Table of Contents
Page 1
General Well Data
Final Location:
Latitude Longitude Northing Easting
8 34’ 30.882”N 102 58’ 32.201”E 948405.43 m 277223.51 m
Rig: Vicksburg
Drilling Contractor: Atwood
Rig Type: Jack Up
RT-MSL: 34.3 m
Water Depth: 62.6 m
Hole size Hole MD Hole TVD Casing size Casing MD Casing TVD
12” 310 m 310 m 9-5/8” 310 m 310 m
8-1/2” 1228 m 1056.63 m 7” 1225 m
6-1/8” 3520 m 2818.70 m
Page 2
AFE depths vs Actual depths Measured Depth True Vertical Depth
12” AFE 305 m 305 m
12” Actual 310 m 310 m
Reason for difference Drill to casing tally
Notes
1 Kim Su-1X is the first exploration well in 2008 campaign.
The well design is a slim hole type, with the first section riser-less drilling 9-
5/8” casing.
2 Drilling rig Vicksburg (Atwood) was towed from Thailand to Vietnam, on-hire
to Chevron Vietnam on 14:00 21-Jan-2008. Towing distance to KS-1X
location is 80 NM (148.2 km)
Page 3
Final Positioning Report
Page 4
Daily Drilling Reports
Page 7
Drilling Morning Report
Location at 1830 hrs, Latitude 8deg 37' .14"N, Longitude 101deg 51' 02"E , Average speed 3.9 knots Miles traveled = 13,
miles to go = 67, seas .3 meters, winds NE @ 10 knots.ETA to location 1230 hrs on 22 January 2008.
Location at 0000 Latitude 8deg 37' .04"N, Longitude 102deg 11' 50"E , Avg speed 3.6, Miles traveled = 33.7, miles to go =
46.3, seas .3 meters winds NE @ 11 knots.ETA to location 1300 hrs on 22 January 2008.
00:00 00:00
00:00 00:00
Mud Checks
Mud / Brine Type Mud Density (lb/gal) pH Water Phase Chlorides (ppm)
Funnel Viscosity (s/qt) PV Calc (cp) YP Calc (lbf/100ft²) HTHP Filtrate (mL/30min)
Drilling Parameters
Depth Start (mKB) TVD Start (mKB) Depth End (mKB) TVD End (mKB) IADC Drilling Time (hrs) Interval ROP (m/hr)
Survey Data
Date MD (mKB) Incl (°) Azm (°) TVD (mKB) VS (m) NS (m) EW (m) DLS (°/30m)
Location at 0000 Latitude 8deg 37' .04"N, Longitude 102deg 11' 50"E , Avg speed 3.6, Miles traveled = 33.7, miles to go =
46.3, seas .3 meters winds NE @ 11 knots.ETA to location 1300 hrs on 22 January 2008.
Location at 0600 hrs, Latitude 8deg 37' .02"N, Longitude 102deg 31' 02"E , Average speed 3.1 knots Miles traveled = 52.7,
miles to go = 27.3, seas .3 meters, winds NE @ 10 knots.ETA to location 1400 HRS on 22 January 2008.
Location at 1200 Latitude 8deg 35' .28"N, Longitude 102deg 49' 40"E , Avg speed .3 knots, Miles traveled = 71.2, miles to go
= 12, seas .3 meters winds ESE @ 11 knots.
Slowing down at 1100 hrs, shorten tow line and prepare to lower legs. Heading changed and speed adjusted for Helicopter
with immigration officials.
15:30 20:30 Commence lowering legs prior to final appproach. Adjust final approach and soft pin Vicksburg at 20:30 hrs.
20:30 23:30 Raise hull to 0 ft draft. Initial penetration port = 63', stbd = 63', bow = 61.5' . Remove seacaps and prepare to start preloading.
Jack hull to 5ft air gap.
23:30 00:00 Laying out 10" flex hoses on deck for preload pumps.
Mud Checks
Mud / Brine Type Mud Density (lb/gal) pH Water Phase Chlorides (ppm)
Funnel Viscosity (s/qt) PV Calc (cp) YP Calc (lbf/100ft²) HTHP Filtrate (mL/30min)
Drilling Parameters
Depth Start (mKB) TVD Start (mKB) Depth End (mKB) TVD End (mKB) IADC Drilling Time (hrs) Interval ROP (m/hr)
Survey Data
Date MD (mKB) Incl (°) Azm (°) TVD (mKB) VS (m) NS (m) EW (m) DLS (°/30m)
03:30 05:00 Held jsa and start preloading, Had 24% preload on board rig was settling and wave action hitting bottom of hull, dump cycle #
1, Raise hull to 5' air gap. Penetration Bow = 68', stbd = 67.5', port 67.5'.
05:00 08:00 Start taking on preload. Had 49% preload on board rig settling and wave action hitting bottom of hull, dump cycle # 2, Raise
hull to 5' air gap. Penetration Bow =72', stbd =71', port 71.5'.
08:00 10:00 Crew change helicopter arrived 0840 hrs made crew change helicopter departed at 0900 hrs, offloaded comms equipment
from heritage service.
10:00 14:00 Start taking on preload, Had 74% preload on board rig settling and wave action hitting bottom of hull, dump cycle # 3, Raise
hull to 5' air gap. Penetration Bow =76', stbd =71', port 75.5'.100% on board at 1830 hrs.
14:00 18:30 Start taking on preload # 4, Had 100% preload on board. Penetration Bow =77', stbd =71', port 77'.100% on board at 1830
hrs.
18:30 00:00 Holding 100% preload.
Mud Checks
Mud / Brine Type Mud Density (lb/gal) pH Water Phase Chlorides (ppm)
Funnel Viscosity (s/qt) PV Calc (cp) YP Calc (lbf/100ft²) HTHP Filtrate (mL/30min)
Drilling Parameters
Depth Start (mKB) TVD Start (mKB) Depth End (mKB) TVD End (mKB) IADC Drilling Time (hrs) Interval ROP (m/hr)
Survey Data
Date MD (mKB) Incl (°) Azm (°) TVD (mKB) VS (m) NS (m) EW (m) DLS (°/30m)
Funnel Viscosity (s/qt) PV Calc (cp) YP Calc (lbf/100ft²) HTHP Filtrate (mL/30min)
Drilling Parameters
Depth Start (mKB) TVD Start (mKB) Depth End (mKB) TVD End (mKB) IADC Drilling Time (hrs) Interval ROP (m/hr)
99.00 99.00 305.00 305.00 1.00 206.0
Survey Data
Date MD (mKB) Incl (°) Azm (°) TVD (mKB) VS (m) NS (m) EW (m) DLS (°/30m)
15:00 22:30 Waiting on geo services to connect electrical cables and equipment.
22:30 00:00 Drill Slide & survey from 311.5m {MD} to 623m {MD}, 595.6 {TVD}.
Mud Checks
Mud / Brine Type Mud Density (lb/gal) pH Water Phase Chlorides (ppm)
Sea Water 8.60
Funnel Viscosity (s/qt) PV Calc (cp) YP Calc (lbf/100ft²) HTHP Filtrate (mL/30min)
Drilling Parameters
Depth Start (mKB) TVD Start (mKB) Depth End (mKB) TVD End (mKB) IADC Drilling Time (hrs) Interval ROP (m/hr)
305.00 305.00 623.00 595.68 1.50 212.0
Survey Data
Date MD (mKB) Incl (°) Azm (°) TVD (mKB) VS (m) NS (m) EW (m) DLS (°/30m)
1/25/2008 316.00 0.50 223.80 316.00 1.14 -1.00 -0.95 0.05
1/25/2008 345.00 0.50 239.80 344.99 1.37 -1.15 -1.15 0.14
1/25/2008 374.00 4.50 263.90 373.96 2.62 -1.33 -2.39 4.19
1/25/2008 403.00 10.10 263.10 402.72 6.28 -1.76 -6.05 5.79
1/25/2008 432.00 14.00 264.10 431.07 12.31 -2.43 -12.07 4.04
1/25/2008 461.00 18.20 263.80 458.93 20.31 -3.28 -20.06 4.35
1/25/2008 490.00 22.80 260.90 486.08 30.43 -4.66 -30.12 4.87
1/25/2008 519.00 29.30 259.50 512.12 43.15 -6.84 -42.66 6.75
1/25/2008 548.00 35.30 259.00 536.63 58.63 -9.74 -57.87 6.21
1/25/2008 606.00 39.90 258.80 582.57 94.01 -16.55 -92.59 2.38
Casing
Casing Description OD (in) Set Depth (mKB) Run Date
Surface 9 5/8 310.27 1/25/2008
08:00 12:00 Drill Slide & survey from 623m {MD} to 1228m {MD}, 1059m {TVD}. Changed over to 9.2 ppg WBM at 855m MD.
12:00 14:00 Perform swab test, drop carbide, pump 50 bbl weighted sweep, circulate 4.5 B/up, Avg hole size 10.6", swab gas 20/17 units.
14:00 15:00 Flow check, well static, pull out of hole to 1010m MD, continuous tight hole, 30k over, Rih to 1058m.
15:00 17:30 Backream from 1058m to casing shoe @ 310m, Circulate B/up.
17:30 18:00 Flow check, well static, pull out of hole to BHA.
18:00 19:00 Remove MWD probe & bit, std 8 1/2" BHA in derrick.
19:00 23:00 Retrieve wear bushing. Offline flush wellhead. R/up 7" casing equipment, p/up 7" shoe track, check floats and rih with 7" 23#,
N-80 BTC casing, fill each jt with 9.2 ppg wbm to 769m unable to pass this spot. 62 jts ran.
23:00 00:00 M/up 7" drive sub to TDS wash and ream to 770m. Formation sample was Claystone-98%, Coal-2%.
Mud Checks
Mud / Brine Type Mud Density (lb/gal) pH Water Phase Chlorides (ppm)
Water (Other) 9.20
Funnel Viscosity (s/qt) PV Calc (cp) YP Calc (lbf/100ft²) HTHP Filtrate (mL/30min)
46 12.0 18.000
Drilling Parameters
Depth Start (mKB) TVD Start (mKB) Depth End (mKB) TVD End (mKB) IADC Drilling Time (hrs) Interval ROP (m/hr)
623.00 595.68 1,228.00 1,058.83 5.00 121.0
Survey Data
Date MD (mKB) Incl (°) Azm (°) TVD (mKB) VS (m) NS (m) EW (m) DLS (°/30m)
1/26/2008 664.00 40.40 258.80 626.90 131.40 -23.81 -129.28 0.26
1/26/2008 693.00 40.40 258.80 648.98 150.20 -27.46 -147.71 0.00
1/26/2008 722.00 40.50 258.80 671.05 169.01 -31.12 -166.17 0.10
1/26/2008 751.00 37.90 259.70 693.52 187.33 -34.54 -184.17 2.75
1/26/2008 780.00 37.40 259.40 716.48 205.04 -37.75 -201.59 0.55
1/26/2008 838.00 41.30 260.60 761.33 241.78 -44.12 -237.81 2.06
1/26/2008 925.00 40.90 260.20 826.89 298.92 -53.66 -294.20 0.17
1/26/2008 955.00 40.80 259.90 849.58 318.53 -57.05 -313.52 0.22
1/26/2008 1,013.00 41.70 259.40 893.19 356.76 -63.92 -351.14 0.50
1/26/2008 1,041.00 41.80 259.00 914.08 375.40 -67.42 -369.46 0.30
1/26/2008 1,070.00 41.90 259.00 935.68 394.74 -71.11 -388.45 0.10
1/26/2008 1,099.00 39.50 257.40 957.66 413.65 -74.97 -406.96 2.71
1/26/2008 1,128.00 39.00 257.40 980.12 432.00 -78.97 -424.87 0.52
1/26/2008 1,158.00 38.00 259.70 1,003.60 450.67 -82.68 -443.17 1.75
1/26/2008 1,187.00 37.90 259.40 1,026.47 468.50 -85.92 -460.70 0.22
1/26/2008 1,212.00 37.70 259.70 1,046.22 483.82 -88.69 -475.77 0.33
Casing
Casing Description OD (in) Set Depth (mKB) Run Date
Surface 9 5/8 310.27 1/25/2008
12:00 13:00 Circulate 3 B/up's whilst working pipe until clean at shale shakers.
13:00 14:30 Check flow, well static, pull out of hole to bha @ 159m.
14:30 15:00 Pull out of hole with bha, break bit, stand bha in derrick.
15:00 18:00 Retrieve wear bushing, ( Flush wellhead offline) R/up B.J.T. to run 7" casing, M/up shoe track, check floats (ok) run in hole
with 7" 23# BTC casing to 772m.
18:00 20:30 Continue to run in hole with 7" casing fill each jt with 9.2 ppg mud to 1208m, M/up 7" hanger and running tool, land at WH, 7"
shoe @ 1225.5m, 100 jts in hole, test hanger seals to 5000 psi (ok) pull test 10k over.
20:30 21:30 R/up B.J cement head and surface equipment, circulate 1 casing volume @ 5 bpm 500 psi. no mud losses.
21:30 22:00 While attempting to pressure test bj lines, found washed rubber seal on standpipe # 10 valve, changed out seal.
22:00 23:30 B.J tested surface lines to 3500 psi, mixed and pumped 95 bbl cement slurry @ 15.9 ppg, drop top plug and displace with
157 bbls sea water, bumped plug to 2500 psi, bled back 1.5 bbl, floats holding, r/down cement head.retrieve landing string l/o
same, r/down B.J.T.
