaking between suction and discharge module, Swapped over to # 3 mud pump drilled 60' and found washout
under seat on the discharge module on # 3 pump.(Seats changed out every 500 hrs on maintenance schedule) 400 hrs on
seat. 2 mud pumps down.
Changed out suction module on mud pump # 2.

08:00 12:00 Drill Slide & survey from 623m {MD} to 1228m {MD}, 1059m {TVD}. Changed over to 9.2 ppg WBM at 855m MD.
12:00 14:00 Perform swab test, drop carbide, pump 50 bbl weighted sweep, circulate 4.5 B/up, Avg hole size 10.6", swab gas 20/17 units.
14:00 15:00 Flow check, well static, pull out of hole to 1010m MD, continuous tight hole, 30k over, Rih to 1058m.
15:00 17:30 Backream from 1058m to casing shoe @ 310m, Circulate B/up.
17:30 18:00 Flow check, well static, pull out of hole to BHA.
18:00 19:00 Remove MWD probe & bit, std 8 1/2" BHA in derrick.
19:00 23:00 Retrieve wear bushing. Offline flush wellhead. R/up 7" casing equipment, p/up 7" shoe track, check floats and rih with 7" 23#,
N-80 BTC casing, fill each jt with 9.2 ppg wbm to 769m unable to pass this spot. 62 jts ran.
23:00 00:00 M/up 7" drive sub to TDS wash and ream to 770m. Formation sample was Claystone-98%, Coal-2%.
Mud Checks
Mud / Brine Type Mud Density (lb/gal) pH Water Phase Chlorides (ppm)
Water (Other) 9.20
Funnel Viscosity (s/qt) PV Calc (cp) YP Calc (lbf/100ft²) HTHP Filtrate (mL/30min)
46 12.0 18.000
Drilling Parameters
Depth Start (mKB) TVD Start (mKB) Depth End (mKB) TVD End (mKB) IADC Drilling Time (hrs) Interval ROP (m/hr)
623.00 595.68 1,228.00 1,058.83 5.00 121.0
Survey Data
Date MD (mKB) Incl (°) Azm (°) TVD (mKB) VS (m) NS (m) EW (m) DLS (°/30m)
1/26/2008 664.00 40.40 258.80 626.90 131.40 -23.81 -129.28 0.26
1/26/2008 693.00 40.40 258.80 648.98 150.20 -27.46 -147.71 0.00
1/26/2008 722.00 40.50 258.80 671.05 169.01 -31.12 -166.17 0.10
1/26/2008 751.00 37.90 259.70 693.52 187.33 -34.54 -184.17 2.75
1/26/2008 780.00 37.40 259.40 716.48 205.04 -37.75 -201.59 0.55
1/26/2008 838.00 41.30 260.60 761.33 241.78 -44.12 -237.81 2.06
1/26/2008 925.00 40.90 260.20 826.89 298.92 -53.66 -294.20 0.17
1/26/2008 955.00 40.80 259.90 849.58 318.53 -57.05 -313.52 0.22
1/26/2008 1,013.00 41.70 259.40 893.19 356.76 -63.92 -351.14 0.50
1/26/2008 1,041.00 41.80 259.00 914.08 375.40 -67.42 -369.46 0.30
1/26/2008 1,070.00 41.90 259.00 935.68 394.74 -71.11 -388.45 0.10
1/26/2008 1,099.00 39.50 257.40 957.66 413.65 -74.97 -406.96 2.71
1/26/2008 1,128.00 39.00 257.40 980.12 432.00 -78.97 -424.87 0.52
1/26/2008 1,158.00 38.00 259.70 1,003.60 450.67 -82.68 -443.17 1.75
1/26/2008 1,187.00 37.90 259.40 1,026.47 468.50 -85.92 -460.70 0.22
1/26/2008 1,212.00 37.70 259.70 1,046.22 483.82 -88.69 -475.77 0.33
Casing
Casing Description OD (in) Set Depth (mKB) Run Date
Surface 9 5/8 310.27 1/25/2008

Page 1/1 Report Printed : 3/20/2008


Drilling Morning Report

Well Name : KS-1X


Date: 1/27/2008
Rig : Vicksburg
Depth End (mKB): 1,228.00 TVD End (mKB): 1,058.83

Total AFE Amount Target Depth (mKB) Target TVD (mKB)


4,852,535.10 3,520.00 2,818.00
Daily Operations
Report Start Date Report End Date
1/27/2008 00:00 1/28/2008 00:00
Daily Cost Total Cum Cost To Date
326,042.92 1,831,414.79
Cum Time Log Days From Spud (days) Cum Time Log Days (days)
3.04 6.42
Ops Supervisors
Wellsite Personnel
Darren Geitz
Randy Ryals
Time Log
Start Time End Time Comment
00:00 01:00 Wash and ream 7" casing to 772m.could not get passed.
01:00 06:00 L/down drive sub & pull out of hole with 7" casing 62 jts, F/C, F/S, R/down 7" handling tools.
06:00 07:00 Run in hole and set wear bushing, M/up 8 1/2" bha, installed MWD probe.
07:00 09:00 Run in hole to 734m & take check shot survey @ 734m & 744m, rih to 768m.
09:00 12:00 Orientate drill pipe at different positions and work down to 776m [No obstructions} backream and ream from {776m to 766m},
{776m to 749m}, rih next two stds and backream and ream down both stds, {776m to 749m}. Rih to 1029m. Ream from
1029m to 1058m. Rih to bottom @ 1228m.

12:00 13:00 Circulate 3 B/up's whilst working pipe until clean at shale shakers.
13:00 14:30 Check flow, well static, pull out of hole to bha @ 159m.
14:30 15:00 Pull out of hole with bha, break bit, stand bha in derrick.
15:00 18:00 Retrieve wear bushing, ( Flush wellhead offline) R/up B.J.T. to run 7" casing, M/up shoe track, check floats (ok) run in hole
with 7" 23# BTC casing to 772m.
18:00 20:30 Continue to run in hole with 7" casing fill each jt with 9.2 ppg mud to 1208m, M/up 7" hanger and running tool, land at WH, 7"
shoe @ 1225.5m, 100 jts in hole, test hanger seals to 5000 psi (ok) pull test 10k over.
20:30 21:30 R/up B.J cement head and surface equipment, circulate 1 casing volume @ 5 bpm 500 psi. no mud losses.
21:30 22:00 While attempting to pressure test bj lines, found washed rubber seal on standpipe # 10 valve, changed out seal.
22:00 23:30 B.J tested surface lines to 3500 psi, mixed and pumped 95 bbl cement slurry @ 15.9 ppg, drop top plug and displace with
157 bbls sea water, bumped plug to 2500 psi, bled back 1.5 bbl, floats holding, r/down cement head.retrieve landing string l/o
same, r/down B.J.T.

23:30 00:00 Set wear bushing, rig up to l/o 5" drill pipe from derrick.
Mud Checks
Mud / Brine Type Mud Density (lb/gal) pH Water Phase Chlorides (ppm)
WBM (Other) 9.20
Funnel Viscosity (s/qt) PV Calc (cp) YP Calc (lbf/100ft²) HTHP Filtrate (mL/30min)
46 12.0 18.000
Drilling Parameters
Depth Start (mKB) TVD Start (mKB) Depth End (mKB) TVD End (mKB) IADC Drilling Time (hrs) Interval ROP (m/hr)
1,228.00 1,058.83 1,228.00 1,058.83
Survey Data
Date MD (mKB) Incl (°) Azm (°) TVD (mKB) VS (m) NS (m) EW (m) DLS (°/30m)

Casing
Casing Description OD (in) Set Depth (mKB) Run Date
Surface 9 5/8 310.27 1/25/2008
Intermediate 7 1,225.04 1/27/2008

Page 1/1 Report Printed : 3/20/2008


Drilling Morning Report

Well Name : KS-1X


Date: 1/28/2008
Rig : Vicksburg
Depth End (mKB): 1,228.00 TVD End (mKB): 1,058.83

Total AFE Amount Target Depth (mKB) Target TVD (mKB)


4,852,535.10 3,520.00 2,818.00
Daily Operations
Report Start Date Report End Date
1/28/2008 00:00 1/29/2008 00:00
Daily Cost Total Cum Cost To Date
442,427.42 2,273,842.21
Cum Time Log Days From Spud (days) Cum Time Log Days (days)
4.04 7.42
Ops Supervisors
Wellsite Personnel
Darren Geitz
Randy Ryals
Time Log
Start Time End Time Comment
00:00 05:00 Held jsa, l/o 114 jts 5" drill pipe + 15 jts HWDP from derrick.
05:00 06:00 Changed out 4 1/2" saver sub to XT 39 on tds while moving 4" handling tools to rig floor. Change out element and bull nose
on B.O.T casing spear to accomadate 4" drill string.
06:00 15:00 Held jsa, pickup 255 jts 4" drill pipe and stand in derrick.
15:00 16:30 Held jsa, slip and cut 119' drill line
16:30 17:00 Service tds, crown and rig floor equipment.
17:00 19:30 Held jsa, M/up 6 1/8" AGS assy, installed MWD probe, shallow test ags with 300 gpm 1780 psi F/G, 1280 psi U/G, Continue
to tih picking up 4" HWDP to 243m.
19:30 23:00 Pickup and rih with 4" drill pipe to 1084m.
23:00 23:30 M/up tds and wash to T.O.C. @ 1162m.
23:30 00:00 Test 7" casing to 5000 psi with B.J for 5 min.(ok).
Mud Checks
Mud / Brine Type Mud Density (lb/gal) pH Water Phase Chlorides (ppm)
SBM (Other) 9.20 161,000
Funnel Viscosity (s/qt) PV Calc (cp) YP Calc (lbf/100ft²) HTHP Filtrate (mL/30min)
48 14.0 10.000 3.0
Drilling Parameters
Depth Start (mKB) TVD Start (mKB) Depth End (mKB) TVD End (mKB) IADC Drilling Time (hrs) Interval ROP (m/hr)
1,228.00 1,058.83 1,228.00 1,058.83
Survey Data
Date MD (mKB) Incl (°) Azm (°) TVD (mKB) VS (m) NS (m) EW (m) DLS (°/30m)

Casing
Casing Description OD (in) Set Depth (mKB) Run Date
Surface 9 5/8 310.27 1/25/2008
Intermediate 7 1,225.04 1/27/2008

Page 1/1 Report Printed : 3/20/2008


Drilling Morning Report

Well Name : KS-1X


Date: 1/29/2008
Rig : Vicksburg
Depth End (mKB): 2,125.00 TVD End (mKB): 1,757.46

Total AFE Amount Target Depth (mKB) Target TVD (mKB)


4,852,535.10 3,520.00 2,818.00
Daily Operations
Report Start Date Report End Date
1/29/2008 00:00 1/30/2008 00:00
Daily Cost Total Cum Cost To Date
285,841.42 2,559,683.63
Cum Time Log Days From Spud (days) Cum Time Log Days (days)
5.04 8.42
Ops Supervisors
Wellsite Personnel
Darren Geitz
Randy Ryals
Time Log
Start Time End Time Comment
00:00 02:00 Drilled out cement and shoe while displacing to SBM. Cleaned out rat hole. Drilled 3m of new formation from 1228m MD to
1231m MD, 1059m TVD. Circulated bottom's up with 9.2 ppg SBM. Sample was 85% clay, 15% cmt. Performed FIT at
1057m TVD to 1230 psi surface casing pressure (16.02 ppg EMW).

02:00 04:30 Drilled 6-1/8" hole from 1231m MD to 1342m, 1150m TVD
04:30 05:00 Shakers started blinding up at 1320m, Stopped drilling and clean shaker screens. Changed shaker screens to 2 x180, and 2
x 80 on all 4 shakers.
05:00 13:30 Drill 6-1/8" hole from 1320m to 1883m MD/ 1568m TVD. Whilst drilling changed the shaker screens back to 2 x 200, and 2 x
180 on all 4 shakers at 11:00 a.m. Shakers blinding. Formation Claystone 85%, Silkstone 15%.
13:30 14:00 Change shaker screens back to 2 x 180, and 2 x 140 on all 4 shakers.
14:00 16:30 Drill 6-1/8" hole from 1883m to 1987m MD/ 1650m TVD. Lost 2200 psi pump pressure on Mud pump #1. Change to pump #
2, same problem.
16:30 21:00 Troubleshoot. Pressure test surface lines to 3600 psi (OK). Start POOH wet, whilst troubleshooting. Check Mud pump #1
fluid end, (OK). Check flow rate of both pumps. 1/3 flow rate on what it is supposed to be was found. Found the suction line to
the mud pumps had barite settlement inside of it. Clean out the suction line. Whilst cleaning out the plugged suction line, we
did a wiper trip to 1344m. RIH to 1982m.

21:00 21:30 Wash from 1982m to bottom @ 1987m, Regain full pump pressure, no fill on bottom.
21:30 00:00 Drilled 6-1/8" hole from 1987m MD to 2125m MD, 1758m TVD.
Mud Checks
Mud / Brine Type Mud Density (lb/gal) pH Water Phase Chlorides (ppm)
SBM (Other) 9.20 168,000
Funnel Viscosity (s/qt) PV Calc (cp) YP Calc (lbf/100ft²) HTHP Filtrate (mL/30min)
57 12.0 17.000 3.0
Drilling Parameters
Depth Start (mKB) TVD Start (mKB) Depth End (mKB) TVD End (mKB) IADC Drilling Time (hrs) Interval ROP (m/hr)
1,228.00 1,058.83 2,125.00 1,757.46 16.00 56.1
Survey Data
Date MD (mKB) Incl (°) Azm (°) TVD (mKB) VS (m) NS (m) EW (m) DLS (°/30m)
1/29/2008 1,245.00 38.30 260.60 1,072.23 504.12 -92.17 -495.79 0.74
1/29/2008 1,274.00 38.30 260.60 1,094.98 522.07 -95.10 -513.52 0.00
1/29/2008 1,303.00 38.10 260.60 1,117.77 539.99 -98.03 -531.21 0.21
1/29/2008 1,332.00 37.80 260.40 1,140.64 557.81 -100.98 -548.80 0.34
1/29/2008 1,361.00 38.40 260.40 1,163.46 575.68 -103.96 -566.45 0.62
1/29/2008 1,390.00 39.00 260.20 1,186.10 593.80 -107.02 -584.32 0.63
1/29/2008 1,419.00 38.80 260.10 1,208.66 612.00 -110.13 -602.26 0.22
1/29/2008 1,448.00 38.30 259.90 1,231.34 630.06 -113.27 -620.06 0.53
1/29/2008 1,477.00 38.20 259.70 1,254.12 648.01 -116.45 -637.73 0.16
1/29/2008 1,506.00 38.90 259.50 1,276.80 666.07 -119.71 -655.51 0.74
1/29/2008 1,536.00 39.10 259.50 1,300.11 684.94 -123.15 -674.07 0.20
1/29/2008 1,564.00 39.20 259.40 1,321.83 702.62 -126.39 -691.45 0.13
1/29/2008 1,593.00 40.00 259.40 1,344.17 721.10 -129.79 -709.62 0.83
1/29/2008 1,622.00 40.40 259.20 1,366.32 739.81 -133.27 -728.01 0.43
1/29/2008 1,651.00 40.20 259.20 1,388.44 758.56 -136.78 -746.44 0.21
1/29/2008 1,680.00 40.40 258.80 1,410.56 777.32 -140.36 -764.85 0.34
1/29/2008 1,709.00 39.50 258.60 1,432.79 795.94 -144.01 -783.11 0.94
1/29/2008 1,738.00 39.20 258.30 1,455.21 814.32 -147.69 -801.12 0.37
1/29/2008 1,767.00 39.00 258.30 1,477.72 832.61 -151.40 -819.03 0.21

Page 1/2 Report Printed : 3/20/2008


Drilling Morning Report

Well Name : KS-1X


Date: 1/29/2008
Rig : Vicksburg

Survey Data
Date MD (mKB) Incl (°) Azm (°) TVD (mKB) VS (m) NS (m) EW (m) DLS (°/30m)
1/29/2008 1,796.00 38.90 258.10 1,500.27 850.84 -155.13 -836.88 0.17
1/29/2008 1,825.00 38.90 258.10 1,522.84 869.05 -158.88 -854.70 0.00
1/29/2008 1,854.00 38.90 257.90 1,545.41 887.27 -162.67 -872.51 0.13
1/29/2008 1,883.00 38.70 257.90 1,568.01 905.44 -166.48 -890.28 0.21
1/29/2008 1,912.00 38.70 257.80 1,590.64 923.57 -170.29 -908.00 0.06
1/29/2008 1,970.00 38.30 257.80 1,636.03 959.67 -177.92 -943.30 0.21
1/29/2008 1,999.00 38.10 257.80 1,658.82 977.61 -181.71 -960.82 0.21
1/29/2008 2,028.00 37.70 257.20 1,681.71 995.42 -185.57 -978.22 0.56
1/29/2008 2,057.00 38.50 256.90 1,704.53 1,013.31 -189.58 -995.65 0.85
1/29/2008 2,086.00 39.00 256.50 1,727.14 1,031.46 -193.75 -1,013.32 0.58
1/29/2008 2,115.00 39.00 256.40 1,749.68 1,049.70 -198.03 -1,031.06 0.07
Casing
Casing Description OD (in) Set Depth (mKB) Run Date
Surface 9 5/8 310.27 1/25/2008
Intermediate 7 1,225.04 1/27/2008

Page 2/2 Report Printed : 3/20/2008


Drilling Morning Report

Well Name : KS-1X


Date: 1/30/2008
Rig : Vicksburg
Depth End (mKB): 2,445.00 TVD End (mKB): 2,003.90

Total AFE Amount Target Depth (mKB) Target TVD (mKB)


4,852,535.10 3,520.00 2,818.00
Daily Operations
Report Start Date Report End Date
1/30/2008 00:00 1/31/2008 00:00
Daily Cost Total Cum Cost To Date
318,332.17 2,878,015.80
Cum Time Log Days From Spud (days) Cum Time Log Days (days)
6.04 9.42
Ops Supervisors
Wellsite Personnel
Darren Geitz
Shayne Atkins
Time Log
Start Time End Time Comment
00:00 05:00 Drilled 6-1/8" hole from 1225m MD / 1757 TVD to 2416m MD / 1981mTVD. Bit walking too hard left could not break trend.
Last two stds 1.4 deg left turn, will miss target by 91m.
05:00 06:00 Performed static gas and swab test at 2416m MD ; circulated bottoms up. Swab gas test: 17/14 units.
06:00 09:30 Flow check (Static). POOH 10 stands. Pump slug and POOH to BHA.
09:30 11:00 POOH w/ BHA. Break bit. Made up BHA #5 with 6-1/8" bit. Ran in the hole and shallow tested both MWD and AGS. AGS
pressure recorded at 300 GPM: 1850 psi under; 2260 psi full.
11:00 12:00 Continued running in hole to shoe at 1225m MD.
12:00 12:30 Service TDS assy.
12:30 14:30 Continue TIH from 1225m to 2387m MD. Wash down from 2387m to 2416m MD.
14:30 15:30 Drilled 6-1/8" hole from 2416m MD / 1981mTVD to 2445m MD / 2003m TVD. MWD failure.
15:30 16:00 Circulated bottoms up at 2445m MD.
16:00 19:30 Flow check (Static). POOH 10 stands. Pump slug and POOH to BHA at 243m.
19:30 20:30 POOH with BHA and changeout MWD assy. RIH and shallow test MWD assy.
MWD not reading correctly. DM not installed correctly.
20:30 21:30 POOH and remove MWD. Check MWD and reinstall same. RIH to shallow test same. OK
21:30 00:00 TIH with 6 1/8" assy to 1576m MD.
Mud Checks
Mud / Brine Type Mud Density (lb/gal) pH Water Phase Chlorides (ppm)
SBM (Other) 9.20
Funnel Viscosity (s/qt) PV Calc (cp) YP Calc (lbf/100ft²) HTHP Filtrate (mL/30min)
61 13.0 14.000 3.0
Drilling Parameters
Depth Start (mKB) TVD Start (mKB) Depth End (mKB) TVD End (mKB) IADC Drilling Time (hrs) Interval ROP (m/hr)
2,416.00 1,981.91 2,445.00 2,003.90 1.00 29.0
Survey Data
Date MD (mKB) Incl (°) Azm (°) TVD (mKB) VS (m) NS (m) EW (m) DLS (°/30m)
1/30/2008 2,144.00 38.90 256.20 1,772.23 1,067.93 -202.35 -1,048.77 0.17
1/30/2008 2,173.00 38.80 255.80 1,794.82 1,086.11 -206.75 -1,066.42 0.28
1/30/2008 2,231.00 38.20 254.20 1,840.21 1,122.16 -216.09 -1,101.30 0.60
1/30/2008 2,260.00 38.00 253.50 1,863.03 1,140.01 -221.07 -1,118.49 0.49
1/30/2008 2,318.00 40.60 251.80 1,907.91 1,176.58 -232.03 -1,153.54 1.46
1/30/2008 2,347.00 41.30 250.40 1,929.82 1,195.44 -238.19 -1,171.52 1.19
1/30/2008 2,376.00 41.00 249.00 1,951.65 1,214.33 -244.81 -1,189.42 1.00
1/30/2008 2,405.00 40.80 247.70 1,973.57 1,233.04 -251.82 -1,207.07 0.90
1/30/2008 2,434.00 40.60 247.40 1,995.56 1,251.64 -259.04 -1,224.54 0.29
Casing
Casing Description OD (in) Set Depth (mKB) Run Date
Surface 9 5/8 310.27 1/25/2008
Intermediate 7 1,225.04 1/27/2008

Page 1/1 Report Printed : 3/20/2008


Drilling Morning Report

Well Name : KS-1X


Date: 1/31/2008
Rig : Vicksburg
Depth End (mKB): 3,048.00 TVD End (mKB): 2,460.87

Total AFE Amount Target Depth (mKB) Target TVD (mKB)


4,852,535.10 3,520.00 2,818.00
Daily Operations
Report Start Date Report End Date
1/31/2008 00:00 2/1/2008 00:00
Daily Cost Total Cum Cost To Date
321,325.42 3,199,341.22
Cum Time Log Days From Spud (days) Cum Time Log Days (days)
7.04 10.42
Ops Supervisors
Wellsite Personnel
Darren Geitz
Shayne Atkins
Time Log
Start Time End Time Comment
00:00 01:30 Continue to RIH to 2445m MD.
01:30 17:30 Drilled 6-1/8" hole from 2445m MD / 2003m TVD to 3048m MD / 2460mTVD. ROP dropped below 10m/hr. Decision made to
POOH.
Note:
Losing mud at 2757m MD reduced pumps to 280GPM.
2789m MD reduced pumps to 250GPM.
2830m MD reduced pumps to 220GPM.
2926m MD reduced pumps to 180GPM.
2926m MD added Vinseal LCM to mud. Losses reduced.

