Download as pdf or txt
Download as pdf or txt
You are on page 1of 1

309+150

309+140

15.331

CENTER CH. 309+074.653 309+130

15.241
41 15.279

309+120 3 2.3

50
SKEW 51.77 0.0 15.175

15.191

ROW 40 MTR. 309+110

10
1

.53
.34
32 15.131

3
15.085
50
0.0 309+100 center pile to pile

8.0

43
74

.45
15.073
15.066

0
1
.34 309+090 27
1.6

40
32

.00

21
0
14.865

.39
15.12
5 0

0
0.0 309+080
15.314 18
5.8
14.751
309+074.653 BRIDGE CENTER CH.
1
.34 14.989
309+070
32 14.863

309+060
14.944

GAS PIPE LINE ROW 13.758

309+050

12
42 INCH GAS PIPE LINE 14.865

12
9.5

13.986 309+040

00
3.3

48 INCH GAS PIPE LINE 15.101


309+030

48&42 INCH GAS PIPE LINE TOP RL 1 8


5.8 309+020

25
1.6
309+010

CENTER CH. 309+074.653


Ca
na
la
tc
h.

309+000
BOX CULVERT OUTER LINE
30

GAS PIPE LINE ROW


9+
00
7

30
8+
95 9
SKEW 24.00
308+990 PR
O
PO
SE
D
B.

308+980
C
CENTER CH. 308+995
PROPOSED SHIFTING BOX CULVERT
308+970 SKEW 24.00

You might also like