Role of a Circuit Breaker
Incoming line
Ground wire
Outgoing line
Transformer
CVT
CVT
BPI
DS
CT
DS
CB
DS
DS
CB
SA
CT
SA
SA
© ABB Group
July 3, 2019 | Slide 4
2
Role of a Circuit breaker
© ABB Group
July 3, 2019 | Slide 5
Fault Occurs
Relay
• Senses and Circuit Breaker
Contact Closes • Trip Coil Energises
• Operating Mechanism Starts
• Contacts Separate
• Arcing between Contacts
• Arc Extinguishes
• CB Fully Opens Fault cleared
© ABB Group
July 3, 2019 | Slide 6
3
Interrupting Principles
§ Oil
© ABB Group
July 3, 2019 | Slide 7
© ABB Group
July 3, 2019 | Slide 8
4
SF6 Puffer Interrupter
Current Breaking Operation
© ABB Group
July 3, 2019 | Slide 9
© ABB Group
July 3, 2019 | Slide 10
5
SF6 Puffer Interrupter
Current Breaking
Operation
Full
Ø Lower conductivity system
prevents current voltage
continuity
© ABB Group
July 3, 2019 | Slide 11
© ABB Group
July 3, 2019 | Slide 12
6
Design features Auto-Puffer™
interrupters
© ABB Group
July 3, 2019 | Slide 13
Ø Tripping started
© ABB Group
July 3, 2019 | Slide 14
7
SF6 Auto-puffer Interrupter
Fault Current or high
current Operation
Ø High temperature of arc begins
to heat SF6 gas Arc
© ABB Group
July 3, 2019 | Slide 15
Full Refill
Ø At closing refill valve
system
valve open , so gas open
voltage
can be drawn into
puffer and auto
puffer volume
© ABB Group
July 3, 2019 | Slide 16
8
SF6 Auto-puffer Interrupter
Fault Current or high current Operation
© ABB Group
July 3, 2019 | Slide 17
© ABB Group
July 3, 2019 | Slide 18
9
SF6 Auto-puffer Interrupter
Low Current Operation
© ABB Group
July 3, 2019 | Slide 19
© ABB Group
July 3, 2019 | Slide 20
10
Time graph of Breaker open position to close position
© ABB Group
July 3, 2019 | Slide 21
11
Construction of Breaking unit (Arc Chamber)
•Desiccant container
•Moving main
contact
•Moving arcing
contact
Closed Open
© ABB Group
July 3, 2019 | Slide 23
• Arc Chamber
Upper Terminal
Fixed Contact
Moving Contact
• Earth Insulation
Lower Terminal
Operating rod
• Mechanism
Housing
© ABB Group
July 3, 2019 | Slide 24
12
LTB portfolio 2010
[kA]
80
HPL B1 HPL B2
63 HPL B4
HPL B2 w/o CAP
50
LTB E2 (BLG)
LTB E4 (BLG)
31,5
LTB D1
LTB D1
ED
LTB E1
LTB Ratings
Characteri 72.5 kV 145 kV 245 kV 420 kV 800 kV
stic/
Voltage
Type EDF SK 1- LTB LTB LTB 420(T)E2 LTB
1 145D1/B 245E1 800(T)E4
Rated 2500A 3150A 4000 A
Current
SC Current 31.5kA 40kA 50 kA
© ABB Group
July 3, 2019 | Slide 26
13
EDF SK 1 – 1
Ø Outdoor
Ø 52 – 72.5 kV
Ø 25 kA, 60Hz
Ø 1, 2 or 3-pole operation
EDI SK 1 – 1
Ø Indoor
Ø Truck Design
Ø 36-72.5kV
Ø 25 kA, 60Hz
Ø 2000 A
14
LTBD1/B : Pole beam version
Ø Voltage 145 kV
Ø Breaking current 40 kA
Ø Frequency 50 Hz
Ø Voltage 145 kV
Ø Breaking current 40 kA
Ø Frequency 50 Hz
Ø Governing standard
IEC62271-100
15
LTB 145 D1/B, three-pole operation with FSA1
LTB245E1
Ø Voltage 245 kV
Ø Breaking current 40 kA
Ø Frequency 50 Hz
16
LTB420E2
Ø Voltage 420 kV
Ø Breaking current 50 kA
Ø Frequency 50 Hz
Ø 800 kV
Ø 50 kA at –30 oC
Ø 40 kA at –40 oC
Ø 4000 A
Ø Spring operated
© ABB Group
July 3, 2019 | Slide 34
17
Operating Mechanism
Warm Counter
gear Position indicator
Spring charge
indicator Closing
Manual lever
Switching
Closing
Opening shaft Trip coil 1
operation
lever lever Trip
Hydraulic
damper coil 2
Closing
Motor Closing coil
spring
Trip
Manual spring
Auxiliary
contacts Opening
operation
lever
© ABB Group
July 3, 2019 | Slide 36
18
Operation of Operating mechanism
•When the trip coil is energized, the trip latch (catchgear) releases
energy of opening spring.
EDF FSA.exe
© ABB Group
July 3, 2019 | Slide 37
Main features
Ø Spring Operated Mechanism
Ø The design incorporates an improved Auto-puffer interrupter based on
experience gained from previous interrupter designs
Ø Low over-voltages when switching inductive currents due to optimum
quenching at current zero
Ø High security against gas leakage due to double X-rings in all dynamic
seals and double O-rings in static seals
Ø Low noise level due to low mechanical energy required for operation
Ø Easy installation and commissioning. Each circuit breaker is pre-tested
and shipped to erection site in form of a few pre-assembled units
Ø Optional synchronized switching due high accuracy and consistency
© ABB Group
July 3, 2019 | Slide 38
19
Routine tests on Circuit Breaker
Ø Dielectric
test on main circuit( Power
frequency test )
Ø Test on auxiliary and control circuit ( 2kV
test)
Ø Contact resistance measurement
Ø SF6 leakage ( Tightness )
Ø Mechanical Operating times
Ø Visual checks
© ABB Group
July 3, 2019 | Slide 39
Pre-commissioning
Ø Check erection as per general arrangement drawing
Ø Fill
SF6 gas to nominal pressure according to pressure -
temperature curve
Ø Check pressure after one hour and correct
Ø Check for leakage
Ø Check wiring according to schematic
Ø Trial mechanical operations
Ø Measure breaker operating timings
Ø Check antipumping feature
Ø Check for leakage
Ø Record all measurements
© ABB Group
July 3, 2019 | Slide 40
20
© ABB Group
July 3, 2019 | Slide 41
21