17:30 22:00 Flow check well. Static. POOH five stands with hole taking correct fluid. Continue out of hole till pipe came wet at 2764m MD.
Pump slug and POOH to BHA.
22:00 00:00 Continue POOH to surface. Changeout MWD probe. Break bit. Made up BHA #6 with 6-1/8" bit. Ran in the hole and shallow
tested both MWD and AGS. AGS pressure recorded at 300 GPM: 1220 psi under; 1770 psi full. RIH to 243m MD.

Mud Checks
Mud / Brine Type Mud Density (lb/gal) pH Water Phase Chlorides (ppm)
SBM (Other) 9.20
Funnel Viscosity (s/qt) PV Calc (cp) YP Calc (lbf/100ft²) HTHP Filtrate (mL/30min)
57 14.0 12.000 3.0
Drilling Parameters
Depth Start (mKB) TVD Start (mKB) Depth End (mKB) TVD End (mKB) IADC Drilling Time (hrs) Interval ROP (m/hr)
3,048.00 2,460.87 3,048.00 2,460.87
Survey Data
Date MD (mKB) Incl (°) Azm (°) TVD (mKB) VS (m) NS (m) EW (m) DLS (°/30m)
1/31/2008 2,474.00 40.50 247.40 2,025.95 1,277.20 -269.03 -1,248.55 0.07
1/31/2008 2,521.00 40.50 247.40 2,061.69 1,307.20 -280.76 -1,276.73 0.00
1/31/2008 2,550.00 40.50 247.70 2,083.74 1,325.73 -287.95 -1,294.14 0.20
1/31/2008 2,579.00 40.70 247.60 2,105.76 1,344.29 -295.13 -1,311.59 0.22
1/31/2008 2,608.00 40.90 247.90 2,127.72 1,362.94 -302.31 -1,329.13 0.29
1/31/2008 2,637.00 41.10 247.40 2,149.60 1,381.65 -309.54 -1,346.73 0.40
1/31/2008 2,666.00 41.10 247.40 2,171.46 1,400.39 -316.87 -1,364.33 0.00
1/31/2008 2,695.00 41.10 247.60 2,193.31 1,419.14 -324.16 -1,381.94 0.14
1/31/2008 2,724.00 41.10 247.70 2,215.16 1,437.89 -331.41 -1,399.57 0.07
1/31/2008 2,753.00 41.10 247.90 2,237.02 1,456.65 -338.61 -1,417.22 0.14
1/31/2008 2,810.00 40.60 248.90 2,280.13 1,493.41 -352.34 -1,451.88 0.43
1/31/2008 2,839.00 40.90 247.40 2,302.10 1,512.06 -359.39 -1,469.45 1.06
1/31/2008 2,897.00 40.70 246.00 2,346.01 1,549.22 -374.37 -1,504.26 0.48
1/31/2008 2,955.00 40.10 245.60 2,390.18 1,585.97 -389.78 -1,538.55 0.34
1/31/2008 2,984.00 40.30 246.10 2,412.33 1,604.26 -397.44 -1,555.63 0.39
1/31/2008 3,013.00 40.60 245.60 2,434.40 1,622.66 -405.14 -1,572.79 0.46
1/31/2008 3,038.00 41.00 245.40 2,453.32 1,638.61 -411.91 -1,587.66 0.50
Casing
Casing Description OD (in) Set Depth (mKB) Run Date
Surface 9 5/8 310.27 1/25/2008
Intermediate 7 1,225.04 1/27/2008

Page 1/1 Report Printed : 3/20/2008


Drilling Morning Report

Well Name : KS-1X


Date: 2/1/2008
Rig : Vicksburg
Depth End (mKB): 3,520.00 TVD End (mKB): 2,818.77

Total AFE Amount Target Depth (mKB) Target TVD (mKB)


4,852,535.10 3,520.00 2,818.00
Daily Operations
Report Start Date Report End Date
2/1/2008 00:00 2/2/2008 00:00
Daily Cost Total Cum Cost To Date
268,251.42 3,467,592.64
Cum Time Log Days From Spud (days) Cum Time Log Days (days)
8.04 11.42
Ops Supervisors
Wellsite Personnel
Shayne Atkins
Van Hieu Trinh
Time Log
Start Time End Time Comment
00:00 04:00 Continue to RIH to 3048m MD.
04:00 22:00 Drilled 6-1/8" hole from 3048m MD / 2460m TVD to planned TD at 3520m MD / 2818m TVD.
Performed mini swab test at 3401m MD / 2721m TVD while drilling. Swab gas was 7/7 units.
Performed mini swab test at 3458m MD / 2772m TVD while drilling. Swab gas was 6/6 units.

22:00 00:00 Performed static gas and swab test at 3520m MD/ 2818m TVD; circulated bottoms up. Swab gas test: 5/5 units.
Mud Checks
Mud / Brine Type Mud Density (lb/gal) pH Water Phase Chlorides (ppm)
SBM (Other) 9.20
Funnel Viscosity (s/qt) PV Calc (cp) YP Calc (lbf/100ft²) HTHP Filtrate (mL/30min)
52 15.0 10.000 2.6
Drilling Parameters
Depth Start (mKB) TVD Start (mKB) Depth End (mKB) TVD End (mKB) IADC Drilling Time (hrs) Interval ROP (m/hr)
3,048.00 2,460.87 3,520.00 2,818.77 18.00 26.2
Survey Data
Date MD (mKB) Incl (°) Azm (°) TVD (mKB) VS (m) NS (m) EW (m) DLS (°/30m)
2/1/2008 3,071.00 41.10 245.10 2,478.21 1,659.74 -420.99 -1,607.34 0.20
2/1/2008 3,100.00 41.10 244.90 2,500.06 1,678.32 -429.04 -1,624.62 0.14
2/1/2008 3,129.00 40.80 244.70 2,521.96 1,696.82 -437.14 -1,641.82 0.34
2/1/2008 3,158.00 40.60 244.70 2,543.95 1,715.23 -445.22 -1,658.91 0.21
2/1/2008 3,187.00 40.40 244.20 2,566.00 1,733.54 -453.34 -1,675.90 0.39
2/1/2008 3,216.00 40.00 243.90 2,588.15 1,751.70 -461.53 -1,692.74 0.46
2/1/2008 3,245.00 40.20 243.70 2,610.34 1,769.81 -469.78 -1,709.50 0.25
2/1/2008 3,274.00 40.20 243.70 2,632.49 1,787.95 -478.07 -1,726.28 0.00
2/1/2008 3,303.00 40.40 243.50 2,654.60 1,806.12 -486.41 -1,743.08 0.25
2/1/2008 3,332.00 40.40 243.30 2,676.69 1,824.31 -494.83 -1,759.88 0.13
2/1/2008 3,361.00 40.50 243.30 2,698.76 1,842.50 -503.28 -1,776.69 0.10
2/1/2008 3,390.00 40.40 243.50 2,720.82 1,860.71 -511.71 -1,793.51 0.17
2/1/2008 3,419.00 40.30 243.30 2,742.92 1,878.88 -520.11 -1,810.30 0.17
2/1/2008 3,448.00 41.30 243.50 2,764.88 1,897.22 -528.60 -1,827.25 1.04
2/1/2008 3,477.00 41.60 243.10 2,786.61 1,915.79 -537.22 -1,844.40 0.41
2/1/2008 3,506.00 41.60 242.60 2,808.30 1,934.37 -546.01 -1,861.53 0.34
2/1/2008 3,520.00 41.60 242.60 2,818.77 1,943.33 -550.29 -1,869.78 0.00
Casing
Casing Description OD (in) Set Depth (mKB) Run Date
Surface 9 5/8 310.27 1/25/2008
Intermediate 7 1,225.04 1/27/2008

Page 1/1 Report Printed : 3/20/2008


Drilling Morning Report

Well Name : KS-1X


Date: 2/2/2008
Rig : Vicksburg
Depth End (mKB): 3,520.00 TVD End (mKB): 2,818.77

Total AFE Amount Target Depth (mKB) Target TVD (mKB)


4,852,535.10 3,520.00 2,818.00
Daily Operations
Report Start Date Report End Date
2/2/2008 00:00 2/3/2008 00:00
Daily Cost Total Cum Cost To Date
256,936.42 3,724,529.06
Cum Time Log Days From Spud (days) Cum Time Log Days (days)
9.04 12.42
Ops Supervisors
Wellsite Personnel
Shayne Atkins
Van Hieu Trinh
Time Log
Start Time End Time Comment
00:00 05:00 Pulled five stands wet and verified hole was taking proper fill. POOH to 3040m pipe coming wet. Pumped slug and pull out to
BHA.
05:00 06:00 POOH with BHA. Layout MWD probe. Break bit and rack back in mast.
06:00 07:30 Held pre-job safety meeting. Rigged up Halliburton wireline and ran in the hole with Quad-combo. Logged down from 280m
to 550m wlm at 2195m/hr. Tension head reading too high.
07:30 08:30 POOH with Quad combo assy. Changeout tension head. RIH to 550m
08:30 18:00 Continue to RIH with Quad-combo. Logged down from 550m to 3520m wlm at 2220 m/hr in casing and 1500 m/hrs in open
hole. Logged up from 3520 m to 1225m wlm at 540 m/hr. All depths are loggers depths.
Average hole size: 6.42"
Bottom hole temp: 310deg

18:00 00:00 Rigged up check shot logging tools, Checked tool string and ran in hole to 1000m. Took first check shot. Ran in hole to
1500m MD took check shot, Ran in hole to 2000m. Ran in hole to 2500m , Ran in hole to 3000m, Started uphole check shot
survey.First uphole check short survey at 3520m. After that take check shots every 50m from 3500m to 2150m.

Mud Checks
Mud / Brine Type Mud Density (lb/gal) pH Water Phase Chlorides (ppm)
SBM (Other) 9.20
Funnel Viscosity (s/qt) PV Calc (cp) YP Calc (lbf/100ft²) HTHP Filtrate (mL/30min)
65 15.0 10.000 2.6
Drilling Parameters
Depth Start (mKB) TVD Start (mKB) Depth End (mKB) TVD End (mKB) IADC Drilling Time (hrs) Interval ROP (m/hr)
3,520.00 2,818.77 3,520.00 2,818.77
Survey Data
Date MD (mKB) Incl (°) Azm (°) TVD (mKB) VS (m) NS (m) EW (m) DLS (°/30m)

Casing
Casing Description OD (in) Set Depth (mKB) Run Date
Surface 9 5/8 310.27 1/25/2008
Intermediate 7 1,225.04 1/27/2008

Page 1/1 Report Printed : 3/20/2008


Drilling Morning Report

Well Name : KS-1X


Date: 2/3/2008
Rig : Vicksburg
Depth End (mKB): 3,520.00 TVD End (mKB): 2,818.77

Total AFE Amount Target Depth (mKB) Target TVD (mKB)


4,852,535.10 3,520.00 2,818.00
Daily Operations
Report Start Date Report End Date
2/3/2008 00:00 2/4/2008 00:00
Daily Cost Total Cum Cost To Date
261,443.42 3,985,972.48
Cum Time Log Days From Spud (days) Cum Time Log Days (days)
10.04 13.42
Ops Supervisors
Wellsite Personnel
Shayne Atkins
Van Hieu Trinh
Time Log
Start Time End Time Comment
00:00 05:30 Continue with the check short survey every 50m from 2150m to 350m. Finish checkshot survey due to casing ring.
POOH to surface.
05:30 16:30 Correlate and take core samples as per program. Rig on radio silence until core guns below 500'. Get cores from 3521m MD
to 1408m MD. POOH & lay down CST gun. R/D Halliburton. {42 shots, 29 good, 5 misfire, 6 empty & 2 lost in the hole}.
16:30 17:00 P/U 6 1/8" BHA from mast. Layout same.
17:00 21:30 M/U 6 1/8" bit, bit sub, HWDP and RIH to 3520m MD.
21:30 23:00 Displace hole to 9.3ppg WBM. NAF returns taken to pits.
23:00 00:00 Flow check well. Static. Pull 5 stands hole taking correct fill. Pump slug and POOH to 3183m MD.
Mud Checks
Mud / Brine Type Mud Density (lb/gal) pH Water Phase Chlorides (ppm)
SBM (Other) 9.20
Funnel Viscosity (s/qt) PV Calc (cp) YP Calc (lbf/100ft²) HTHP Filtrate (mL/30min)
68 15.0 10.000 2.6
Drilling Parameters
Depth Start (mKB) TVD Start (mKB) Depth End (mKB) TVD End (mKB) IADC Drilling Time (hrs) Interval ROP (m/hr)
3,520.00 2,818.77 3,520.00 2,818.77
Survey Data
Date MD (mKB) Incl (°) Azm (°) TVD (mKB) VS (m) NS (m) EW (m) DLS (°/30m)

Casing
Casing Description OD (in) Set Depth (mKB) Run Date
Surface 9 5/8 310.27 1/25/2008
Intermediate 7 1,225.04 1/27/2008

Page 1/1 Report Printed : 3/20/2008


Drilling Morning Report

Well Name : KS-1X


Date: 2/4/2008
Rig : Vicksburg
Depth End (mKB): 3,520.00 TVD End (mKB): 2,818.77

Total AFE Amount Target Depth (mKB) Target TVD (mKB)


4,852,535.10 3,520.00 2,818.00
Daily Operations
Report Start Date Report End Date
2/4/2008 00:00 2/5/2008 00:00
Daily Cost Total Cum Cost To Date
353,999.12 4,339,971.60
Cum Time Log Days From Spud (days) Cum Time Log Days (days)
11.04 14.42
Ops Supervisors
Wellsite Personnel
Shayne Atkins
Van Hieu Trinh
Time Log
Start Time End Time Comment
00:00 01:00 POOH from 3183m to 2313m MD.
01:00 07:30 Continue to POOH form 2313m to 227m. Laying down 4" DP to the deck. (216 joints total)
07:30 08:30 POOH and laydown 4" HWDP. (24 joints total). Break bit, bitsub and x/over. Layout same.
08:30 11:30 M/U 7" EZSV & RIH to 1195m MD. M/U pump in sub assy. Circ. Set retainer. Test retainer to 2500 psi.
11:30 12:00 R/U BJ lines. Test lines to 2500 psi. Perform injection rate: 1 BPM=970psi, 2 BPM=1090psi, 3 BPM=1195 psi, 4
BPM=1230psi, Static 800psi. Sting out. Pump 15.9 ppg cement slurry with BJ. Squeeze 20 bbls below the retainer, sting out
and set a 10 bbl balanced cement plug on top of retainer. R/D BJ lines. L/O pump in assy.

12:00 13:00 POOH 5 stands. Circulate hole clean. Flow check (OK).
13:00 16:30 POOH & L/O sideways 4" drillpipe. L/D Halliburton MST. (Offline test 7" x 9-5/8" annulus. Pumping away. Static pressure 200
psi.)
16:30 17:30 M/U 7" casing cutter. RIH to 276m MD. Locate collar at 282m MD. P/U & cut 7" casing at 276m MD. Close annular and
pump 9.3ppg WBM thru cut - full returns observed.
17:30 18:30 Displace 9-5/8" annulus with 9.4 ppg WBM. Flow check (OK). POOH & L/O 7" casing cutter.
18:30 22:00 Pull wear bushing. Jet wellhead. P/U landing joint and R/R tool & RIH & screw into 7" hanger. Pull free at 15 k above block
weight. L/D 7" casing hanger & 10' pup jont. L/O sideways 7" casing 21 joints + 8.69m cut off. Rig down BJT and installed
wear bushing.

22:00 23:00 Makeup 9 5/8" EZSV and run in hole on 4" drill pipe to 268m MD and set retainer. Test same to 1000 psi.(ok).
23:00 23:30 Sting into EZSV, Rig up B.J. lines and test same, Perform injection rates, 1 BPM= 300 psi, 2 BPM= 335 psi, 3 BPM= 360 psi,
4 BPM= 415 psi, static= 260 psi.. Mix and pump 30 bbl slurry @ 15.9 ppg. Squeeze 20 bbls below EZSV. Sting out and
pump 10 bbl balanced plug on top of EZSV. Pull out of hole 3 stands and circulate bottoms up.

