Professional Documents
Culture Documents
HSVC1 PP4-QA, QC Equipment Status Report - 20190904
HSVC1 PP4-QA, QC Equipment Status Report - 20190904
HSVC1 PP4-QA, QC Equipment Status Report - 20190904
Miscellaneou
Description Vessel Column Heat Ex. Filter Reactor Agitator Fan & Blower Pump Package Total Ratio
s
Total Equipment 66 6 39 30 4 10 7 50 77 400 689
Last week
Inspection Test
Mechanical
EQ installation 9 4 2 5 0 0 0 13 0 28 61 8.85%
Plan
Miscellaneou
This week (variation)
Description Vessel Column Heat Ex. Filter Reactor Agitator Fan & Blower Pump Package Total Ratio
s
Total Equipment 0 0 0 0 0 0 0 0 0 0 0
Foundation check 25 1 14 5 2 0 2 2 1 119 171
Inspection Test
Mechanical
Miscellaneou
Description Vessel Column Heat Ex. Filter Reactor Agitator Fan & Blower Pump Package Total Ratio
s
Total Equipment 66 6 39 30 4 10 7 50 77 400 689
Cumulation
6/Aug/20
Air Compressor(PKG.) 66 66 66 0 66 0
Miscellaneous 23 3 3 0 1 0
DETAIL EQUIPMENT INSPECTION STATUS FOR UTILITY AREA
JOB NO. :
CLIENT HYOSUNG VINA CHEMICALS CO., LTD.
PROJECT HSVC1 PP4 PROJECT
P INSPECTION QUALITY CONTROL FLOW
R
A
No E ITEM NO. SERVICE QTY. SPECIFICATION P&ID REMARK FLUID
R
REMARK
V FOUNDATION INSTALLATION PRE-ALIGHMENT GROUTING FINAL INSPECTION
T
Update 6-Aug-2020
INSPECTION ATTENDEE
INSPECTION ITP No
S/N- SUB CON INSPECTION DATE INSPECTION ACTIVITY RFI No RESULT DOCUMENT STATUS REMARKS/ Reprot Number
LOCATION ITP Rev
SUB-CON eTEC HYOSUNG
May 3, 2019 Center line & Padding for Foundation Mr. Thai
1 YSE/PTSC Pelletizer area PP4-QC-PP-0010 Rev. A YSE-HSVC1 PP4-RFI-ME-0001 Acceptable DONE Mr. Phuc Mr. Dinh
08:00AM ZR-4801 & ZM-4801 (PTCS)
May 14 2019 Center line & Padding for foundation Mr. Thai
4 YSE/PTSC ISBL PP4-QC-PP-0010 Rev. A YSE-HSVC1 PP4-RFI-ME-0004 Acceptable DONE Mr. Cuong Mr. Dinh
08:00AM of D-4304, T-4501, T-4701, D-4302 (PTCS)
May 18 2019 Center line & Padding for foundation Mr. Thai
8 YSE/PTSC ISBL PP4-QC-PP-0010 Rev. A YSE-HSVC1 PP4-RFI-ME-0008 Acceptable DONE Mr. Cuong Mr. Dinh
08:00AM of C-4610, D-4009, D-4604 (PTCS)
Update 6-Aug-2020
INSPECTION ATTENDEE
INSPECTION ITP No
S/N- SUB CON INSPECTION DATE INSPECTION ACTIVITY RFI No RESULT DOCUMENT STATUS REMARKS/ Reprot Number
LOCATION ITP Rev
Update 6-Aug-2020
INSPECTION ATTENDEE
INSPECTION ITP No
S/N- SUB CON INSPECTION DATE INSPECTION ACTIVITY RFI No RESULT DOCUMENT STATUS REMARKS/ Reprot Number
LOCATION ITP Rev
-Centerline, Pading Inspection
June 7, 2019 - PK-4601, T-4503A/B Mr. Khôi
24 YSE/PTSC ISBL PP4-QC-PP-0010 Rev. A YSE-HSVC1 PP4-RFI-ME-0024 Acceptable SUBMITTED TO HSVC Mr. Cuong Mr. Dinh
08:00AM (PTCS)
- Centerline Inspection
June 13, 2019 * F-4812, Z-4811, W-4804, W-4805, W- Mr. Khôi - Foundation not yet done W-
33 YSE/PTSC ISBL 4809 PP4-QC-PP-0010 Rev. A YSE-HSVC1 PP4-RFI-ME-0033 Acceptable SUBMITTED TO HSVC Mr. Cuong Mr. Dinh
08:00AM (PTCS) 4804/4805/4809
- Base Grouting
June 13, 2019 * Z-4803, ZR-4801 Mr. Khôi
34 YSE/PTSC ISBL PP4-QC-PP-0010 Rev. A YSE-HSVC1 PP4-RFI-ME-0034 Acceptable SUBMITTED TO HSVC Mr. Cuong Mr. Dinh
08:00AM (PTCS)
- Base Grouting
June 14, 2019 * T-4501, T-4502, T-4701,D-4604, D- Mr. Khôi
35 YSE/PTSC ISBL 4606, D-4304, D-4611 PP4-QC-PP-0010 Rev. A YSE-HSVC1 PP4-RFI-ME-0035 Acceptable SUBMITTED TO HSVC Mr. Cuong Mr. Dinh
08:00AM (PTCS)
T-4302
- Grouting Sample test
June 14, 2019 * Z-4804-Z4807 Permanent Rail1 Mr. Khôi
36 YSE/PTSC ISBL PP4-QC-PP-0010 Rev. A YSE-HSVC1 PP4-RFI-ME-0036 Acceptable SUBMITTED TO HSVC Mr. Cuong Mr. Dinh
08:00AM (PTCS)
HSVC1 PP4 PROJECT
Update 6-Aug-2020
INSPECTION ATTENDEE
INSPECTION ITP No
S/N- SUB CON INSPECTION DATE INSPECTION ACTIVITY RFI No RESULT DOCUMENT STATUS REMARKS/ Reprot Number
LOCATION ITP Rev
- Centerline ,Padding Inspection
June 14, 2019 * D-1604 Mr. Khôi
37 YSE/PTSC Boiler, Utility PP4-QC-PP-0010 Rev. A YSE-HSVC1 PP4-RFI-ME-0037 Acceptable SUBMITTED TO HSVC Mr. Cuong Mr. Dinh
08:00AM (PTCS)
- Centreline,Padding Inspection
June 18, 2019 -P-1101A/B, PK-1601A/B/C Mr. Khôi
44 YSE/PTSC ISBL and Boiler, Utility PK-1602A/B/C PP4-QC-PP-0010 Rev. A YSE-HSVC1 PP4-RFI-ME-0044 Acceptable Mr. Cuong Mr. Dinh
08:00AM (PTCS)
-PK-4501, PK4603, PK-4709A/B
'- Bolts Tightening and anchor bolts
June 18, 2019 tightening of ZR-4801, Z-4803 Mr. Khôi
45 YSE/PTSC ISBL PP4-QC-PP-0010 Rev. A YSE-HSVC1 PP4-RFI-ME-0045 Acceptable Mr. Cuong Mr. Dinh
08:00AM (PTCS)
Update 6-Aug-2020
INSPECTION ATTENDEE
INSPECTION ITP No
S/N- SUB CON INSPECTION DATE INSPECTION ACTIVITY RFI No RESULT DOCUMENT STATUS REMARKS/ Reprot Number
LOCATION ITP Rev
- Sika Test (7 days)
June 21, 2019 + Z-4803, ZR-4801 Mr. Khôi
52 YSE/PTSC ISBL * T-4501, T-4502, T-4701, D-4604, D- PP4-QC-PP-0010 Rev. A YSE-HSVC1 PP4-RFI-ME-0052 Acceptable Mr. Cuong Mr. Dinh
08:00AM (PTCS)
4606, D-4304, D-4611, T-4302."