23:30 00:00 Set wear bushing, rig up to l/o 5" drill pipe from derrick.
Mud Checks
Mud / Brine Type Mud Density (lb/gal) pH Water Phase Chlorides (ppm)
WBM (Other) 9.20
Funnel Viscosity (s/qt) PV Calc (cp) YP Calc (lbf/100ft²) HTHP Filtrate (mL/30min)
46 12.0 18.000
Drilling Parameters
Depth Start (mKB) TVD Start (mKB) Depth End (mKB) TVD End (mKB) IADC Drilling Time (hrs) Interval ROP (m/hr)
1,228.00 1,058.83 1,228.00 1,058.83
Survey Data
Date MD (mKB) Incl (°) Azm (°) TVD (mKB) VS (m) NS (m) EW (m) DLS (°/30m)
Casing
Casing Description OD (in) Set Depth (mKB) Run Date
Surface 9 5/8 310.27 1/25/2008
Intermediate 7 1,225.04 1/27/2008
Casing
Casing Description OD (in) Set Depth (mKB) Run Date
Surface 9 5/8 310.27 1/25/2008
Intermediate 7 1,225.04 1/27/2008
02:00 04:30 Drilled 6-1/8" hole from 1231m MD to 1342m, 1150m TVD
04:30 05:00 Shakers started blinding up at 1320m, Stopped drilling and clean shaker screens. Changed shaker screens to 2 x180, and 2
x 80 on all 4 shakers.
05:00 13:30 Drill 6-1/8" hole from 1320m to 1883m MD/ 1568m TVD. Whilst drilling changed the shaker screens back to 2 x 200, and 2 x
180 on all 4 shakers at 11:00 a.m. Shakers blinding. Formation Claystone 85%, Silkstone 15%.
13:30 14:00 Change shaker screens back to 2 x 180, and 2 x 140 on all 4 shakers.
14:00 16:30 Drill 6-1/8" hole from 1883m to 1987m MD/ 1650m TVD. Lost 2200 psi pump pressure on Mud pump #1. Change to pump #
2, same problem.
16:30 21:00 Troubleshoot. Pressure test surface lines to 3600 psi (OK). Start POOH wet, whilst troubleshooting. Check Mud pump #1
fluid end, (OK). Check flow rate of both pumps. 1/3 flow rate on what it is supposed to be was found. Found the suction line to
the mud pumps had barite settlement inside of it. Clean out the suction line. Whilst cleaning out the plugged suction line, we
did a wiper trip to 1344m. RIH to 1982m.
21:00 21:30 Wash from 1982m to bottom @ 1987m, Regain full pump pressure, no fill on bottom.
21:30 00:00 Drilled 6-1/8" hole from 1987m MD to 2125m MD, 1758m TVD.
Mud Checks
Mud / Brine Type Mud Density (lb/gal) pH Water Phase Chlorides (ppm)
SBM (Other) 9.20 168,000
Funnel Viscosity (s/qt) PV Calc (cp) YP Calc (lbf/100ft²) HTHP Filtrate (mL/30min)
57 12.0 17.000 3.0
Drilling Parameters
Depth Start (mKB) TVD Start (mKB) Depth End (mKB) TVD End (mKB) IADC Drilling Time (hrs) Interval ROP (m/hr)
1,228.00 1,058.83 2,125.00 1,757.46 16.00 56.1
Survey Data
Date MD (mKB) Incl (°) Azm (°) TVD (mKB) VS (m) NS (m) EW (m) DLS (°/30m)
1/29/2008 1,245.00 38.30 260.60 1,072.23 504.12 -92.17 -495.79 0.74
1/29/2008 1,274.00 38.30 260.60 1,094.98 522.07 -95.10 -513.52 0.00
1/29/2008 1,303.00 38.10 260.60 1,117.77 539.99 -98.03 -531.21 0.21
1/29/2008 1,332.00 37.80 260.40 1,140.64 557.81 -100.98 -548.80 0.34
1/29/2008 1,361.00 38.40 260.40 1,163.46 575.68 -103.96 -566.45 0.62
1/29/2008 1,390.00 39.00 260.20 1,186.10 593.80 -107.02 -584.32 0.63
1/29/2008 1,419.00 38.80 260.10 1,208.66 612.00 -110.13 -602.26 0.22
1/29/2008 1,448.00 38.30 259.90 1,231.34 630.06 -113.27 -620.06 0.53
1/29/2008 1,477.00 38.20 259.70 1,254.12 648.01 -116.45 -637.73 0.16
1/29/2008 1,506.00 38.90 259.50 1,276.80 666.07 -119.71 -655.51 0.74
1/29/2008 1,536.00 39.10 259.50 1,300.11 684.94 -123.15 -674.07 0.20
1/29/2008 1,564.00 39.20 259.40 1,321.83 702.62 -126.39 -691.45 0.13
1/29/2008 1,593.00 40.00 259.40 1,344.17 721.10 -129.79 -709.62 0.83
1/29/2008 1,622.00 40.40 259.20 1,366.32 739.81 -133.27 -728.01 0.43
1/29/2008 1,651.00 40.20 259.20 1,388.44 758.56 -136.78 -746.44 0.21
1/29/2008 1,680.00 40.40 258.80 1,410.56 777.32 -140.36 -764.85 0.34
1/29/2008 1,709.00 39.50 258.60 1,432.79 795.94 -144.01 -783.11 0.94
1/29/2008 1,738.00 39.20 258.30 1,455.21 814.32 -147.69 -801.12 0.37
1/29/2008 1,767.00 39.00 258.30 1,477.72 832.61 -151.40 -819.03 0.21
Survey Data
Date MD (mKB) Incl (°) Azm (°) TVD (mKB) VS (m) NS (m) EW (m) DLS (°/30m)
1/29/2008 1,796.00 38.90 258.10 1,500.27 850.84 -155.13 -836.88 0.17
1/29/2008 1,825.00 38.90 258.10 1,522.84 869.05 -158.88 -854.70 0.00
1/29/2008 1,854.00 38.90 257.90 1,545.41 887.27 -162.67 -872.51 0.13
1/29/2008 1,883.00 38.70 257.90 1,568.01 905.44 -166.48 -890.28 0.21
1/29/2008 1,912.00 38.70 257.80 1,590.64 923.57 -170.29 -908.00 0.06
1/29/2008 1,970.00 38.30 257.80 1,636.03 959.67 -177.92 -943.30 0.21
1/29/2008 1,999.00 38.10 257.80 1,658.82 977.61 -181.71 -960.82 0.21
1/29/2008 2,028.00 37.70 257.20 1,681.71 995.42 -185.57 -978.22 0.56
1/29/2008 2,057.00 38.50 256.90 1,704.53 1,013.31 -189.58 -995.65 0.85
1/29/2008 2,086.00 39.00 256.50 1,727.14 1,031.46 -193.75 -1,013.32 0.58
1/29/2008 2,115.00 39.00 256.40 1,749.68 1,049.70 -198.03 -1,031.06 0.07
Casing
Casing Description OD (in) Set Depth (mKB) Run Date
Surface 9 5/8 310.27 1/25/2008
Intermediate 7 1,225.04 1/27/2008
17:30 22:00 Flow check well. Static. POOH five stands with hole taking correct fluid. Continue out of hole till pipe came wet at 2764m MD.
Pump slug and POOH to BHA.
22:00 00:00 Continue POOH to surface. Changeout MWD probe. Break bit. Made up BHA #6 with 6-1/8" bit. Ran in the hole and shallow
tested both MWD and AGS. AGS pressure recorded at 300 GPM: 1220 psi under; 1770 psi full. RIH to 243m MD.
Mud Checks
Mud / Brine Type Mud Density (lb/gal) pH Water Phase Chlorides (ppm)
SBM (Other) 9.20
Funnel Viscosity (s/qt) PV Calc (cp) YP Calc (lbf/100ft²) HTHP Filtrate (mL/30min)
57 14.0 12.000 3.0
Drilling Parameters
Depth Start (mKB) TVD Start (mKB) Depth End (mKB) TVD End (mKB) IADC Drilling Time (hrs) Interval ROP (m/hr)
3,048.00 2,460.87 3,048.00 2,460.87
Survey Data
Date MD (mKB) Incl (°) Azm (°) TVD (mKB) VS (m) NS (m) EW (m) DLS (°/30m)
1/31/2008 2,474.00 40.50 247.40 2,025.95 1,277.20 -269.03 -1,248.55 0.07
1/31/2008 2,521.00 40.50 247.40 2,061.69 1,307.20 -280.76 -1,276.73 0.00
1/31/2008 2,550.00 40.50 247.70 2,083.74 1,325.73 -287.95 -1,294.14 0.20
1/31/2008 2,579.00 40.70 247.60 2,105.76 1,344.29 -295.13 -1,311.59 0.22
1/31/2008 2,608.00 40.90 247.90 2,127.72 1,362.94 -302.31 -1,329.13 0.29
1/31/2008 2,637.00 41.10 247.40 2,149.60 1,381.65 -309.54 -1,346.73 0.40
1/31/2008 2,666.00 41.10 247.40 2,171.46 1,400.39 -316.87 -1,364.33 0.00
1/31/2008 2,695.00 41.10 247.60 2,193.31 1,419.14 -324.16 -1,381.94 0.14
1/31/2008 2,724.00 41.10 247.70 2,215.16 1,437.89 -331.41 -1,399.57 0.07
1/31/2008 2,753.00 41.10 247.90 2,237.02 1,456.65 -338.61 -1,417.22 0.14
1/31/2008 2,810.00 40.60 248.90 2,280.13 1,493.41 -352.34 -1,451.88 0.43
1/31/2008 2,839.00 40.90 247.40 2,302.10 1,512.06 -359.39 -1,469.45 1.06
1/31/2008 2,897.00 40.70 246.00 2,346.01 1,549.22 -374.37 -1,504.26 0.48
1/31/2008 2,955.00 40.10 245.60 2,390.18 1,585.97 -389.78 -1,538.55 0.34
1/31/2008 2,984.00 40.30 246.10 2,412.33 1,604.26 -397.44 -1,555.63 0.39
1/31/2008 3,013.00 40.60 245.60 2,434.40 1,622.66 -405.14 -1,572.79 0.46
1/31/2008 3,038.00 41.00 245.40 2,453.32 1,638.61 -411.91 -1,587.66 0.50
Casing
Casing Description OD (in) Set Depth (mKB) Run Date
Surface 9 5/8 310.27 1/25/2008
Intermediate 7 1,225.04 1/27/2008
22:00 00:00 Performed static gas and swab test at 3520m MD/ 2818m TVD; circulated bottoms up. Swab gas test: 5/5 units.
Mud Checks
Mud / Brine Type Mud Density (lb/gal) pH Water Phase Chlorides (ppm)
SBM (Other) 9.20
Funnel Viscosity (s/qt) PV Calc (cp) YP Calc (lbf/100ft²) HTHP Filtrate (mL/30min)
52 15.0 10.000 2.6
Drilling Parameters
Depth Start (mKB) TVD Start (mKB) Depth End (mKB) TVD End (mKB) IADC Drilling Time (hrs) Interval ROP (m/hr)
3,048.00 2,460.87 3,520.00 2,818.77 18.00 26.2
Survey Data
Date MD (mKB) Incl (°) Azm (°) TVD (mKB) VS (m) NS (m) EW (m) DLS (°/30m)
2/1/2008 3,071.00 41.10 245.10 2,478.21 1,659.74 -420.99 -1,607.34 0.20
2/1/2008 3,100.00 41.10 244.90 2,500.06 1,678.32 -429.04 -1,624.62 0.14
2/1/2008 3,129.00 40.80 244.70 2,521.96 1,696.82 -437.14 -1,641.82 0.34
2/1/2008 3,158.00 40.60 244.70 2,543.95 1,715.23 -445.22 -1,658.91 0.21
2/1/2008 3,187.00 40.40 244.20 2,566.00 1,733.54 -453.34 -1,675.90 0.39
2/1/2008 3,216.00 40.00 243.90 2,588.15 1,751.70 -461.53 -1,692.74 0.46
2/1/2008 3,245.00 40.20 243.70 2,610.34 1,769.81 -469.78 -1,709.50 0.25
2/1/2008 3,274.00 40.20 243.70 2,632.49 1,787.95 -478.07 -1,726.28 0.00
2/1/2008 3,303.00 40.40 243.50 2,654.60 1,806.12 -486.41 -1,743.08 0.25
2/1/2008 3,332.00 40.40 243.30 2,676.69 1,824.31 -494.83 -1,759.88 0.13
2/1/2008 3,361.00 40.50 243.30 2,698.76 1,842.50 -503.28 -1,776.69 0.10
2/1/2008 3,390.00 40.40 243.50 2,720.82 1,860.71 -511.71 -1,793.51 0.17
2/1/2008 3,419.00 40.30 243.30 2,742.92 1,878.88 -520.11 -1,810.30 0.17
2/1/2008 3,448.00 41.30 243.50 2,764.88 1,897.22 -528.60 -1,827.25 1.04
2/1/2008 3,477.00 41.60 243.10 2,786.61 1,915.79 -537.22 -1,844.40 0.41
2/1/2008 3,506.00 41.60 242.60 2,808.30 1,934.37 -546.01 -1,861.53 0.34
2/1/2008 3,520.00 41.60 242.60 2,818.77 1,943.33 -550.29 -1,869.78 0.00
Casing
Casing Description OD (in) Set Depth (mKB) Run Date
Surface 9 5/8 310.27 1/25/2008
Intermediate 7 1,225.04 1/27/2008
18:00 00:00 Rigged up check shot logging tools, Checked tool string and ran in hole to 1000m. Took first check shot. Ran in hole to
1500m MD took check shot, Ran in hole to 2000m. Ran in hole to 2500m , Ran in hole to 3000m, Started uphole check shot
survey.First uphole check short survey at 3520m. After that take check shots every 50m from 3500m to 2150m.
