This document outlines equipment and data that will be provided by the client for plugging and abandoning wells. The client will refurbish and provide several tools needed for the operation, including a tree connector assembly, tree cap tool, test skid, and running tool. The client will also provide well data, including drilling and completion reports, Christmas tree manuals, weather data, logs, and wellhead survey reports to assist with engineering and executing the plugging and abandonment procedures.
Original Description:
Original Title
013_ EXHIBIT VIII - EQUIPMENT AND DATA PROVIDED BY CLIENT
This document outlines equipment and data that will be provided by the client for plugging and abandoning wells. The client will refurbish and provide several tools needed for the operation, including a tree connector assembly, tree cap tool, test skid, and running tool. The client will also provide well data, including drilling and completion reports, Christmas tree manuals, weather data, logs, and wellhead survey reports to assist with engineering and executing the plugging and abandonment procedures.
This document outlines equipment and data that will be provided by the client for plugging and abandoning wells. The client will refurbish and provide several tools needed for the operation, including a tree connector assembly, tree cap tool, test skid, and running tool. The client will also provide well data, including drilling and completion reports, Christmas tree manuals, weather data, logs, and wellhead survey reports to assist with engineering and executing the plugging and abandonment procedures.
PROVISION OF ENGINEERING AND EXECUTION OF PLUGGING AND ABANDONMENT OF DH-1P, DH-2P, DH-3P WELL AT DAI HUNG FIELD, BLOCK 05-1A, OFFSHORE VIETNAM PAGE 1 OF 2 EXHIBIT VIII
EQUIPMENT AND DATA PROVIDED BY CLIENT
VIII-1.0 EQUIPMENT PROVIDED BY CLIENT
CLIENT shall perform a refurbishment work of required tools as listed below and handover to CONTRACTOR by September 2018 to support P&A operation. Item Description Qty Remarks This item is required for 13-5/8”-5K CONNECTOR ASSY – interface between RLWI/ LRP & 1 TREE RT CONNECTOR 1 Xmas Tree. It included in TRT P/N: 189-010-042 (P/N: 180-570-129) TREE CAP R/R TOOL This item is required to run and 2 1 P/N: 180-570-131 retrieve Tree Cap. TRT TEST SKID 3 1 This item combined with TRT P/N: 180-570-120 TRT HANDLING AND TEST TOOL This item for transportation and 4 1 P/N: 180-570-135 testing UGB RUNNING TOOL This item is required to pull 5 1 P/N: 180-570-110 UGB
VIII-2.0 DATA PROVIDED BY CLIENT
CLIENT to provide listing of well data for review, evaluation, engineering and preparation of well plugging and abandonment procedures, operation sequences and all required equipment, tools for executing the WORKS. List supporting documents shall be provided as following:
No. Description Remark
1 Drilling program and end of well reports
2 Completion program and end of well reports
3 Subsea Christmas Tree Manual
4 Dai Hung Field weather Data
5 Cement Bond Log Data
Final Well Report - Directional Drilling & 6 MWD Services 7 Final Well Report - Cementing Services
8 Final Well Report - Drilling Fluids
9 Xmas tree and wellhead survey report
TENDER NO.: PVEP POC-18-10108 EXHIBIT VIII
PROVISION OF ENGINEERING AND EXECUTION OF PLUGGING AND ABANDONMENT OF DH-1P, DH-2P, DH-3P WELL AT DAI HUNG FIELD, BLOCK 05-1A, OFFSHORE VIETNAM PAGE 2 OF 2