PESA 2013 Summer Oil 101 Heiskell PDF

You might also like

Download as pdf or txt
Download as pdf or txt
You are on page 1of 27

VIKING OIL TOOLS

PESA Oil 101 / September 2013

Presentation by:  Wes Heiskell
President and Chief Executive Officer

Well Intervention and Well End‐Of‐Life
www.vikingoiltools.com
© 2012 VIKING. All rights reserved.
A Minute on Safety

Remember…..
No job is so important and No service is so 
urgent, that we cannot take time to perform 
our work safely.

© 2012 VIKING. All rights reserved.


The Well Life Cycle

Seismic Data              Drilling Operation              
Seismic Data              Drilling Operation               Evaluation                           Completion              
Evaluation                           Completion               Production                       Intervention
Production                       Intervention

New Reservoirs 
New Reservoirs  Depleting Reservoirs 
Depleting Reservoirs  Intruding H
Intruding  H22O
O

Hot Zones Formation Damage  Oxidation of Metals 

Deeper Zones Fluid Circulation Issues Reservoir Management

Remote Access Differential Sticking Sand Access

Complex Differentiability  Production Failures  Production Differentiability 

Velocity Flow Poor Production Recovery Bypass Reservoir

© 2012 VIKING. All rights reserved.


Decommissioning / Well Abandonment

Offshore Operation
Offshore Operation Land Operation
Land Operation H
H22O
O

Well Plugging and Abandonment
Well Plugging and Abandonment Groundwater Aquifer 
Groundwater Aquifer 

Government Views Water Quality Questions 

Guidelines Groundwater Pollution

Likely Options Depth to Various Aquifers

Removal Fleet Channel Contaminants
Disposal Options Ground Water Monitor 

© 2012 VIKING. All rights reserved.


Well Intervention Cycle & Methods

Drilling Operation          Evaluation                  Completion               Production               Intervention
Drilling Operation          Evaluation                  Completion               Production               Intervention

A well intervention, or 'well 
work', is any operation carried 
out on an oil or gas well during, 
or at the end of, its productive 
life, that alters the state of the 
well and or well geometry, 
provides well diagnostics or 
manages the production of the 
well.

© 2012 VIKING. All rights reserved.


USA Oldest Producing Well?
McClintock No. 1 (Quaker State Corporation)

 Location: Pennsylvania, PA, United States
 12 barrels a month since drilled in August 1861 (152 years) = $665M X 3% royalties $20M 

© 2012 VIKING. All rights reserved.


Production Management Systems

4. Make the data available for analysis, 
optimization
3. Turn data into meaningful 
5. Enable correct decisions for the asset  information
management

1. Capture the measurements 

2. Production Database
Securely store in a collaborative environment

© 2012 VIKING. All rights reserved.


Production Issues and how they are Identified

Finding the PROBLEM?
Finding the PROBLEM? How do we FIX IT?
Intervention
How do we FIX IT?

Water and Gas Influx
Water and Gas Influx
Asset Monitoring
Asset Monitoring Wax
Wax
Hydrates
Hydrates
H2S
H2S
Well Diagnostic Logging
Well Diagnostic Logging Scales
Scales

Brown Field Development 
Brown Field Development 
Intelligent Completion
Intelligent Completion
Accessing New Reserves
Accessing New Reserves

Production Improvements
Production Improvements Retrieval (Fishing) 
Retrieval (Fishing) 
Operation
Operation

Technology
Technology

Decommissioning
Decommissioning

© 2012 VIKING. All rights reserved.


Well Completion Design & Production Issues
Standard Gas 
Standard Gas 
Configuration
Configuration

 Gas production decreased?
Gas production decreased?
 Producing water or sand?
Producing water or sand?
 Increase or decrease pressure?
Increase or decrease pressure?
 Production STOPPED?
Production STOPPED?

I need to get my well producing! I need to start with a
I need to start with a
I need to get my well producing!
How do I fix it? What’s wrong? wireline log for a diagnostic 
wireline log for a diagnostic 
How do I fix it? What’s wrong?
Examination.
Examination.

Gas Gas Gas Gas

© 2012 VIKING. All rights reserved.


Well Completion Design & Production Issues
Oil Pump Jack
Oil Pump Jack Production Problems!!
Production Problems!!
 Oil STOPPED?
Oil STOPPED?
 Sand, scale or paraffin problems?
Sand, scale or paraffin problems?
 Pump not working?
Pump not working?
 High oil viscosity?
High oil viscosity?
 Rod parted?
Rod parted?

I need to get my well producing!
I need to get my well producing!
How do I fix it? What’s wrong?
How do I fix it? What’s wrong?

I need to start with a
I need to start with a
Remedial workover.
Remedial workover.

Oil

© 2012 VIKING. All rights reserved.