- Sika 214-11 (200 bags)
June 21, 2019 Mr. Khôi
53 YSE/PTSC ISBL PP4-QC-PP-0010 Rev. A YSE-HSVC1 PP4-RFI-ME-0053 Acceptable Mr. Cuong Mr. Dinh
08:00AM (PTCS)
Update 6-Aug-2020
INSPECTION ATTENDEE
INSPECTION ITP No
S/N- SUB CON INSPECTION DATE INSPECTION ACTIVITY RFI No RESULT DOCUMENT STATUS REMARKS/ Reprot Number
LOCATION ITP Rev
- Centerline, Padding Inspection.
June 26, 2019 * Support PK-1101, SP-2 ITP No.: PP4-QC-PP- Mr. Khôi
66 YSE/PTSC Boiler YSE-HSVC1 PP4-RFI-ME-0065 Acceptable Mr. Cuong Mr. Dinh
8:00 AM 0011 (PTCS)
- Sika Inspection
June 26, 2019 * Sika 214-11 ITP No.: PP4-QC-PP- Mr. Khôi
69 YSE/PTSC ISBL * Sika dur 42mp YSE-HSVC1 PP4-RFI-ME-0068 Acceptable Mr. Cuong Mr. Dinh
8:00 AM 0011 (PTCS)
- Base Grouting.
June 27 2019 * D-4707, D-4114 ITP No.: PP4-QC-PP- Mr. Khôi DOC g to be kept until post-
75 YSE/PTSC ISBL Area YSE-HSVC1 PP4-RFI-ME-0074 Acceptable ETEC KEEPING Mr. Cuong Mr. Dinh
08.00AM 0011 (PTCS) grout
Update 6-Aug-2020
INSPECTION ATTENDEE
INSPECTION ITP No
S/N- SUB CON INSPECTION DATE INSPECTION ACTIVITY RFI No RESULT DOCUMENT STATUS REMARKS/ Reprot Number
LOCATION ITP Rev
- Sika 214-11 Test (7 days).
* Z-4808A/B, D-4808, F-4808A/B, E-
4808A/B
June 29 2019 * P-4701A/B, P-4113, P-4205, P- ITP No.: PP4-QC-PP- Mr. Khôi
80 YSE/PTSC ISBL Area 4309A/B, P-4302A/B YSE-HSVC1 PP4-RFI-ME-0078 Acceptable Mr. Cuong Mr. Dinh
8:00AM 0011 (PTCS)
'- SikaDUR 42MP Test (7 days)
* ZM-4801
- Base Grouting.
* ZR-4804, ITP No.: PP4-QC-PP-
Jul 03 2019 Mr. Khôi
92 YSE/PTSC Pelletizer Area 0010 YSE-HSVC1 PP4-RFI-ME-0090 Acceptable ETEC KEEPING Mr. Cuong
10.00AM (PTCS)
Rev A
Update 6-Aug-2020
INSPECTION ATTENDEE
INSPECTION ITP No
S/N- SUB CON INSPECTION DATE INSPECTION ACTIVITY RFI No RESULT DOCUMENT STATUS REMARKS/ Reprot Number
LOCATION ITP Rev
- Check Ceterline and Grouting Anchor
Bolts. ITP No.: PP4-QC-PP-
04 Jul 2019 Mr. Khôi
94 YSE/PTSC Utility Area * Z-1107, Chemical Dosing System For 0011 YSE-HSVC1 PP4-RFI-ME-0092 Acceptable ETEC KEEPING Mr. Cuong
08.00AM (PTCS)
PK-1101, PK-1101, P-1101A/B Rev A
- Leveling Inspection.
* Z-4801A ITP No.: PP4-QC-PP-
05 Jul 2019 Mr. Khôi
102 YSE/PTSC Pelletizer Area 0010 YSE-HSVC1 PP4-RFI-ME-0098 Acceptable ETEC KEEPING Mr. Cuong
08.30AM (PTCS)
Rev: A
- Leveling Inspection.
* PK-1101 ITP No.: PP4-QC-PP-
05 Jul 2019 Mr. Khôi
106 YSE/PTSC Utility Area 0010 YSE-HSVC1 PP4-RFI-ME-0102 Acceptable Mr. Cuong
01.30PM (PTCS)
Rev A
Update 6-Aug-2020
INSPECTION ATTENDEE
INSPECTION ITP No
S/N- SUB CON INSPECTION DATE INSPECTION ACTIVITY RFI No RESULT DOCUMENT STATUS REMARKS/ Reprot Number
LOCATION ITP Rev
- Grouting Base Plate. P-4603A/B, P-4304A/B, P-
* P-4603A/B, P-4304A/B, P-4502A/B, P- ITP No.: PP4-QC-PP- 4502A/B cancel
05 Jul 2019 Mr. Khôi
109 YSE/PTSC Utility Area 4501A/B, P-4605, P-4606A/B 0011 YSE-HSVC1 PP4-RFI-ME-0105 Acceptable Mr. Cuong
01.30PM (PTCS)
Rev A
Update 6-Aug-2020
INSPECTION ATTENDEE
INSPECTION ITP No
S/N- SUB CON INSPECTION DATE INSPECTION ACTIVITY RFI No RESULT DOCUMENT STATUS REMARKS/ Reprot Number
LOCATION ITP Rev
- Grouting Base Plate.
ITP No.: PP4-QC-PP-
10 Jul 2019 * P-4603A/B, P-4304A/B, P- Mr. Khôi
124 YSE/PTSC ISBL Area 0011 YSE-HSVC1 PP4-RFI-ME-0120 Acceptable Mr. Cuong P-4302A/B, P-4808A/B cancel
08.30AM 4502A/B, P-4309A/B, P-4302A/B, P- (PTCS)
Rev: A
4808A/B, R-4201 R-4202.