Mud Checks
Mud / Brine Type Mud Density (lb/gal) pH Water Phase Chlorides (ppm)
SBM (Other) 9.20
Funnel Viscosity (s/qt) PV Calc (cp) YP Calc (lbf/100ft²) HTHP Filtrate (mL/30min)
65 15.0 10.000 2.6
Drilling Parameters
Depth Start (mKB) TVD Start (mKB) Depth End (mKB) TVD End (mKB) IADC Drilling Time (hrs) Interval ROP (m/hr)
3,520.00 2,818.77 3,520.00 2,818.77
Survey Data
Date MD (mKB) Incl (°) Azm (°) TVD (mKB) VS (m) NS (m) EW (m) DLS (°/30m)
Casing
Casing Description OD (in) Set Depth (mKB) Run Date
Surface 9 5/8 310.27 1/25/2008
Intermediate 7 1,225.04 1/27/2008
Casing
Casing Description OD (in) Set Depth (mKB) Run Date
Surface 9 5/8 310.27 1/25/2008
Intermediate 7 1,225.04 1/27/2008
12:00 13:00 POOH 5 stands. Circulate hole clean. Flow check (OK).
13:00 16:30 POOH & L/O sideways 4" drillpipe. L/D Halliburton MST. (Offline test 7" x 9-5/8" annulus. Pumping away. Static pressure 200
psi.)
16:30 17:30 M/U 7" casing cutter. RIH to 276m MD. Locate collar at 282m MD. P/U & cut 7" casing at 276m MD. Close annular and
pump 9.3ppg WBM thru cut - full returns observed.
17:30 18:30 Displace 9-5/8" annulus with 9.4 ppg WBM. Flow check (OK). POOH & L/O 7" casing cutter.
18:30 22:00 Pull wear bushing. Jet wellhead. P/U landing joint and R/R tool & RIH & screw into 7" hanger. Pull free at 15 k above block
weight. L/D 7" casing hanger & 10' pup jont. L/O sideways 7" casing 21 joints + 8.69m cut off. Rig down BJT and installed
wear bushing.
22:00 23:00 Makeup 9 5/8" EZSV and run in hole on 4" drill pipe to 268m MD and set retainer. Test same to 1000 psi.(ok).
23:00 23:30 Sting into EZSV, Rig up B.J. lines and test same, Perform injection rates, 1 BPM= 300 psi, 2 BPM= 335 psi, 3 BPM= 360 psi,
4 BPM= 415 psi, static= 260 psi.. Mix and pump 30 bbl slurry @ 15.9 ppg. Squeeze 20 bbls below EZSV. Sting out and
pump 10 bbl balanced plug on top of EZSV. Pull out of hole 3 stands and circulate bottoms up.
23:30 00:00 POOH 3 stands and circulate to clean pipe with 9.3 PPg, CMT to surface, POOH L/D 18 Jts 4" drill pipe
Mud Checks
Mud / Brine Type Mud Density (lb/gal) pH Water Phase Chlorides (ppm)
SBM (Other) 9.20
Funnel Viscosity (s/qt) PV Calc (cp) YP Calc (lbf/100ft²) HTHP Filtrate (mL/30min)
72 15.0 10.000 2.6
Drilling Parameters
Depth Start (mKB) TVD Start (mKB) Depth End (mKB) TVD End (mKB) IADC Drilling Time (hrs) Interval ROP (m/hr)
Survey Data
Date MD (mKB) Incl (°) Azm (°) TVD (mKB) VS (m) NS (m) EW (m) DLS (°/30m)
Casing
Casing Description OD (in) Set Depth (mKB) Run Date
Surface 9 5/8 310.27 1/25/2008
Intermediate 7 1,225.04 1/27/2008
18:00 18:30 Commence Pulling on port leg, no success, connect Jetting line
18:30 20:30 Commence jetting port leg, gain 12' @ 20:30 Hrs
20:30 00:00 Connect jetting line bow leg, commence jetting on bow leg
Mud Checks
Mud / Brine Type Mud Density (lb/gal) pH Water Phase Chlorides (ppm)
Funnel Viscosity (s/qt) PV Calc (cp) YP Calc (lbf/100ft²) HTHP Filtrate (mL/30min)
Drilling Parameters
Depth Start (mKB) TVD Start (mKB) Depth End (mKB) TVD End (mKB) IADC Drilling Time (hrs) Interval ROP (m/hr)
Survey Data
Date MD (mKB) Incl (°) Azm (°) TVD (mKB) VS (m) NS (m) EW (m) DLS (°/30m)
Casing
Casing Description OD (in) Set Depth (mKB) Run Date
Surface 9 5/8 310.27 1/25/2008
Intermediate 7 1,225.04 1/27/2008
Mud Checks
Mud / Brine Type Mud Density (lb/gal) pH Water Phase Chlorides (ppm)
Funnel Viscosity (s/qt) PV Calc (cp) YP Calc (lbf/100ft²) HTHP Filtrate (mL/30min)
Drilling Parameters
Depth Start (mKB) TVD Start (mKB) Depth End (mKB) TVD End (mKB) IADC Drilling Time (hrs) Interval ROP (m/hr)
Survey Data
Date MD (mKB) Incl (°) Azm (°) TVD (mKB) VS (m) NS (m) EW (m) DLS (°/30m)
Casing
Casing Description OD (in) Set Depth (mKB) Run Date
Surface 9 5/8 310.27 1/25/2008
Intermediate 7 1,225.04 1/27/2008
Page 26
BHA Summary
WellView
Well Name: KS-1X
Job Type: Drilling - Original
API/UWI Surface Legal Location Well Configuration Type Ground Elevation (mKB) KB-Casing Flange Distance (m) KB-Tubing Head Distance (m) Total Depth (mKB)
KS-1X Deviated 3,520.01
Bits
Bit BHA Drill Time BHA ROP
Run No. Drill String Name BHA Drill Bit Bit Dull Depth In (mKB) Depth Out (mKB) Drilled (m) (hrs) (m/hr)
#1 1 Casing drill BBL, 9 5/8" float collar, 12" bbl drill shoe 12in, BBL, 16687003-1 ------- 99.00 623.00 524.00 3.00 174.7
#2 2 Motor Build Hycalog HC 604, 7" sperry Drill Lobe 7/8 - 7.5 Stg, 6 3/4" Float sub, 8 1/2in, HC 604, 7210098 1-1-WT-A-X-0-NO-TD 305.00 1,228.00 923.00 6.50 142.0
Non Mag MWD Hang off collar, 6 3/4" Non Mag Screen sun, 15
HWDP
#3 3 Cleanout Hycalog HC 604, 7" sperry Drill Lobe 7/8 - 7.5 Stg, 6 3/4" Float sub, 8 1/2in, HC 604, 7210098 1-1-WT-A-X-0-NO-TD 1,228.06 1,228.06 0.00 0.00
RR Non Mag MWD Hang off collar, 6 3/4" Non Mag Screen sun, 15
HWDP
#4 4 Rotary AGS Hycalog DSR 416 B2, 6 1/8" Modular NB Stabilizer, 2ft Extension 6 1/8in, DSR 416 B2, 3-2-CT-A-X-0-N0-BHA 1,228.00 2,416.00 1,188.00 22.00 54.0
sub, Adjustable Gauge stabilizer, 5" Non Mag hang off collar, 5 1/2" 217914
Integral blade stabilizer, Non Mag 4 3/4" screen sub, Cross over sub,
24 X 4" HWDP
#5 5 Rotary AGS Smith MI416PX(ER20669), 6 1/8" Modular NB Stabilizer, 2ft 6 1/8in, 8-2-RO-T-X-0-LT-PR 2,416.00 3,048.00 632.00 17.00 37.2
Extension sub, Adjustable Gauge stabilizer, 5" Non Mag hang off MI416PX(ER20669),
collar, 5 1/2" Integral blade stabilizer, Non Mag 4 3/4" screen sub, JX7400
Cross over sub, 24 X 4" HWDP
#6 6 Rotary AGS Security FM3543ZR, 6 1/8" Modular NB Stabilizer, 2ft Extension sub, 6 1/8in, FM3543ZR, 1-2-WT-T-X-0-NO-TD 3,048.00 3,520.00 472.00 18.00 26.2
Adjustable Gauge stabilizer, 5" Non Mag hang off collar, 5 1/2" 10947814
Integral blade stabilizer, Non Mag 4 3/4" screen sub, Cross over sub,
24 X 4" HWDP
7RR 7 Displacement Hycalog DSR 416 B2, Bit Sub w/Float, XO Sub, 24 X 4" HWDP 6 1/8in, DSR 416 B2, ------- 3,520.00 3,520.00 0.00 0.00
217914
Page 28
WellView Casing Summary
Surface, 310.27mKB
Set Depth (mKB) Set Tension (kips) String Nominal OD (in) String Minimum Drift (in) Centralizers Scratchers
310.27 9 5/8
P (collapse)
Jts Item Description OD (in) ID (in) Wt (lbs/ft) Grade Top Thread Top (mKB) Btm (mKB) Len (m) Burst Pres (psi) (psi)
1 Top of Wellhead to 0.00 15.15 15.15
Rig Floor
1 KOP Wellhead 15.15 17.35 2.20
Assembly
22 9.625" 40# N-80 BTC 9 5/8 8.835 40.00 N-80 BTC 17.35 284.18 266.83
CSG.
1 FLOAT COLLAR 9 9 5/8 8.835 40.00 N-80 BTC 284.18 296.90 12.72
5/8" GRADE 40ppf
1 CASING SHOE 9 5/8" 9 5/8 8.835 40.00 N-80 BTC 296.90 310.27 13.37
GRADE 40ppf
Intermediate, 1,225.04mKB
Set Depth (mKB) Set Tension (kips) String Nominal OD (in) String Minimum Drift (in) Centralizers Scratchers
1,225.04 7
P (collapse)
Jts Item Description OD (in) ID (in) Wt (lbs/ft) Grade Top Thread Top (mKB) Btm (mKB) Len (m) Burst Pres (psi) (psi)
1 RKB to HGR 7 0.00 15.15 15.15
1 Hanger assembly 7 6.366 23.00 L-80 BTC 15.15 17.45 2.30
2 7" 23 ppf BTC casing 7 6.366 23.00 L-80 BTC 17.45 41.39 23.94
N-80
96 7" 23 ppf BTC casing 7 6.366 23.00 N-80 BTC 41.39 1,199.59 1,158.20
N-80
1 Halliburton Float Assy 7 6.366 23.00 N-80 BTC 1,199.59 1,212.27 12.68
1 Halliburton Shoe 7 6.366 23.00 N-80 BTC 1,212.27 1,225.04 12.77
Original Hole
Wellbore Name Profile Type Kick Off Depth (mKB) Vertical Section Direction (°)
Original Hole Directional 365.76 258.00
Section Size (in) Act Top (mKB) Act Btm (mKB)
Surface 12 1/4 99.00 305.01
Intermediate 8 1/2 305.01 1,228.01
Production 6 1/8 1,228.01 3,520.01
Surface, 310.27mKB
Casing Description Wellbore Run Date Set Depth (mKB) Stick Up (mKB) Set Tension (kips)
Surface Original Hole 1/25/2008 310.27 0.00
Centralizers Scratchers
Top Conn
Jts Item Description OD (in) ID (in) Wt (lbs/ft) Grade Sz (in) Top Thread Len (m) Top (mKB) Btm (mKB)
1 Top of Wellhead to Rig Floor 15.15 0.00 15.15
1 KOP Wellhead Assembly 2.20 15.15 17.35
22 9.625" 40# N-80 BTC CSG. 9 5/8 8.835 40.00 N-80 BTC 266.83 17.35 284.18
1 FLOAT COLLAR 9 5/8" GRADE 9 5/8 8.835 40.00 N-80 BTC 12.72 284.18 296.90
40ppf
1 CASING SHOE 9 5/8" GRADE 9 5/8 8.835 40.00 N-80 BTC 13.37 296.90 310.27
40ppf
Intermediate, 1,225.04mKB
Casing Description Wellbore Run Date Set Depth (mKB) Stick Up (mKB) Set Tension (kips)
Intermediate Original Hole 1/27/2008 1,225.04 0.00
Centralizers Scratchers
Top Conn
Jts Item Description OD (in) ID (in) Wt (lbs/ft) Grade Sz (in) Top Thread Len (m) Top (mKB) Btm (mKB)
1 RKB to HGR 7 15.15 0.00 15.15
1 Hanger assembly 7 6.366 23.00 L-80 BTC 2.30 15.15 17.45
2 7" 23 ppf BTC casing N-80 7 6.366 23.00 L-80 BTC 23.94 17.45 41.39
96 7" 23 ppf BTC casing N-80 7 6.366 23.00 N-80 BTC 1,158.20 41.39 1,199.59
1 Halliburton Float Assy 7 6.366 23.00 N-80 BTC 12.68 1,199.59 1,212.27
1 Halliburton Shoe 7 6.366 23.00 N-80 BTC 12.77 1,212.27 1,225.04
Surface Casing Cement, casing, 1/25/2008 03:56
Cementing Start Date Cementing End Date Wellbore
1/25/2008 1/25/2008 Original Hole
Evaluation Method Cement Evaluation Results
Comment
9-5/8" Casing Cement Job Details¿ planned to mix 355 cuft (257 sxs) of class G (+40% S8C) cement with 6.894 gps seawater + 0.336 gps A-300L +
0.160 gps A-3L + 0.034 gps FP-9LS for 7.424 gps or 45.4 bbls of mixed fluid. Slurry weight was 15.5 ppg and the yield was 1.691 cuft/sx. Total calculated
slurry volume = 77.4 bbls. Pumped 2 bbls seawater to break circulation. BJ tested lines to 2,500 psig. Mixed and pumped 77.5 bbls of slurry at 6.1 bpm
and 338 psi. Displaced with 68.0 bbls seawater (planned displacement was 68.3 bbls) at 7.0 bpm and 641 psi. Did not drop plug. No wiper plug used in
9-5/8" section. Bled back and float held. Cement in place at 4:20 hours. Estimated top of cement at seabed. Total of 4 BBL centralizers run.