23:30 00:00 POOH 3 stands and circulate to clean pipe with 9.3 PPg, CMT to surface, POOH L/D 18 Jts 4" drill pipe
Mud Checks
Mud / Brine Type Mud Density (lb/gal) pH Water Phase Chlorides (ppm)
SBM (Other) 9.20
Funnel Viscosity (s/qt) PV Calc (cp) YP Calc (lbf/100ft²) HTHP Filtrate (mL/30min)
72 15.0 10.000 2.6
Drilling Parameters
Depth Start (mKB) TVD Start (mKB) Depth End (mKB) TVD End (mKB) IADC Drilling Time (hrs) Interval ROP (m/hr)

Survey Data
Date MD (mKB) Incl (°) Azm (°) TVD (mKB) VS (m) NS (m) EW (m) DLS (°/30m)

Casing
Casing Description OD (in) Set Depth (mKB) Run Date
Surface 9 5/8 310.27 1/25/2008
Intermediate 7 1,225.04 1/27/2008

Page 1/1 Report Printed : 3/20/2008


Drilling Morning Report

Well Name : KS-1X


Date: 2/5/2008
Rig : Vicksburg
Depth End (mKB): 3,520.00 TVD End (mKB): 2,818.77

Total AFE Amount Target Depth (mKB) Target TVD (mKB)


4,852,535.10 3,520.00 2,818.00
Daily Operations
Report Start Date Report End Date
2/5/2008 00:00 2/6/2008 00:00
Daily Cost Total Cum Cost To Date
250,650.42 4,590,622.02
Cum Time Log Days From Spud (days) Cum Time Log Days (days)
12.04 15.42
Ops Supervisors
Wellsite Personnel
Shayne Atkins
Van Hieu Trinh
Time Log
Start Time End Time Comment
00:00 03:00 Held jsa, remove pollution pans, flowline and bell nipple, N/down bops, remove drilling spool, secure bops to set back area.
03:00 04:30 Make up 9 5/8" casing cutter RIH and confirm casing collar at 102m MD, P/up and cut casing at 100m MD, POOH. Laydown
12 joints 4" DP.
04:30 05:30 Retrieve wear bushing. M/up KOP wellhead running tool, latch 9 5/8" casing at WH and bring to rotary table. (75k).
05:30 07:00 Held jsa. Rig up BJT equipment. Pull out laying down 7 jts 9 5/8" casing & 8' cut jt, Rig down BJT.
07:00 12:00 Prepare decks and rig floor for move. Disconnect and reposition temp living quarters. Remove Icon tensioner from guide
deck, Raise and secure guide deck. Take up bulk hoses and secure.
12:00 13:00 Skid in Cantilever and pin in stow position.
13:00 13:30 Fire and abandon drill. Pre tow meeting with all personnel.
13:30 15:30 Prepare and tie down equipment for rig move, place jetting equipment at legs, install caps and barriers to overboard
openings.
15:30 18:00 Held jsa, Jack test, commence jacking down rig to 20' air gap. Remove port and forward mooring ropes from legs. M/V
Premaraj Tide connect to Port bow bridle @ 16:30 hrs. M/V Heritage Service connect to starboard bow bridle @ 16:45hrs.
Resume jacking down to 8' draft. Water tight integrity check - ok

18:00 18:30 Commence Pulling on port leg, no success, connect Jetting line
18:30 20:30 Commence jetting port leg, gain 12' @ 20:30 Hrs
20:30 00:00 Connect jetting line bow leg, commence jetting on bow leg
Mud Checks
Mud / Brine Type Mud Density (lb/gal) pH Water Phase Chlorides (ppm)

Funnel Viscosity (s/qt) PV Calc (cp) YP Calc (lbf/100ft²) HTHP Filtrate (mL/30min)

Drilling Parameters
Depth Start (mKB) TVD Start (mKB) Depth End (mKB) TVD End (mKB) IADC Drilling Time (hrs) Interval ROP (m/hr)

Survey Data
Date MD (mKB) Incl (°) Azm (°) TVD (mKB) VS (m) NS (m) EW (m) DLS (°/30m)

Casing
Casing Description OD (in) Set Depth (mKB) Run Date
Surface 9 5/8 310.27 1/25/2008
Intermediate 7 1,225.04 1/27/2008

Page 1/1 Report Printed : 3/20/2008


Drilling Morning Report

Well Name : KS-1X


Date: 2/6/2008
Rig : Vicksburg
Depth End (mKB): 3,520.00 TVD End (mKB): 2,818.77

Total AFE Amount Target Depth (mKB) Target TVD (mKB)


4,852,535.10 3,520.00 2,818.00
Daily Operations
Report Start Date Report End Date
2/6/2008 00:00 2/7/2008 00:00
Daily Cost Total Cum Cost To Date
64,039.10 4,654,661.12
Cum Time Log Days From Spud (days) Cum Time Log Days (days)
12.29 15.67
Ops Supervisors
Wellsite Personnel
Shayne Atkins
Van Hieu Trinh
Time Log
Start Time End Time Comment
00:00 01:30 Continue jetting and working bow leg. Gained 15'
01:30 05:00 Connect jetting hoses to starboard leg. Commence jetting and working straboard leg. Gained 11'.
05:00 06:00 Commence working all legs. Legs free.
Off location KS-1X and Under tow to NKL-3X at 06:00 hrs.
"Rig released from KS-1X to NKL-3X at 06:00hrs."

Mud Checks
Mud / Brine Type Mud Density (lb/gal) pH Water Phase Chlorides (ppm)

Funnel Viscosity (s/qt) PV Calc (cp) YP Calc (lbf/100ft²) HTHP Filtrate (mL/30min)

Drilling Parameters
Depth Start (mKB) TVD Start (mKB) Depth End (mKB) TVD End (mKB) IADC Drilling Time (hrs) Interval ROP (m/hr)

Survey Data
Date MD (mKB) Incl (°) Azm (°) TVD (mKB) VS (m) NS (m) EW (m) DLS (°/30m)

Casing
Casing Description OD (in) Set Depth (mKB) Run Date
Surface 9 5/8 310.27 1/25/2008
Intermediate 7 1,225.04 1/27/2008

Page 1/1 Report Printed : 3/20/2008


Bit Record

Page 26
BHA Summary
WellView
Well Name: KS-1X
Job Type: Drilling - Original
API/UWI Surface Legal Location Well Configuration Type Ground Elevation (mKB) KB-Casing Flange Distance (m) KB-Tubing Head Distance (m) Total Depth (mKB)
KS-1X Deviated 3,520.01

Bits
Bit BHA Drill Time BHA ROP
Run No. Drill String Name BHA Drill Bit Bit Dull Depth In (mKB) Depth Out (mKB) Drilled (m) (hrs) (m/hr)
#1 1 Casing drill BBL, 9 5/8" float collar, 12" bbl drill shoe 12in, BBL, 16687003-1 ------- 99.00 623.00 524.00 3.00 174.7
#2 2 Motor Build Hycalog HC 604, 7" sperry Drill Lobe 7/8 - 7.5 Stg, 6 3/4" Float sub, 8 1/2in, HC 604, 7210098 1-1-WT-A-X-0-NO-TD 305.00 1,228.00 923.00 6.50 142.0
Non Mag MWD Hang off collar, 6 3/4" Non Mag Screen sun, 15
HWDP
#3 3 Cleanout Hycalog HC 604, 7" sperry Drill Lobe 7/8 - 7.5 Stg, 6 3/4" Float sub, 8 1/2in, HC 604, 7210098 1-1-WT-A-X-0-NO-TD 1,228.06 1,228.06 0.00 0.00
RR Non Mag MWD Hang off collar, 6 3/4" Non Mag Screen sun, 15
HWDP
#4 4 Rotary AGS Hycalog DSR 416 B2, 6 1/8" Modular NB Stabilizer, 2ft Extension 6 1/8in, DSR 416 B2, 3-2-CT-A-X-0-N0-BHA 1,228.00 2,416.00 1,188.00 22.00 54.0
sub, Adjustable Gauge stabilizer, 5" Non Mag hang off collar, 5 1/2" 217914
Integral blade stabilizer, Non Mag 4 3/4" screen sub, Cross over sub,
24 X 4" HWDP
#5 5 Rotary AGS Smith MI416PX(ER20669), 6 1/8" Modular NB Stabilizer, 2ft 6 1/8in, 8-2-RO-T-X-0-LT-PR 2,416.00 3,048.00 632.00 17.00 37.2
Extension sub, Adjustable Gauge stabilizer, 5" Non Mag hang off MI416PX(ER20669),
collar, 5 1/2" Integral blade stabilizer, Non Mag 4 3/4" screen sub, JX7400
Cross over sub, 24 X 4" HWDP
#6 6 Rotary AGS Security FM3543ZR, 6 1/8" Modular NB Stabilizer, 2ft Extension sub, 6 1/8in, FM3543ZR, 1-2-WT-T-X-0-NO-TD 3,048.00 3,520.00 472.00 18.00 26.2
Adjustable Gauge stabilizer, 5" Non Mag hang off collar, 5 1/2" 10947814
Integral blade stabilizer, Non Mag 4 3/4" screen sub, Cross over sub,
24 X 4" HWDP
7RR 7 Displacement Hycalog DSR 416 B2, Bit Sub w/Float, XO Sub, 24 X 4" HWDP 6 1/8in, DSR 416 B2, ------- 3,520.00 3,520.00 0.00 0.00
217914

www.peloton.com Page 1/1 Report Printed: 2/13/2008


Casing and Cementing Summary

Page 28
WellView Casing Summary

Well Name: KS-1X


API/UWI Surface Legal Location Field Name License No./Property Code State/Province Well Configuration Type
KS-1X KIM SU Deviated
Ground Elevation (mKB) Casing Flange Elevation (m) KB-Ground Distance (m) KB-Casing Flange Distance (m) Spud Date Rig Release Date
1/23/2008 11:00:00 PM 2/6/2008 6:00:00 AM

Surface, 310.27mKB
Set Depth (mKB) Set Tension (kips) String Nominal OD (in) String Minimum Drift (in) Centralizers Scratchers
310.27 9 5/8
P (collapse)
Jts Item Description OD (in) ID (in) Wt (lbs/ft) Grade Top Thread Top (mKB) Btm (mKB) Len (m) Burst Pres (psi) (psi)
1 Top of Wellhead to 0.00 15.15 15.15
Rig Floor
1 KOP Wellhead 15.15 17.35 2.20
Assembly
22 9.625" 40# N-80 BTC 9 5/8 8.835 40.00 N-80 BTC 17.35 284.18 266.83
CSG.
1 FLOAT COLLAR 9 9 5/8 8.835 40.00 N-80 BTC 284.18 296.90 12.72
5/8" GRADE 40ppf
1 CASING SHOE 9 5/8" 9 5/8 8.835 40.00 N-80 BTC 296.90 310.27 13.37
GRADE 40ppf

Intermediate, 1,225.04mKB
Set Depth (mKB) Set Tension (kips) String Nominal OD (in) String Minimum Drift (in) Centralizers Scratchers
1,225.04 7
P (collapse)
Jts Item Description OD (in) ID (in) Wt (lbs/ft) Grade Top Thread Top (mKB) Btm (mKB) Len (m) Burst Pres (psi) (psi)
1 RKB to HGR 7 0.00 15.15 15.15
1 Hanger assembly 7 6.366 23.00 L-80 BTC 15.15 17.45 2.30
2 7" 23 ppf BTC casing 7 6.366 23.00 L-80 BTC 17.45 41.39 23.94
N-80
96 7" 23 ppf BTC casing 7 6.366 23.00 N-80 BTC 41.39 1,199.59 1,158.20
N-80
1 Halliburton Float Assy 7 6.366 23.00 N-80 BTC 1,199.59 1,212.27 12.68
1 Halliburton Shoe 7 6.366 23.00 N-80 BTC 1,212.27 1,225.04 12.77

www.peloton.com Page 1/1 Report Printed: 3/20/2008


WellView Cement Summary

Well Name: KS-1X Surface Casing Cement


API/UWI Surface Legal Location Field Name License No./Property Code State/Province Well Configuration Type
KS-1X KIM SU Deviated
Ground Elevation (mKB) Casing Flange Elevation (m) KB-Ground Distance (m) KB-Casing Flange Distance (m) Spud Date Rig Release Date
1/23/2008 11:00:00 PM 2/6/2008 6:00:00 AM

Original Hole
Wellbore Name Profile Type Kick Off Depth (mKB) Vertical Section Direction (°)
Original Hole Directional 365.76 258.00
Section Size (in) Act Top (mKB) Act Btm (mKB)
Surface 12 1/4 99.00 305.01
Intermediate 8 1/2 305.01 1,228.01
Production 6 1/8 1,228.01 3,520.01

Type Install Date

Description Make Model WP (psi) Service SN

Surface, 310.27mKB
Casing Description Wellbore Run Date Set Depth (mKB) Stick Up (mKB) Set Tension (kips)
Surface Original Hole 1/25/2008 310.27 0.00
Centralizers Scratchers

Top Conn
Jts Item Description OD (in) ID (in) Wt (lbs/ft) Grade Sz (in) Top Thread Len (m) Top (mKB) Btm (mKB)
1 Top of Wellhead to Rig Floor 15.15 0.00 15.15
1 KOP Wellhead Assembly 2.20 15.15 17.35
22 9.625" 40# N-80 BTC CSG. 9 5/8 8.835 40.00 N-80 BTC 266.83 17.35 284.18
1 FLOAT COLLAR 9 5/8" GRADE 9 5/8 8.835 40.00 N-80 BTC 12.72 284.18 296.90
40ppf
1 CASING SHOE 9 5/8" GRADE 9 5/8 8.835 40.00 N-80 BTC 13.37 296.90 310.27
40ppf
Intermediate, 1,225.04mKB
Casing Description Wellbore Run Date Set Depth (mKB) Stick Up (mKB) Set Tension (kips)
Intermediate Original Hole 1/27/2008 1,225.04 0.00
Centralizers Scratchers

Top Conn
Jts Item Description OD (in) ID (in) Wt (lbs/ft) Grade Sz (in) Top Thread Len (m) Top (mKB) Btm (mKB)
1 RKB to HGR 7 15.15 0.00 15.15
1 Hanger assembly 7 6.366 23.00 L-80 BTC 2.30 15.15 17.45
2 7" 23 ppf BTC casing N-80 7 6.366 23.00 L-80 BTC 23.94 17.45 41.39
96 7" 23 ppf BTC casing N-80 7 6.366 23.00 N-80 BTC 1,158.20 41.39 1,199.59
1 Halliburton Float Assy 7 6.366 23.00 N-80 BTC 12.68 1,199.59 1,212.27
1 Halliburton Shoe 7 6.366 23.00 N-80 BTC 12.77 1,212.27 1,225.04
Surface Casing Cement, casing, 1/25/2008 03:56
Cementing Start Date Cementing End Date Wellbore
1/25/2008 1/25/2008 Original Hole
Evaluation Method Cement Evaluation Results

Comment
9-5/8" Casing Cement Job Details¿ planned to mix 355 cuft (257 sxs) of class G (+40% S8C) cement with 6.894 gps seawater + 0.336 gps A-300L +
0.160 gps A-3L + 0.034 gps FP-9LS for 7.424 gps or 45.4 bbls of mixed fluid. Slurry weight was 15.5 ppg and the yield was 1.691 cuft/sx. Total calculated
slurry volume = 77.4 bbls. Pumped 2 bbls seawater to break circulation. BJ tested lines to 2,500 psig. Mixed and pumped 77.5 bbls of slurry at 6.1 bpm
and 338 psi. Displaced with 68.0 bbls seawater (planned displacement was 68.3 bbls) at 7.0 bpm and 641 psi. Did not drop plug. No wiper plug used in
9-5/8" section. Bled back and float held. Cement in place at 4:20 hours. Estimated top of cement at seabed. Total of 4 BBL centralizers run.

1, 112.78-310.29mKB
Top (mKB) Bottom (mKB) Full Return? Cmnt Rtrn (bbl) Top Plug? Bottom Plug?
112.78 310.29 No 0.0 No No
Initial Pump Rate (bbl/min) Final Pump Rate (bbl/min) Average Pump Rate (bbl/min) Final Pump Pressure (psi) Plug Bump Pressure (psi)
7 641 0 0.0
Pipe Reciprocated? Reciprocation Stroke Length (m) Reciprocation Rate (spm) Pipe Rotated? Pipe RPM (rpm)
No No
Depth tagged (mKB) Tag Method Depth Plug Drilled Out To (mKB) Drill Out Diameter (in) Drill Out Date

Cement
Fluid Type Fluid Description Amount (sacks) Class Volume Pumped (bbl)
Cement Cement from lot #A-221 2 Sea Water 15.5
Estimated Top (mKB) Estimated Bottom (mKB) Percent Excess Pumped (%) Yield (ft³/sack) Mix H20 Ratio (gal/sack)
112.78 310.29 77.50
Free Water (%) Density (lb/gal) Plastic Viscosity (cp) Thickening Time (hrs) 1st Compressive Strength (psi)

Cement Fluid Additives


Add Type Conc
A-3L Accelerator or Retarder 0.16
FP-9LS Defoamer 0.034
A-300L Extender 0.336

www.peloton.com Page 1/2 Report Printed: 3/20/2008


WellView Cement Summary

Well Name: KS-1X Surface Casing Cement


API/UWI Surface Legal Location Field Name License No./Property Code State/Province Well Configuration Type
KS-1X KIM SU Deviated
Ground Elevation (mKB) Casing Flange Elevation (m) KB-Ground Distance (m) KB-Casing Flange Distance (m) Spud Date Rig Release Date
1/23/2008 11:00:00 PM 2/6/2008 6:00:00 AM

Seawater
Fluid Type Fluid Description Amount (sacks) Class Volume Pumped (bbl)
Seawater
Estimated Top (mKB) Estimated Bottom (mKB) Percent Excess Pumped (%) Yield (ft³/sack) Mix H20 Ratio (gal/sack)
68.00
Free Water (%) Density (lb/gal) Plastic Viscosity (cp) Thickening Time (hrs) 1st Compressive Strength (psi)

Cement Fluid Additives


Add Type Conc

www.peloton.com Page 2/2 Report Printed: 3/20/2008


WellView Cement Summary

Well Name: KS-1X Intermediate Casing String


API/UWI Surface Legal Location Field Name License No./Property Code State/Province Well Configuration Type
KS-1X KIM SU Deviated
Ground Elevation (mKB) Casing Flange Elevation (m) KB-Ground Distance (m) KB-Casing Flange Distance (m) Spud Date Rig Release Date
1/23/2008 11:00:00 PM 2/6/2008 6:00:00 AM

Original Hole
Wellbore Name Profile Type Kick Off Depth (mKB) Vertical Section Direction (°)
Original Hole Directional 365.76 258.00
Section Size (in) Act Top (mKB) Act Btm (mKB)
Surface 12 1/4 99.00 305.01
Intermediate 8 1/2 305.01 1,228.01
Production 6 1/8 1,228.01 3,520.01

Type Install Date

Description Make Model WP (psi) Service SN

Surface, 310.27mKB
Casing Description Wellbore Run Date Set Depth (mKB) Stick Up (mKB) Set Tension (kips)
Surface Original Hole 1/25/2008 310.27 0.00
Centralizers Scratchers

Top Conn
Jts Item Description OD (in) ID (in) Wt (lbs/ft) Grade Sz (in) Top Thread Len (m) Top (mKB) Btm (mKB)
1 Top of Wellhead to Rig Floor 15.15 0.00 15.15
1 KOP Wellhead Assembly 2.20 15.15 17.35
22 9.625" 40# N-80 BTC CSG. 9 5/8 8.835 40.00 N-80 BTC 266.83 17.35 284.18
1 FLOAT COLLAR 9 5/8" GRADE 9 5/8 8.835 40.00 N-80 BTC 12.72 284.18 296.90
40ppf
1 CASING SHOE 9 5/8" GRADE 9 5/8 8.835 40.00 N-80 BTC 13.37 296.90 310.27
40ppf
Intermediate, 1,225.04mKB
Casing Description Wellbore Run Date Set Depth (mKB) Stick Up (mKB) Set Tension (kips)
Intermediate Original Hole 1/27/2008 1,225.04 0.00
Centralizers Scratchers

Top Conn
Jts Item Description OD (in) ID (in) Wt (lbs/ft) Grade Sz (in) Top Thread Len (m) Top (mKB) Btm (mKB)
1 RKB to HGR 7 15.15 0.00 15.15
1 Hanger assembly 7 6.366 23.00 L-80 BTC 2.30 15.15 17.45
2 7" 23 ppf BTC casing N-80 7 6.366 23.00 L-80 BTC 23.94 17.45 41.39
96 7" 23 ppf BTC casing N-80 7 6.366 23.00 N-80 BTC 1,158.20 41.39 1,199.59
1 Halliburton Float Assy 7 6.366 23.00 N-80 BTC 12.68 1,199.59 1,212.27
1 Halliburton Shoe 7 6.366 23.00 N-80 BTC 12.77 1,212.27 1,225.04
Intermediate Casing String, casing, 1/27/2008 21:39
Cementing Start Date Cementing End Date Wellbore
1/27/2008 1/27/2008 Original Hole
Evaluation Method Cement Evaluation Results

Comment
7" Casing Cement Job Details¿ for lead slurry, planned to mix 0 cuft (0 sxs) of class G (+40% S8C) cement with 0.000 gps seawater + for 0.000 gps or
0.0 bbls of mixed fluid. Lead slurry weight was 0.0 ppg and the yield was 0.000 cuft/sx. For tail slurry, planned to mix 464 cuft (337 sxs) of class G (+40%
S8C) cement with 6.177 gps seawater + 0.035 gps R-8LS + 0.032 gps FP-9L + 0.430 gps BJ Ultra for 6.674 gps or 53.6 bbls of mixed fluid. Tail slurry
weight was 15.9 ppg and the yield was 1.590 cuft/sx. Total calculated slurry volume (lead + tail) = 0.0 + 95.5 = 95.5 bbls. Pumped 2 bbls seawater
preflush. BJ tested lines to 3,500 psig. Mixed and pumped 95.0 bbls of 15.9 ppg tail slurry at 5.5 bpm and 590 psi. Actual slurry volume (lead + tail) =
95.0 bbls. Dropped wiper plug. Pumped 5 bbls 15.9 ppg tail slurry behind plug. Displaced with 156.4 bbls seawater (planned displacement was 156.8
bbls) at 2.0 bpm and a final pressure of 1,107 psi. Bumped plug with 1,107 psi. Bled back and float held. Cement in place at 22:35 hours. Estimated top
of cement at 768' MD. Total of 25 Spirolizers run.