ITP No.:PP4-QC-PP-
12 Jul 2019 - Centerline, Pading Inspection. Mr. Khôi
133 YSE/PTSC Jetty Area 0010 YSE-HSVC1 PP4-RFI-ME-0129 Acceptable Mr. Cuong
08.00AM * C-2401A/B (PTCS)
Rev: A
ITP No.:PP4-QC-PP-
12 Jul 2019 - Grouting Anchor Bolts. Mr. Khôi
134 YSE/PTSC ISBL Area 0011 YSE-HSVC1 PP4-RFI-ME-0130 Acceptable Mr. Cuong
09.00AM * PK-4501, E-4305, E-4703, D-4115 (PTCS)
Rev: A
ITP No.:PP4-QC-PP-
12 Jul 2019 - Grouting Base Plate. Mr. Khôi
135 YSE/PTSC ISBL Area 0011 YSE-HSVC1 PP4-RFI-ME-0131 Acceptable Mr. Cuong
09.00AM * P-4301A/B (PTCS)
Rev: A
Update 6-Aug-2020
INSPECTION ATTENDEE
INSPECTION ITP No
S/N- SUB CON INSPECTION DATE INSPECTION ACTIVITY RFI No RESULT DOCUMENT STATUS REMARKS/ Reprot Number
LOCATION ITP Rev
- Grouting Base Plate Column (steel ITP No.:PP4-QC-PP-
12 Jul 2019
138 YSE/PTSC
01.30PM
Boiler Area structure PK-1101). 0011 YSE-HSVC1 PP4-RFI-ME-0134 Cancel
* A1~A7, AD~AE, Rev: A
ITP No.:PP4-QC-PP-
12 Jul 2019 - Grouting Base Plate. Mr. Khôi
139 YSE/PTSC Pelletizer Area 0011 YSE-HSVC1 PP4-RFI-ME-0135 Acceptable Mr. Cuong
08.30AM * ZM-4804 (PTCS)
Rev: A
15 Jul 2019 - Grouting Anchor Bols. ITP No.: PP4-QC-PP- Mr. Khôi
145 YSE/PTSC ISBL Area YSE-HSVC1 PP4-RFI-ME-0141 Acceptable Mr. Cuong
08.00AM * P-4602, P-4103, F-4601 0011 Rev: A (PTCS)
15 Jul 2019 - Grouting Anchor Bolts. ITP No.: PP4-QC-PP- Mr. Khôi
148 YSE/PTSC Pelletizer Area YSE-HSVC1 PP4-RFI-ME-0144 Acceptable Mr. Cuong
01.30PM * Z-4804~Z4807, Z-4810, Z-4813 0011 Rev: A (PTCS)
15 Jul 2019 - Grouting Base Plate. ITP No.: PP4-QC-PP- Mr. Khôi
149 YSE/PTSC Pelletizer Area YSE-HSVC1 PP4-RFI-ME-0145 Acceptable Mr. Cuong P-4302A/B is cancel
01.30PM * P-4808A/B, P-4302A/B 0011 Rev: A (PTCS)
15 Jul 2019 - Grouting Base Plate. ITP No.: PP4-QC-PP- Mr. Khôi
150 YSE/PTSC ISBL Area YSE-HSVC1 PP4-RFI-ME-0146 Acceptable Mr. Cuong
02.00PM * P-4302A/B 0011 Rev: A (PTCS)
15 Jul 2019 - Grouting Base Plate. ITP No.: PP4-QC-PP- Mr. Khôi
151 YSE/PTSC Utility Area YSE-HSVC1 PP4-RFI-ME-0147 Acceptable Mr. Cuong
02.30PM * Steel Structure PK-1101 0011 Rev: A (PTCS)
HSVC1 PP4 PROJECT
Update 6-Aug-2020
INSPECTION ATTENDEE
INSPECTION ITP No
S/N- SUB CON INSPECTION DATE INSPECTION ACTIVITY RFI No RESULT DOCUMENT STATUS REMARKS/ Reprot Number
LOCATION ITP Rev
- Leveling, Alighnment Inspection
16 Jul 2019 before Base Grout ITP No.: PP4-QC-PP- Mr. Khôi
152 YSE/PTSC ISBL Area YSE-HSVC1 PP4-RFI-ME-0148 Acceptable Mr. Cuong P-4602, P-4103 are cancel
08.00AM * P-4203, P-4204, P-4602, P-4103, 0010 Rev: A (PTCS)
PK-4501
16 Jul 2019 - Bolts Tightening of Flange Joint. ITP No.: PP4-QC-PP- Mr. Khôi
153 YSE/PTSC ISBL Area YSE-HSVC1 PP4-RFI-ME-0149 Acceptable Mr. Cuong
08.30AM * PK-4601 0010 Rev: A (PTCS)
17 Jul 2019 - Grouting Anchor Bolts. ITP No.: PP4-QC-PP- Mr. Khôi
161 YSE/PTSC Utility Area YSE-HSVC1 PP4-RFI-ME-0157 Acceptable Mr. Cuong
08.00AM * PK-1601A/B/C, PK-1602A/B/C. 0011 Rev: A (PTCS)
- Alighment, Elevation,Leveling
17 Jul 2019 ITP No.: PP4-QC-PP- Mr. Khôi
163 YSE/PTSC ISBL Area Inspection. YSE-HSVC1 PP4-RFI-ME-0159 Acceptable Mr. Cuong
09.30AM 0010 Rev: A (PTCS)
* E-4610, F-4108, F-4601
18 Jul 2019 - Alighment Steel Structure ITP No.: PP4-QC-PP- Mr. Khôi
164 YSE/PTSC Utility Area YSE-HSVC1 PP4-RFI-ME-0160 Acceptable Mr. Cuong
08.00PM * A1 ~A7, AA~AC 0006 Rev: A (PTCS)
Update 6-Aug-2020
INSPECTION ATTENDEE
INSPECTION ITP No
S/N- SUB CON INSPECTION DATE INSPECTION ACTIVITY RFI No RESULT DOCUMENT STATUS REMARKS/ Reprot Number
LOCATION ITP Rev
- Test Hicon Non-shrinking (7days).
18 Jul 2019 Mr. Khôi
166 YSE/PTSC Lab Room * P-4603A/B, P-4304A/B, P- ITP No.: N/A YSE-HSVC1 PP4-RFI-ME-0162 Acceptable Mr. Cuong
01.30PM (PTCS)
4502A/B, P-4309A/B, P-4401
18 Jul 2019 - Grouting Anchor Bolts. ITP No.: PP4-QC-PP- Mr. Khôi
173 YSE/PTSC Jetty Area YSE-HSVC1 PP4-RFI-ME-0169 Acceptable Mr. Cuong
02.30PM * C-2401A/B 0011 Rev: A (PTCS)
20 Jul 2019 - Centerline, Padding Inspection ITP No.: PP4-QC-PP- Mr. Khôi
175 YSE/PTSC Jetty Area YSE-HSVC1 PP4-RFI-ME-0171 Acceptable Mr. Cuong
08.00AM * PK-2501, P-2602A/B 0010 Rev: A (PTCS)
- Elevation,Orientation, Leveling
20 Jul 2019 ITP No.: PP4-QC-PP- Mr. Khôi
176 YSE/PTSC ISBL Area Inspection. YSE-HSVC1 PP4-RFI-ME-0172 Acceptable Mr. Cuong
09.00AM 0010 Rev: A (PTCS)
* E-4208, E-4209, E-4502A/B
- Elevation,Orientation, Leveling
Inspection.
20 Jul 2019 * Lube Oil Unit for Mixer Gear ITP No.: PP4-QC-PP- Mr. Khôi
177 YSE/PTSC Pelletizer Area YSE-HSVC1 PP4-RFI-ME-0173 Acceptable Mr. Cuong
09.30AM Reducer, Lube Oil Unit for Motor, 0010 Rev: A (PTCS)
Lube Oil Unit for Gear Pump G/R, D-
4830, CCW Unit
- Test Hicon Non-shrinking (7 days).
* P-4301A/B, D-1102, D-1103, Z-
20 Jul 2019 Mr. Khôi
178 YSE/PTSC Lab Room 1107, Chemical Dosing system for ITP No.: N/A YSE-HSVC1 PP4-RFI-ME-0174 Acceptable Mr. Cuong
01.30PM (PTCS)
PK-1101, D-1604.
PK 4501, E-4305, E-4703, D-4115
22 Jul 2019 - Levelling Inspection. ITP No.: PP4-QC-PP- Mr. Khôi
179 YSE/PTSC ISBL Area YSE-HSVC1 PP4-RFI-ME-0174 Acceptable Mr. Cuong
08.00AM * P-4602, P-4103 0010 Rev: A (PTCS)
- Grouting Base Plate.
22 Jul 2019 ITP No.: PP4-QC-PP- Mr. Khôi
180 YSE/PTSC ISBL Area * P-4113, P-4106A/B, P-4602, P- YSE-HSVC1 PP4-RFI-ME-0174 Acceptable Mr. Cuong
08.30AM 0011 Rev: A (PTCS)
4103.