1, 112.78-310.29mKB
Top (mKB) Bottom (mKB) Full Return? Cmnt Rtrn (bbl) Top Plug? Bottom Plug?
112.78 310.29 No 0.0 No No
Initial Pump Rate (bbl/min) Final Pump Rate (bbl/min) Average Pump Rate (bbl/min) Final Pump Pressure (psi) Plug Bump Pressure (psi)
7 641 0 0.0
Pipe Reciprocated? Reciprocation Stroke Length (m) Reciprocation Rate (spm) Pipe Rotated? Pipe RPM (rpm)
No No
Depth tagged (mKB) Tag Method Depth Plug Drilled Out To (mKB) Drill Out Diameter (in) Drill Out Date
Cement
Fluid Type Fluid Description Amount (sacks) Class Volume Pumped (bbl)
Cement Cement from lot #A-221 2 Sea Water 15.5
Estimated Top (mKB) Estimated Bottom (mKB) Percent Excess Pumped (%) Yield (ft³/sack) Mix H20 Ratio (gal/sack)
112.78 310.29 77.50
Free Water (%) Density (lb/gal) Plastic Viscosity (cp) Thickening Time (hrs) 1st Compressive Strength (psi)
Seawater
Fluid Type Fluid Description Amount (sacks) Class Volume Pumped (bbl)
Seawater
Estimated Top (mKB) Estimated Bottom (mKB) Percent Excess Pumped (%) Yield (ft³/sack) Mix H20 Ratio (gal/sack)
68.00
Free Water (%) Density (lb/gal) Plastic Viscosity (cp) Thickening Time (hrs) 1st Compressive Strength (psi)
Original Hole
Wellbore Name Profile Type Kick Off Depth (mKB) Vertical Section Direction (°)
Original Hole Directional 365.76 258.00
Section Size (in) Act Top (mKB) Act Btm (mKB)
Surface 12 1/4 99.00 305.01
Intermediate 8 1/2 305.01 1,228.01
Production 6 1/8 1,228.01 3,520.01
Surface, 310.27mKB
Casing Description Wellbore Run Date Set Depth (mKB) Stick Up (mKB) Set Tension (kips)
Surface Original Hole 1/25/2008 310.27 0.00
Centralizers Scratchers
Top Conn
Jts Item Description OD (in) ID (in) Wt (lbs/ft) Grade Sz (in) Top Thread Len (m) Top (mKB) Btm (mKB)
1 Top of Wellhead to Rig Floor 15.15 0.00 15.15
1 KOP Wellhead Assembly 2.20 15.15 17.35
22 9.625" 40# N-80 BTC CSG. 9 5/8 8.835 40.00 N-80 BTC 266.83 17.35 284.18
1 FLOAT COLLAR 9 5/8" GRADE 9 5/8 8.835 40.00 N-80 BTC 12.72 284.18 296.90
40ppf
1 CASING SHOE 9 5/8" GRADE 9 5/8 8.835 40.00 N-80 BTC 13.37 296.90 310.27
40ppf
Intermediate, 1,225.04mKB
Casing Description Wellbore Run Date Set Depth (mKB) Stick Up (mKB) Set Tension (kips)
Intermediate Original Hole 1/27/2008 1,225.04 0.00
Centralizers Scratchers
Top Conn
Jts Item Description OD (in) ID (in) Wt (lbs/ft) Grade Sz (in) Top Thread Len (m) Top (mKB) Btm (mKB)
1 RKB to HGR 7 15.15 0.00 15.15
1 Hanger assembly 7 6.366 23.00 L-80 BTC 2.30 15.15 17.45
2 7" 23 ppf BTC casing N-80 7 6.366 23.00 L-80 BTC 23.94 17.45 41.39
96 7" 23 ppf BTC casing N-80 7 6.366 23.00 N-80 BTC 1,158.20 41.39 1,199.59
1 Halliburton Float Assy 7 6.366 23.00 N-80 BTC 12.68 1,199.59 1,212.27
1 Halliburton Shoe 7 6.366 23.00 N-80 BTC 12.77 1,212.27 1,225.04
Intermediate Casing String, casing, 1/27/2008 21:39
Cementing Start Date Cementing End Date Wellbore
1/27/2008 1/27/2008 Original Hole
Evaluation Method Cement Evaluation Results
Comment
7" Casing Cement Job Details¿ for lead slurry, planned to mix 0 cuft (0 sxs) of class G (+40% S8C) cement with 0.000 gps seawater + for 0.000 gps or
0.0 bbls of mixed fluid. Lead slurry weight was 0.0 ppg and the yield was 0.000 cuft/sx. For tail slurry, planned to mix 464 cuft (337 sxs) of class G (+40%
S8C) cement with 6.177 gps seawater + 0.035 gps R-8LS + 0.032 gps FP-9L + 0.430 gps BJ Ultra for 6.674 gps or 53.6 bbls of mixed fluid. Tail slurry
weight was 15.9 ppg and the yield was 1.590 cuft/sx. Total calculated slurry volume (lead + tail) = 0.0 + 95.5 = 95.5 bbls. Pumped 2 bbls seawater
preflush. BJ tested lines to 3,500 psig. Mixed and pumped 95.0 bbls of 15.9 ppg tail slurry at 5.5 bpm and 590 psi. Actual slurry volume (lead + tail) =
95.0 bbls. Dropped wiper plug. Pumped 5 bbls 15.9 ppg tail slurry behind plug. Displaced with 156.4 bbls seawater (planned displacement was 156.8
bbls) at 2.0 bpm and a final pressure of 1,107 psi. Bumped plug with 1,107 psi. Bled back and float held. Cement in place at 22:35 hours. Estimated top
of cement at 768' MD. Total of 25 Spirolizers run.
1, 234.09-373.68mKB
Top (mKB) Bottom (mKB) Full Return? Cmnt Rtrn (bbl) Top Plug? Bottom Plug?
234.09 373.68 Yes 0.0 Yes No
Initial Pump Rate (bbl/min) Final Pump Rate (bbl/min) Average Pump Rate (bbl/min) Final Pump Pressure (psi) Plug Bump Pressure (psi)
6 1,107 2,500 0.0 0.0
Pipe Reciprocated? Reciprocation Stroke Length (m) Reciprocation Rate (spm) Pipe Rotated? Pipe RPM (rpm)
No No
Depth tagged (mKB) Tag Method Depth Plug Drilled Out To (mKB) Drill Out Diameter (in) Drill Out Date
Sea Water
Fluid Type Fluid Description Amount (sacks) Class Volume Pumped (bbl)
Sea Water
Estimated Top (mKB) Estimated Bottom (mKB) Percent Excess Pumped (%) Yield (ft³/sack) Mix H20 Ratio (gal/sack)
2.00
Free Water (%) Density (lb/gal) Plastic Viscosity (cp) Thickening Time (hrs) 1st Compressive Strength (psi)
8.60
Tail
Fluid Type Fluid Description Amount (sacks) Class Volume Pumped (bbl)
Tail Cement from lot #A-221 2 Sea Water
Estimated Top (mKB) Estimated Bottom (mKB) Percent Excess Pumped (%) Yield (ft³/sack) Mix H20 Ratio (gal/sack)
234.21 373.53 95.00
Free Water (%) Density (lb/gal) Plastic Viscosity (cp) Thickening Time (hrs) 1st Compressive Strength (psi)
15.90
Cement Fluid Additives
Add Type Conc
R-8LS Accelerator or Retarder 0.04
FP-9L Defoamer 0.03
BJ Ultra Gas Control Additive/Bonding Agent 0.43
Seawater
Fluid Type Fluid Description Amount (sacks) Class Volume Pumped (bbl)
Seawater
Estimated Top (mKB) Estimated Bottom (mKB) Percent Excess Pumped (%) Yield (ft³/sack) Mix H20 Ratio (gal/sack)
156.40
Free Water (%) Density (lb/gal) Plastic Viscosity (cp) Thickening Time (hrs) 1st Compressive Strength (psi)
8.60
Cement Fluid Additives
Add Type Conc
Original Hole
Wellbore Name Profile Type Kick Off Depth (mKB) Vertical Section Direction (°)
Original Hole Directional 365.76 258.00
Section Size (in) Act Top (mKB) Act Btm (mKB)
Surface 12 1/4 99.00 305.01
Intermediate 8 1/2 305.01 1,228.01
Production 6 1/8 1,228.01 3,520.01
Surface, 310.27mKB
Casing Description Wellbore Run Date Set Depth (mKB) Stick Up (mKB) Set Tension (kips)
Surface Original Hole 1/25/2008 310.27 0.00
Centralizers Scratchers
Top Conn
Jts Item Description OD (in) ID (in) Wt (lbs/ft) Grade Sz (in) Top Thread Len (m) Top (mKB) Btm (mKB)
1 Top of Wellhead to Rig Floor 15.15 0.00 15.15
1 KOP Wellhead Assembly 2.20 15.15 17.35
22 9.625" 40# N-80 BTC CSG. 9 5/8 8.835 40.00 N-80 BTC 266.83 17.35 284.18
1 FLOAT COLLAR 9 5/8" GRADE 9 5/8 8.835 40.00 N-80 BTC 12.72 284.18 296.90
40ppf
1 CASING SHOE 9 5/8" GRADE 9 5/8 8.835 40.00 N-80 BTC 13.37 296.90 310.27
40ppf
Intermediate, 1,225.04mKB
Casing Description Wellbore Run Date Set Depth (mKB) Stick Up (mKB) Set Tension (kips)
Intermediate Original Hole 1/27/2008 1,225.04 0.00
Centralizers Scratchers
Top Conn
Jts Item Description OD (in) ID (in) Wt (lbs/ft) Grade Sz (in) Top Thread Len (m) Top (mKB) Btm (mKB)
1 RKB to HGR 7 15.15 0.00 15.15
1 Hanger assembly 7 6.366 23.00 L-80 BTC 2.30 15.15 17.45
2 7" 23 ppf BTC casing N-80 7 6.366 23.00 L-80 BTC 23.94 17.45 41.39
96 7" 23 ppf BTC casing N-80 7 6.366 23.00 N-80 BTC 1,158.20 41.39 1,199.59
1 Halliburton Float Assy 7 6.366 23.00 N-80 BTC 12.68 1,199.59 1,212.27
1 Halliburton Shoe 7 6.366 23.00 N-80 BTC 12.77 1,212.27 1,225.04
7" Casing P&A Cement, plug, 2/4/2008 11:30
Cementing Start Date Cementing End Date Wellbore
2/4/2008 2/4/2008 Original Hole
Evaluation Method Cement Evaluation Results
Comment
Set 7" EZSV Cement Retainer at 11:00.
Pressure test lines to 2500 psi at 11:32. Pump injection test at 11:34, 1 BPM=970psi, 2 BPM=1090psi, 3 BPM=1195 psi, 4 BPM=1230psi, Static = 800 psi.