1, 234.09-373.68mKB
Top (mKB) Bottom (mKB) Full Return? Cmnt Rtrn (bbl) Top Plug? Bottom Plug?
234.09 373.68 Yes 0.0 Yes No
Initial Pump Rate (bbl/min) Final Pump Rate (bbl/min) Average Pump Rate (bbl/min) Final Pump Pressure (psi) Plug Bump Pressure (psi)
6 1,107 2,500 0.0 0.0
Pipe Reciprocated? Reciprocation Stroke Length (m) Reciprocation Rate (spm) Pipe Rotated? Pipe RPM (rpm)
No No
Depth tagged (mKB) Tag Method Depth Plug Drilled Out To (mKB) Drill Out Diameter (in) Drill Out Date

Sea Water
Fluid Type Fluid Description Amount (sacks) Class Volume Pumped (bbl)
Sea Water
Estimated Top (mKB) Estimated Bottom (mKB) Percent Excess Pumped (%) Yield (ft³/sack) Mix H20 Ratio (gal/sack)
2.00
Free Water (%) Density (lb/gal) Plastic Viscosity (cp) Thickening Time (hrs) 1st Compressive Strength (psi)
8.60

www.peloton.com Page 1/2 Report Printed: 3/20/2008


WellView Cement Summary

Well Name: KS-1X Intermediate Casing String


API/UWI Surface Legal Location Field Name License No./Property Code State/Province Well Configuration Type
KS-1X KIM SU Deviated
Ground Elevation (mKB) Casing Flange Elevation (m) KB-Ground Distance (m) KB-Casing Flange Distance (m) Spud Date Rig Release Date
1/23/2008 11:00:00 PM 2/6/2008 6:00:00 AM

Cement Fluid Additives


Add Type Conc

Tail
Fluid Type Fluid Description Amount (sacks) Class Volume Pumped (bbl)
Tail Cement from lot #A-221 2 Sea Water
Estimated Top (mKB) Estimated Bottom (mKB) Percent Excess Pumped (%) Yield (ft³/sack) Mix H20 Ratio (gal/sack)
234.21 373.53 95.00
Free Water (%) Density (lb/gal) Plastic Viscosity (cp) Thickening Time (hrs) 1st Compressive Strength (psi)
15.90
Cement Fluid Additives
Add Type Conc
R-8LS Accelerator or Retarder 0.04
FP-9L Defoamer 0.03
BJ Ultra Gas Control Additive/Bonding Agent 0.43
Seawater
Fluid Type Fluid Description Amount (sacks) Class Volume Pumped (bbl)
Seawater
Estimated Top (mKB) Estimated Bottom (mKB) Percent Excess Pumped (%) Yield (ft³/sack) Mix H20 Ratio (gal/sack)
156.40
Free Water (%) Density (lb/gal) Plastic Viscosity (cp) Thickening Time (hrs) 1st Compressive Strength (psi)
8.60
Cement Fluid Additives
Add Type Conc

www.peloton.com Page 2/2 Report Printed: 3/20/2008


WellView Cement Summary

Well Name: KS-1X 7" Casing P&A Cement


API/UWI Surface Legal Location Field Name License No./Property Code State/Province Well Configuration Type
KS-1X KIM SU Deviated
Ground Elevation (mKB) Casing Flange Elevation (m) KB-Ground Distance (m) KB-Casing Flange Distance (m) Spud Date Rig Release Date
1/23/2008 11:00:00 PM 2/6/2008 6:00:00 AM

Original Hole
Wellbore Name Profile Type Kick Off Depth (mKB) Vertical Section Direction (°)
Original Hole Directional 365.76 258.00
Section Size (in) Act Top (mKB) Act Btm (mKB)
Surface 12 1/4 99.00 305.01
Intermediate 8 1/2 305.01 1,228.01
Production 6 1/8 1,228.01 3,520.01

Type Install Date

Description Make Model WP (psi) Service SN

Surface, 310.27mKB
Casing Description Wellbore Run Date Set Depth (mKB) Stick Up (mKB) Set Tension (kips)
Surface Original Hole 1/25/2008 310.27 0.00
Centralizers Scratchers

Top Conn
Jts Item Description OD (in) ID (in) Wt (lbs/ft) Grade Sz (in) Top Thread Len (m) Top (mKB) Btm (mKB)
1 Top of Wellhead to Rig Floor 15.15 0.00 15.15
1 KOP Wellhead Assembly 2.20 15.15 17.35
22 9.625" 40# N-80 BTC CSG. 9 5/8 8.835 40.00 N-80 BTC 266.83 17.35 284.18
1 FLOAT COLLAR 9 5/8" GRADE 9 5/8 8.835 40.00 N-80 BTC 12.72 284.18 296.90
40ppf
1 CASING SHOE 9 5/8" GRADE 9 5/8 8.835 40.00 N-80 BTC 13.37 296.90 310.27
40ppf
Intermediate, 1,225.04mKB
Casing Description Wellbore Run Date Set Depth (mKB) Stick Up (mKB) Set Tension (kips)
Intermediate Original Hole 1/27/2008 1,225.04 0.00
Centralizers Scratchers

Top Conn
Jts Item Description OD (in) ID (in) Wt (lbs/ft) Grade Sz (in) Top Thread Len (m) Top (mKB) Btm (mKB)
1 RKB to HGR 7 15.15 0.00 15.15
1 Hanger assembly 7 6.366 23.00 L-80 BTC 2.30 15.15 17.45
2 7" 23 ppf BTC casing N-80 7 6.366 23.00 L-80 BTC 23.94 17.45 41.39
96 7" 23 ppf BTC casing N-80 7 6.366 23.00 N-80 BTC 1,158.20 41.39 1,199.59
1 Halliburton Float Assy 7 6.366 23.00 N-80 BTC 12.68 1,199.59 1,212.27
1 Halliburton Shoe 7 6.366 23.00 N-80 BTC 12.77 1,212.27 1,225.04
7" Casing P&A Cement, plug, 2/4/2008 11:30
Cementing Start Date Cementing End Date Wellbore
2/4/2008 2/4/2008 Original Hole
Evaluation Method Cement Evaluation Results

Comment
Set 7" EZSV Cement Retainer at 11:00.
Pressure test lines to 2500 psi at 11:32. Pump injection test at 11:34, 1 BPM=970psi, 2 BPM=1090psi, 3 BPM=1195 psi, 4 BPM=1230psi, Static = 800 psi.
Sting out of retainer at 11:40 Mix and pump 30 bbls 15.9 ppg cement with 0. 20 gps BJUltra, 0.35 gps CD-33L, 0.05 gps FP-9L, yield=1.53 ft3/sx, total mix
fluid=6.36 gps. Displace cement to stinger with 11 bbls 9.3 ppg WBM. Sting into retainer at 11:53, squeeze 20 bbls 9.3 ppg WBM to place 20 bbls cement
below retainer. Sting out of retainer at 11:58 pump 3 bbls 9.3ppg WBM to balance 10 bbls cement on top of retainer. CIP= 12:00

<Stg No.?>, 1,195.00-1,347.00mKB


Top (mKB) Bottom (mKB) Full Return? Cmnt Rtrn (bbl) Top Plug? Bottom Plug?
1,195.00 1,347.00 No No No
Initial Pump Rate (bbl/min) Final Pump Rate (bbl/min) Average Pump Rate (bbl/min) Final Pump Pressure (psi) Plug Bump Pressure (psi)

Pipe Reciprocated? Reciprocation Stroke Length (m) Reciprocation Rate (spm) Pipe Rotated? Pipe RPM (rpm)
No No
Depth tagged (mKB) Tag Method Depth Plug Drilled Out To (mKB) Drill Out Diameter (in) Drill Out Date

Fluid Type Fluid Description Amount (sacks) Class Volume Pumped (bbl)

Estimated Top (mKB) Estimated Bottom (mKB) Percent Excess Pumped (%) Yield (ft³/sack) Mix H20 Ratio (gal/sack)

Free Water (%) Density (lb/gal) Plastic Viscosity (cp) Thickening Time (hrs) 1st Compressive Strength (psi)

Cement Fluid Additives


Add Type Conc

www.peloton.com Page 1/2 Report Printed: 3/20/2008


WellView Cement Summary

Well Name: KS-1X 7" Casing P&A Cement


API/UWI Surface Legal Location Field Name License No./Property Code State/Province Well Configuration Type
KS-1X KIM SU Deviated
Ground Elevation (mKB) Casing Flange Elevation (m) KB-Ground Distance (m) KB-Casing Flange Distance (m) Spud Date Rig Release Date
1/23/2008 11:00:00 PM 2/6/2008 6:00:00 AM

<Stg No.?>, 1,115.00-1,195.00mKB


Top (mKB) Bottom (mKB) Full Return? Cmnt Rtrn (bbl) Top Plug? Bottom Plug?
1,115.00 1,195.00 No No No
Initial Pump Rate (bbl/min) Final Pump Rate (bbl/min) Average Pump Rate (bbl/min) Final Pump Pressure (psi) Plug Bump Pressure (psi)

Pipe Reciprocated? Reciprocation Stroke Length (m) Reciprocation Rate (spm) Pipe Rotated? Pipe RPM (rpm)
No No
Depth tagged (mKB) Tag Method Depth Plug Drilled Out To (mKB) Drill Out Diameter (in) Drill Out Date

Fluid Type Fluid Description Amount (sacks) Class Volume Pumped (bbl)

Estimated Top (mKB) Estimated Bottom (mKB) Percent Excess Pumped (%) Yield (ft³/sack) Mix H20 Ratio (gal/sack)

Free Water (%) Density (lb/gal) Plastic Viscosity (cp) Thickening Time (hrs) 1st Compressive Strength (psi)

Cement Fluid Additives


Add Type Conc

www.peloton.com Page 2/2 Report Printed: 3/20/2008


WellView Cement Summary

Well Name: KS-1X 9 5/8" Casing P&A Cement


API/UWI Surface Legal Location Field Name License No./Property Code State/Province Well Configuration Type
KS-1X KIM SU Deviated
Ground Elevation (mKB) Casing Flange Elevation (m) KB-Ground Distance (m) KB-Casing Flange Distance (m) Spud Date Rig Release Date
1/23/2008 11:00:00 PM 2/6/2008 6:00:00 AM

Original Hole
Wellbore Name Profile Type Kick Off Depth (mKB) Vertical Section Direction (°)
Original Hole Directional 365.76 258.00
Section Size (in) Act Top (mKB) Act Btm (mKB)
Surface 12 1/4 99.00 305.01
Intermediate 8 1/2 305.01 1,228.01
Production 6 1/8 1,228.01 3,520.01

Type Install Date

Description Make Model WP (psi) Service SN

Surface, 310.27mKB
Casing Description Wellbore Run Date Set Depth (mKB) Stick Up (mKB) Set Tension (kips)
Surface Original Hole 1/25/2008 310.27 0.00
Centralizers Scratchers

Top Conn
Jts Item Description OD (in) ID (in) Wt (lbs/ft) Grade Sz (in) Top Thread Len (m) Top (mKB) Btm (mKB)
1 Top of Wellhead to Rig Floor 15.15 0.00 15.15
1 KOP Wellhead Assembly 2.20 15.15 17.35
22 9.625" 40# N-80 BTC CSG. 9 5/8 8.835 40.00 N-80 BTC 266.83 17.35 284.18
1 FLOAT COLLAR 9 5/8" GRADE 9 5/8 8.835 40.00 N-80 BTC 12.72 284.18 296.90
40ppf
1 CASING SHOE 9 5/8" GRADE 9 5/8 8.835 40.00 N-80 BTC 13.37 296.90 310.27
40ppf
Intermediate, 1,225.04mKB
Casing Description Wellbore Run Date Set Depth (mKB) Stick Up (mKB) Set Tension (kips)
Intermediate Original Hole 1/27/2008 1,225.04 0.00
Centralizers Scratchers

Top Conn
Jts Item Description OD (in) ID (in) Wt (lbs/ft) Grade Sz (in) Top Thread Len (m) Top (mKB) Btm (mKB)
1 RKB to HGR 7 15.15 0.00 15.15
1 Hanger assembly 7 6.366 23.00 L-80 BTC 2.30 15.15 17.45
2 7" 23 ppf BTC casing N-80 7 6.366 23.00 L-80 BTC 23.94 17.45 41.39
96 7" 23 ppf BTC casing N-80 7 6.366 23.00 N-80 BTC 1,158.20 41.39 1,199.59
1 Halliburton Float Assy 7 6.366 23.00 N-80 BTC 12.68 1,199.59 1,212.27
1 Halliburton Shoe 7 6.366 23.00 N-80 BTC 12.77 1,212.27 1,225.04
9 5/8" Casing P&A Cement, plug, 2/4/2008 23:00
Cementing Start Date Cementing End Date Wellbore
2/4/2008 2/4/2008 Original Hole
Evaluation Method Cement Evaluation Results

Comment
Set 9 5/8" EZSV Cement Retainer at 22:20. Pressure test retainer to 1000 psi at 22:25.
Sting into retainer at 22:30, Pressure test lines to 800 psi at 22:40. Pump injection test with SW at 22:43, 1 BPM=300psi, 2 BPM=335psi, 3 BPM=360 psi,
4 BPM=415psi, static=260psi. Stay stung in and Mix and pump 30 bbls 15.9 ppg cement with 0.05 gps FP-9L, 2% BWOC A-7, yield=1.62 ft3/sx, total mix
fluid=7.05 gps.
Sting out of retainer at 22:55, pump 3.0 bbls SW to balance 10 bbls cement on top of retainer. CIP= 22:56.

<Stg No.?>, 268.00-376.00mKB


Top (mKB) Bottom (mKB) Full Return? Cmnt Rtrn (bbl) Top Plug? Bottom Plug?
268.00 376.00 No No No
Initial Pump Rate (bbl/min) Final Pump Rate (bbl/min) Average Pump Rate (bbl/min) Final Pump Pressure (psi) Plug Bump Pressure (psi)

Pipe Reciprocated? Reciprocation Stroke Length (m) Reciprocation Rate (spm) Pipe Rotated? Pipe RPM (rpm)
No No
Depth tagged (mKB) Tag Method Depth Plug Drilled Out To (mKB) Drill Out Diameter (in) Drill Out Date

Fluid Type Fluid Description Amount (sacks) Class Volume Pumped (bbl)

Estimated Top (mKB) Estimated Bottom (mKB) Percent Excess Pumped (%) Yield (ft³/sack) Mix H20 Ratio (gal/sack)

Free Water (%) Density (lb/gal) Plastic Viscosity (cp) Thickening Time (hrs) 1st Compressive Strength (psi)

Cement Fluid Additives


Add Type Conc

www.peloton.com Page 1/2 Report Printed: 3/20/2008


WellView Cement Summary

Well Name: KS-1X 9 5/8" Casing P&A Cement


API/UWI Surface Legal Location Field Name License No./Property Code State/Province Well Configuration Type
KS-1X KIM SU Deviated
Ground Elevation (mKB) Casing Flange Elevation (m) KB-Ground Distance (m) KB-Casing Flange Distance (m) Spud Date Rig Release Date
1/23/2008 11:00:00 PM 2/6/2008 6:00:00 AM

<Stg No.?>, 227.00-268.00mKB


Top (mKB) Bottom (mKB) Full Return? Cmnt Rtrn (bbl) Top Plug? Bottom Plug?
227.00 268.00 No No No
Initial Pump Rate (bbl/min) Final Pump Rate (bbl/min) Average Pump Rate (bbl/min) Final Pump Pressure (psi) Plug Bump Pressure (psi)

Pipe Reciprocated? Reciprocation Stroke Length (m) Reciprocation Rate (spm) Pipe Rotated? Pipe RPM (rpm)
No No
Depth tagged (mKB) Tag Method Depth Plug Drilled Out To (mKB) Drill Out Diameter (in) Drill Out Date

Fluid Type Fluid Description Amount (sacks) Class Volume Pumped (bbl)

Estimated Top (mKB) Estimated Bottom (mKB) Percent Excess Pumped (%) Yield (ft³/sack) Mix H20 Ratio (gal/sack)

Free Water (%) Density (lb/gal) Plastic Viscosity (cp) Thickening Time (hrs) 1st Compressive Strength (psi)

Cement Fluid Additives


Add Type Conc

www.peloton.com Page 2/2 Report Printed: 3/20/2008


Directional Drilling/ Surveys

Page 38
Field: EXPLORATION WELL
Site: KS-1X
Well: KS-1X
Wellpath: KS-1X
Survey: KS-1X 6-1/8" MWD

1000

9 5/8" Csg Actual


500

500
9 5/8" Csg Actual

7" Csg Actual

1000 0
7" Csg Actual
True Vertical Depth [610m/in]

South(-)/North(+) [500m/in]
°
40

1500 A (Hp14) A (Hp14)


-500

2000 TD (Basement)

-1000

2500

-1500

3000 TD (Basement)

0 500 1000 1500 2000 -2000 -1500 -1000 -500 0 500


Vertical Section at 259.00° [610m/in] West(-)/East(+) [500m/in]

MD Inc. AZI TVD KEY

BLUE --- PLAN


7" Csg Actual Plan 4012.70 39.00 259.00 3468.00
RED --- ACTUAL WELLBORE
7" Csg Actual Survey 3976.38 37.70 259.70 3432.50 GREEN --- PROJECTED STRAIGHT LINE
Halliburton Company
Survey Report
Company: CHEVRON VIETNAM Date: 28/03/2008 Time: 13:28:32 Page: 1
Field: EXPLORATION WELL Co-ordinate(NE) Reference: Site: KS-1X, Grid North
Site: KS-1X Vertical (TVD) Reference: RKB 34.4
Well: KS-1X Section (VS) Reference: Site (0.00N,0.00E,259.00Azi)
Wellpath: KS-1X Survey Calculation Method: Minimum Curvature Db: Sybase
Field: EXPLORATION WELL

VIETNAM
Map System: Universal Transverse Mercator Map Zone: UTM Zone 48, North 102E to 108E
Geo Datum: INDIAN75 (Everest 1830) Coordinate System: Site Centre
Sys Datum: Mean Sea Level Geomagnetic Model: bggm2007

Site: KS-1X

Site Position: Northing: 948408.00 m Latitude: 8 34 30.965 N


From: Map Easting: 277221.00 m Longitude: 102 58 32.118 E
Position Uncertainty: 0.00 m North Reference: Grid
Water Depth: 62.60 m Grid Convergence: -0.30 deg

Well: KS-1X Slot Name:


move from 948408mN, 277221mE
Well Position: +N/-S -2.57 m Northing: 948405.43 m Latitude: 8 34 30.882 N
+E/-W 2.51 m Easting : 277223.51 m Longitude: 102 58 32.201 E
Position Uncertainty: 0.00 m

Wellpath: KS-1X Drilled From: Surface


Tie-on Depth: 0.00 m
Current Datum: RKB Height 34.44 m Above System Datum: Mean Sea Level
Magnetic Data: 24/01/2008 Declination: -0.15 deg
Field Strength: 41396 nT Mag Dip Angle: 1.59 deg
Vertical Section: Depth From (TVD) +N/-S +E/-W Direction
m m m deg
0.00 0.00 0.00 259.00

Survey Program for Definitive Wellpath


Date: 28/03/2008 Validated: No Version: 0
Actual From To Survey Toolcode Tool Name
m m
97.00 1212.00 KS-1X 8-1/2" MWD (97.00-1212. MWD+SCC MWD + Short Collar correction
1245.00 3520.00 KS-1X 6-1/8" MWD (1245.00-3520 MWD+SCC MWD + Short Collar correction