HSVC1 PP4 PROJECT
Update 6-Aug-2020
INSPECTION ATTENDEE
INSPECTION ITP No
S/N- SUB CON INSPECTION DATE INSPECTION ACTIVITY RFI No RESULT DOCUMENT STATUS REMARKS/ Reprot Number
LOCATION ITP Rev
22 Jul 2019 - Grouting Anchor Bolts. ITP No.: PP4-QC-PP- Mr. Khôi
181 YSE/PTSC ISBL Area YSE-HSVC1 PP4-RFI-ME-0174 Acceptable Mr. Cuong
08.30AM * C-4610 0011 Rev: A (PTCS)
- Test Sika 214-11 (28 days).
20 Jul 2019 * Z-4808A/B, D-4808, F-4808A/B, E- Mr. Khôi
182 YSE/PTSC Lab Room ITP No.: N/A YSE-HSVC1 PP4-RFI-ME-0174 Acceptable Mr. Cuong
01.30PM 4808A/B, P-4701A/B, P-4113, P- (PTCS)
4205, P-4309A/B, P-4302A/B
20 Jul 2019 - Test Sikadur 42MP (28 days). Mr. Khôi
183 YSE/PTSC Lab Room ITP No.: N/A YSE-HSVC1 PP4-RFI-ME-0179 Acceptable Mr. Cuong
01.30PM * ZM-4801 (PTCS)
21 Jul 2019 - Test Sikadur 42MP (7 days). Mr. Khôi
184 YSE/PTSC Lab Room ITP No.: N/A YSE-HSVC1 PP4-RFI-ME-0180 Acceptable Mr. Cuong
01.30PM * ZM-4804 (PTCS)
- Test Hicon Non-shrinking (7 days).
* A1~A7, AD~AE of PK-1101, P-
4205. P-4206. P-4701A/B. P-
22 Jul 2019 Mr. Khôi
185 YSE/PTSC Lab Room 4105A/B. P-4107A/B. P-4110A/B. P- ITP No.: N/A YSE-HSVC1 PP4-RFI-ME-0181 Acceptable Mr. Cuong
01.30PM (PTCS)
4109. P-4302A/B. P-4808A/B, P-
4103, F-4601, Z-4810, Z-4813, Z-
4804~Z4807
22 Jul 2019 - Test Sika 214-11 (28 days). Mr. Khôi
186 YSE/PTSC Lab Room ITP No.: N/A YSE-HSVC1 PP4-RFI-ME-0182 Acceptable Mr. Cuong
01.30PM * PK-4601 (PTCS)
- Centerline Inspection.
22 Jul 2019 ITP No.: PP4-QC-PP- Mr. Khôi
187 YSE/PTSC ISBL Area * E-4401, R-4401, S-4502, D-4502, YSE-HSVC1 PP4-RFI-ME-0183 Acceptable Mr. Cuong
09.00AM 0010 Rev: A (PTCS)
E-4310, F-4302A/B, T-4301.
- Grouting Base Plate.
22 Jul 2019 ITP No.: PP4-QC-PP- Mr. Khôi
188 YSE/PTSC ISBL Area * PK-4501, F-4601, P-4203,P-4204, YSE-HSVC1 PP4-RFI-ME-0184 Acceptable Mr. Cuong
08.00AM 0011 Rev: A (PTCS)
E-4204, E-4201, E-4205
- Elevation,Orientation, Leveling
23 Jul 2019 ITP No.: PP4-QC-PP- Mr. Khôi
189 YSE/PTSC ISBL Area Inspection. YSE-HSVC1 PP4-RFI-ME-0185 Acceptable Mr. Cuong
08.00AM 0010 Rev: A (PTCS)
* E-4411.
- Elevation,Orientation, Leveling
23 Jul 2019 ITP No.: PP4-QC-PP- Mr. Khôi
190 YSE/PTSC Pelletizer Area Inspection. YSE-HSVC1 PP4-RFI-ME-0186 Acceptable Mr. Cuong
08.30AM 0010 Rev: A (PTCS)
* D-4804, D-4805, D-4809.
23 Jul 2019 - Test Hicon Epoxy (7 days). Mr. Khôi
191 YSE/PTSC Lab Room ITP No.: N/A YSE-HSVC1 PP4-RFI-ME-0187 Acceptable Mr. Cuong
01.30PM * Trial Test (PTCS)
24 Jul 2019 - Grouting Base Plate. ITP No.: PP4-QC-PP- Mr. Khôi
192 YSE/PTSC Utility Area YSE-HSVC1 PP4-RFI-ME-0158A Acceptable Mr. Cuong
09.00AM * P-1101A/B 0011 Rev: A (PTCS)
- Centerline Inspection.
24 Jul 2019 * E-4203, D-4110A/B/C, D-4113A/B, ITP No.: PP4-QC-PP- Mr. Khôi
193 YSE/PTSC ISBL Area YSE-HSVC1 PP4-RFI-ME-0188 Acceptable Mr. Cuong
08.00AM D-4105A/B, D-4112, F-4106, D-4701, 0010 (PTCS)
E-4704, E-4701.
- Elevation, Orientation, Levelling
24 Jul 2019 ITP No.: PP4-QC-PP- Mr. Khôi
194 YSE/PTSC Utility Area Inspection. YSE-HSVC1 PP4-RFI-ME-0189 Acceptable Mr. Cuong
09.00AM 0010 (PTCS)
* PK-1601A/B/C, PK-1602A/B/C.
24 Jul 2019 - Centerline Inspection. ITP No.: PP4-QC-PP- Mr. Khôi
195 YSE/PTSC Utility Area YSE-HSVC1 PP4-RFI-ME-0190 Acceptable Mr. Cuong
09.00AM * C-1101 0010 (PTCS)
24 Jul 2019 - Test Hicon Non-shrinking (7 days). Mr. Khôi
196 YSE/PTSC Lab Room ITP No.: N/A YSE-HSVC1 PP4-RFI-ME-0190 Acceptable Mr. Cuong
01.30PM * PK1601ABC, PK1602ABC (PTCS)
- Test Sika 214-11 (28 days).
24 Jul 2019 Mr. Khôi
197 YSE/PTSC Lab Room * D-4509, D-4510, T-4503A/B, F- ITP No.: N/A YSE-HSVC1 PP4-RFI-ME-0190 Acceptable Mr. Cuong
01.30PM (PTCS)
4201, P-4109, F-4702A/B, F-4701
24 Jul 2019 - Grouting Anchor Bolts. ITP No.: PP4-QC-PP- Mr. Khôi
198 YSE/PTSC Utility Area YSE-HSVC1 PP4-RFI-ME-0193 Acceptable Mr. Cuong
02.00PM * C-1101 0011 Rev: A (PTCS)
- Grouting Base Plate.
24 Jul 2019 * Z-4804~Z-4807 (layer 4), Lube oil ITP No.: PP4-QC-PP- Mr. Khôi
199 YSE/PTSC Pelletizer Area Unit for Mixer Gear Reducer, Lube YSE-HSVC1 PP4-RFI-ME-0194 Acceptable Mr. Cuong
08.30AM 0011 Rev: A (PTCS)
oil Unit for Gear Pump Gear
Reducer.
- Test Hicon Non-shrinking (7 days).
25 Jul 2019 * E-4610, E-4302, E-4305, E-4710, E- Mr. Khôi
200 YSE/PTSC Lab Room ITP No.: N/A YSE-HSVC1 PP4-RFI-ME-0195 Acceptable Mr. Cuong
01.30PM 4711, E-4712, D-4115, E-4703, F- (PTCS)
4108.C-2401A/B
- Test Sika 214-11 (28 days).