Sting out of retainer at 11:40 Mix and pump 30 bbls 15.9 ppg cement with 0. 20 gps BJUltra, 0.35 gps CD-33L, 0.05 gps FP-9L, yield=1.53 ft3/sx, total mix
fluid=6.36 gps. Displace cement to stinger with 11 bbls 9.3 ppg WBM. Sting into retainer at 11:53, squeeze 20 bbls 9.3 ppg WBM to place 20 bbls cement
below retainer. Sting out of retainer at 11:58 pump 3 bbls 9.3ppg WBM to balance 10 bbls cement on top of retainer. CIP= 12:00
Pipe Reciprocated? Reciprocation Stroke Length (m) Reciprocation Rate (spm) Pipe Rotated? Pipe RPM (rpm)
No No
Depth tagged (mKB) Tag Method Depth Plug Drilled Out To (mKB) Drill Out Diameter (in) Drill Out Date
Fluid Type Fluid Description Amount (sacks) Class Volume Pumped (bbl)
Estimated Top (mKB) Estimated Bottom (mKB) Percent Excess Pumped (%) Yield (ft³/sack) Mix H20 Ratio (gal/sack)
Free Water (%) Density (lb/gal) Plastic Viscosity (cp) Thickening Time (hrs) 1st Compressive Strength (psi)
Pipe Reciprocated? Reciprocation Stroke Length (m) Reciprocation Rate (spm) Pipe Rotated? Pipe RPM (rpm)
No No
Depth tagged (mKB) Tag Method Depth Plug Drilled Out To (mKB) Drill Out Diameter (in) Drill Out Date
Fluid Type Fluid Description Amount (sacks) Class Volume Pumped (bbl)
Estimated Top (mKB) Estimated Bottom (mKB) Percent Excess Pumped (%) Yield (ft³/sack) Mix H20 Ratio (gal/sack)
Free Water (%) Density (lb/gal) Plastic Viscosity (cp) Thickening Time (hrs) 1st Compressive Strength (psi)
Original Hole
Wellbore Name Profile Type Kick Off Depth (mKB) Vertical Section Direction (°)
Original Hole Directional 365.76 258.00
Section Size (in) Act Top (mKB) Act Btm (mKB)
Surface 12 1/4 99.00 305.01
Intermediate 8 1/2 305.01 1,228.01
Production 6 1/8 1,228.01 3,520.01
Surface, 310.27mKB
Casing Description Wellbore Run Date Set Depth (mKB) Stick Up (mKB) Set Tension (kips)
Surface Original Hole 1/25/2008 310.27 0.00
Centralizers Scratchers
Top Conn
Jts Item Description OD (in) ID (in) Wt (lbs/ft) Grade Sz (in) Top Thread Len (m) Top (mKB) Btm (mKB)
1 Top of Wellhead to Rig Floor 15.15 0.00 15.15
1 KOP Wellhead Assembly 2.20 15.15 17.35
22 9.625" 40# N-80 BTC CSG. 9 5/8 8.835 40.00 N-80 BTC 266.83 17.35 284.18
1 FLOAT COLLAR 9 5/8" GRADE 9 5/8 8.835 40.00 N-80 BTC 12.72 284.18 296.90
40ppf
1 CASING SHOE 9 5/8" GRADE 9 5/8 8.835 40.00 N-80 BTC 13.37 296.90 310.27
40ppf
Intermediate, 1,225.04mKB
Casing Description Wellbore Run Date Set Depth (mKB) Stick Up (mKB) Set Tension (kips)
Intermediate Original Hole 1/27/2008 1,225.04 0.00
Centralizers Scratchers
Top Conn
Jts Item Description OD (in) ID (in) Wt (lbs/ft) Grade Sz (in) Top Thread Len (m) Top (mKB) Btm (mKB)
1 RKB to HGR 7 15.15 0.00 15.15
1 Hanger assembly 7 6.366 23.00 L-80 BTC 2.30 15.15 17.45
2 7" 23 ppf BTC casing N-80 7 6.366 23.00 L-80 BTC 23.94 17.45 41.39
96 7" 23 ppf BTC casing N-80 7 6.366 23.00 N-80 BTC 1,158.20 41.39 1,199.59
1 Halliburton Float Assy 7 6.366 23.00 N-80 BTC 12.68 1,199.59 1,212.27
1 Halliburton Shoe 7 6.366 23.00 N-80 BTC 12.77 1,212.27 1,225.04
9 5/8" Casing P&A Cement, plug, 2/4/2008 23:00
Cementing Start Date Cementing End Date Wellbore
2/4/2008 2/4/2008 Original Hole
Evaluation Method Cement Evaluation Results
Comment
Set 9 5/8" EZSV Cement Retainer at 22:20. Pressure test retainer to 1000 psi at 22:25.
Sting into retainer at 22:30, Pressure test lines to 800 psi at 22:40. Pump injection test with SW at 22:43, 1 BPM=300psi, 2 BPM=335psi, 3 BPM=360 psi,
4 BPM=415psi, static=260psi. Stay stung in and Mix and pump 30 bbls 15.9 ppg cement with 0.05 gps FP-9L, 2% BWOC A-7, yield=1.62 ft3/sx, total mix
fluid=7.05 gps.
Sting out of retainer at 22:55, pump 3.0 bbls SW to balance 10 bbls cement on top of retainer. CIP= 22:56.
Pipe Reciprocated? Reciprocation Stroke Length (m) Reciprocation Rate (spm) Pipe Rotated? Pipe RPM (rpm)
No No
Depth tagged (mKB) Tag Method Depth Plug Drilled Out To (mKB) Drill Out Diameter (in) Drill Out Date
Fluid Type Fluid Description Amount (sacks) Class Volume Pumped (bbl)
Estimated Top (mKB) Estimated Bottom (mKB) Percent Excess Pumped (%) Yield (ft³/sack) Mix H20 Ratio (gal/sack)
Free Water (%) Density (lb/gal) Plastic Viscosity (cp) Thickening Time (hrs) 1st Compressive Strength (psi)
Pipe Reciprocated? Reciprocation Stroke Length (m) Reciprocation Rate (spm) Pipe Rotated? Pipe RPM (rpm)
No No
Depth tagged (mKB) Tag Method Depth Plug Drilled Out To (mKB) Drill Out Diameter (in) Drill Out Date
Fluid Type Fluid Description Amount (sacks) Class Volume Pumped (bbl)
Estimated Top (mKB) Estimated Bottom (mKB) Percent Excess Pumped (%) Yield (ft³/sack) Mix H20 Ratio (gal/sack)
Free Water (%) Density (lb/gal) Plastic Viscosity (cp) Thickening Time (hrs) 1st Compressive Strength (psi)
Page 38
Field: EXPLORATION WELL
Site: KS-1X
Well: KS-1X
Wellpath: KS-1X
Survey: KS-1X 6-1/8" MWD
1000
500
9 5/8" Csg Actual
1000 0
7" Csg Actual
True Vertical Depth [610m/in]
South(-)/North(+) [500m/in]
°
40
2000 TD (Basement)
-1000
2500
-1500
3000 TD (Basement)
VIETNAM
Map System: Universal Transverse Mercator Map Zone: UTM Zone 48, North 102E to 108E
Geo Datum: INDIAN75 (Everest 1830) Coordinate System: Site Centre
Sys Datum: Mean Sea Level Geomagnetic Model: bggm2007
Site: KS-1X
Survey
MD Incl Azim TVD +N/-S +E/-W VS DLS Build Turn Tool/Comment
m deg deg m m m m deg/30m deg/30m deg/30m
0.00 0.00 0.00 0.00 -2.57 2.51 -1.97 0.000 0.000 0.000 TIE LINE
97.00 0.00 0.00 97.00 -2.57 2.51 -1.97 0.000 0.000 0.000 MWD+SCC
309.98 0.49 223.80 309.98 -3.22 1.88 -1.23 0.068 0.068 0.000 9 5/8" Csg Actual
316.00 0.50 223.80 316.00 -3.26 1.85 -1.19 0.068 0.068 0.000 MWD+SCC
345.00 0.50 239.80 345.00 -3.41 1.65 -0.97 0.144 0.000 16.552 MWD+SCC
374.00 4.50 263.90 373.96 -3.60 0.41 0.28 4.189 4.138 24.932 MWD+SCC
403.00 10.10 263.10 402.72 -4.03 -3.25 3.96 5.794 5.793 -0.828 MWD+SCC
432.00 14.00 264.10 431.07 -4.69 -9.26 9.99 4.040 4.035 1.035 MWD+SCC
461.00 18.20 263.80 458.93 -5.54 -17.26 18.00 4.345 4.345 -0.310 MWD+SCC
490.00 22.80 260.90 486.08 -6.92 -27.32 28.13 4.872 4.759 -3.000 MWD+SCC
519.00 29.30 259.50 512.13 -9.11 -39.86 40.86 6.753 6.724 -1.448 MWD+SCC
548.00 35.30 259.00 536.63 -12.00 -55.07 56.35 6.213 6.207 -0.517 MWD+SCC
606.00 39.90 258.80 582.57 -18.81 -89.79 91.73 2.380 2.379 -0.103 MWD+SCC
664.00 40.40 258.70 626.90 -26.11 -126.47 129.13 0.261 0.259 -0.052 MWD+SCC
693.00 40.40 258.80 648.98 -29.78 -144.90 147.92 0.067 0.000 0.103 MWD+SCC
722.00 40.50 258.80 671.05 -33.43 -163.36 166.74 0.103 0.103 0.000 MWD+SCC
751.00 37.90 259.70 693.52 -36.85 -181.36 185.06 2.753 -2.690 0.931 MWD+SCC
780.00 37.40 259.40 716.49 -40.07 -198.78 202.78 0.551 -0.517 -0.310 MWD+SCC
838.00 41.30 260.60 761.33 -46.44 -234.99 239.53 2.055 2.017 0.621 MWD+SCC
925.00 40.90 260.20 826.89 -55.97 -291.38 296.71 0.165 -0.138 -0.138 MWD+SCC
954.00 40.80 259.90 848.82 -59.25 -310.07 315.67 0.228 -0.103 -0.310 MWD+SCC
1013.00 41.70 259.40 893.18 -66.24 -348.33 354.57 0.487 0.458 -0.254 MWD+SCC
1041.00 41.80 259.00 914.07 -69.73 -366.65 373.22 0.305 0.107 -0.429 MWD+SCC
1070.00 41.90 259.20 935.67 -73.39 -385.65 392.57 0.172 0.103 0.207 MWD+SCC
1099.00 39.50 257.40 957.66 -77.22 -404.16 411.47 2.764 -2.483 -1.862 MWD+SCC
1128.00 39.00 257.40 980.12 -81.22 -422.07 429.81 0.517 -0.517 0.000 MWD+SCC
1157.00 38.00 259.70 1002.81 -84.81 -439.76 447.86 1.807 -1.035 2.379 MWD+SCC
Halliburton Company
Survey Report
Company: CHEVRON VIETNAM Date: 28/03/2008 Time: 13:28:32 Page: 2
Field: EXPLORATION WELL Co-ordinate(NE) Reference: Site: KS-1X, Grid North
Site: KS-1X Vertical (TVD) Reference: RKB 34.4
Well: KS-1X Section (VS) Reference: Site (0.00N,0.00E,259.00Azi)
Wellpath: KS-1X Survey Calculation Method: Minimum Curvature Db: Sybase
Survey
MD Incl Azim TVD +N/-S +E/-W VS DLS Build Turn Tool/Comment
m deg deg m m m m deg/30m deg/30m deg/30m
1186.00 37.90 259.40 1025.68 -88.04 -457.30 465.70 0.217 -0.103 -0.310 MWD+SCC
1212.00 37.70 259.70 1046.23 -90.93 -472.97 481.63 0.313 -0.231 0.346 MWD+SCC
1225.00 37.94 260.06 1056.49 -92.34 -480.82 489.60 0.742 0.544 0.825 7" Csg Actual
1245.00 38.30 260.60 1072.23 -94.41 -492.99 501.94 0.742 0.547 0.814 MWD+SCC
1274.00 38.30 260.60 1094.99 -97.34 -510.72 519.91 0.000 0.000 0.000 MWD+SCC
1303.00 38.20 260.60 1117.76 -100.28 -528.43 537.86 0.103 -0.103 0.000 MWD+SCC
1332.00 37.80 260.40 1140.61 -103.22 -546.04 555.70 0.433 -0.414 -0.207 MWD+SCC