Survey
MD Incl Azim TVD +N/-S +E/-W VS DLS Build Turn Tool/Comment
m deg deg m m m m deg/30m deg/30m deg/30m
0.00 0.00 0.00 0.00 -2.57 2.51 -1.97 0.000 0.000 0.000 TIE LINE
97.00 0.00 0.00 97.00 -2.57 2.51 -1.97 0.000 0.000 0.000 MWD+SCC
309.98 0.49 223.80 309.98 -3.22 1.88 -1.23 0.068 0.068 0.000 9 5/8" Csg Actual
316.00 0.50 223.80 316.00 -3.26 1.85 -1.19 0.068 0.068 0.000 MWD+SCC
345.00 0.50 239.80 345.00 -3.41 1.65 -0.97 0.144 0.000 16.552 MWD+SCC

374.00 4.50 263.90 373.96 -3.60 0.41 0.28 4.189 4.138 24.932 MWD+SCC
403.00 10.10 263.10 402.72 -4.03 -3.25 3.96 5.794 5.793 -0.828 MWD+SCC
432.00 14.00 264.10 431.07 -4.69 -9.26 9.99 4.040 4.035 1.035 MWD+SCC
461.00 18.20 263.80 458.93 -5.54 -17.26 18.00 4.345 4.345 -0.310 MWD+SCC
490.00 22.80 260.90 486.08 -6.92 -27.32 28.13 4.872 4.759 -3.000 MWD+SCC

519.00 29.30 259.50 512.13 -9.11 -39.86 40.86 6.753 6.724 -1.448 MWD+SCC
548.00 35.30 259.00 536.63 -12.00 -55.07 56.35 6.213 6.207 -0.517 MWD+SCC
606.00 39.90 258.80 582.57 -18.81 -89.79 91.73 2.380 2.379 -0.103 MWD+SCC
664.00 40.40 258.70 626.90 -26.11 -126.47 129.13 0.261 0.259 -0.052 MWD+SCC
693.00 40.40 258.80 648.98 -29.78 -144.90 147.92 0.067 0.000 0.103 MWD+SCC

722.00 40.50 258.80 671.05 -33.43 -163.36 166.74 0.103 0.103 0.000 MWD+SCC
751.00 37.90 259.70 693.52 -36.85 -181.36 185.06 2.753 -2.690 0.931 MWD+SCC
780.00 37.40 259.40 716.49 -40.07 -198.78 202.78 0.551 -0.517 -0.310 MWD+SCC
838.00 41.30 260.60 761.33 -46.44 -234.99 239.53 2.055 2.017 0.621 MWD+SCC
925.00 40.90 260.20 826.89 -55.97 -291.38 296.71 0.165 -0.138 -0.138 MWD+SCC

954.00 40.80 259.90 848.82 -59.25 -310.07 315.67 0.228 -0.103 -0.310 MWD+SCC
1013.00 41.70 259.40 893.18 -66.24 -348.33 354.57 0.487 0.458 -0.254 MWD+SCC
1041.00 41.80 259.00 914.07 -69.73 -366.65 373.22 0.305 0.107 -0.429 MWD+SCC
1070.00 41.90 259.20 935.67 -73.39 -385.65 392.57 0.172 0.103 0.207 MWD+SCC
1099.00 39.50 257.40 957.66 -77.22 -404.16 411.47 2.764 -2.483 -1.862 MWD+SCC

1128.00 39.00 257.40 980.12 -81.22 -422.07 429.81 0.517 -0.517 0.000 MWD+SCC
1157.00 38.00 259.70 1002.81 -84.81 -439.76 447.86 1.807 -1.035 2.379 MWD+SCC
Halliburton Company
Survey Report
Company: CHEVRON VIETNAM Date: 28/03/2008 Time: 13:28:32 Page: 2
Field: EXPLORATION WELL Co-ordinate(NE) Reference: Site: KS-1X, Grid North
Site: KS-1X Vertical (TVD) Reference: RKB 34.4
Well: KS-1X Section (VS) Reference: Site (0.00N,0.00E,259.00Azi)
Wellpath: KS-1X Survey Calculation Method: Minimum Curvature Db: Sybase
Survey
MD Incl Azim TVD +N/-S +E/-W VS DLS Build Turn Tool/Comment
m deg deg m m m m deg/30m deg/30m deg/30m
1186.00 37.90 259.40 1025.68 -88.04 -457.30 465.70 0.217 -0.103 -0.310 MWD+SCC
1212.00 37.70 259.70 1046.23 -90.93 -472.97 481.63 0.313 -0.231 0.346 MWD+SCC
1225.00 37.94 260.06 1056.49 -92.34 -480.82 489.60 0.742 0.544 0.825 7" Csg Actual

1245.00 38.30 260.60 1072.23 -94.41 -492.99 501.94 0.742 0.547 0.814 MWD+SCC
1274.00 38.30 260.60 1094.99 -97.34 -510.72 519.91 0.000 0.000 0.000 MWD+SCC
1303.00 38.20 260.60 1117.76 -100.28 -528.43 537.86 0.103 -0.103 0.000 MWD+SCC
1332.00 37.80 260.40 1140.61 -103.22 -546.04 555.70 0.433 -0.414 -0.207 MWD+SCC
1361.00 38.40 260.40 1163.44 -106.21 -563.68 573.59 0.621 0.621 0.000 MWD+SCC

1390.00 39.00 260.20 1186.07 -109.26 -581.56 591.72 0.634 0.621 -0.207 MWD+SCC
1419.00 38.80 260.10 1208.64 -112.38 -599.50 609.93 0.217 -0.207 -0.103 MWD+SCC
1448.00 38.30 259.90 1231.32 -115.52 -617.30 628.00 0.533 -0.517 -0.207 MWD+SCC
1477.00 38.20 259.70 1254.09 -118.70 -634.97 645.95 0.165 -0.103 -0.207 MWD+SCC
1507.00 38.90 259.50 1277.55 -122.07 -653.36 664.64 0.711 0.700 -0.200 MWD+SCC

1565.00 39.20 259.40 1322.60 -128.76 -689.28 701.18 0.159 0.155 -0.052 MWD+SCC
1593.00 40.00 259.40 1344.17 -132.04 -706.82 719.03 0.857 0.857 0.000 MWD+SCC
1622.00 40.40 259.20 1366.32 -135.52 -725.21 737.75 0.435 0.414 -0.207 MWD+SCC
1651.00 40.20 259.20 1388.44 -139.03 -743.64 756.51 0.207 -0.207 0.000 MWD+SCC
1680.00 40.40 258.80 1410.55 -142.61 -762.05 775.26 0.338 0.207 -0.414 MWD+SCC

1709.00 39.50 258.60 1432.79 -146.26 -780.31 793.88 0.940 -0.931 -0.207 MWD+SCC
1738.00 39.20 258.30 1455.21 -149.94 -798.33 812.27 0.367 -0.310 -0.310 MWD+SCC
1767.00 39.00 258.30 1477.72 -153.65 -816.24 830.56 0.207 -0.207 0.000 MWD+SCC
1796.00 38.90 258.10 1500.27 -157.38 -834.08 848.79 0.166 -0.103 -0.207 MWD+SCC
1825.00 38.90 258.10 1522.84 -161.14 -851.90 867.00 0.000 0.000 0.000 MWD+SCC

1854.00 38.90 257.90 1545.41 -164.92 -869.71 885.20 0.130 0.000 -0.207 MWD+SCC
1883.00 38.70 257.90 1568.01 -168.73 -887.48 903.37 0.207 -0.207 0.000 MWD+SCC
1912.00 38.70 257.80 1590.64 -172.55 -905.21 921.50 0.065 0.000 -0.103 MWD+SCC
1970.00 38.30 257.80 1636.03 -180.18 -940.50 957.60 0.207 -0.207 0.000 MWD+SCC
1999.00 38.10 257.80 1658.82 -183.97 -958.03 975.53 0.207 -0.207 0.000 MWD+SCC

2028.00 37.70 257.20 1681.71 -187.82 -975.42 993.34 0.563 -0.414 -0.621 MWD+SCC
2057.00 38.50 256.90 1704.53 -191.83 -992.86 1011.22 0.849 0.828 -0.310 MWD+SCC
2086.00 39.00 256.50 1727.14 -196.01 -1010.52 1029.36 0.578 0.517 -0.414 MWD+SCC
2115.00 39.00 256.40 1749.68 -200.28 -1028.26 1047.59 0.065 0.000 -0.103 MWD+SCC
2144.00 38.90 256.20 1772.23 -204.60 -1045.98 1065.80 0.166 -0.103 -0.207 MWD+SCC

2173.00 38.80 255.80 1794.82 -209.00 -1063.63 1083.96 0.279 -0.103 -0.414 MWD+SCC
2231.00 38.20 254.20 1840.21 -218.34 -1098.50 1119.98 0.601 -0.310 -0.828 MWD+SCC
2260.00 38.00 253.50 1863.03 -223.32 -1115.69 1137.80 0.492 -0.207 -0.724 MWD+SCC
2318.00 40.60 251.80 1907.91 -234.29 -1150.74 1174.30 1.455 1.345 -0.879 MWD+SCC
2347.00 41.30 250.40 1929.82 -240.45 -1168.72 1193.13 1.194 0.724 -1.448 MWD+SCC

2376.00 41.00 249.00 1951.65 -247.07 -1186.62 1211.96 1.002 -0.310 -1.448 MWD+SCC
2405.00 40.80 247.70 1973.57 -254.07 -1204.27 1230.62 0.904 -0.207 -1.345 MWD+SCC
2434.00 40.60 247.40 1995.56 -261.29 -1221.75 1249.15 0.289 -0.207 -0.310 MWD+SCC
2463.00 40.50 247.40 2017.59 -268.54 -1239.15 1267.62 0.103 -0.103 0.000 MWD+SCC
2492.00 40.40 247.40 2039.66 -275.77 -1256.52 1286.05 0.103 -0.103 0.000 MWD+SCC

2521.00 40.50 247.40 2061.73 -283.00 -1273.89 1304.48 0.103 0.103 0.000 MWD+SCC
2550.00 40.50 247.70 2083.78 -290.19 -1291.30 1322.94 0.202 0.000 0.310 MWD+SCC
2579.00 40.70 247.60 2105.80 -297.37 -1308.75 1341.45 0.218 0.207 -0.103 MWD+SCC
2608.00 40.90 247.40 2127.75 -304.62 -1326.26 1360.02 0.247 0.207 -0.207 MWD+SCC
2637.00 41.10 247.40 2149.64 -311.93 -1343.82 1378.65 0.207 0.207 0.000 MWD+SCC

2666.00 41.10 247.40 2171.49 -319.26 -1361.42 1397.33 0.000 0.000 0.000 MWD+SCC
2695.00 41.10 247.60 2193.35 -326.55 -1379.04 1416.01 0.136 0.000 0.207 MWD+SCC
2724.00 41.10 247.70 2215.20 -333.80 -1396.67 1434.70 0.068 0.000 0.103 MWD+SCC
2753.00 41.10 247.90 2237.05 -341.00 -1414.32 1453.40 0.136 0.000 0.207 MWD+SCC
2810.00 40.60 248.10 2280.17 -354.97 -1448.89 1490.00 0.272 -0.263 0.105 MWD+SCC

2839.00 40.90 247.40 2302.14 -362.14 -1466.41 1508.56 0.565 0.310 -0.724 MWD+SCC
2868.00 40.70 246.80 2324.09 -369.51 -1483.86 1527.10 0.455 -0.207 -0.621 MWD+SCC
2897.00 40.70 246.00 2346.08 -377.08 -1501.19 1545.56 0.540 0.000 -0.828 MWD+SCC
2926.00 40.80 245.40 2368.05 -384.87 -1518.44 1563.98 0.418 0.103 -0.621 MWD+SCC
2955.00 40.10 245.60 2390.12 -392.67 -1535.56 1582.28 0.736 -0.724 0.207 MWD+SCC
Halliburton Company
Survey Report
Company: CHEVRON VIETNAM Date: 28/03/2008 Time: 13:28:32 Page: 3
Field: EXPLORATION WELL Co-ordinate(NE) Reference: Site: KS-1X, Grid North
Site: KS-1X Vertical (TVD) Reference: RKB 34.4
Well: KS-1X Section (VS) Reference: Site (0.00N,0.00E,259.00Azi)
Wellpath: KS-1X Survey Calculation Method: Minimum Curvature Db: Sybase
Survey
MD Incl Azim TVD +N/-S +E/-W VS DLS Build Turn Tool/Comment
m deg deg m m m m deg/30m deg/30m deg/30m
2984.00 40.30 246.10 2412.27 -400.33 -1552.64 1600.50 0.393 0.207 0.517 MWD+SCC
3013.00 40.60 245.60 2434.33 -408.03 -1569.81 1618.83 0.457 0.310 -0.517 MWD+SCC
3038.00 41.00 245.40 2453.26 -414.80 -1584.68 1634.71 0.505 0.480 -0.240 MWD+SCC
3071.00 41.10 245.10 2478.15 -423.88 -1604.36 1655.76 0.201 0.091 -0.273 MWD+SCC
3100.00 41.10 244.90 2500.00 -431.93 -1621.63 1674.26 0.136 0.000 -0.207 MWD+SCC

3129.00 40.80 244.70 2521.90 -440.03 -1638.83 1692.68 0.339 -0.310 -0.207 MWD+SCC
3158.00 40.60 244.70 2543.89 -448.11 -1655.93 1711.01 0.207 -0.207 0.000 MWD+SCC
3187.00 40.40 244.20 2565.94 -456.23 -1672.92 1729.24 0.395 -0.207 -0.517 MWD+SCC
3216.00 40.00 243.90 2588.09 -464.42 -1689.75 1747.32 0.460 -0.414 -0.310 MWD+SCC
3245.00 40.20 243.70 2610.27 -472.67 -1706.51 1765.35 0.246 0.207 -0.207 MWD+SCC

3274.00 40.20 243.70 2632.42 -480.96 -1723.29 1783.40 0.000 0.000 0.000 MWD+SCC
3303.00 40.40 243.50 2654.54 -489.30 -1740.09 1801.49 0.246 0.207 -0.207 MWD+SCC
3332.00 40.40 243.30 2676.62 -497.72 -1756.90 1819.59 0.134 0.000 -0.207 MWD+SCC
3361.00 40.50 243.30 2698.69 -506.17 -1773.71 1837.70 0.103 0.103 0.000 MWD+SCC
3390.00 40.40 243.50 2720.76 -514.60 -1790.53 1855.82 0.169 -0.103 0.207 MWD+SCC

3419.00 40.30 243.30 2742.86 -523.00 -1807.32 1873.91 0.169 -0.103 -0.207 MWD+SCC
3448.00 41.30 243.50 2764.81 -531.49 -1824.26 1892.16 1.043 1.034 0.207 MWD+SCC
3477.00 41.60 243.10 2786.55 -540.11 -1841.41 1910.64 0.414 0.310 -0.414 MWD+SCC
3506.00 41.60 242.60 2808.24 -548.90 -1858.55 1929.13 0.343 0.000 -0.517 MWD+SCC
3520.00 41.60 242.40 2818.71 -553.19 -1866.79 1938.05 0.285 0.000 -0.429 MWD+SCC

Casing Points
MD TVD Diameter Hole Size Name
m m in in
309.98 309.98 9.625 12.250 9 5/8" Csg Actual
1225.00 1056.49 7.000 8.500 7" Csg Actual
Client : Chevron VietNam
Well Name : KS-1X
Field :
Slot :
Rig : Vicksburg
BHA Report Job # : VT-DD-0005619436 BHA# 2

BHA# 2 : Date In :25/01/2008 MD In (m) : 0 TVD In (m) : 0 Date Out: 26/01/2008 MD Out (m): 1228 TVD Out (m): 1059

BIT DATA
Bit # OD (in) MFR Style Serial# Nozzles (/32's) TFA (in²) Dull Condition
1 8.500 Hycalog HC 604 7210098 6x14 0.902 1-1-WT-A -X-I-NO-TD

MOTOR DATA
Run # OD (in) MFR Model Serial# Bend Nzl (/32's) Avg Dif (psi) Cum Circ Hrs
1 7.000 SSDS SperryDrill 700021 1.40° 258 42.00

COMPONENT DATA
Item Description Serial OD ID Gauge Weight Top Con Length Bit - Center
# # (in) (in) (in) (lbs/ft) (m) Blade (m)
1 HC 604 7210098 8.500 2.500 176.66 P 4-1/2" Reg 0.34
2 7" SperryDrill Lobe 7/8 - 7.5 stg 700021 7.000 4.753 70.69 B 4-1/2" IF 8.62
3 6 3/4" Float Sub 10761264 6.750 2.813 100.77 B 4-1/2" IF 0.96
4 Non-Mag MWD Hang Off Collar 231801 6.750 2.813 101.00 B 4-1/2" IF 8.53
5 6 3/4" Non Mag Screen Sub STH0455 6.750 2.813 100.77 B 4-1/2" IF 1.83
6 15 x HWDP Atwood 5.000 3.000 49.30 B 4-1/2" IF 139.20
________
159.48

Parameter Min Max Ave Activity Hrs BHA Weight (lb) Drill String OD(in) Len (m)
WOB (klbs) : 8 220 21 Drilling : 6.50 in Air (Total) : 28457
RPM (rpm) : 120 120 120 Reaming : 2.75 in Mud (Total) :
Flow (gpm) : 800 800 800 Circ-Other : 4.25 in Air (Bel Jars) : 0
SPP (psi) : 1900 2700 2362 Total : 13.50 in Mud (Bel Jars) :

PERFORMANCE
In Out Distance (m) ROP (m/hr) Build (°/30m) Turn (°/30m) DLS (°/30m)
Inclination (deg) 0.00 37.99 Oriented : 199.30 190 8.00
Azimuth (deg) 0.00 260.14 Rotated : 1028.70 189
Total : 1228.00 189 0.93 0.00 0.93

COMMENTS
Drilled vertically down as program
Build commenced at 362m, motor output was 8°/30m initially.
The assembly had a left hand walk tendency and slight build trend.
The section was drilled with seawater & hi visc sweeps every 5 stands.
We switched to mud from 826m MD.
After which each stand was back reamed 1x to maximise hole diameter.
TD was 1228 m we were 4.7m long on section & 4 m right of plan .
Client : Chevron VietNam
Well Name : KS-1X
Field :
Slot :
Rig : Vicksburg
BHA Report Job # : VT-DD-0005619436 BHA# 3

BHA# 3 : Date In :27/01/2008 MD In (m) : 1228 TVD In (m) : 1059 Date Out: 27/01/2008 MD Out (m): 1228 TVD Out (m): 1059

BIT DATA
Bit # OD (in) MFR Style Serial# Nozzles (/32's) TFA (in²) Dull Condition
1rr1 8.500 Hycalog HC 604 7210098 6x14 0.902 1-1-WT-A -X-I-NO-TD

MOTOR DATA
Run # OD (in) MFR Model Serial# Bend Nzl (/32's) Avg Dif (psi) Cum Circ Hrs
2 7.000 SSDS SperryDrill 700021 1.40° 45.25

COMPONENT DATA
Item Description Serial OD ID Gauge Weight Top Con Length Bit - Center
# # (in) (in) (in) (lbs/ft) (m) Blade (m)
1 HC 604 7210098 8.500 2.500 176.66 P 4-1/2" Reg 0.34
2 7" SperryDrill Lobe 7/8 - 7.5 stg 700021 7.000 4.753 70.69 B 4-1/2" IF 8.62
3 6 3/4" Float Sub 10761264 6.750 2.813 100.77 B 4-1/2" IF 0.96
4 Non-Mag MWD Hang Off Collar 231801 6.750 2.813 101.00 B 4-1/2" IF 8.53
5 6 3/4" Non Mag Screen Sub STH0455 6.750 2.813 100.77 B 4-1/2" IF 1.83
6 15 x HWDP Atwood 5.000 3.000 49.30 B 4-1/2" IF 139.20
________
159.48

Parameter Min Max Ave Activity Hrs BHA Weight (lb) Drill String OD(in) Len (m)
WOB (klbs) : Drilling : 0.00 in Air (Total) : 28457
RPM (rpm) : Reaming : 2.00 in Mud (Total) :
Flow (gpm) : Circ-Other : 1.25 in Air (Bel Jars) : 0
SPP (psi) : Total : 3.25 in Mud (Bel Jars) :

PERFORMANCE
In Out Distance (m) ROP (m/hr) Build (°/30m) Turn (°/30m) DLS (°/30m)
Inclination (deg) 37.99 37.99 Oriented :
Azimuth (deg) 260.14 260.14 Rotated :
Total :