Production Problems

Some PROBLEMS
Some PROBLEMS

Wax
Hydrates
H2S ‐ hydrogen sulfide 
Fines migration
Phase related permeability 
changes
Scales
Obstructions
C02 Corrosion
Well interventions have a large opportunity to enhance well production if correctly 
designed and implemented. Conversely, they can have a large negative impact on 
production if they’re not.

© 2012 VIKING. All rights reserved.


Well Intervention Conveyance Methods

Rig based workovers
Coiled tubing
Hydraulic workover
Wireline (slickline & e‐line)
Intervention in sub‐sea wells (Rig 
and mono‐hull vessel techniques) 
with horizontal and conventional 
trees
Deepwater Drillship

© 2012 VIKING. All rights reserved.


Well Testing Methods

 Service Units – Land & Offshore
 Well Losses vs. Aquifer Losses
 Observed drawdown in a pumping 
well
 Well Efficiency
 Characterize the behavior of oil and 
gas reservoirs, and to predict their 
future performance
 Being due to flow through the well 
screen 
 Specific Capacity
 Well fluid analysis
 Normally obtained from a step 
drawdown test

© 2012 VIKING. All rights reserved.


Wireline Conveyance and Intervention Methods

 Service Units – Land & Offshore
 Free Point / Backoff Services
 Pipe Cutting Services
 Pipe Recovery
 Mechanical Services
 Bridge Plugs
 Packers
 Cement Dumping
 Logging Services
 Cement Bond Log
 Gamma Ray Log
 Neutron Log
 Temperature Log
 Noise Log
 Casing Caliper Log
 Stuck Pipe Log
 Perforating Services

© 2012 VIKING. All rights reserved.


Wireline Conveyance and Intervention Methods
 Identify completion components?
Identify completion components?
 Identifying downhole issues quickly?
Identifying downhole issues quickly?
 Wireline fishing techniques?
Wireline fishing techniques?
 Wax cutting and scale chipping?
Wax cutting and scale chipping?
 Nipple setting for plugging zone?
Nipple setting for plugging zone?

Lubricator
Lubricator

Logs
Logs
Pipe Cutting Services
Pipe Cutting Services
Wireline 
Wireline 
tractor can 
tractor can 
support 
support 
high 
high 
deviated 
deviated 
wells
wells

© 2012 VIKING. All rights reserved.


Coil Tubing Conveyance and Intervention Methods 
 Service Units – Land & Offshore Faster deployment method, small and transportable with 
 Reduced Operational Footprint
 The ability to intervene without a rig normally 1" to 3.25" in diameter continues coil tubing, 
 Offer a highly effective and cost‐ rigless operations
efficient alternative
 Well Cleaning
 Multi ‐ Zone Solation
 Stimulation & Fracturing
 Weight Kill Fluids
 Acid Stimulation/Nitrogen Pumping 
 Fishing, motor milling and drillout of 
plugs, Pipe Cutting Services
 Mechanical Services
 Bridge Plugs
 Packers
 Cement Dumping
 Logging Services
 Cement Bond Log
 Gamma Ray Log
 Neutron Log
 Temperature Log
 Noise Log
 Casing Caliper Log
 Stuck Pipe Log
 Perforating Services Trailer Mounted Coil Tubing Unit
 The global oil and gas industry is using  Off Shore Coil Tubing Unit
coiled tubing for an ever‐increasing 
array of well intervention projects.

© 2012 VIKING. All rights reserved.


Multi‐Stage Horizontal Fracturing
 TCP gun run on CT to 
perforate toe
 Hydraulic fracture 
stimulation for 1 ststage 
performed
 Composite bridge 
plug/perforation gun 
assembly pumped down 
on WL
 Hydraulic fracture 
stimulation for next stage 
 Process repeated until 
full horizontal section 

© 2012 VIKING. All rights reserved.


Well Fishing & Intervention Methods
Fishing Services
The application of tools, equipment and techniques for the removal of junk, debris 
or  fish  from  a  wellbore.  The  key  elements  of  a  fishing  operation include  an 
understanding of the dimensions and nature of the fish to be removed, the wellbore 
conditions,  the  tools  and  techniques  employed  and  the  process  by which  the 
recovered fish will be handled at surface.

© 2012 VIKING. All rights reserved.


Well Fishing & Intervention Methods

Managing Drilling Risk
 Stuck Pipe Prevention
 Rock Mechanics
 Wellbore Stress
 Wellbore Instability
Unconsolidated
 Trend Recognition Unconsolidated
Formations
Formations
 Hole Cleaning
 Differential Sticking
 Wellbore Geometry
 Tripping Practices

Junk
Junk

© 2012 VIKING. All rights reserved.