25 Jul 2019 Mr. Khôi
201 YSE/PTSC Lab Room * T-4705A/B, T-4710, T-4711, T- ITP No.: N/A YSE-HSVC1 PP4-RFI-ME-0196 Acceptable Mr. Cuong
01.30PM (PTCS)
4703A/B, D-4707, D-4114
HSVC1 PP4 PROJECT
Update 6-Aug-2020
INSPECTION ATTENDEE
INSPECTION ITP No
S/N- SUB CON INSPECTION DATE INSPECTION ACTIVITY RFI No RESULT DOCUMENT STATUS REMARKS/ Reprot Number
LOCATION ITP Rev
- Grouting Base Plate. ITP No.: PP4-QC-PP-
24 Jul 2019 Mr. Khôi
202 YSE/PTSC Pelletizer Area * Lube oil unit mixer motor, 0011 YSE-HSVC1 PP4-RFI-ME-0197 Acceptable Mr. Cuong
02.00PM (PTCS)
Hydraulic oil unit D-4830. Rev: A
- Elevation, orientation, Leveling ITP No.: PP4-QC-PP-
25 Jul 2019 Mr. Khôi
203 YSE/PTSC Utility Area Inspection. 0010 YSE-HSVC1 PP4-RFI-ME-0198 Acceptable Mr. Cuong
08.00AM (PTCS)
* C-1101. Rev: A
- Grouting Base Plate.
ITP No.: PP4-QC-PP-
25 Jul 2019 * PK-1601A/B/C, PK-1602A/B/C, C- Mr. Khôi
204 YSE/PTSC Utility Area 0011 YSE-HSVC1 PP4-RFI-ME-0199 Acceptable Mr. Cuong
08.30AM 1101, Support Duct SP01/SP02/SP03, (PTCS)
Rev: A
E-1101.
- Post-Pour Inspection.
* D-4606, T-4302, D-4304, T-4501,
T-4502, D-4611, T-4503A/B, F-4601,
ITP No.: PP4-QC-PP-
25 Jul 2019 D-4509, D-4510, E-4610, F-4201A/B, Mr. Khôi
205 YSE/PTSC ISBL Area 0011 YSE-HSVC1 PP4-RFI-ME-0200 Acceptable Mr. Cuong
09.00AM E-4302, E-4305, F-4701, T-4703A/B, (PTCS)
Rev: A
T-4705A/B, F-4702A/B, D-4114, D-
4115, D-4707, T-4701, E-4703, D-
4604.
26 Jul 2019 - Test Sika 214-11 (28 days). Mr. Khôi
206 YSE/PTSC Lab Room ITP No.: N/A YSE-HSVC1 PP4-RFI-ME-0201 Acceptable Mr. Cuong
01.30PM * E-1101, D-1102, D-1103, D-1604. (PTCS)
- Test Hicon Non-shrinking (7 days).
* -permanent rail Z4804~Z4807 (part
3)
26 Jul 2019 Mr. Khôi
207 YSE/PTSC Lab Room Lube oil unit for mixer motor, Lube ITP No.: N/A YSE-HSVC1 PP4-RFI-ME-0202 Acceptable Mr. Cuong
01.30PM (PTCS)
oil unit for mixer gear reducer, CCW
unit,Lube oil unit for gear pump gear
reducer, Z-4810, Z-4813.
- Test Hicon Epoxy (7 days).
26 Jul 2019 Mr. Khôi
208 YSE/PTSC Lab Room * Permanent rail Z4804~Z4807(Base ITP No.: N/A YSE-HSVC1 PP4-RFI-ME-0203 Acceptable Mr. Cuong
01.30PM (PTCS)
middle of Rail (part 2)
- Centerline, Padding Inspection. ITP No.: PP4-QC-PP-
26 Jul 2019 Mr. Khôi
209 YSE/PTSC Flare Stack Area * Z-1701(F-2), Z-1701 (F1-1), Z- 0010 YSE-HSVC1 PP4-RFI-ME-0204 Acceptable Mr. Cuong
08.00AM (PTCS)
1701(F1-2), Z-1701(F1-3) Rev: A
Update 6-Aug-2020
INSPECTION ATTENDEE
INSPECTION ITP No
S/N- SUB CON INSPECTION DATE INSPECTION ACTIVITY RFI No RESULT DOCUMENT STATUS REMARKS/ Reprot Number
LOCATION ITP Rev
- Bolts tightening of Derrick Block 2 ITP No.: PP4-QC-PP-
27/07/2019 Mr. Khôi
219 YSE/PTSC Flare Stack Area and 3 for Flare stack 0006 YSE-HSVC1 PP4-RFI-ME-0214 Acceptable Mr. Cuong
'09:30AM (PTCS)
'* Z-1701 Rev: A
27/07/2019 - Grouting Sole plate of Motor PP4-QC-PP-0011 Mr. Khôi
220 YSE/PTSC Jetty Area YSE-HSVC1 PP4-RFI-ME-0215 Acceptable Mr. Cuong
13:30 PM '* C-2401A & C-2401B Rev: A (PTCS)
Update 6-Aug-2020
INSPECTION ATTENDEE
INSPECTION ITP No
S/N- SUB CON INSPECTION DATE INSPECTION ACTIVITY RFI No RESULT DOCUMENT STATUS REMARKS/ Reprot Number
LOCATION ITP Rev
- Grouting Anchor Bolts
*PK-2501
Jetty Area ITP No.: PP4-QC-PP-
02 August 2019 - Grouting Anchor Bolts Lube oil Unit Mr. Khôi
235 YSE/PTSC ISBL Area 0011 YSE-HSVC1 PP4-RFI-ME-0230 Acceptable Mr. Cuong
08h30AM C-4401, Seal Gas Unit (PTCS)
Petellizer Rev: A
- Grouting base
*Z-4810 + Z-4813
ITP No.: PP4-QC-PP-
02 August 2019 - Grouting base for compressor Mr. Khôi
236 YSE/PTSC 0011 YSE-HSVC1 PP4-RFI-ME-0231 Acceptable Mr. Cuong
08h30AM ISBL Area *PK-4301 (PTCS)
Rev: A
-Grouting base for Derrick + Liquid ITP No.: PP4-QC-PP-
02-Aug-2019 Mr. Khôi
237 YSE/PTSC Seal Drum 0011 YSE-HSVC1 PP4-RFI-ME-0232 Acceptable Mr. Cuong
10h00AM Flare stack Area (PTCS)
*Z-1701 Rev: A
-Alignment Inspection for Derrick ITP No.: PP4-QC-PP-
02-Aug-2019 Mr. Khôi
238 YSE/PTSC Block 01 0010 YSE-HSVC1 PP4-RFI-ME-0233 Acceptable Mr. Cuong
09h00AM Flare stack Area (PTCS)
*Z-1701 Rev: A
-Bolts tightening Inspection for ITP No.: PP4-QC-PP-
02-Aug-2019 Mr. Khôi
239 YSE/PTSC Derrick Block 01 0010 YSE-HSVC1 PP4-RFI-ME-0234 Acceptable Mr. Cuong
09h30AM Flare stack Area (PTCS)
*Z-1701 Rev: A
- Centerline, Padding Inspection. ITP No.: PP4-QC-PP-
3 Aug 2019 Mr. Khôi
240 YSE/PTSC Silo Area * D-4901G, D-4901H, D-4904G, D- 0010 YSE-HSVC1 PP4-RFI-ME-0235 Cancel Mr. Cuong
08.00AM (PTCS)
4904H. Rev: A
3 Aug 2019 - Trial Test HICON Non-shrinking Mr. Khôi