COMMENTS
Wiper Trip
Client : Chevron VietNam
Well Name : KS-1X
Field :
Slot :
Rig : Vicksburg
BHA Report Job # : VT-DD-0005619436 BHA# 4

BHA# 4 : Date In :28/01/2008 MD In (m) : 1228 TVD In (m) : 1059 Date Out: 30/01/2008 MD Out (m): 2416 TVD Out (m): 1982

BIT DATA
Bit # OD (in) MFR Style Serial# Nozzles (/32's) TFA (in²) Dull Condition
3 6.125 Smith Mi416PX 217914 4x12 0.442 3-2-CT-A -X-I-ER-BHA

MOTOR DATA
Run # OD (in) MFR Model Serial# Bend Nzl (/32's) Avg Dif (psi) Cum Circ Hrs

COMPONENT DATA
Item Description Serial OD ID Gauge Weight Top Con Length Bit - Center
# # (in) (in) (in) (lbs/ft) (m) Blade (m)
1 DRS416 B2 217914 6.125 2.000 6.125 89.71 P 3-1/2" Reg 0.21
2 6 1/8" Modular NB stabilizer 10854019 4.750 2.250 6.093 46.84 B HT-38 0.76 0.50
3 2ft Extension sub 10937391 5.000 2.250 53.37 B HT-38 0.61
4 Adjustable Gauge Stabilizer 325077 5.000 2.250 6.120 53.37 B HT-38 3.20 3.40
5 5" Non-Mag Hang Off Collar 10961179 5.000 2.250 53.37 B 3-1/2" IF 9.55
6 5 1/2" Integral Blade Stabilizer 91420 4.750 2.250 5.500 46.84 B 3-1/2" IF 1.26 14.94
7 4 3/4" Screen Sub 10803373 4.750 2.250 46.84 B 3-1/2" IF 1.72
8 Cross Over Sub(Chevron) COR313 AD 5.000 2.250 53.37 B XTF-39 0.71
9 24 x 4" HWDP 4.000 2.563 29.70 B XTF-39
10 DP (S)

Parameter Min Max Ave Activity Hrs BHA Weight (lb) Drill String OD(in) Len (m)
WOB (klbs) : 6 10 10 Drilling : 18.25 in Air (Total) :
RPM (rpm) : 210 240 239 Reaming : 0.00 in Mud (Total) :
Flow (gpm) : 294 310 299 Circ-Other : 4.00 in Air (Bel Jars) : 0
SPP (psi) : 2440 3370 3014 Total : 22.25 in Mud (Bel Jars) : 0

PERFORMANCE
In Out Distance (m) ROP (m/hr) Build (°/30m) Turn (°/30m) DLS (°/30m)
Inclination (deg) 37.99 40.73 Oriented : 0.00 0 8.00
Azimuth (deg) 260.14 247.59 Rotated : 1188.00 65
Total : 1188.00 65 0.07 -0.32 0.21

COMMENTS
The BHA was run in and after drilling cement and shoe a leak off test was carried out. Drilling commenced in the full gauge position. After
establishing a drop drilling continued with only three sets in under gauge to maintain the well's trajectory. at 1988m a drop in pressure of 1000 psi
was recorded and the BHA was tripped looking for a wash out.After tripping 20 stands and checking surface equipment it was found to be barite
sag in the mud blocking the suction lines.We tripped back in and continued drilling. Left hand walk began to accelerate beyond 2272 to
unacceptable levels and the BHA was tripped out to run a Smith 416 (669).
Client : Chevron VietNam
Well Name : KS-1X
Field :
Slot :
Rig : Vicksburg
BHA Report Job # : VT-DD-0005619436 BHA# 5

BHA# 5 : Date In :30/01/2008 MD In (m) : 2416 TVD In (m) : 1982 Date Out: 30/01/2008 MD Out (m): 2445 TVD Out (m): 2004

BIT DATA
Bit # OD (in) MFR Style Serial# Nozzles (/32's) TFA (in²) Dull Condition
3 6.125 Smith Mi416PX JX7400 4x12 0.442 1-1-NO-A -X-I-NO-DTF

MOTOR DATA
Run # OD (in) MFR Model Serial# Bend Nzl (/32's) Avg Dif (psi) Cum Circ Hrs

COMPONENT DATA
Item Description Serial OD ID Gauge Weight Top Con Length Bit - Center
# # (in) (in) (in) (lbs/ft) (m) Blade (m)
1 Mi 416 PX (ER20699) JX7400 6.125 2.000 6.125 89.71 P 3-1/2" Reg 0.20
2 6 1/8" Modular NB stabilizer 10854019 4.750 2.250 6.093 46.84 B HT-38 0.76 0.49
3 2ft Extension sub 10937391 5.000 2.250 53.37 B HT-38 0.61
4 Adjustable Gauge Stabilizer 325077 5.000 2.250 6.120 53.37 B HT-38 3.20 3.40
5 5" Non-Mag Hang Off Collar 10961179 5.000 2.250 53.37 B 3-1/2" IF 9.55
6 5 1/2" Integral Blade Stabilizer 91420 4.750 2.250 5.500 46.84 B 3-1/2" IF 1.26 14.93
7 4 3/4" Screen Sub 10803373 4.750 2.250 46.84 B 3-1/2" IF 1.72
8 Cross Over Sub(Chevron) COR313 AD 5.000 2.250 53.37 B XTF-39 0.71
9 24 x 4" HWDP 4.000 2.563 29.70 B XTF-39
10 DP (S)

Parameter Min Max Ave Activity Hrs BHA Weight (lb) Drill String OD(in) Len (m)
WOB (klbs) : 10 10 10 Drilling : 1.00 in Air (Total) :
RPM (rpm) : 240 240 240 Reaming : 0.00 in Mud (Total) :
Flow (gpm) : 300 300 300 Circ-Other : 0.50 in Air (Bel Jars) : 0
SPP (psi) : 3220 3220 3220 Total : 1.50 in Mud (Bel Jars) : 0

PERFORMANCE
In Out Distance (m) ROP (m/hr) Build (°/30m) Turn (°/30m) DLS (°/30m)
Inclination (deg) 40.73 40.57 Oriented : 0.00 0
Azimuth (deg) 247.59 247.40 Rotated : 29.00 29
Total : 29.00 29 -0.16 -0.19 0.21

COMMENTS
The BHA was run in hole and after drilling one stand the MWD failed.
Client : Chevron VietNam
Well Name : KS-1X
Field :
Slot :
Rig : Vicksburg
BHA Report Job # : VT-DD-0005619436 BHA# 6

BHA# 6 : Date In :30/01/2008 MD In (m) : 2445 TVD In (m) : 2004 Date Out: 31/01/2008 MD Out (m): 3049 TVD Out (m): 2462

BIT DATA
Bit # OD (in) MFR Style Serial# Nozzles (/32's) TFA (in²) Dull Condition
3rr1 6.125 Smith Mi416PX JX7400 4x12 0.442 8-2-RO-T -X-I-LT-PR

MOTOR DATA
Run # OD (in) MFR Model Serial# Bend Nzl (/32's) Avg Dif (psi) Cum Circ Hrs

COMPONENT DATA
Item Description Serial OD ID Gauge Weight Top Con Length Bit - Center
# # (in) (in) (in) (lbs/ft) (m) Blade (m)
1 Mi 416 PX (ER20699) JX7400 6.125 2.000 6.125 89.71 P 3-1/2" Reg 0.20
2 6 1/8" Modular NB stabilizer 10854019 4.750 2.250 6.093 46.84 B HT-38 0.76 0.49
3 2ft Extension sub 10937391 5.000 2.250 53.37 B HT-38 0.61
4 Adjustable Gauge Stabilizer 325077 5.000 2.250 6.120 53.37 B HT-38 3.20 3.40
5 5" Non-Mag Hang Off Collar 10961179 5.000 2.250 53.37 B 3-1/2" IF 9.55
6 5 1/2" Integral Blade Stabilizer 91420 4.750 2.250 5.500 46.84 B 3-1/2" IF 1.26 14.93
7 4 3/4" Screen Sub 10803373 4.750 2.250 46.84 B 3-1/2" IF 1.72
8 Cross Over Sub(Chevron) COR313 AD 5.000 2.250 53.37 B XTF-39 0.71
9 24 x 4" HWDP 4.000 2.563 29.70 B XTF-39
10 DP (S)

Parameter Min Max Ave Activity Hrs BHA Weight (lb) Drill String OD(in) Len (m)
WOB (klbs) : 10 12 11 Drilling : 16.00 in Air (Total) :
RPM (rpm) : 220 240 230 Reaming : 0.50 in Mud (Total) :
Flow (gpm) : 180 300 262 Circ-Other : 0.50 in Air (Bel Jars) : 0
SPP (psi) : 1604 3520 2814 Total : 17.00 in Mud (Bel Jars) : 0

PERFORMANCE
In Out Distance (m) ROP (m/hr) Build (°/30m) Turn (°/30m) DLS (°/30m)
Inclination (deg) 40.57 41.03 Oriented : 0.00 0
Azimuth (deg) 247.40 245.30 Rotated : 604.00 38
Total : 604.00 38 0.02 -0.10 0.07

COMMENTS
The BHA was run in and drilling commenced. The left hand trend was immediately arrested and drilling continued in the full position for the next
600m. Drilling rate initially was very good, the WOB was kept to a minimum with 240 RPM. The ROP, however dropped off markedly over two
stands eventually down to 5 m/hr. It was decided to pull out for a five bladed bit.
Client : Chevron VietNam
Well Name : KS-1X
Field :
Slot :
Rig : Vicksburg
BHA Report Job # : VT-DD-0005619436 BHA# 7

BHA# 7 : Date In :31/01/2008 MD In (m) : 3049 TVD In (m) : 2462 Date Cur: 03/02/2008 MD Cur (m): 3520 TVD Cur (m): 2819

BIT DATA
Bit # OD (in) MFR Style Serial# Nozzles (/32's) TFA (in²) Dull Condition
4 6.125 Security DBS FMH3543ZR 10947814 3x14, 2x10 0.604 1-2-WT-T -X-I-NO-TD

MOTOR DATA
Run # OD (in) MFR Model Serial# Bend Nzl (/32's) Avg Dif (psi) Cum Circ Hrs

COMPONENT DATA
Item Description Serial OD ID Gauge Weight Top Con Length Bit - Center
# # (in) (in) (in) (lbs/ft) (m) Blade (m)
1 FMH3543ZR 10947814 6.125 2.000 6.125 89.71 P 3-1/2" Reg 0.20
2 6 1/8" Modular NB stabilizer 10854019 4.750 2.250 6.093 46.84 B HT-38 0.76 0.49
3 2ft Extension sub 10937391 5.000 2.250 53.37 B HT-38 0.61
4 Adjustable Gauge Stabilizer 325077 5.000 2.250 6.120 53.37 B HT-38 3.20 3.40
5 5" Non-Mag Hang Off Collar 10961179 5.000 2.250 53.37 B 3-1/2" IF 9.55
6 5 1/2" Integral Blade Stabilizer 91420 4.750 2.250 5.500 46.84 B 3-1/2" IF 1.26 14.93
7 4 3/4" Screen Sub 10803373 4.750 2.250 46.84 B 3-1/2" IF 1.72
8 Cross Over Sub(Chevron) COR313 AD 5.000 2.250 53.37 B XTF-39 0.71
9 24 x 4" HWDP 4.000 2.563 29.70 B XTF-39
10 DP (S)

Parameter Min Max Ave Activity Hrs BHA Weight (lb) Drill String OD(in) Len (m)
WOB (klbs) : 10 12 10 Drilling : 17.50 in Air (Total) :
RPM (rpm) : 230 240 240 Reaming : 0.00 in Mud (Total) :
Flow (gpm) : 190 239 217 Circ-Other : 2.00 in Air (Bel Jars) : 0
SPP (psi) : 1604 2270 2031 Total : 19.50 in Mud (Bel Jars) : 0

PERFORMANCE
In Out Distance (m) ROP (m/hr) Build (°/30m) Turn (°/30m) DLS (°/30m)
Inclination (deg) 41.03 41.60 Oriented : 0.00 0
Azimuth (deg) 245.30 242.40 Rotated : 471.00 27
Total : 471.00 27 0.04 -0.18 0.13

COMMENTS
The BHA was run in and drilling commenced with a greatly improved ROP of up tp 50m/hr. WOB was kept at a constant 10klbs and RPM at 240.
The trajectory basically held angle with a slight left hand walk tendencey until 3430m where the BHA built a degree over a stand; after which the
BHA held angle to TD at 3520m.
Page : 1
Client : Chevron VietNam Field :
Well Name : KS-1X Slot :
Rig : Vicksburg Job # : VT-DD-0005619436
Survey and Drilling Parameters North Ref : Mag Declination : ° VS Dir : 259.00° (from Wellhead)

WELLBORE SURVEY DRILLING PARAMETERS


Measured Incl Azi Vertical Vertical Coordinates DLS Build Turn WOB RPM Flow Stand Orientation Tool ROP BHA Comment
Depth Angle Dir Depth Section N/S E/W Rate Rate Rate Pipe From To Face No.
(m) (deg) (deg) (m) (m) (m) (m) (°/30m) (°/30m) (°/30m) (klbs) (gpm) (psi) (m) (m) (deg) (m/hr) (#)

0.00 0.00 0.00 0.0 -2.0 -2.6 2.5 0.00 0.00 0.00 2 Tieon
97.00 0.00 0.00 97.0 -2.0 -2.6 2.5 0.00 0.00 0.00 2
316.00 0.50 223.80 316.0 -1.2 -3.3 1.8 0.07 0.07 0.00 120 2
345.00 0.50 239.80 345.0 -1.0 -3.4 1.7 0.14 0.00 0.00 120 2
374.00 4.50 263.90 374.0 0.3 -3.6 0.4 4.19 4.14 0.00 12 800 1900 362 374 259m 145 2
403.00 10.10 263.10 402.7 4.0 -4.0 -3.2 5.79 5.79 -0.83 12 800 2000 374 382 259m 158 2
391 403 HS 2
432.00 14.00 264.10 431.1 10.0 -4.7 -9.3 4.04 4.03 1.03 15 120 800 2000 403 411 HS 2
420 430 HS 2
461.00 18.20 263.80 458.9 18.0 -5.5 -17.3 4.35 4.34 -0.31 12 800 2000 450 461 10L 216 2
490.00 22.80 260.90 486.1 28.1 -6.9 -27.3 4.87 4.76 -3.00 12 800 2000 461 464 10L 150 2
478 490 10L 2
519.00 29.30 259.50 512.1 40.9 -9.1 -39.9 6.75 6.72 -1.45 12 800 2000 490 501 10L 216 2
507 519 HS 2
548.00 35.30 259.00 536.6 56.3 -12.0 -55.1 6.21 6.21 -0.52 12 800 2000 519 530 HS 216 2
536 548 10R 2
606.00 39.90 258.80 582.6 91.7 -18.8 -89.8 2.38 2.38 -0.10 15 120 800 2000 548 560 10R 216 2
594 604 10R 2
664.00 40.40 258.77 626.9 129.1 -26.1 -126.5 0.26 0.26 -0.02 15 120 800 2450 271 2
693.00 40.40 258.80 649.0 147.9 -29.7 -144.9 0.00 0.00 0.03 15 120 800 2450 249 2
722.00 40.50 258.80 671.1 166.7 -33.4 -163.4 0.10 0.10 0.00 15 120 800 2450 290 2
751.00 37.90 259.70 693.5 185.1 -36.8 -181.4 2.75 -2.69 0.93 15 120 800 2450 2
780.00 37.40 259.40 716.5 202.8 -40.0 -198.8 0.55 -0.52 -0.31 15 120 800 2450 218 2
838.00 41.30 260.60 761.3 239.5 -46.4 -235.0 2.06 2.02 0.62 15 120 800 2500 797 810 10R 246 2
925.00 40.90 260.20 826.9 296.7 -55.9 -291.4 0.17 -0.14 -0.14 20 120 800 2500 158 2
955.00 40.80 259.90 849.6 316.3 -59.3 -310.7 0.22 -0.10 -0.30 20 120 800 2500 170 2
1013.00 41.70 259.40 893.2 354.6 -66.2 -348.3 0.50 0.47 -0.26 15 120 800 2500 177 2
1041.00 41.80 259.00 914.1 373.2 -69.7 -366.7 0.30 0.11 -0.43 22 120 800 2650 109 2
1070.00 41.90 259.00 935.7 392.6 -73.4 -385.6 0.10 0.10 0.00 22 120 800 2650 101 2
1099.00 39.50 257.40 957.7 411.5 -77.2 -404.2 2.71 -2.48 -1.66 220 120 800 2700 1087 1097 LS 102 2
Page : 2
Client : Chevron VietNam Field :
Well Name : KS-1X Slot :
Rig : Vicksburg Job # : VT-DD-0005619436
Survey and Drilling Parameters North Ref : Mag Declination : ° VS Dir : 259.00° (from Wellhead)

WELLBORE SURVEY DRILLING PARAMETERS


Measured Incl Azi Vertical Vertical Coordinates DLS Build Turn WOB RPM Flow Stand Orientation Tool ROP BHA Comment
Depth Angle Dir Depth Section N/S E/W Rate Rate Rate Pipe From To Face No.
(m) (deg) (deg) (m) (m) (m) (m) (°/30m) (°/30m) (°/30m) (klbs) (gpm) (psi) (m) (m) (deg) (m/hr) (#)
1128.00 39.00 257.40 980.1 429.8 -81.2 -422.1 0.52 -0.52 0.00 22 120 800 2700 103 2
1158.00 38.00 259.70 1003.6 448.5 -85.0 -440.4 1.75 -1.00 2.30 25 120 800 2700 1145 1152 88 2
1187.00 37.90 259.40 1026.5 466.3 -88.2 -457.9 0.22 -0.10 -0.31 22 120 800 2700 97 2
1212.00 37.70 259.70 1046.2 481.6 -91.0 -473.0 0.33 -0.24 0.36 22 120 800 2700 104 2
1245.00 38.30 260.60 1072.2 501.9 -94.4 -493.0 0.74 0.55 0.82 10 240 300 2870 22 4 FG
1274.00 38.30 260.60 1095.0 519.9 -97.4 -510.7 0.00 0.00 0.00 10 240 300 2870 73 4 FG
1303.00 38.10 260.60 1117.8 537.8 -100.3 -528.4 0.21 -0.21 0.00 10 240 300 2870 79 4 FG
1332.00 37.80 260.40 1140.6 555.7 -103.3 -546.0 0.34 -0.31 -0.21 10 240 300 2870 77 4 FG
1361.00 38.40 260.40 1163.5 573.6 -106.2 -563.6 0.62 0.62 0.00 10 210 310 2440 30 4 UG
1390.00 39.00 260.20 1186.1 591.7 -109.3 -581.5 0.63 0.62 -0.21 10 240 300 2840 21 4 FG
1419.00 38.80 260.10 1208.7 609.9 -112.4 -599.5 0.22 -0.21 -0.10 10 240 300 2910 80 4 FG
1448.00 38.30 259.90 1231.3 628.0 -115.5 -617.3 0.53 -0.52 -0.21 10 240 300 2900 84 4 FG
1477.00 38.20 259.70 1254.1 645.9 -118.7 -634.9 0.16 -0.10 -0.21 10 240 300 2980 91 4 FG
1506.00 38.90 259.50 1276.8 664.0 -122.0 -652.7 0.74 0.72 -0.21 10 240 300 2470 81 4 UG
1564.00 39.20 259.40 1321.8 700.5 -128.7 -688.6 0.16 0.16 -0.05 10 240 300 2970 66 4 FG
1593.00 40.00 259.40 1344.2 719.0 -132.1 -706.8 0.83 0.83 0.00 10 240 310 2650 110 4 UG
1622.00 40.40 259.20 1366.3 737.7 -135.6 -725.2 0.43 0.41 -0.21 10 240 300 3030 164 4 FG
1651.00 40.20 259.20 1388.5 756.5 -139.1 -743.6 0.21 -0.21 0.00 10 240 300 3030 83 4 FG
1680.00 40.40 258.80 1410.6 775.2 -142.7 -762.0 0.34 0.21 -0.41 10 240 300 3075 80 4 FG
1709.00 39.50 258.60 1432.8 793.9 -146.3 -780.3 0.94 -0.93 -0.21 10 240 300 3075 81 4 FG
1738.00 39.20 258.30 1455.2 812.2 -150.0 -798.3 0.37 -0.31 -0.31 10 240 300 3126 76 4 FG
1767.00 39.00 258.30 1477.7 830.5 -153.7 -816.2 0.21 -0.21 0.00 10 240 300 3124 62 4 FG
1796.00 38.90 258.10 1500.3 848.8 -157.4 -834.1 0.17 -0.10 -0.21 10 240 300 3183 113 4 FG
1854.00 38.90 257.90 1545.4 885.2 -165.0 -869.7 0.06 0.00 -0.10 10 240 300 3183 65 4 FG
1883.00 38.70 257.90 1568.0 903.3 -168.8 -887.4 0.21 -0.21 0.00 10 240 300 3228 51 4 FG
1912.00 38.70 257.80 1590.7 921.5 -172.6 -905.2 0.06 0.00 -0.10 10 240 300 3152 73 4 FG
1970.00 38.30 257.80 1636.0 957.6 -180.2 -940.5 0.21 -0.21 0.00 10 240 300 3020 45 4 FG
1999.00 38.10 257.80 1658.8 975.5 -184.0 -958.0 0.21 -0.21 0.00 10 240 300 3120 5 4 FG
2028.00 37.70 257.20 1681.7 993.3 -187.9 -975.4 0.56 -0.41 -0.62 10 240 300 3130 74 4 FG
2057.00 38.50 256.90 1704.5 1011.2 -191.9 -992.8 0.85 0.83 -0.31 10 240 308 2740 72 4 UG
Page : 3
Client : Chevron VietNam Field :
Well Name : KS-1X Slot :
Rig : Vicksburg Job # : VT-DD-0005619436
Survey and Drilling Parameters North Ref : Mag Declination : ° VS Dir : 259.00° (from Wellhead)