1361.00 38.40 260.40 1163.44 -106.21 -563.68 573.59 0.621 0.621 0.000 MWD+SCC
1390.00 39.00 260.20 1186.07 -109.26 -581.56 591.72 0.634 0.621 -0.207 MWD+SCC
1419.00 38.80 260.10 1208.64 -112.38 -599.50 609.93 0.217 -0.207 -0.103 MWD+SCC
1448.00 38.30 259.90 1231.32 -115.52 -617.30 628.00 0.533 -0.517 -0.207 MWD+SCC
1477.00 38.20 259.70 1254.09 -118.70 -634.97 645.95 0.165 -0.103 -0.207 MWD+SCC
1507.00 38.90 259.50 1277.55 -122.07 -653.36 664.64 0.711 0.700 -0.200 MWD+SCC
1565.00 39.20 259.40 1322.60 -128.76 -689.28 701.18 0.159 0.155 -0.052 MWD+SCC
1593.00 40.00 259.40 1344.17 -132.04 -706.82 719.03 0.857 0.857 0.000 MWD+SCC
1622.00 40.40 259.20 1366.32 -135.52 -725.21 737.75 0.435 0.414 -0.207 MWD+SCC
1651.00 40.20 259.20 1388.44 -139.03 -743.64 756.51 0.207 -0.207 0.000 MWD+SCC
1680.00 40.40 258.80 1410.55 -142.61 -762.05 775.26 0.338 0.207 -0.414 MWD+SCC
1709.00 39.50 258.60 1432.79 -146.26 -780.31 793.88 0.940 -0.931 -0.207 MWD+SCC
1738.00 39.20 258.30 1455.21 -149.94 -798.33 812.27 0.367 -0.310 -0.310 MWD+SCC
1767.00 39.00 258.30 1477.72 -153.65 -816.24 830.56 0.207 -0.207 0.000 MWD+SCC
1796.00 38.90 258.10 1500.27 -157.38 -834.08 848.79 0.166 -0.103 -0.207 MWD+SCC
1825.00 38.90 258.10 1522.84 -161.14 -851.90 867.00 0.000 0.000 0.000 MWD+SCC
1854.00 38.90 257.90 1545.41 -164.92 -869.71 885.20 0.130 0.000 -0.207 MWD+SCC
1883.00 38.70 257.90 1568.01 -168.73 -887.48 903.37 0.207 -0.207 0.000 MWD+SCC
1912.00 38.70 257.80 1590.64 -172.55 -905.21 921.50 0.065 0.000 -0.103 MWD+SCC
1970.00 38.30 257.80 1636.03 -180.18 -940.50 957.60 0.207 -0.207 0.000 MWD+SCC
1999.00 38.10 257.80 1658.82 -183.97 -958.03 975.53 0.207 -0.207 0.000 MWD+SCC
2028.00 37.70 257.20 1681.71 -187.82 -975.42 993.34 0.563 -0.414 -0.621 MWD+SCC
2057.00 38.50 256.90 1704.53 -191.83 -992.86 1011.22 0.849 0.828 -0.310 MWD+SCC
2086.00 39.00 256.50 1727.14 -196.01 -1010.52 1029.36 0.578 0.517 -0.414 MWD+SCC
2115.00 39.00 256.40 1749.68 -200.28 -1028.26 1047.59 0.065 0.000 -0.103 MWD+SCC
2144.00 38.90 256.20 1772.23 -204.60 -1045.98 1065.80 0.166 -0.103 -0.207 MWD+SCC
2173.00 38.80 255.80 1794.82 -209.00 -1063.63 1083.96 0.279 -0.103 -0.414 MWD+SCC
2231.00 38.20 254.20 1840.21 -218.34 -1098.50 1119.98 0.601 -0.310 -0.828 MWD+SCC
2260.00 38.00 253.50 1863.03 -223.32 -1115.69 1137.80 0.492 -0.207 -0.724 MWD+SCC
2318.00 40.60 251.80 1907.91 -234.29 -1150.74 1174.30 1.455 1.345 -0.879 MWD+SCC
2347.00 41.30 250.40 1929.82 -240.45 -1168.72 1193.13 1.194 0.724 -1.448 MWD+SCC
2376.00 41.00 249.00 1951.65 -247.07 -1186.62 1211.96 1.002 -0.310 -1.448 MWD+SCC
2405.00 40.80 247.70 1973.57 -254.07 -1204.27 1230.62 0.904 -0.207 -1.345 MWD+SCC
2434.00 40.60 247.40 1995.56 -261.29 -1221.75 1249.15 0.289 -0.207 -0.310 MWD+SCC
2463.00 40.50 247.40 2017.59 -268.54 -1239.15 1267.62 0.103 -0.103 0.000 MWD+SCC
2492.00 40.40 247.40 2039.66 -275.77 -1256.52 1286.05 0.103 -0.103 0.000 MWD+SCC
2521.00 40.50 247.40 2061.73 -283.00 -1273.89 1304.48 0.103 0.103 0.000 MWD+SCC
2550.00 40.50 247.70 2083.78 -290.19 -1291.30 1322.94 0.202 0.000 0.310 MWD+SCC
2579.00 40.70 247.60 2105.80 -297.37 -1308.75 1341.45 0.218 0.207 -0.103 MWD+SCC
2608.00 40.90 247.40 2127.75 -304.62 -1326.26 1360.02 0.247 0.207 -0.207 MWD+SCC
2637.00 41.10 247.40 2149.64 -311.93 -1343.82 1378.65 0.207 0.207 0.000 MWD+SCC
2666.00 41.10 247.40 2171.49 -319.26 -1361.42 1397.33 0.000 0.000 0.000 MWD+SCC
2695.00 41.10 247.60 2193.35 -326.55 -1379.04 1416.01 0.136 0.000 0.207 MWD+SCC
2724.00 41.10 247.70 2215.20 -333.80 -1396.67 1434.70 0.068 0.000 0.103 MWD+SCC
2753.00 41.10 247.90 2237.05 -341.00 -1414.32 1453.40 0.136 0.000 0.207 MWD+SCC
2810.00 40.60 248.10 2280.17 -354.97 -1448.89 1490.00 0.272 -0.263 0.105 MWD+SCC
2839.00 40.90 247.40 2302.14 -362.14 -1466.41 1508.56 0.565 0.310 -0.724 MWD+SCC
2868.00 40.70 246.80 2324.09 -369.51 -1483.86 1527.10 0.455 -0.207 -0.621 MWD+SCC
2897.00 40.70 246.00 2346.08 -377.08 -1501.19 1545.56 0.540 0.000 -0.828 MWD+SCC
2926.00 40.80 245.40 2368.05 -384.87 -1518.44 1563.98 0.418 0.103 -0.621 MWD+SCC
2955.00 40.10 245.60 2390.12 -392.67 -1535.56 1582.28 0.736 -0.724 0.207 MWD+SCC
Halliburton Company
Survey Report
Company: CHEVRON VIETNAM Date: 28/03/2008 Time: 13:28:32 Page: 3
Field: EXPLORATION WELL Co-ordinate(NE) Reference: Site: KS-1X, Grid North
Site: KS-1X Vertical (TVD) Reference: RKB 34.4
Well: KS-1X Section (VS) Reference: Site (0.00N,0.00E,259.00Azi)
Wellpath: KS-1X Survey Calculation Method: Minimum Curvature Db: Sybase
Survey
MD Incl Azim TVD +N/-S +E/-W VS DLS Build Turn Tool/Comment
m deg deg m m m m deg/30m deg/30m deg/30m
2984.00 40.30 246.10 2412.27 -400.33 -1552.64 1600.50 0.393 0.207 0.517 MWD+SCC
3013.00 40.60 245.60 2434.33 -408.03 -1569.81 1618.83 0.457 0.310 -0.517 MWD+SCC
3038.00 41.00 245.40 2453.26 -414.80 -1584.68 1634.71 0.505 0.480 -0.240 MWD+SCC
3071.00 41.10 245.10 2478.15 -423.88 -1604.36 1655.76 0.201 0.091 -0.273 MWD+SCC
3100.00 41.10 244.90 2500.00 -431.93 -1621.63 1674.26 0.136 0.000 -0.207 MWD+SCC
3129.00 40.80 244.70 2521.90 -440.03 -1638.83 1692.68 0.339 -0.310 -0.207 MWD+SCC
3158.00 40.60 244.70 2543.89 -448.11 -1655.93 1711.01 0.207 -0.207 0.000 MWD+SCC
3187.00 40.40 244.20 2565.94 -456.23 -1672.92 1729.24 0.395 -0.207 -0.517 MWD+SCC
3216.00 40.00 243.90 2588.09 -464.42 -1689.75 1747.32 0.460 -0.414 -0.310 MWD+SCC
3245.00 40.20 243.70 2610.27 -472.67 -1706.51 1765.35 0.246 0.207 -0.207 MWD+SCC
3274.00 40.20 243.70 2632.42 -480.96 -1723.29 1783.40 0.000 0.000 0.000 MWD+SCC
3303.00 40.40 243.50 2654.54 -489.30 -1740.09 1801.49 0.246 0.207 -0.207 MWD+SCC
3332.00 40.40 243.30 2676.62 -497.72 -1756.90 1819.59 0.134 0.000 -0.207 MWD+SCC
3361.00 40.50 243.30 2698.69 -506.17 -1773.71 1837.70 0.103 0.103 0.000 MWD+SCC
3390.00 40.40 243.50 2720.76 -514.60 -1790.53 1855.82 0.169 -0.103 0.207 MWD+SCC
3419.00 40.30 243.30 2742.86 -523.00 -1807.32 1873.91 0.169 -0.103 -0.207 MWD+SCC
3448.00 41.30 243.50 2764.81 -531.49 -1824.26 1892.16 1.043 1.034 0.207 MWD+SCC
3477.00 41.60 243.10 2786.55 -540.11 -1841.41 1910.64 0.414 0.310 -0.414 MWD+SCC
3506.00 41.60 242.60 2808.24 -548.90 -1858.55 1929.13 0.343 0.000 -0.517 MWD+SCC
3520.00 41.60 242.40 2818.71 -553.19 -1866.79 1938.05 0.285 0.000 -0.429 MWD+SCC
Casing Points
MD TVD Diameter Hole Size Name
m m in in
309.98 309.98 9.625 12.250 9 5/8" Csg Actual
1225.00 1056.49 7.000 8.500 7" Csg Actual
Client : Chevron VietNam
Well Name : KS-1X
Field :
Slot :
Rig : Vicksburg
BHA Report Job # : VT-DD-0005619436 BHA# 2
BHA# 2 : Date In :25/01/2008 MD In (m) : 0 TVD In (m) : 0 Date Out: 26/01/2008 MD Out (m): 1228 TVD Out (m): 1059
BIT DATA
Bit # OD (in) MFR Style Serial# Nozzles (/32's) TFA (in²) Dull Condition
1 8.500 Hycalog HC 604 7210098 6x14 0.902 1-1-WT-A -X-I-NO-TD
MOTOR DATA
Run # OD (in) MFR Model Serial# Bend Nzl (/32's) Avg Dif (psi) Cum Circ Hrs
1 7.000 SSDS SperryDrill 700021 1.40° 258 42.00
COMPONENT DATA
Item Description Serial OD ID Gauge Weight Top Con Length Bit - Center
# # (in) (in) (in) (lbs/ft) (m) Blade (m)
1 HC 604 7210098 8.500 2.500 176.66 P 4-1/2" Reg 0.34
2 7" SperryDrill Lobe 7/8 - 7.5 stg 700021 7.000 4.753 70.69 B 4-1/2" IF 8.62
3 6 3/4" Float Sub 10761264 6.750 2.813 100.77 B 4-1/2" IF 0.96
4 Non-Mag MWD Hang Off Collar 231801 6.750 2.813 101.00 B 4-1/2" IF 8.53
5 6 3/4" Non Mag Screen Sub STH0455 6.750 2.813 100.77 B 4-1/2" IF 1.83
6 15 x HWDP Atwood 5.000 3.000 49.30 B 4-1/2" IF 139.20
________
159.48
Parameter Min Max Ave Activity Hrs BHA Weight (lb) Drill String OD(in) Len (m)
WOB (klbs) : 8 220 21 Drilling : 6.50 in Air (Total) : 28457
RPM (rpm) : 120 120 120 Reaming : 2.75 in Mud (Total) :
Flow (gpm) : 800 800 800 Circ-Other : 4.25 in Air (Bel Jars) : 0
SPP (psi) : 1900 2700 2362 Total : 13.50 in Mud (Bel Jars) :
PERFORMANCE
In Out Distance (m) ROP (m/hr) Build (°/30m) Turn (°/30m) DLS (°/30m)
Inclination (deg) 0.00 37.99 Oriented : 199.30 190 8.00
Azimuth (deg) 0.00 260.14 Rotated : 1028.70 189
Total : 1228.00 189 0.93 0.00 0.93
COMMENTS
Drilled vertically down as program
Build commenced at 362m, motor output was 8°/30m initially.
The assembly had a left hand walk tendency and slight build trend.
The section was drilled with seawater & hi visc sweeps every 5 stands.
We switched to mud from 826m MD.
After which each stand was back reamed 1x to maximise hole diameter.
TD was 1228 m we were 4.7m long on section & 4 m right of plan .