Well Fishing & Intervention Methods
Production 
Production 
Issues!!
Issues!!
 How long do I spend FISHING before I abandon the well?
How long do I spend FISHING before I abandon the well?
 How much production can I afford to lose trying to fix this?
How much production can I afford to lose trying to fix this?
 What on Earth is down there?
What on Earth is down there?
 Is it riskier to fix this or drill a new well?
Is it riskier to fix this or drill a new well?

I need to get my well producing 
I need to get my well producing 
 Production or
Production or drilling
drilling again; time is money!!!
again; time is money!!!
string
string
 Production
Production
equipment
equipment
 Downhole pumps
Downhole pumps
 Pipe or
Pipe or sucker
sucker rods
rods
 Casing or
Casing or liners
liners
 Packers
Packers

© 2012 VIKING. All rights reserved.


Well Fishing & Intervention Methods
 The hydraulic Jar, single acting (Up 
only) is a high‐impact, pressure 
and temperature compensated jar  Fishing & Jarring Services
Milling and Cutting
designed specifically for fishing  Pilot Mills
Fishing Jar
Fishing Jar Fishing Tools and Services
operations.
 Multistring Cutters
‐ Open hole and cased hole
 The Accelerator maximises jar 
impact regardless of depth   Washover Shoes
Milling and Cutting
because it either replaces drill pipe   Packer Retrieving Equipment
Casing Exit Systems
stretch as the energy source in 
 Junk Mills
External Casing Patch
shallow wells or supplements the 
pipe stretch energy in deeper   Section Mills
Power Swivels
wells when used in conjunction   Underreamers
with the fishing jar. High Pressure Pumps
Bumper Sub
Bumper Sub
 Bumper Sub provides a durable 
upward or downward bumping 
action for fishing operations.

External Catch
External Catch Internal Catch
Internal Catch Magnets
Magnets Junk Catch
Junk Catch Mill
Mill

© 2012 VIKING. All rights reserved.


Well Departure & Intervention Methods

Production Enhancement
Production Enhancement

Brown Field Development
Brown Field Development Multilaterals Development
Multilaterals Development
Casing
Casing

Casing
Casing

Cased Hole Sidetrack
Open Hole Sidetrack

Cased Hole Sidetrack
Open Hole Sidetrack

Whipstock
Whipstock

Whipstock
Whipstock

© 2012 VIKING. All rights reserved.


What is Decommissioning?
Decommissioning is a controlled process used to safely retire a facility that is no longer 
needed.  During  decommissioning,  radioactive  and  hazardous  materials,  equipment  or 
structures are cleaned or secured so that the facility does not pose a risk to public health 
or the environment now or in the future.

End‐of‐life (product)

Land
Land Offshore Platform
Offshore Platform Offshore Subsea
Offshore Subsea Pipelines
Pipelines

© 2012 VIKING. All rights reserved.


Decommissioning / Well Abandonment
North West Hutton 
North West Hutton 
North West Hutton
North West Hutton Topside
Topside

Expected cost for the overall 
decommissioning program for North 
West Hutton is $288 million.

North West Hutton Jacket
North West Hutton Jacket

© 2012 VIKING. All rights reserved.


What is Plug & Abandon (P&A)?

It is the first stage of the decommissioning process Definition

To prepare a well to be closed temporal or permanently

If logs confirms insufficient hydrocarbons is place

After  production operations have drained the 
reservoir fluids

Most countries have their own regulations in place

Cement plug placement across fresh water 
aquifers, wellbore

Placement of bridge plugs to avoid higher density 
slurries from falling

© 2012 VIKING. All rights reserved.


P&A Regulations Overview
Modern regulatory standards in all US jurisdictions require specific provisions for plugging and 
documenting oil and natural gas wells before they are abandoned. Plugging and abandonment 
(P&A) regulations vary to some degree among states and countries, but all regulations prescribe 
the depth intervals which must be cemented as well as the materials that are allowable in 
plugging practices.
UK
UK Norway
Norway USA
USA
Permanent Barriers Prim/Sec Prim/Sec As req’d. Min 2

Cases Temp/Perm Temp/Perm Temp/Perm

Plugging Fluids/Materials Open Open Cement

Cmt Ret / B. Plug allowed? Yes Yes Yes

Heavy fluid required? If possible If possible If possible

Wireline Evaluation needed? If needed If needed If needed

Permanent /Temporal Barrier Tag/P test Tag/P test Tag/P test


testing Method?
Conductor Casing Severance 15 ft. 15 ft. 10-15 ft
Requirement?

Site Clearance 70 m radius Not specified 800 m

Marine Signs required after Required Required Required


P&A?
Well P&A vs. License Expiry Date 1 yr before 1 yr before Now idle iron > 5 yrs

© 2012 VIKING. All rights reserved.


Thank You!

Well Intervention and Well End‐Of‐Life
© 2012 VIKING. All rights reserved.

You might also like