WELLBORE SURVEY DRILLING PARAMETERS


Measured Incl Azi Vertical Vertical Coordinates DLS Build Turn WOB RPM Flow Stand Orientation Tool ROP BHA Comment
Depth Angle Dir Depth Section N/S E/W Rate Rate Rate Pipe From To Face No.
(m) (deg) (deg) (m) (m) (m) (m) (°/30m) (°/30m) (°/30m) (klbs) (gpm) (psi) (m) (m) (deg) (m/hr) (#)
2086.00 39.00 256.50 1727.2 1029.3 -196.1 -1010.5 0.58 0.52 -0.41 10 240 300 3300 92 4 FG
2115.00 39.00 256.40 1749.7 1047.6 -200.4 -1028.2 0.07 0.00 -0.10 10 240 300 3300 30 4 FG
2144.00 38.90 256.20 1772.3 1065.8 -204.7 -1045.9 0.17 -0.10 -0.21 10 240 297 3100 68 4 FG
2173.00 38.80 255.80 1794.8 1083.9 -209.1 -1063.6 0.28 -0.10 -0.41 10 240 296 3140 19 4 FG
2231.00 38.20 254.20 1840.2 1120.0 -218.4 -1098.5 0.60 -0.31 -0.83 10 240 294 3075 86 4 FG
2260.00 38.00 253.50 1863.0 1137.8 -223.4 -1115.7 0.49 -0.21 -0.72 10 240 294 3075 85 4 FG
2318.00 40.60 251.80 1907.9 1174.3 -234.4 -1150.7 1.46 1.34 -0.88 10 240 294 2790 88 4 UG
2347.00 41.30 250.40 1929.8 1193.1 -240.5 -1168.7 1.19 0.72 -1.45 10 240 294 3100 92 4 FG
2376.00 41.00 249.00 1951.7 1211.9 -247.1 -1186.6 1.00 -0.31 -1.45 6 240 294 3370 93 4 FG
2405.00 40.80 247.70 1973.6 1230.6 -254.1 -1204.2 0.90 -0.21 -1.34 6 240 294 3280 38 4 FG
2434.00 40.62 247.40 1995.6 1249.1 -261.4 -1221.7 0.28 -0.19 -0.31 10 240 300 3220 38 5 FG
2463.00 40.50 247.40 2017.6 1267.6 -268.6 -1239.1 0.12 -0.12 0.00 10 235 300 3250 60 6 FG
2492.00 40.40 247.40 2039.7 1286.0 -275.8 -1256.5 0.10 -0.10 0.00 10 235 300 3250 60 6 FG
2521.00 40.50 247.40 2061.7 1304.5 -283.1 -1273.9 0.10 0.10 0.00 10 240 299 3280 63 6 FG
2550.00 40.50 247.70 2083.8 1322.9 -290.3 -1291.3 0.20 0.00 0.31 10 240 300 3220 66 6 FG
2579.00 40.70 247.60 2105.8 1341.4 -297.4 -1308.7 0.22 0.21 -0.10 10 240 300 3364 70 6 FG
2608.00 40.90 247.40 2127.8 1360.0 -304.7 -1326.2 0.25 0.21 -0.21 10 240 300 3520 68 6 FG
2637.00 41.10 247.40 2149.7 1378.6 -312.0 -1343.8 0.21 0.21 0.00 12 240 300 3422 63 6 FG
2666.00 41.10 247.40 2171.5 1397.3 -319.3 -1361.4 0.00 0.00 0.00 12 220 300 3490 72 6 FG
2695.00 41.10 247.60 2193.4 1416.0 -326.6 -1379.0 0.14 0.00 0.21 12 220 300 3440 73 6 FG
2724.00 41.10 247.70 2215.2 1434.7 -333.9 -1396.6 0.07 0.00 0.10 12 220 300 3440 64 6 FG
2753.00 41.10 247.90 2237.1 1453.4 -341.1 -1414.3 0.14 0.00 0.21 12 220 300 3350 64 6 FG
2810.00 40.60 248.90 2280.2 1490.0 -354.8 -1449.0 0.43 -0.26 0.53 12 220 300 3350 64 6 FG
2839.00 40.90 247.40 2302.2 1508.6 -361.8 -1466.5 1.06 0.31 -1.55 12 220 225 2243 65 6 FG
2869.00 40.70 246.80 2324.9 1527.8 -369.5 -1484.6 0.44 -0.20 -0.60 12 220 214 2280 68 6 FG
2897.00 40.70 246.00 2346.1 1545.6 -376.8 -1501.3 0.56 0.00 -0.86 12 220 215 2200 40 6 FG
2926.00 40.80 245.40 2368.1 1564.0 -384.6 -1518.6 0.42 0.10 -0.62 10 240 195 1720 38 6 FG
2955.00 40.10 245.60 2390.1 1582.3 -392.4 -1535.7 0.74 -0.72 0.21 10 240 180 1620 42 6 FG
2984.00 40.30 246.10 2412.3 1600.6 -400.0 -1552.8 0.39 0.21 0.52 10 240 185 1642 18 6 FG
3013.00 40.60 245.60 2434.3 1618.9 -407.7 -1569.9 0.46 0.31 -0.52 10 240 190 1700 13 6 FG
Page : 4
Client : Chevron VietNam Field :
Well Name : KS-1X Slot :
Rig : Vicksburg Job # : VT-DD-0005619436
Survey and Drilling Parameters North Ref : Mag Declination : ° VS Dir : 259.00° (from Wellhead)

WELLBORE SURVEY DRILLING PARAMETERS


Measured Incl Azi Vertical Vertical Coordinates DLS Build Turn WOB RPM Flow Stand Orientation Tool ROP BHA Comment
Depth Angle Dir Depth Section N/S E/W Rate Rate Rate Pipe From To Face No.
(m) (deg) (deg) (m) (m) (m) (m) (°/30m) (°/30m) (°/30m) (klbs) (gpm) (psi) (m) (m) (deg) (m/hr) (#)
3038.00 41.00 245.40 2453.3 1634.8 -414.5 -1584.8 0.50 0.48 -0.24 12 230 190 1604 7 6 FG
3071.00 41.10 245.10 2478.2 1655.8 -423.6 -1604.5 0.20 0.09 -0.27 10 240 239 2270 23 7 FG
3100.00 41.10 244.90 2500.0 1674.3 -431.6 -1621.8 0.14 0.00 -0.21 10 240 224 2151 40 7 FG
3129.00 40.80 244.70 2521.9 1692.7 -439.7 -1639.0 0.34 -0.31 -0.21 10 240 224 2160 54 7 FG
3158.00 40.60 244.70 2543.9 1711.1 -447.8 -1656.0 0.21 -0.21 0.00 10 240 228 2208 37 7 FG
3187.00 40.40 244.20 2566.0 1729.3 -455.9 -1673.0 0.39 -0.21 -0.52 10 240 225 2150 38 7 FG
3216.00 40.00 243.90 2588.1 1747.4 -464.1 -1689.9 0.46 -0.41 -0.31 10 240 226 2196 33 7 FG
3245.00 40.20 243.70 2610.3 1765.4 -472.4 -1706.6 0.25 0.21 -0.21 10 240 227 2203 38 7 FG
3274.00 40.20 243.70 2632.4 1783.5 -480.7 -1723.4 0.00 0.00 0.00 10 240 223 2101 48 7 FG
3303.00 40.40 243.70 2654.6 1801.6 -489.0 -1740.2 0.21 0.21 0.00 10 240 223 2140 40 7 FG
3332.00 40.40 243.30 2676.6 1819.7 -497.4 -1757.0 0.27 0.00 -0.41 10 240 202 1838 41 7 FG
3361.00 40.50 243.30 2698.7 1837.8 -505.8 -1773.9 0.10 0.10 0.00 10 240 204 1886 33 7 FG
3390.00 40.40 243.50 2720.8 1855.9 -514.2 -1790.7 0.17 -0.10 0.21 10 240 205 1912 37 7 FG
3419.00 40.30 243.30 2742.9 1874.0 -522.6 -1807.5 0.17 -0.10 -0.21 10 240 205 1842 35 7 FG
3448.00 41.30 243.50 2764.8 1892.2 -531.1 -1824.4 1.04 1.03 0.21 10 240 207 1924 20 7 FG
3477.00 41.60 243.10 2786.6 1910.7 -539.8 -1841.6 0.41 0.31 -0.41 10 240 207 1874 11 7 FG
3506.00 41.60 242.60 2808.2 1929.2 -548.5 -1858.7 0.34 0.00 -0.52 10 240 202 1730 9 7 FG
3520.00 41.60 242.40 2818.7 1938.1 -552.8 -1866.9 0.28 0.00 -0.43 7 FG
Chevron VietNam KS-1X

Hours by Operation Summary Hours per BHA Breakdown


40
40

59.25
Drilling

Tripping 51.75
35
31

Total Hours Below Rotary


30 29
Rig Up / Tear Down 46.5 27
Wireline Logs 35 25
Operation

Miscellaneous 29.5 20
Run Casing / Cement 21.75
15
PU/LD BHA 11.5 10
10 9
Circulate 9
5
Rig Service & Repair 8.5
0
Other 15.25
2 3 4 5 6 7
0 20 40 60 BHA Number
Drilling Circulating
Total Hours During Job Reaming Other

Days vs. Depth Average Rate of Penetration per BHA


0 200 188.9

180
200
160
400
140

600 120
ROP (m/hr)

100
800
80
65.1
1000 60
37.8
1200 40 29.0 26.9

20
1400
0
Measured Depth (m)

2 3 4 5 6 7
1600
BHA Number
1800
Footage per BHA
2000
1400
2200
1228
1188
1200
2400
1000
Footage Drilled (m)

2600
800
2800
604
600
3000 471

400
3200
200
3400 29
0
3600 2 3 4 5 6 7
0 1 2 3 4 5 6 7 8 9 10 11 12 BHA Number
Day Rotated Oriented

Thailand Page 5 Sperry-Sun Drilling Services


Drilling Fluids Recap

Well Summary:

Drilling Fluids

Hole From – Casing Max Max Max Chemical


Days
Section To (m) @m MW BHT Incl. Cost (US$)
12 ¼” 0-310 305 9.2 N/a N/a 0.25 13,650.00

8 ½" 310-1228 1223 9.2 N/a 39 2.4 10,730.00


1228 –
6 ⅛" N/a 9.2 132 41 6.6 157,393.2
3520
P&A N/A N/a 9.3 132 41 1.5 5,287.00

Drilling Days & Cost 10.75 187,060.2

Cost Analysis

Section Drilled Volume Built Chemical & Other


Hole Section Days
(m) (bbl) Cost (US$)
P A P A P A P A

12 ¼” 0.26 0.25 310 310 900 900 13,650.0 13,650.0

8 ½” 1.43 2.4 918 918 950 950 10,730.0 10,730.0

6 ⅛” 4.77 6.6 2292 2292 1460 1569 137,185.69 157,393.2

P&A 2.14 1.5 N/A N/A 900 900(Wbm) 5,287.00 5,287.00

P = plan, A = actual.

Total Days on well: 17.2 Days


Total Engineering Cost: 24,424 USD
Total Chemicals Cost: 187,060.20 USD
Total Well Cost: 211,484.20 USD

M-I SWACO Engineers:


Project Engineer: Randy Lydda

Field Engineers: Slobodan Lazic, Sarit Songmuang,


Siriwat Teachawattanapanich

Page 54
12-1/4” Section

Details of operation:

9 5/8” casing @ 305 m MD


12 ¼ ” hole drilled from 0m
12 ¼” hole drilled to 310 m
Cost for section $ 13,650.0
Cost / m $ 44.0
Cost / bbl $ 17.1
Volume built 850 bbls
Volume used 850 bbls

Summary of drilling events:


Spud in well at 22:30 on Jan 24th. Drilled in with the 9 5/8” casing with 9.2 ppg
seawater/Xantham (10.0 ppg) (Duovis) gum mud (split stream). While drilling it
was observing for the shallow gas on sea bed. The casing was cemented as per
program and displaced with the seawater.

Drilling Fluid Properties and Performance:


The mud for this section was Xantham (Duovis) 10.0 ppg. It was pumped to the
hole as split stream with seawater to maintain 9.2 ppg in the hole.

Hole Problems:
None

Other Problems:
None

Solids Control Equipment Performance:


None

Cost Comments:
The cost for this section was $13,650.

Lessons Learned and Recommendations:


The practices above mentioned proved to be sufficient and effective and could be
continued for similar wells in this area.

Page 55
8-1/2” Section

Details of operation:

7” casing @ 1223 m MD
8 ½ ” hole drilled from 310 m
8 ½” hole drilled to 1228 m
Cost for section $ 10,730.0
Cost / m $ 11.7
Cost / bbl $ 15.34
Volume built 700 bbl
Volume used 700 bbl

Summary of drilling events:


Drill 8 ½” section with seawater to 767m when pump had failed. Repaired mud
pump in 7 hours, pumped hi vis pill and displaced well to 9.2 ppg WBM/Polymer.
Continue to drill ahead to TD 1228 m MD /1228 m VD without problems. The 7”
casing was hang up at 760m.Pulled out the casing and run in the hole for the
wiper trip. Drilled string passed the hang up depth without resistance. Run in the
hole with the casing without any problems to 1223m. Cemented as per program
and displaced well to seawater.

Drilling Fluid Properties and Performance:


Drilled the section with seawater to 767m and displaced to 9.2ppg WBM/PHPA.
The LGS content was below 5%, the chlorides around 20,000 mg/l, API filtrate
around 4ml. The yield point was more then 12 lb/sq ft with 6 rpm above 4.

Hole Problems:
Casing hang up at 767m, after run in hole for wiper trip no more problems.

Other Problems:
None

Solids Control Equipment Performance:


Solid control equipment which has used in this section was 4 ea Derrick/Super G
3 Panel shale shakers, All shale shaker were ran all the time while drilling with
PHPA WBM without any problem.

Page 56
Shaker Screen Usage
Mesh Size New Used
Vicksburg 30 mesh 0
Brandt HP 180 mesh 0
Brandt HP 80 mesh 0

Cost Comments:
The cost for this section was $10,730.

Lessons Learned and Recommendations:


The practices above mentioned proved to be sufficient and effective and could be
continued for similar wells in this area.

Page 57
6-1/8” Section

Details of operation:

3 ½” liner @ N/a
6 ⅛ ” hole drilled from 1228 m
6 ⅛” hole drilled to 3520 m
Cost for section $ 157,393.2
Cost / m $ 59.38
Cost / bbl $ 185.39
Volume built 1569 bbls
Volume used 849 bbls

Summary of drilling events:


After nipple up and testing the BOPs, the BHA was picked up and run in the hole,
tagging the top of the cement at 1206 m. The cement was drilled to 1225 m with
seawater before displacing to 9.2ppg SBM mud. Continue drilled out cement and
shoe and 3 m of new formation to 1231m. Performed FIT to 16.2 ppg EMW then
continued drilling formation directionally to 1300mMD when got over flow on the
shakers due to drilling through fine formation (siltstone, sandstone). Replaced all
shakers from HP-A200F to HP-A140 (or HP 180 old version) mesh screens
(according to API RP 13C). After drilled out 200m, observed screens and started
to replace them to finer mesh as on previous wells. Drilled ahead to 2414 m MD
when has observed wrong well path. Pulled out of the hole and replaced 6 1/8” bit.
Continue to drill ahead to 2445 m MD when MWD tool failed, replaced the tool to
new one. Observed 15-20 bbl/hr looses at 2850 m MD while drilling through
sandstone formation. Reduced pump rate to 200 then to 170gpm. Continue to drill
ahead while mixing bridging agent in system, mixed 3 ppb Vinseal M in the
system. Losses stopped and the ROP reduced to 10 then to 5m/hr. Pulled out of
the hole at 3048 m MD to replace the bit. Continue to drill ahead to TD of the well
3520 m MD/2819 m TVD while was maintaining 2-3 ppb Vinseal F/M in the
system. The mud weight on TD was 9.2 ppg and wasn’t increased to 9.5 ppg as
per previous weight up schedule due to occurred losses while drilling. Circulate
hole clean, swab test then pumped slug and pulled out of the hole. While pulling
out hasn’t observed any tight spot or drag.

Halliburton wire line was rigged up and log with Q/Combo-GR/Check Shoot-
Seismic /SWT in tree runs without problem. The Halliburton’s logs indicated 132 °
C BHT and 6.42” average hole size.

After wire line logging done, the 6 1/8” bit on HWDP was run to bottom at 3520 m
MD and displaced the well to 9.3 ppb WBM as Plug and Abandonment plan.
Afterwards was ran 7” retainer and set at 1195 m MD. Then it was squeezed 20

Page 58
bbl of cement below retainer and spot 10 bbl above. Then it was circulated with
WBM to clean out the drill pipes. Then cut the casing with 7”cutter and pulled
casing out to surface. The same procedure was done on 9 5/8” casing; set 9 5/8”
retainer at 268 m MD, spot 20 bbl below and 10 bbl above retainer and then cut
with 9 5/8” cutter and pulled to surface the casing. All contaminated WBM and
cement were dumped overboard.

Drilling Fluid Properties and Performance:


The mud for this section was Synthetic based mud system with Saraline 200 base
oil and 10 ppb Versacoat, which built at mud plant, then transported 800 bbl of
fresh mud to the rig. The fresh mud then treated on the rig to get properties in
proper range prior to displace seawater in the hole.

Initial mud weight was 9.2 ppg when drill out cement and shoe track. After FIT
done, the mud weight 9.2 ppg was maintained to TD. Also, the swab test was
performed before pulled out of hole on TD.

During drilling, properties and volume in active system was maintained by


transferring premixed mud. All the chemicals were premixed prior to transfer to
active. The Rheology was controlled with Bentone 38 as primary viscosifier to
have 6 rpm reading between 6 and 9. During drilling was mixed and maintained
to TD 3ppb bridging agent (Vinseal M/F) and was mixed Versacoat in the same
time to avoid wet cuttings by seawater.

Oil water ratio was maintained as 80/20 with Saraline 200 as base oil.

The Versacoat is the emulsifier in this system. The Electrical stability was
maintained above 600 V. Initial value was around 650 V, crawled up to 900 V
when the mud sheared and heated. The premix mud was built with 10 ppb of
Versacoat which was enough to maintain the ES in active.

Lime was used to activate the emulsifier in the system, also to maintain the
alkalinity of the mud to have more than 3 ppb of excess lime in the system.
Premixed mud was built with 5 ppb of lime. While drilling, addition was made to
the active to kept minimum concentration of excess lime at 4 ppb throughout.
Prior to logging 2.5ppb additional lime was added to the active.