241 YSE/PTSC Lab Room ITP No.: N/A YSE-HSVC1 PP4-RFI-ME-0236 Acceptable Mr. Cuong
01.30PM (28 days). (PTCS)
Update 6-Aug-2020
INSPECTION ATTENDEE
INSPECTION ITP No
S/N- SUB CON INSPECTION DATE INSPECTION ACTIVITY RFI No RESULT DOCUMENT STATUS REMARKS/ Reprot Number
LOCATION ITP Rev
07 Aug 2019 Mr. Khôi
253 YSE/PTSC Warehouse 2 Area -Sika 214-11 Inspection. ITP No.: N/A YSE-HSVC1 PP4-RFI-ME-0248 Acceptable Mr. Cuong
08.00AM (PTCS)
ITP No.: PP4-QC-PP-
07 Aug 2019 - Grouting Base plate Mr. Khôi
254 YSE/PTSC Utility Area 0011 YSE-HSVC1 PP4-RFI-ME-0249 Acceptable Mr. Cuong
08.30AM * C-1101, E-1101, Z-1101 (PTCS)
Rev: A
ITP No.: PP4-QC-PP-
07 Aug 2019 - Grouting Base plate Mr. Khôi
255 YSE/PTSC Flare Stack 0011 YSE-HSVC1 PP4-RFI-ME-0250 Acceptable Mr. Cuong
08.30AM * Z-1701 (PTCS)
Rev: A
Update 6-Aug-2020
INSPECTION ATTENDEE
INSPECTION ITP No
S/N- SUB CON INSPECTION DATE INSPECTION ACTIVITY RFI No RESULT DOCUMENT STATUS REMARKS/ Reprot Number
LOCATION ITP Rev
- Test Hicon non-shrinking (28 days)
* A1~A7, AD~AE of PK-1101, P-
12 Aug 2019 4205, P-4206, P-4701A/B, P- Mr. Khôi
275 YSE/PTSC Lab room N/A YSE-HSVC1 PP4-RFI-ME-0270 Acceptable Mr. Cuong
09.00AM 4105A/B, P-4107A/B, P-4110A/B, P- (PTCS)
4109, P-4302A/B, P-4808A/B, P-
4103, F-4601,Z -4804~Z-4807
13 Aug 2019 - Test Hicon Epoxy Stacrete (28 days) Mr. Khôi
278 YSE/PTSC Lab room ITP No.: N/A YSE-HSVC1 PP4-RFI-ME-0273 Acceptable Mr. Cuong
08.00AM * Trial test (PTCS)
Update 6-Aug-2020
INSPECTION ATTENDEE
INSPECTION ITP No
S/N- SUB CON INSPECTION DATE INSPECTION ACTIVITY RFI No RESULT DOCUMENT STATUS REMARKS/ Reprot Number
LOCATION ITP Rev
ITP No.: PP4-QC-PP-
15 Aug 2019 - Grouting Base plate Mr. Khôi
294 YSE/PTSC ISBL Area 0011 YSE-HSVC1 PP4-RFI-ME-0289 Acceptable Mr. Cuong
01.30PM * C-4401 (PTCS)
Update 6-Aug-2020
INSPECTION ATTENDEE
INSPECTION ITP No
S/N- SUB CON INSPECTION DATE INSPECTION ACTIVITY RFI No RESULT DOCUMENT STATUS REMARKS/ Reprot Number
LOCATION ITP Rev
17 Aug 2019 ITP No.: N/A Mr. Khôi
314 YSE/PTSC Ware house 2 - Sika 214-11 inspection YSE-HSVC1 PP4-RFI-ME-0308 Acceptable Mr. Cuong
01.30PM (PTCS)
ITP No.: PP4-QC-PP-
17 Aug 2019 - Grouting anchor bolts inspection Mr. Khôi
315 YSE/PTSC ISBL Area 0011 YSE-HSVC1 PP4-RFI-ME-0309 Acceptable Mr. Cuong
09.00AM * PK-4301 (PTCS)
- Aligment inspection
ITP No.: PP4-QC-PP-
18 Aug 2019 * E-2201A, E-2201B, E-2201C, E- Mr. Khôi
317 YSE/PTSC Jetty Area 0010 YSE-HSVC1 PP4-RFI-ME-0311 Acceptable Mr. Cuong
08.30AM 2201D, E-2201E, E-2201F, E-2201G, (PTCS)
E-2201H, E-2201I (Vaporizer)
- Grouting base plate inspection
ITP No.: PP4-QC-PP-
18 Aug 2019 * E-2201A, E-2201B, E-2201C, E- Mr. Khôi
318 YSE/PTSC Jetty Area 0011 YSE-HSVC1 PP4-RFI-ME-0312 Acceptable Mr. Cuong
09.00AM 2201D, E-2201E, E-2201F, E-2201G, (PTCS)
E-2201H, E-2201I (Vaporizer)
ITP No.: PP4-QC-PP-
18 Aug 2019 - Grouting base plate inspection Mr. Khôi
319 YSE/PTSC Peletizer building 0011 YSE-HSVC1 PP4-RFI-ME-0313 Acceptable Mr. Cuong
09.30AM *C-4809 (PTCS)
Update 6-Aug-2020
INSPECTION ATTENDEE
INSPECTION ITP No
S/N- SUB CON INSPECTION DATE INSPECTION ACTIVITY RFI No RESULT DOCUMENT STATUS REMARKS/ Reprot Number
LOCATION ITP Rev
21 Aug 2019 - Grouting anchor bolts inspection Mr. Khôi
337 YSE/PTSC Jetty Area PP4-QC-PP-0011 YSE-HSVC1 PP4-RFI-ME-0332 Acceptable Mr. Cuong
08.00 AM * P-2203A/B (PTCS)
21 Aug 2019 - Grouting anchor bolts inspection Mr. Khôi
338 YSE/PTSC Propane tank Area PP4-QC-PP-0011 YSE-HSVC1 PP4-RFI-ME-0333 Acceptable Mr. Cuong
08.00 AM * P-1001A/B (PTCS)
21 Aug 2019 - Grouting anchor bolts inspection Mr. Khôi
339 YSE/PTSC Raw water pond Area PP4-QC-PP-0011 YSE-HSVC1 PP4-RFI-ME-0334 Acceptable Mr. Cuong
08.30 AM * P-1309A/B (PTCS)
- Center line inspection
21 Aug 2019 Mr. Khôi
340 YSE/PTSC ISBL Area * PK-4101, D-4106A/B, E-4101A/B, PP4-QC-PP-0010 YSE-HSVC1 PP4-RFI-ME-0335 Acceptable Mr. Cuong
09.00 AM (PTCS)
D-4107
Aligment inspection
* D-4110A/B/C, D-4113A/B, F-4106, D-4110A/B/C; D-4106A/B; D-
21 Aug 2019 ITP No.: PP4-QC-PP-
341 YSE/PTSC ISBL Area D-4105A/B, D-4112, PK-4101, E- YSE-HSVC1 PP4-RFI-ME-0336 Acceptable 4105A/B;D-4112; T-4401 to
09.30 AM 0010
4101A/B, D-4107, D-4106A/B, T- be cancelled
4301, T-4401
21 Aug 2019 - Test Hicon Epoxy starcrete (28 days) Mr. Khôi
342 YSE/PTSC Lab room N/A YSE-HSVC1 PP4-RFI-ME-0337 Acceptable Mr. Cuong
01.30 PM * P-1101A/B (PTCS)
Update 6-Aug-2020
INSPECTION ATTENDEE
INSPECTION ITP No
S/N- SUB CON INSPECTION DATE INSPECTION ACTIVITY RFI No RESULT DOCUMENT STATUS REMARKS/ Reprot Number