Client : Chevron VietNam
Well Name : KS-1X
Field :
Slot :
Rig : Vicksburg
BHA Report Job # : VT-DD-0005619436 BHA# 3
BHA# 3 : Date In :27/01/2008 MD In (m) : 1228 TVD In (m) : 1059 Date Out: 27/01/2008 MD Out (m): 1228 TVD Out (m): 1059
BIT DATA
Bit # OD (in) MFR Style Serial# Nozzles (/32's) TFA (in²) Dull Condition
1rr1 8.500 Hycalog HC 604 7210098 6x14 0.902 1-1-WT-A -X-I-NO-TD
MOTOR DATA
Run # OD (in) MFR Model Serial# Bend Nzl (/32's) Avg Dif (psi) Cum Circ Hrs
2 7.000 SSDS SperryDrill 700021 1.40° 45.25
COMPONENT DATA
Item Description Serial OD ID Gauge Weight Top Con Length Bit - Center
# # (in) (in) (in) (lbs/ft) (m) Blade (m)
1 HC 604 7210098 8.500 2.500 176.66 P 4-1/2" Reg 0.34
2 7" SperryDrill Lobe 7/8 - 7.5 stg 700021 7.000 4.753 70.69 B 4-1/2" IF 8.62
3 6 3/4" Float Sub 10761264 6.750 2.813 100.77 B 4-1/2" IF 0.96
4 Non-Mag MWD Hang Off Collar 231801 6.750 2.813 101.00 B 4-1/2" IF 8.53
5 6 3/4" Non Mag Screen Sub STH0455 6.750 2.813 100.77 B 4-1/2" IF 1.83
6 15 x HWDP Atwood 5.000 3.000 49.30 B 4-1/2" IF 139.20
________
159.48
Parameter Min Max Ave Activity Hrs BHA Weight (lb) Drill String OD(in) Len (m)
WOB (klbs) : Drilling : 0.00 in Air (Total) : 28457
RPM (rpm) : Reaming : 2.00 in Mud (Total) :
Flow (gpm) : Circ-Other : 1.25 in Air (Bel Jars) : 0
SPP (psi) : Total : 3.25 in Mud (Bel Jars) :
PERFORMANCE
In Out Distance (m) ROP (m/hr) Build (°/30m) Turn (°/30m) DLS (°/30m)
Inclination (deg) 37.99 37.99 Oriented :
Azimuth (deg) 260.14 260.14 Rotated :
Total :
COMMENTS
Wiper Trip
Client : Chevron VietNam
Well Name : KS-1X
Field :
Slot :
Rig : Vicksburg
BHA Report Job # : VT-DD-0005619436 BHA# 4
BHA# 4 : Date In :28/01/2008 MD In (m) : 1228 TVD In (m) : 1059 Date Out: 30/01/2008 MD Out (m): 2416 TVD Out (m): 1982
BIT DATA
Bit # OD (in) MFR Style Serial# Nozzles (/32's) TFA (in²) Dull Condition
3 6.125 Smith Mi416PX 217914 4x12 0.442 3-2-CT-A -X-I-ER-BHA
MOTOR DATA
Run # OD (in) MFR Model Serial# Bend Nzl (/32's) Avg Dif (psi) Cum Circ Hrs
COMPONENT DATA
Item Description Serial OD ID Gauge Weight Top Con Length Bit - Center
# # (in) (in) (in) (lbs/ft) (m) Blade (m)
1 DRS416 B2 217914 6.125 2.000 6.125 89.71 P 3-1/2" Reg 0.21
2 6 1/8" Modular NB stabilizer 10854019 4.750 2.250 6.093 46.84 B HT-38 0.76 0.50
3 2ft Extension sub 10937391 5.000 2.250 53.37 B HT-38 0.61
4 Adjustable Gauge Stabilizer 325077 5.000 2.250 6.120 53.37 B HT-38 3.20 3.40
5 5" Non-Mag Hang Off Collar 10961179 5.000 2.250 53.37 B 3-1/2" IF 9.55
6 5 1/2" Integral Blade Stabilizer 91420 4.750 2.250 5.500 46.84 B 3-1/2" IF 1.26 14.94
7 4 3/4" Screen Sub 10803373 4.750 2.250 46.84 B 3-1/2" IF 1.72
8 Cross Over Sub(Chevron) COR313 AD 5.000 2.250 53.37 B XTF-39 0.71
9 24 x 4" HWDP 4.000 2.563 29.70 B XTF-39
10 DP (S)
Parameter Min Max Ave Activity Hrs BHA Weight (lb) Drill String OD(in) Len (m)
WOB (klbs) : 6 10 10 Drilling : 18.25 in Air (Total) :
RPM (rpm) : 210 240 239 Reaming : 0.00 in Mud (Total) :
Flow (gpm) : 294 310 299 Circ-Other : 4.00 in Air (Bel Jars) : 0
SPP (psi) : 2440 3370 3014 Total : 22.25 in Mud (Bel Jars) : 0
PERFORMANCE
In Out Distance (m) ROP (m/hr) Build (°/30m) Turn (°/30m) DLS (°/30m)
Inclination (deg) 37.99 40.73 Oriented : 0.00 0 8.00
Azimuth (deg) 260.14 247.59 Rotated : 1188.00 65
Total : 1188.00 65 0.07 -0.32 0.21
COMMENTS
The BHA was run in and after drilling cement and shoe a leak off test was carried out. Drilling commenced in the full gauge position. After
establishing a drop drilling continued with only three sets in under gauge to maintain the well's trajectory. at 1988m a drop in pressure of 1000 psi
was recorded and the BHA was tripped looking for a wash out.After tripping 20 stands and checking surface equipment it was found to be barite
sag in the mud blocking the suction lines.We tripped back in and continued drilling. Left hand walk began to accelerate beyond 2272 to
unacceptable levels and the BHA was tripped out to run a Smith 416 (669).
Client : Chevron VietNam
Well Name : KS-1X
Field :
Slot :
Rig : Vicksburg
BHA Report Job # : VT-DD-0005619436 BHA# 5
BHA# 5 : Date In :30/01/2008 MD In (m) : 2416 TVD In (m) : 1982 Date Out: 30/01/2008 MD Out (m): 2445 TVD Out (m): 2004
BIT DATA
Bit # OD (in) MFR Style Serial# Nozzles (/32's) TFA (in²) Dull Condition
3 6.125 Smith Mi416PX JX7400 4x12 0.442 1-1-NO-A -X-I-NO-DTF
MOTOR DATA
Run # OD (in) MFR Model Serial# Bend Nzl (/32's) Avg Dif (psi) Cum Circ Hrs
COMPONENT DATA
Item Description Serial OD ID Gauge Weight Top Con Length Bit - Center
# # (in) (in) (in) (lbs/ft) (m) Blade (m)
1 Mi 416 PX (ER20699) JX7400 6.125 2.000 6.125 89.71 P 3-1/2" Reg 0.20
2 6 1/8" Modular NB stabilizer 10854019 4.750 2.250 6.093 46.84 B HT-38 0.76 0.49
3 2ft Extension sub 10937391 5.000 2.250 53.37 B HT-38 0.61
4 Adjustable Gauge Stabilizer 325077 5.000 2.250 6.120 53.37 B HT-38 3.20 3.40
5 5" Non-Mag Hang Off Collar 10961179 5.000 2.250 53.37 B 3-1/2" IF 9.55
6 5 1/2" Integral Blade Stabilizer 91420 4.750 2.250 5.500 46.84 B 3-1/2" IF 1.26 14.93
7 4 3/4" Screen Sub 10803373 4.750 2.250 46.84 B 3-1/2" IF 1.72
8 Cross Over Sub(Chevron) COR313 AD 5.000 2.250 53.37 B XTF-39 0.71
9 24 x 4" HWDP 4.000 2.563 29.70 B XTF-39
10 DP (S)
Parameter Min Max Ave Activity Hrs BHA Weight (lb) Drill String OD(in) Len (m)
WOB (klbs) : 10 10 10 Drilling : 1.00 in Air (Total) :
RPM (rpm) : 240 240 240 Reaming : 0.00 in Mud (Total) :
Flow (gpm) : 300 300 300 Circ-Other : 0.50 in Air (Bel Jars) : 0
SPP (psi) : 3220 3220 3220 Total : 1.50 in Mud (Bel Jars) : 0
PERFORMANCE
In Out Distance (m) ROP (m/hr) Build (°/30m) Turn (°/30m) DLS (°/30m)
Inclination (deg) 40.73 40.57 Oriented : 0.00 0
Azimuth (deg) 247.59 247.40 Rotated : 29.00 29
Total : 29.00 29 -0.16 -0.19 0.21
COMMENTS
The BHA was run in hole and after drilling one stand the MWD failed.
Client : Chevron VietNam
Well Name : KS-1X
Field :
Slot :
Rig : Vicksburg
BHA Report Job # : VT-DD-0005619436 BHA# 6
BHA# 6 : Date In :30/01/2008 MD In (m) : 2445 TVD In (m) : 2004 Date Out: 31/01/2008 MD Out (m): 3049 TVD Out (m): 2462
BIT DATA
Bit # OD (in) MFR Style Serial# Nozzles (/32's) TFA (in²) Dull Condition
3rr1 6.125 Smith Mi416PX JX7400 4x12 0.442 8-2-RO-T -X-I-LT-PR
MOTOR DATA
Run # OD (in) MFR Model Serial# Bend Nzl (/32's) Avg Dif (psi) Cum Circ Hrs
COMPONENT DATA
Item Description Serial OD ID Gauge Weight Top Con Length Bit - Center
# # (in) (in) (in) (lbs/ft) (m) Blade (m)
1 Mi 416 PX (ER20699) JX7400 6.125 2.000 6.125 89.71 P 3-1/2" Reg 0.20
2 6 1/8" Modular NB stabilizer 10854019 4.750 2.250 6.093 46.84 B HT-38 0.76 0.49
3 2ft Extension sub 10937391 5.000 2.250 53.37 B HT-38 0.61
4 Adjustable Gauge Stabilizer 325077 5.000 2.250 6.120 53.37 B HT-38 3.20 3.40
5 5" Non-Mag Hang Off Collar 10961179 5.000 2.250 53.37 B 3-1/2" IF 9.55
6 5 1/2" Integral Blade Stabilizer 91420 4.750 2.250 5.500 46.84 B 3-1/2" IF 1.26 14.93
7 4 3/4" Screen Sub 10803373 4.750 2.250 46.84 B 3-1/2" IF 1.72
8 Cross Over Sub(Chevron) COR313 AD 5.000 2.250 53.37 B XTF-39 0.71
9 24 x 4" HWDP 4.000 2.563 29.70 B XTF-39
10 DP (S)
Parameter Min Max Ave Activity Hrs BHA Weight (lb) Drill String OD(in) Len (m)
WOB (klbs) : 10 12 11 Drilling : 16.00 in Air (Total) :
RPM (rpm) : 220 240 230 Reaming : 0.50 in Mud (Total) :
Flow (gpm) : 180 300 262 Circ-Other : 0.50 in Air (Bel Jars) : 0
SPP (psi) : 1604 3520 2814 Total : 17.00 in Mud (Bel Jars) : 0
PERFORMANCE
In Out Distance (m) ROP (m/hr) Build (°/30m) Turn (°/30m) DLS (°/30m)
Inclination (deg) 40.57 41.03 Oriented : 0.00 0
Azimuth (deg) 247.40 245.30 Rotated : 604.00 38
Total : 604.00 38 0.02 -0.10 0.07
COMMENTS
The BHA was run in and drilling commenced. The left hand trend was immediately arrested and drilling continued in the full position for the next
600m. Drilling rate initially was very good, the WOB was kept to a minimum with 240 RPM. The ROP, however dropped off markedly over two
stands eventually down to 5 m/hr. It was decided to pull out for a five bladed bit.
Client : Chevron VietNam
Well Name : KS-1X
Field :
Slot :
Rig : Vicksburg
BHA Report Job # : VT-DD-0005619436 BHA# 7
BHA# 7 : Date In :31/01/2008 MD In (m) : 3049 TVD In (m) : 2462 Date Cur: 03/02/2008 MD Cur (m): 3520 TVD Cur (m): 2819
BIT DATA
Bit # OD (in) MFR Style Serial# Nozzles (/32's) TFA (in²) Dull Condition
4 6.125 Security DBS FMH3543ZR 10947814 3x14, 2x10 0.604 1-2-WT-T -X-I-NO-TD
MOTOR DATA
Run # OD (in) MFR Model Serial# Bend Nzl (/32's) Avg Dif (psi) Cum Circ Hrs
COMPONENT DATA
Item Description Serial OD ID Gauge Weight Top Con Length Bit - Center
# # (in) (in) (in) (lbs/ft) (m) Blade (m)
1 FMH3543ZR 10947814 6.125 2.000 6.125 89.71 P 3-1/2" Reg 0.20
2 6 1/8" Modular NB stabilizer 10854019 4.750 2.250 6.093 46.84 B HT-38 0.76 0.49
3 2ft Extension sub 10937391 5.000 2.250 53.37 B HT-38 0.61
4 Adjustable Gauge Stabilizer 325077 5.000 2.250 6.120 53.37 B HT-38 3.20 3.40
5 5" Non-Mag Hang Off Collar 10961179 5.000 2.250 53.37 B 3-1/2" IF 9.55
6 5 1/2" Integral Blade Stabilizer 91420 4.750 2.250 5.500 46.84 B 3-1/2" IF 1.26 14.93
7 4 3/4" Screen Sub 10803373 4.750 2.250 46.84 B 3-1/2" IF 1.72
8 Cross Over Sub(Chevron) COR313 AD 5.000 2.250 53.37 B XTF-39 0.71
9 24 x 4" HWDP 4.000 2.563 29.70 B XTF-39
10 DP (S)
Parameter Min Max Ave Activity Hrs BHA Weight (lb) Drill String OD(in) Len (m)
WOB (klbs) : 10 12 10 Drilling : 17.50 in Air (Total) :
RPM (rpm) : 230 240 240 Reaming : 0.00 in Mud (Total) :
Flow (gpm) : 190 239 217 Circ-Other : 2.00 in Air (Bel Jars) : 0
SPP (psi) : 1604 2270 2031 Total : 19.50 in Mud (Bel Jars) : 0
PERFORMANCE
In Out Distance (m) ROP (m/hr) Build (°/30m) Turn (°/30m) DLS (°/30m)
Inclination (deg) 41.03 41.60 Oriented : 0.00 0
Azimuth (deg) 245.30 242.40 Rotated : 471.00 27
Total : 471.00 27 0.04 -0.18 0.13
COMMENTS
The BHA was run in and drilling commenced with a greatly improved ROP of up tp 50m/hr. WOB was kept at a constant 10klbs and RPM at 240.
The trajectory basically held angle with a slight left hand walk tendencey until 3430m where the BHA built a degree over a stand; after which the
BHA held angle to TD at 3520m.
