Download as pdf or txt
Download as pdf or txt
You are on page 1of 2

EXHIBIT VI

APPROVED SUB-CONTRACTOR LIST

CONTRACTOR is to provide the list of Sub-contractors of all services to be applied for


P&A WORK for CLIENT to review and approve in accordance with below table:
The Services mentioned below is just tentative list recommended.

NAME OF SUB- EXPERIENCE


NO SCOPE OF WORKS
CONTRACTOR YEARS
1 DP Floating Unit
2 ROV/Diving Services

Subsea Well Control System


3
and Xmas-Tree Services
4 Cementing Services
5 Fluid Services
6 Wellhead Services
7 Rig Positioning Services
8 Fishing and Cutting Services
9 Wireline Services

10 Wellhead Services
11 Mud Logging Services
Slickline & MonoCable
12
Services
13 Tubular Handling Services
14 Coiled Tubing Services
15 HSE Related Services

16 Supply Vessel Services


17 Helicopter Services
18 Logistic Support Services
19 Well Control Services
20 P&A Insurance Services
21 Communication Services

TENDER NO.: PVEP POC-18-10108 EXHIBIT VI


PROVISION OF ENGINEERING AND EXECUTION OF PLUGGING AND ABANDONMENT OF DH-1P, DH-2P, DH-3P WELL AT
DAI HUNG FIELD, BLOCK 05-1A, OFFSHORE VIETNAM PAGE 1 OF 2
NAME OF SUB- EXPERIENCE
NO SCOPE OF WORKS
CONTRACTOR YEARS
22 Key Personnel Services
23 Engineering

Provision Of MGO,
24
Materials And Equipment
25 Other Services

26 To be provided

NOTE:
- CONTRACTOR is requested to provide a list of the Sub-contractors that
CONTRACTOR would intend to involve in the performance of the WORKS.
Details should include the following:

(a) Address and location from which the Sub-contractors will be supporting
the work together with a clear statement as to the extent of the work;
(b) The extent of your experience with each Sub-contractor;
(c) Basis of selection of each Sub-contractor.

- All the Sub-contractors involving in P&A operations must have sufficient


capability with at least 5 years’ experience on the such service provided.
- Maximising the contributions of local content to perform the WORKS are
preferable.
- CONTRACTOR is requested to submit for CLIENT review and approval of any
change from the approved Sub-contractor list. Failure to do as requested,
CONTRACTOR shall be responsible and its sole expense to bear any matters may
arise.

TENDER NO.: PVEP POC-18-10108 EXHIBIT VI


PROVISION OF ENGINEERING AND EXECUTION OF PLUGGING AND ABANDONMENT OF DH-1P, DH-2P, DH-3P WELL AT
DAI HUNG FIELD, BLOCK 05-1A, OFFSHORE VIETNAM PAGE 2 OF 2

You might also like