Salinity was controlled with CaCl2 to have water phase salinity more than 200,000
ppm in active system. The concentration for premix was 22 ppb at the beginning.

Prior to pooh for logging extra lime, Versacoat, Versatrol and Ecotrol were added
direct to the active to ensure good properties during logging operations.

Hole Problems:
At 2850 m MD observed losses 15-20 bbl/hr. The losses stopped after mixed 3
ppb Vinseal in the system and when drilled out the sandstone formation.

Page 59
Pump suction line was plugged with barite and shaker screen was blinded due to
new mud mixed and not yet stable.

Other Problems:
None

Solids Control Equipment Performance:


Solid control equipment which has used in this section was 4 ea Derrick/Super G
3 Panel shale shakers, 2 ea Brandt HS2172 centrifuge and Brandt Vortex Dryer.
All shale shaker were ran all time drilling and circulation without any problem.
Due to drilling through fine formation as siltstone and sandstone and over flow on
the shakers, the shaker screens were replaced to finer 140 mesh screens as per
new API standard. After 200m drilled the screens are redressed again to all four
ea shale shakers with HP-A200F (according to new API RP 13 C standard) mesh
screens and drilled to TD.
The centrifuges were run as needed to keep LGS in the desired range and
maintained the mud weight. Most of the time 1 was run with an additional one put
on line when needed.
Also, the Brandt Vortex Dryer was run to reduce surface losses and saved SBM.
The Dryer discharge was passing through the centrifuge and returned back to
sand trap in the system.

Shaker Screen Usage


Mesh Size New Used
Vicksburg 30 mesh 1
Brandt HP 180 mesh 9
Brandt HP 265 mesh 9
Brandt HP-A325 mesh 2

Cost Comments:
The cost for this section was $157,393.2. The built volume increased mud cost on
this section due to occurred down hole losses mainly and partly due to surface
losses. Good solid control equipment also contributed to have low cost. Good
solid control will minimize treatment of mud.

Lessons Learned and Recommendations:

9 It was planned to use lower mud weight during drilling and circulation to
provide better ROP and increase the mud weight prior to TD to balance the
formation especially at coal layer to provide stable hole condition while
static for long time / logging. But, due to losses the mud weight wasn’t
increased to 9.5 ppg at TD as per plan. Anyway, the same mud weight on
TD didn’t effect the any hole problems.
9 Adding excess emulsifier, lime and HTHP filtration control prior to logging
would give stable mud properties during long period of logging.

Page 60
Solid Control Report on Vicksburg
GENERAL INFORMATION
COUNTRY Vietnam REPORT NO. -
LOCATION Vietnam DATE 29 Jan 08
OPERATOR Chevron MUD TYPE SBM
CONTRACTOR Vicksburg BIT SIZE Exploration 6 1/8"
WELL NO. KS-1X BIT TYPE 6.125-in Smith Mi416px
ENGINEER ONBOARD 2 LITHOLOGY
SCREEN USAGE 11 MIDNIGHT DEPTH 2230 METRE
DAILY SAFETY CARD 0 TOTAL DRILLED 1002 METRE
EQUIPMENT OPERATION
Cent#1 AM Cent#2 AM Cent#1 PM Cent#2 PM Dryer AM Dryer PM
MODEL 2172 2172 2172 2172 Vortex Vortex
OPERATION HOURS 12 0 4 4 12 4
OPERATION TYPE Drill Drill Drill Drill Drill
SCROLL SPEED (RPM) 900 900 900
BOWL SPEED (RPM) 2000 2000 2500
FEED RATE GPM 10 10 80
MAIN DRIVE TORQUE % MAX. 20 20 30
MUD WEIGHT IN PPG 12 12 9.2
MUD WEIGHT OUT PPG 8.8 8.8 8.7
DISCHARGE WEIGHT PPG 14.3 14.3 21
CUT POINT 3.2 3.2 0.5
CENTRATE - RETORTING RESULT
Cent#1 AM Cent#2 AM Cent#1 PM Cent#2 PM Dryer AM Dryer PM
SAMPLE TIME 9.00 16.00 16.00
SAMPLE DEPTH 1582.00 1980.00 1980.00
CENTRATE WEIGHT PPG 8.82 8.82 8.71
RETORTED OIL % vol. 73.00 73.00 73.00
RETORTED WATER % vol. 19.00 19.00 20.00
SOLIDS DISCHARGE - RETORTING RESULT
Cent#1 AM Cent#2 AM Cent#1 PM Cent#2 PM Dryer AM Dryer PM
SAMPLE TIME 9.00 3.00 16.00 9.00 16.00
SAMPLE DEPTH 1582.00 1980.00 1980.00 1582.00 1980.00
RETORT WT - EMPTY (50 ML) A 844.30 844.30 845.20 839.50 836.90
RETORT WT + SAMPLE B 930.20 930.20 974.50 918.60 908.00
RETORT WT + DRY CUTTINGS C 909.00 909.00 958.90 906.40 896.40
GRAD. CYL. WT - EMPTY D 63.30 63.30 63.10 63.20 63.10
GRAD. CYL. WT + CONDENSATE E 84.00 84.00 78.40 75.10 74.10
VOLUME OF WATER F 14.00 14.00 7.00 10.00 9.00
VOLUME OF OIL G 11.00 11.00 19.00 5.00 5.00
RESULT
OOC% (Discharge) 7.80 7.80 6.42 2.40 2.81
Sampling Error (0.95 to 1.05) 0.99 0.99 1.00 1.00 0.99
O.O.C. (Gms/Kg) DRY 102.96 102.96 118.14 50.82 56.54
Daily Base Fluid Discharged, Kg.
COMMENTS
Rig start drilling on 6-1/8"hole. Run 1xcentrifuge cut back mud weight from dryer and 1xcentrifuge from sandtrap. Dryer running with
slightly vibration. Check screen conditions.

BRANDT ENGINEER : Thonglor J. Sittha T. OFFICE TEL: (66)2 937 5657


Chuchart L. OFFICE FAX: (66)2 937 5660
Solid Control Report on Vicksburg
GENERAL INFORMATION
COUNTRY Vietnam REPORT NO. -
LOCATION Vietnam DATE 30 Jan 08
OPERATOR Chevron MUD TYPE SBM
CONTRACTOR Vicksburg BIT SIZE Exploration 6 1/8"
WELL NO. KS-1X BIT TYPE 6.125-in Smith Mi416px
ENGINEER ONBOARD 2 LITHOLOGY
SCREEN USAGE 5 MIDNIGHT DEPTH 2445 METRE
DAILY SAFETY CARD 1 TOTAL DRILLED 215 METRE
EQUIPMENT OPERATION
Cent#1 AM Cent#2 AM Cent#1 PM Cent#2 PM Dryer AM Dryer PM
MODEL 2172 2172 2172 2172 Vortex Vortex
OPERATION HOURS 7 2 0 2 7 2
OPERATION TYPE Drill Drill Drill Drill Drill Drill
SCROLL SPEED (RPM) 900 900 900 900
BOWL SPEED (RPM) 2000 2300 2000 2300
FEED RATE GPM 10 60 10 60
MAIN DRIVE TORQUE % MAX. 22 32 22 32
MUD WEIGHT IN PPG 13 9.2 13 9.2
MUD WEIGHT OUT PPG 9 8.7 9 8.7
DISCHARGE WEIGHT PPG 14.9 18.3 14.9 18.3
CUT POINT 4 0.5 4 0.5
CENTRATE - RETORTING RESULT
Cent#1 AM Cent#2 AM Cent#1 PM Cent#2 PM Dryer AM Dryer PM
SAMPLE TIME 7.00 7.00 16.00 16.00 7.00 16.00
SAMPLE DEPTH 2416.00 2416.00 2445.00 2445.00 2416.00 2445.00
CENTRATE WEIGHT PPG 9.01 8.76 9.01 8.76
RETORTED OIL % vol. 72.00 26.00 72.00 26.00
RETORTED WATER % vol. 19.00 70.00 19.00 70.00
SOLIDS DISCHARGE - RETORTING RESULT
Cent#1 AM Cent#2 AM Cent#1 PM Cent#2 PM Dryer AM Dryer PM
SAMPLE TIME 7.00 16.00 7.00 16.00 7.00 16.00
SAMPLE DEPTH 2416.00 2445.00 2416.00 2445.00 2416.00 1445.00
RETORT WT - EMPTY (50 ML) A 837.50 835.10 837.50 835.10 837.50 837.50
RETORT WT + SAMPLE B 927.10 945.00 927.10 945.00 910.00 910.00
RETORT WT + DRY CUTTINGS C 914.60 925.60 914.60 925.60 904.00 904.00
GRAD. CYL. WT - EMPTY D 63.10 63.10 63.10 63.10 63.10 63.10
GRAD. CYL. WT + CONDENSATE E 75.30 82.20 75.30 82.20 68.70 68.70
VOLUME OF WATER F 6.00 12.50 6.00 12.50 4.00 4.00
VOLUME OF OIL G 12.00 10.50 12.00 10.50 5.00 5.00
RESULT
OOC% (Discharge) 6.92 6.01 6.92 6.01 2.21 2.21
Sampling Error (0.95 to 1.05) 1.00 1.00 1.00 1.00 0.99 0.99
O.O.C. (Gms/Kg) DRY 107.68 76.82 107.68 76.82 55.45 55.45
Daily Base Fluid Discharged, Kg.
COMMENTS
Continue drilling to depth 2416M. Circ& POOH to change new BHA.RIH and continue drilling to 2445 M. Circ& POOH, MWD tools failed.
RIH and continue drilling from. Run 1xcentrifuge cut back mud weight from dryer and 1xcentrifuge from sandtrap. Dryer running with
slightly vibration. screen surface without gettting stuck very 20 Min. but now should be OK.

BRANDT ENGINEER : Thonglor J. Sittha T. OFFICE TEL: (66)2 937 5657


Chuchart L. OFFICE FAX: (66)2 937 5660
Solid Control Report on Vicksburg
GENERAL INFORMATION
COUNTRY Vietnam REPORT NO. -
LOCATION Vietnam DATE 31 Jan 08
OPERATOR Chevron MUD TYPE SBM
CONTRACTOR Vicksburg BIT SIZE Exploration 6 1/8"
WELL NO. KS-1X BIT TYPE 6.125-in Smith Mi416px
ENGINEER ONBOARD 2 LITHOLOGY
SCREEN USAGE 0 MIDNIGHT DEPTH 3048 METRE
DAILY SAFETY CARD 0 TOTAL DRILLED 603 METRE
EQUIPMENT OPERATION
Cent#1 AM Cent#2 AM Cent#1 PM Cent#2 PM Dryer AM Dryer PM
MODEL 2172 2172 2172 2172 Vortex Vortex
OPERATION HOURS 10.7 8.7 1 0 10.7 6
OPERATION TYPE Drill Drill Drill Drill Drill
SCROLL SPEED (RPM) 900 900 900
BOWL SPEED (RPM) 2000 2300 2000
FEED RATE GPM 10 60 10
MAIN DRIVE TORQUE % MAX. 18 30 18
MUD WEIGHT IN PPG 13.2 9.2 13.2 16 16
MUD WEIGHT OUT PPG 9.1 8.7 9.1 13.2 13.2
DISCHARGE WEIGHT PPG 13.8 18.5 13.8 12 12
CUT POINT 4.1 0.5 4.1 2.8 2.8
CENTRATE - RETORTING RESULT
Cent#1 AM Cent#2 AM Cent#1 PM Cent#2 PM Dryer AM Dryer PM
SAMPLE TIME 8.00 8.00 13.00 15.00
SAMPLE DEPTH 2871.00 2871.00 2900.00 0.00
CENTRATE WEIGHT PPG 9.17 8.72 9.17 9.12
RETORTED OIL % vol. 71.00 73.00 71.00 69.00
RETORTED WATER % vol. 20.00 20.00 20.00 20.00
SOLIDS DISCHARGE - RETORTING RESULT
Cent#1 AM Cent#2 AM Cent#1 PM Cent#2 PM Dryer AM Dryer PM
SAMPLE TIME 8.00 8.00 13.00 8.00 13.00
SAMPLE DEPTH 2871.00 2871.00 2900.00 2871.00 2900.00
RETORT WT - EMPTY (50 ML) A 839.00 835.70 839.00 844.60 844.60
RETORT WT + SAMPLE B 922.20 946.60 922.20 912.80 912.80
RETORT WT + DRY CUTTINGS C 903.30 924.50 903.30 903.40 903.40
GRAD. CYL. WT - EMPTY D 63.20 63.10 63.20 63.20 63.20
GRAD. CYL. WT + CONDENSATE E 82.10 84.80 82.10 72.20 72.20
VOLUME OF WATER F 15.00 13.00 15.00 7.00 7.00
VOLUME OF OIL G 7.00 13.00 7.00 5.00 5.00
RESULT
OOC% (Discharge) 4.69 7.84 4.69 2.93 2.93
Sampling Error (0.95 to 1.05) 1.00 1.00 1.00 0.99 0.99
O.O.C. (Gms/Kg) DRY 67.64 94.25 67.64 58.94 58.94
Daily Base Fluid Discharged, Kg.
COMMENTS
Continue drilling on 6-1/8" section Run 1xcentrifuge cut back mud weight from dryer and 1xcentrifuge from sandtrap. Dryer running with
slightly vibration. Check screen conditions.

BRANDT ENGINEER : Thonglor J. Sittha T. OFFICE TEL: (66)2 937 5657


Chuchart L. OFFICE FAX: (66)2 937 5660
Solid Control Report on Vicksburg
GENERAL INFORMATION
COUNTRY Vietnam REPORT NO. -
LOCATION Vietnam DATE 1 Feb 08
OPERATOR Chevron MUD TYPE SBM
CONTRACTOR Vicksburg BIT SIZE Exploration 6 1/8"
WELL NO. KS-1X BIT TYPE 6.125-in Smith Mi416px
ENGINEER ONBOARD 3 LITHOLOGY
SCREEN USAGE 1 MIDNIGHT DEPTH 3520 METRE
DAILY SAFETY CARD 1 TOTAL DRILLED 472 METRE
EQUIPMENT OPERATION
Cent#1 AM Cent#2 AM Cent#1 PM Cent#2 PM Dryer AM Dryer PM
MODEL 2172 2172 2172 2172 Vortex Vortex
OPERATION HOURS 1 4 3 6 8 12
OPERATION TYPE Drill Drill Drill Drill Drill Drill
SCROLL SPEED (RPM) 900 900 900 900
BOWL SPEED (RPM) 2000 2000 2000 2000
FEED RATE GPM 10 60 10 60
MAIN DRIVE TORQUE % MAX. 18 26 18 26
MUD WEIGHT IN PPG 13.4 9.2 13.4 9.2 15.4 15.4
MUD WEIGHT OUT PPG 9.1 8.7 9.1 8.7 13.2 13.2
DISCHARGE WEIGHT PPG 13 14.5 13 14.5 11.2 11.2
CUT POINT 4.3 0.5 4.3 0.5 2.2 2.2
CENTRATE - RETORTING RESULT
Cent#1 AM Cent#2 AM Cent#1 PM Cent#2 PM Dryer AM Dryer PM
SAMPLE TIME 9.00 9.00 15.00 15.00 9.00 15.00
SAMPLE DEPTH 3227.00 3227.00
CENTRATE WEIGHT PPG 9.12 8.77 9.12 8.77
RETORTED OIL % vol. 69.00 73.00 69.00 73.00
RETORTED WATER % vol. 20.00 19.00 20.00 19.00
SOLIDS DISCHARGE - RETORTING RESULT
Cent#1 AM Cent#2 AM Cent#1 PM Cent#2 PM Dryer AM Dryer PM
SAMPLE TIME 9.00 9.00 15.00 15.00 9.00 15.00
SAMPLE DEPTH 3227.00 3227.00 3227.00
RETORT WT - EMPTY (50 ML) A 835.20 839.60 835.20 839.60 840.40 840.40
RETORT WT + SAMPLE B 913.00 929.20 913.00 929.20 908.00 908.00
RETORT WT + DRY CUTTINGS C 896.50 908.10 896.50 908.10 896.30 896.30
GRAD. CYL. WT - EMPTY D 63.20 63.10 63.20 63.10 63.10 63.10
GRAD. CYL. WT + CONDENSATE E 79.40 84.10 79.40 84.10 74.50 74.50
VOLUME OF WATER F 12.00 14.00 12.00 14.00 9.00 9.00
VOLUME OF OIL G 7.00 9.50 7.00 9.50 3.00 3.00
RESULT
OOC% (Discharge) 5.40 7.81 5.40 7.81 3.55 3.55
Sampling Error (0.95 to 1.05) 1.00 1.00 1.00 1.00 1.00 1.00
O.O.C. (Gms/Kg) DRY 72.34 85.25 72.34 85.25 35.68 35.68
Daily Base Fluid Discharged, Kg.
COMMENTS
Continue drilling on 6-1/8" section to TD3520M. Run 1xcentrifuge cut back mud weight from dryer and 1xcentrifuge from sandtrap. Dryer
running with slightly vibration. Check screen conditions. And change diaphragm for wilden pump.

BRANDT ENGINEER : Thonglor J. Sittha T. OFFICE TEL: (66)2 937 5657


Chuchart L. OFFICE FAX: (66)2 937 5660
Cuttings Base Fluid Retention
Well KS-1X
10
9 At Centifuges
At Dryer
8
7
6
% OOC

5
4
3
2
1
0
29-Jan 30-Jan 31-Jan 1-Feb
Day
Abandonment Schematic

Page 66
CHEVRON VIETNAM
WELL ABANDONMENT SCHEMATIC

KS-1X TYPE Exploration


PLAN Vicksburg, Rt - Sea level = 97m Proposed
MD VD Water depth = 62.6m MD VD DESCRIPTION
casing collar at 91 m Mud line 97m 9-5/8" cut-off at 100m (~3m below mud line)
casing collar at 102 m
TOC-228 m
Collar at ~259 m BOC-268 m Balance 10 bbl cement on top of 9-5/8"" retainer
set retainer at 268 m 9-5/8" Retainer at 268m (8m above 7" cut)
Float collar at 272 m Squeeze 20 bbl cement below retainer
7" casing collar 270 7" cut-off at 276m (34m above 9-5/8" shoe)
csg cut
7" casing collar 282
276m
TOC-268 m 310 mMD 310 TVD 9-5/8" casing shoe, LOT = 12.9 ppg EMW
BOC-383 m

9.3 ppg WBM


TOC-1118 m
7"Collar at ~1187.5 m BOC-1195 m Balance 10 bbl cement on top of 7" retainer
set 7"retainer at 1195 m 7" Retainer @ 1195m (30m above 7" shoe)
7" collar at ~1199.6 m TOC-1195 m Squeeze 20 bbl cement below retainer
BOC-1344 m
1225 mMD 1056.5 mTVD 7" casing shoe, FIT = 16 ppg EMW

displace from SBM to 9.3 ppg WBM

Note: There are no HydroCarbon bearing zones in 6-1/8" section

3520 mMD 2818.8 mTVD TD 6-1/8" hole

3/20/20083-3_PA Schematic_final_actual.xlsKS-1X
Time vs Depth, and Cost Summaries

Page 68
Rig on tow: 14:00 21 Jan 08 Rig released: 06:00 6 Feb 08
Time vs. Depth & Cost
0 $6.00
Mud pump Well B-KS-1X
leaking
Waiting on
Geoservices

$5.01 $5.08
500 Casing running $5.00
issues $4.74
$4.85

Suction line
plugging $4.37

$4.16
$4.08
1000 $4.00
$3.80

TVD Cost
$3.51
(m) (MM)

$3.17
$3.06
1500 $3.00
$2.83

Mud
$2.52
losing

Bit walking
$2.13
Bit trip
2000 $1.96 $2.00
$1.79
$1.72
$1.54
MWD
failure

$1.17 $1.21

2500 $1.00
$0.89
Bit trip
$0.62
Planned Depth
Actual Depth
AFE
$0.35 $0.25
Actual Cost
3000 $-
0 1 2 3 4 5 6 7 Days 8 9 10 11 12 13 14 15 16
NPT Summaries

Page 70
Well KS-1X
NPT by Major Category
28
30

23.5
25
21.5

20

Hour 15
11

10
6

5
0.5
0

0
Cement Downhole Fluids Rig Repairs Surface Wait On Wellbore
Failures Equipment Problems
Failure
Category
This is the last page of this EOWR.