Page : 1
Client : Chevron VietNam Field :
Well Name : KS-1X Slot :
Rig : Vicksburg Job # : VT-DD-0005619436
Survey and Drilling Parameters North Ref : Mag Declination : ° VS Dir : 259.00° (from Wellhead)
0.00 0.00 0.00 0.0 -2.0 -2.6 2.5 0.00 0.00 0.00 2 Tieon
97.00 0.00 0.00 97.0 -2.0 -2.6 2.5 0.00 0.00 0.00 2
316.00 0.50 223.80 316.0 -1.2 -3.3 1.8 0.07 0.07 0.00 120 2
345.00 0.50 239.80 345.0 -1.0 -3.4 1.7 0.14 0.00 0.00 120 2
374.00 4.50 263.90 374.0 0.3 -3.6 0.4 4.19 4.14 0.00 12 800 1900 362 374 259m 145 2
403.00 10.10 263.10 402.7 4.0 -4.0 -3.2 5.79 5.79 -0.83 12 800 2000 374 382 259m 158 2
391 403 HS 2
432.00 14.00 264.10 431.1 10.0 -4.7 -9.3 4.04 4.03 1.03 15 120 800 2000 403 411 HS 2
420 430 HS 2
461.00 18.20 263.80 458.9 18.0 -5.5 -17.3 4.35 4.34 -0.31 12 800 2000 450 461 10L 216 2
490.00 22.80 260.90 486.1 28.1 -6.9 -27.3 4.87 4.76 -3.00 12 800 2000 461 464 10L 150 2
478 490 10L 2
519.00 29.30 259.50 512.1 40.9 -9.1 -39.9 6.75 6.72 -1.45 12 800 2000 490 501 10L 216 2
507 519 HS 2
548.00 35.30 259.00 536.6 56.3 -12.0 -55.1 6.21 6.21 -0.52 12 800 2000 519 530 HS 216 2
536 548 10R 2
606.00 39.90 258.80 582.6 91.7 -18.8 -89.8 2.38 2.38 -0.10 15 120 800 2000 548 560 10R 216 2
594 604 10R 2
664.00 40.40 258.77 626.9 129.1 -26.1 -126.5 0.26 0.26 -0.02 15 120 800 2450 271 2
693.00 40.40 258.80 649.0 147.9 -29.7 -144.9 0.00 0.00 0.03 15 120 800 2450 249 2
722.00 40.50 258.80 671.1 166.7 -33.4 -163.4 0.10 0.10 0.00 15 120 800 2450 290 2
751.00 37.90 259.70 693.5 185.1 -36.8 -181.4 2.75 -2.69 0.93 15 120 800 2450 2
780.00 37.40 259.40 716.5 202.8 -40.0 -198.8 0.55 -0.52 -0.31 15 120 800 2450 218 2
838.00 41.30 260.60 761.3 239.5 -46.4 -235.0 2.06 2.02 0.62 15 120 800 2500 797 810 10R 246 2
925.00 40.90 260.20 826.9 296.7 -55.9 -291.4 0.17 -0.14 -0.14 20 120 800 2500 158 2
955.00 40.80 259.90 849.6 316.3 -59.3 -310.7 0.22 -0.10 -0.30 20 120 800 2500 170 2
1013.00 41.70 259.40 893.2 354.6 -66.2 -348.3 0.50 0.47 -0.26 15 120 800 2500 177 2
1041.00 41.80 259.00 914.1 373.2 -69.7 -366.7 0.30 0.11 -0.43 22 120 800 2650 109 2
1070.00 41.90 259.00 935.7 392.6 -73.4 -385.6 0.10 0.10 0.00 22 120 800 2650 101 2
1099.00 39.50 257.40 957.7 411.5 -77.2 -404.2 2.71 -2.48 -1.66 220 120 800 2700 1087 1097 LS 102 2
Page : 2
Client : Chevron VietNam Field :
Well Name : KS-1X Slot :
Rig : Vicksburg Job # : VT-DD-0005619436
Survey and Drilling Parameters North Ref : Mag Declination : ° VS Dir : 259.00° (from Wellhead)
59.25
Drilling
Tripping 51.75
35
31
Miscellaneous 29.5 20
Run Casing / Cement 21.75
15
PU/LD BHA 11.5 10
10 9
Circulate 9
5
Rig Service & Repair 8.5
0
Other 15.25
2 3 4 5 6 7
0 20 40 60 BHA Number
Drilling Circulating
Total Hours During Job Reaming Other
180
200
160
400
140
600 120
ROP (m/hr)
100
800
80
65.1
1000 60
37.8
1200 40 29.0 26.9
20
1400
0
Measured Depth (m)
2 3 4 5 6 7
1600
BHA Number
1800
Footage per BHA
2000
1400
2200
1228
1188
1200
2400
1000
Footage Drilled (m)
2600
800
2800
604
600
3000 471
400
3200
200
3400 29
0
3600 2 3 4 5 6 7
0 1 2 3 4 5 6 7 8 9 10 11 12 BHA Number
Day Rotated Oriented
Well Summary:
Drilling Fluids
Cost Analysis
P = plan, A = actual.
Page 54
12-1/4” Section
Details of operation:
Hole Problems:
None
Other Problems:
None
Cost Comments:
The cost for this section was $13,650.
Page 55
8-1/2” Section
Details of operation:
7” casing @ 1223 m MD
8 ½ ” hole drilled from 310 m
8 ½” hole drilled to 1228 m
Cost for section $ 10,730.0
Cost / m $ 11.7
Cost / bbl $ 15.34
Volume built 700 bbl
Volume used 700 bbl
Hole Problems:
Casing hang up at 767m, after run in hole for wiper trip no more problems.
Other Problems:
None
Page 56
Shaker Screen Usage
Mesh Size New Used
Vicksburg 30 mesh 0
Brandt HP 180 mesh 0
Brandt HP 80 mesh 0
Cost Comments:
The cost for this section was $10,730.
Page 57
6-1/8” Section
Details of operation:
3 ½” liner @ N/a
6 ⅛ ” hole drilled from 1228 m
6 ⅛” hole drilled to 3520 m
Cost for section $ 157,393.2
Cost / m $ 59.38
Cost / bbl $ 185.39
Volume built 1569 bbls
Volume used 849 bbls
Halliburton wire line was rigged up and log with Q/Combo-GR/Check Shoot-
Seismic /SWT in tree runs without problem. The Halliburton’s logs indicated 132 °
C BHT and 6.42” average hole size.
After wire line logging done, the 6 1/8” bit on HWDP was run to bottom at 3520 m
MD and displaced the well to 9.3 ppb WBM as Plug and Abandonment plan.
Afterwards was ran 7” retainer and set at 1195 m MD. Then it was squeezed 20
Page 58
bbl of cement below retainer and spot 10 bbl above. Then it was circulated with
WBM to clean out the drill pipes. Then cut the casing with 7”cutter and pulled
casing out to surface. The same procedure was done on 9 5/8” casing; set 9 5/8”
retainer at 268 m MD, spot 20 bbl below and 10 bbl above retainer and then cut
with 9 5/8” cutter and pulled to surface the casing. All contaminated WBM and
cement were dumped overboard.
Initial mud weight was 9.2 ppg when drill out cement and shoe track. After FIT
done, the mud weight 9.2 ppg was maintained to TD. Also, the swab test was
performed before pulled out of hole on TD.
Oil water ratio was maintained as 80/20 with Saraline 200 as base oil.
The Versacoat is the emulsifier in this system. The Electrical stability was
maintained above 600 V. Initial value was around 650 V, crawled up to 900 V
when the mud sheared and heated. The premix mud was built with 10 ppb of
Versacoat which was enough to maintain the ES in active.
Lime was used to activate the emulsifier in the system, also to maintain the
alkalinity of the mud to have more than 3 ppb of excess lime in the system.
Premixed mud was built with 5 ppb of lime. While drilling, addition was made to
the active to kept minimum concentration of excess lime at 4 ppb throughout.
Prior to logging 2.5ppb additional lime was added to the active.
Salinity was controlled with CaCl2 to have water phase salinity more than 200,000
ppm in active system. The concentration for premix was 22 ppb at the beginning.
Prior to pooh for logging extra lime, Versacoat, Versatrol and Ecotrol were added
direct to the active to ensure good properties during logging operations.
Hole Problems:
At 2850 m MD observed losses 15-20 bbl/hr. The losses stopped after mixed 3
ppb Vinseal in the system and when drilled out the sandstone formation.
Page 59
Pump suction line was plugged with barite and shaker screen was blinded due to
new mud mixed and not yet stable.
Other Problems:
None
Cost Comments:
The cost for this section was $157,393.2. The built volume increased mud cost on
this section due to occurred down hole losses mainly and partly due to surface
losses. Good solid control equipment also contributed to have low cost. Good
solid control will minimize treatment of mud.
9 It was planned to use lower mud weight during drilling and circulation to
provide better ROP and increase the mud weight prior to TD to balance the
formation especially at coal layer to provide stable hole condition while
static for long time / logging. But, due to losses the mud weight wasn’t
increased to 9.5 ppg at TD as per plan. Anyway, the same mud weight on
TD didn’t effect the any hole problems.
9 Adding excess emulsifier, lime and HTHP filtration control prior to logging
would give stable mud properties during long period of logging.
Page 60
Solid Control Report on Vicksburg
GENERAL INFORMATION
COUNTRY Vietnam REPORT NO. -
LOCATION Vietnam DATE 29 Jan 08
OPERATOR Chevron MUD TYPE SBM
CONTRACTOR Vicksburg BIT SIZE Exploration 6 1/8"
WELL NO. KS-1X BIT TYPE 6.125-in Smith Mi416px
ENGINEER ONBOARD 2 LITHOLOGY
SCREEN USAGE 11 MIDNIGHT DEPTH 2230 METRE
DAILY SAFETY CARD 0 TOTAL DRILLED 1002 METRE
EQUIPMENT OPERATION
Cent#1 AM Cent#2 AM Cent#1 PM Cent#2 PM Dryer AM Dryer PM
MODEL 2172 2172 2172 2172 Vortex Vortex
OPERATION HOURS 12 0 4 4 12 4
OPERATION TYPE Drill Drill Drill Drill Drill
SCROLL SPEED (RPM) 900 900 900
BOWL SPEED (RPM) 2000 2000 2500
FEED RATE GPM 10 10 80
MAIN DRIVE TORQUE % MAX. 20 20 30
MUD WEIGHT IN PPG 12 12 9.2
MUD WEIGHT OUT PPG 8.8 8.8 8.7
DISCHARGE WEIGHT PPG 14.3 14.3 21
CUT POINT 3.2 3.2 0.5
CENTRATE - RETORTING RESULT
Cent#1 AM Cent#2 AM Cent#1 PM Cent#2 PM Dryer AM Dryer PM
SAMPLE TIME 9.00 16.00 16.00
SAMPLE DEPTH 1582.00 1980.00 1980.00
CENTRATE WEIGHT PPG 8.82 8.82 8.71
RETORTED OIL % vol. 73.00 73.00 73.00
RETORTED WATER % vol. 19.00 19.00 20.00
SOLIDS DISCHARGE - RETORTING RESULT
Cent#1 AM Cent#2 AM Cent#1 PM Cent#2 PM Dryer AM Dryer PM
SAMPLE TIME 9.00 3.00 16.00 9.00 16.00
SAMPLE DEPTH 1582.00 1980.00 1980.00 1582.00 1980.00
RETORT WT - EMPTY (50 ML) A 844.30 844.30 845.20 839.50 836.90
RETORT WT + SAMPLE B 930.20 930.20 974.50 918.60 908.00
RETORT WT + DRY CUTTINGS C 909.00 909.00 958.90 906.40 896.40
GRAD. CYL. WT - EMPTY D 63.30 63.30 63.10 63.20 63.10
GRAD. CYL. WT + CONDENSATE E 84.00 84.00 78.40 75.10 74.10
VOLUME OF WATER F 14.00 14.00 7.00 10.00 9.00
VOLUME OF OIL G 11.00 11.00 19.00 5.00 5.00
RESULT
OOC% (Discharge) 7.80 7.80 6.42 2.40 2.81
Sampling Error (0.95 to 1.05) 0.99 0.99 1.00 1.00 0.99
O.O.C. (Gms/Kg) DRY 102.96 102.96 118.14 50.82 56.54
Daily Base Fluid Discharged, Kg.
COMMENTS
Rig start drilling on 6-1/8"hole. Run 1xcentrifuge cut back mud weight from dryer and 1xcentrifuge from sandtrap. Dryer running with
slightly vibration. Check screen conditions.
5
4
3
2
1
0
29-Jan 30-Jan 31-Jan 1-Feb
Day
Abandonment Schematic
Page 66
CHEVRON VIETNAM
WELL ABANDONMENT SCHEMATIC
3/20/20083-3_PA Schematic_final_actual.xlsKS-1X
Time vs Depth, and Cost Summaries
Page 68
Rig on tow: 14:00 21 Jan 08 Rig released: 06:00 6 Feb 08
Time vs. Depth & Cost
0 $6.00
Mud pump Well B-KS-1X
leaking
Waiting on
Geoservices
$5.01 $5.08
500 Casing running $5.00
issues $4.74
$4.85
Suction line
plugging $4.37
$4.16
$4.08
1000 $4.00
$3.80
TVD Cost
$3.51
(m) (MM)
$3.17
$3.06
1500 $3.00
$2.83
Mud
$2.52
losing
Bit walking
$2.13
Bit trip
2000 $1.96 $2.00
$1.79
$1.72
$1.54
MWD
failure
$1.17 $1.21
2500 $1.00
$0.89
Bit trip
$0.62
Planned Depth
Actual Depth
AFE
$0.35 $0.25
Actual Cost
3000 $-
0 1 2 3 4 5 6 7 Days 8 9 10 11 12 13 14 15 16
NPT Summaries
Page 70
Well KS-1X
NPT by Major Category
28
30
23.5
25
21.5
20
Hour 15
11
10
6
5
0.5
0
0
Cement Downhole Fluids Rig Repairs Surface Wait On Wellbore
Failures Equipment Problems
Failure
Category
This is the last page of this EOWR.
Page 72