LOCATION ITP Rev
23 Aug 2019 - Grouting anchor bolts inspection ITP No.: PP4-QC-PP-
358 YSE/PTSC Utility Area YSE-HSVC1 PP4-RFI-ME-0351 Pending
08.30 AM * E-1301 0011
23 Aug 2019 Mr. Khôi
359 YSE/PTSC Ware house 2 - Hicon non-shrinking inspection ITP No.: N/A YSE-HSVC1 PP4-RFI-ME-0352 acceptable Mr. Son
09.00 AM (PTCS)
- Test Sika 214-11 (7 days)
23 Aug 2019 Mr. Khôi
360 YSE/PTSC Lab room * P-1301A/B/C, Lube oil unit, Seal ITP No.: N/A YSE-HSVC1 PP4-RFI-ME-0353 acceptable Mr. Son
01.30 PM (PTCS)
gas unit, PK-4502, D-4004, PK-4702
- Final grouting full skid inspection
23 Aug 2019 ITP No.: PP4-QC-PP-
361 YSE/PTSC Utility Area * P-1303A/B/C, P-1304, P- YSE-HSVC1 PP4-RFI-ME-0354
01.30 PM 0011
1305A/B/C, P-1307A/B
- Bolt tightening inspection
23 Aug 2019 ITP No.: PP4-QC-PP- Mr. Khôi
362 YSE/PTSC Flare stack * Connect derrick block 1~5 YSE-HSVC1 PP4-RFI-ME-0355 acceptable Mr. Son
02.30 PM 0010 (PTCS)
23 Aug 2019 - Center line inspection ITP No.: PP4-QC-PP- Mr. Khôi
366 YSE/PTSC ISBL Area YSE-HSVC1 PP4-RFI-ME-0359 acceptable Mr. Son
02.30 PM * C-4801A, C-4801B 0010 (PTCS)
- Leveling, orientation, elevation
23 Aug 2019 ITP No.: PP4-QC-PP- Mr. Khôi
367 YSE/PTSC ISBL Area inspection YSE-HSVC1 PP4-RFI-ME-0360 acceptable Mr. Son
02.30 PM 0010 (PTCS)
* C-4801A, C-4801B
23 Aug 2019 -Grouting base plate inspection ITP No.: PP4-QC-PP- Mr. Khôi
368 YSE/PTSC ISBL Area YSE-HSVC1 PP4-RFI-ME-0361 acceptable Mr. Son
04.00 PM * C-4801A, C-4801B 0011 (PTCS)
-Test sika 214-11 (7 days)
* ZM-4801A, D-4009, PK-4502, PK-
25 Aug 2019 Mr. Khôi
369 YSE/PTSC Lab room 4701, E-2201A, E-2201B, E-2201C ITP No.: N/A YSE-HSVC1 PP4-RFI-ME-0362 acceptable Mr. Son
01.30 PM (PTCS)
,E-2201D, E-2201E, E-2201F, E-
2201G, E-2201H, E-2201I
25 Aug 2019 -Grouting anchor bolts inspection ITP No.: PP4-QC-PP- Mr. Khôi
370 YSE/PTSC ISBL Area YSE-HSVC1 PP4-RFI-ME-0363 acceptable Mr. Son
08.00 AM * P-4610A, P-4610B 0011 (PTCS)
25 Aug 2019 -Grouting anchor bolts inspection ITP No.: PP4-QC-PP- Mr. Khôi
371 YSE/PTSC Jetty Area YSE-HSVC1 PP4-RFI-ME-0364 acceptable Mr. Son
08.30 AM * P-2602A, P-2602B 0011 (PTCS)
- Center line & padding inspection
25 Aug 2019 ITP No.: PP4-QC-PP- Mr. Khôi
372 YSE/PTSC Ball tank Area * P-1002 A/B/C/D, P-1003A/B, P- YSE-HSVC1 PP4-RFI-ME-0365 acceptable Mr. Son
09.00 AM 0012 (PTCS)
1004A/B
-Test hicon non-shrinking (28 days)
* Steel structure line AA~CC,
24 Aug 2019 A2~A6, PK-1601A/B/C, PK- Mr. Khôi
373 YSE/PTSC Lab room ITP No.: N/A YSE-HSVC1 PP4-RFI-ME-0366 acceptable Mr. Son
01.30 PM 1602A/B/C,Support Duct (PTCS)
SP01/SP02/SP03, Motor for C-
2401A/B, Motor of C2401A/B.
-Test sika 214-11 (7 days)
26 Aug 2019 Mr. Khôi
374 YSE/PTSC Lab room * C-4401, PK-4603, PK-4301(Base ITP No.: N/A YSE-HSVC1 PP4-RFI-ME-0367 acceptable Mr. Son
01.30 PM (PTCS)
motor), PK-4709A/B
26 Aug 2019 -Test Hicon non-shrinking (28 days) Mr. Khôi
375 YSE/PTSC Lab room ITP No.: N/A YSE-HSVC1 PP4-RFI-ME-0368 acceptable Mr. Son
01.30 PM * Compressor PK4301 (PTCS)
- Leveling, elevation, orientation
21 Aug 2019 inspection ITP No.: PP4-QC-PP- Mr. Khôi
376 YSE/PTSC Utility Area YSE-HSVC1 PP4-RFI-ME-0369 Acceptable Mr. Cuong
02.30 PM * P-1303A/B/C, P-1304, P- 0010 (PTCS)
1305A/B/C, P-1307A/B
Update 6-Aug-2020
INSPECTION ATTENDEE
INSPECTION ITP No
S/N- SUB CON INSPECTION DATE INSPECTION ACTIVITY RFI No RESULT DOCUMENT STATUS REMARKS/ Reprot Number
LOCATION ITP Rev
- Center line & paddding
27 Aug 2019 ITP No.: PP4-QC-PP- Mr. Khôi
378 YSE/PTSC Silo Area inspection YSE-HSVC1 PP4-RFI-ME-0371 Acceptable
(PTCS)
Mr. Son
08.30 AM 0010
* D-4904D
- Grouting base plate inspection
27 Aug 2019 ITP No.: PP4-QC-PP- Mr. Khôi
379 YSE/PTSC Jetty Area * Z-2301, BL-2301A, BL-2301B, YSE-HSVC1 PP4-RFI-ME-0372 Acceptable
(PTCS)
Mr. Son
09.00 AM 0011
D-2301, D-2302
- Leveling, orientation, elevation
27 Aug 2019 ITP No.: PP4-QC-PP- Mr. Khôi
380 YSE/PTSC Propane tank inspection YSE-HSVC1 PP4-RFI-ME-0373 Acceptable Mr. Son
09.30 AM 0010 (PTCS)
* P-1001A, P-1001B
- Test Hicon Epoxy Starcrete (7
27 Aug 2019 Mr. Khôi
381 YSE/PTSC Lab room days) ITP No.: N/A YSE-HSVC1 PP4-RFI-ME-0374 Acceptable Mr. Son
01.30 PM (PTCS)
* ZM-4801A
- Center line inspection
27 Aug 2019 ITP No.: PP4-QC-PP- Mr. Khôi
382 YSE/PTSC Peletizer Building * F-4805, C-4802A, C-4802B, E- YSE-HSVC1 PP4-RFI-ME-0375 Acceptable
(PTCS)
Mr. Son
02.30 PM 0010
4805
27 Aug 2019 - Grouting anchor bolts inspection ITP No.: PP4-QC-PP- Mr. Khôi
383 YSE/PTSC Jetty Area YSE-HSVC1 PP4-RFI-ME-0376 Acceptable Mr. Son
01.30 PM * P-2201A/B/C 0011 (PTCS)
28 Aug 2019 - Center line & padding inspection ITP No.: PP4-QC-PP- Mr. Khôi
389 YSE/PTSC Cooling water YSE-HSVC1 PP4-RFI-ME-0382 acceptable Mr. Son
01.30 PM * PK-1201A/B/C 0010 (PTCS)
Update 6-Aug-2020
INSPECTION ATTENDEE
INSPECTION ITP No
S/N- SUB CON INSPECTION DATE INSPECTION ACTIVITY RFI No RESULT DOCUMENT STATUS REMARKS/ Reprot Number
LOCATION ITP Rev
29 Aug 2019 - Bagging System inspection ITP No.: PP4-QC-PP-
394 YSE/PTSC Auto Warehouse YSE-HSVC1 PP4-RFI-ME-0387
09.30 AM 0010
28 Aug 2019 - Grouting base plate inspection ITP No.: PP4-QC-PP- Mr. Khôi
395 YSE/PTSC Propane tanl Area YSE-HSVC1 PP4-RFI-ME-0388 acceptable Mr. Son
01.30 PM * P-1001A, P-1001B 0011 (PTCS)
30Aug 2019 - Grouting base plate inspection ITP No.: PP4-QC-PP- Mr. Khôi
399 YSE/PTSC Propane tank Area YSE-HSVC1 PP4-RFI-ME-0392 acceptable Mr. Amado
08.30 AM * D-1701A 0011 (PTCS)
30Aug 2019 - Grouting base plate inspection ITP No.: PP4-QC-PP- Mr. Khôi
400 YSE/PTSC Utility Area YSE-HSVC1 PP4-RFI-ME-0393 acceptable
(PTCS)
Mr. Amado
08.30 AM * E-1301 0011
30Aug 2019 - Aligment inspection ITP No.: PP4-QC-PP- Mr. Khôi
401 YSE/PTSC Silo Area YSE-HSVC1 PP4-RFI-ME-0394 acceptable
(PTCS)
Mr. Amado
09.00 AM * D-4904B 0010
- Center line inspection
30Aug 2019 ITP No.: PP4-QC-PP- Mr. Khôi
402 YSE/PTSC Jetty Area * Damp-001/ Damp-002/ E-2401 ( YSE-HSVC1 PP4-RFI-ME-0395 acceptable
(PTCS)
Mr. Son
09.30 AM 0010
of PK-2401A)
- Center line inspection
30Aug 2019 ITP No.: PP4-QC-PP- Mr. Khôi
403 YSE/PTSC Jetty Area * Damp-001/ Damp-002/ E-2401 ( YSE-HSVC1 PP4-RFI-ME-0396 acceptable
(PTCS)
Mr. Son
09.30 AM 0010
of PK-2401B )
- Aligment inspection
30Aug 2019 ITP No.: PP4-QC-PP-
404 YSE/PTSC Jetty Area * Damp-001/ Damp-002/ E-2401 ( YSE-HSVC1 PP4-RFI-ME-0397
09.30 AM 0010
of PK-2401A )
- Aligment inspection
30Aug 2019 ITP No.: PP4-QC-PP-
405 YSE/PTSC Jetty Area * Damp-001/ Damp-002/ E-2401 ( YSE-HSVC1 PP4-RFI-ME-0398
09.30 AM 0010
of PK-2401B )
- Test Hicon non-shrinking (7
30 Aug 2019 days) Mr. Khôi
406 YSE/PTSC Lab room ITP No.: N/A YSE-HSVC1 PP4-RFI-ME-0399 acceptable Mr. Son
01.30 PM * PK-4709A/B, P-1309A/B, C- (PTCS)
4801A/B, D-1701A
- Test Hicon non-shrinking (28
30 Aug 2019 Mr. Khôi
407 YSE/PTSC Lab room days) ITP No.: N/A YSE-HSVC1 PP4-RFI-ME-0400 acceptable
(PTCS)
Mr. Son
01.30 PM
* Z-4813, Derrick of Z-1701
- Test Hicon Epoxy Starcrete (28
30 Aug 2019 Mr. Khôi
408 YSE/PTSC Lab room days) ITP No.: N/A YSE-HSVC1 PP4-RFI-ME-0401 acceptable
(PTCS)
Mr. Son
01.30 PM
* Z-4810, PK-4301
31 Aug 2019 - Grouting Base Plate. ITP No.: PP4-QC-PP- Mr. Khôi
409 YSE/PTSC Silo Area YSE-HSVC1 PP4-RFI-ME-0402 acceptable Mr. Amado
08.00 AM * D-4901A, D-4901B, D-4904A 0011 (PTCS)
Update 6-Aug-2020
INSPECTION ATTENDEE
INSPECTION ITP No
S/N- SUB CON INSPECTION DATE INSPECTION ACTIVITY RFI No RESULT DOCUMENT STATUS REMARKS/ Reprot Number
LOCATION ITP Rev
- Bolts Tightening Flange Joint
31 Aug 2019 ITP No.: PP4-QC-PP- Mr. Khôi
411 YSE/PTSC ISBL Area Inspection of. YSE-HSVC1 PP4-RFI-ME-0404 acceptable
(PTCS)
Mr. Amado
09.00 AM 0010
* E-4825 & F-4825
31 Aug 2019 - Final Alignment Inspection. ITP No.: PP4-QC-PP- Mr. Khôi
412 YSE/PTSC Water Pond Area YSE-HSVC1 PP4-RFI-ME-0405 acceptable Mr. Amado
09.30 AM * P-1301A, P-1301B, P-1301C 0010 (PTCS)
01 Sept 2019 - Test Hicon Non-shrink (7 days) Mr. Khôi
413 YSE/PTSC Lab Room ITP No.: N/A YSE-HSVC1 PP4-RFI-ME-0406 acceptable
(PTCS)
Mr. Son
13.30 PM * P-4610A/P-4610B
- Leveling, elevation, orientation
01 Sept 2019 inspection ITP No.: PP4-QC-PP-
414 YSE/PTSC ISBL Area YSE-HSVC1 PP4-RFI-ME-0407
08.00 AM * D-4105A/D-4105B, D- 0010
4106A/D-4106B
01 Sept 2019 - Aligment inspection ITP No.: PP4-QC-PP-
415 YSE/PTSC ISBL Area YSE-HSVC1 PP4-RFI-ME-0408
08.00 AM * E-4301 0010
01 Sept 2019 - Grouting anchor bolts inspection ITP No.: PP4-QC-PP- Mr. Khôi
416 YSE/PTSC Cooling Water Area YSE-HSVC1 PP4-RFI-ME-0409 acceptable Mr. Son
08.30 AM * PK-1201A/B/C 0011 (PTCS)
- Pre-aligment inspection
01 Sept 2019 ITP No.: PP4-QC-PP- Mr. Khôi
417 YSE/PTSC Jetty Area * P-2601A/P-2601B, P-2602A/P- YSE-HSVC1 PP4-RFI-ME-0410 acceptable
(PTCS)
Mr. Amado
09.00 AM 0010
2602B
- Grouting base plate inspection
01 Sept 2019 ITP No.: PP4-QC-PP- Mr. Khôi
418 YSE/PTSC Jetty Area * P-2601A/P-2601B, P-2602A/P- YSE-HSVC1 PP4-RFI-ME-0411 acceptable
(PTCS)
Mr. Amado
09.30 AM 0011
2602B
01 Sept 2019 - Grouting base plate inspection ITP No.: PP4-QC-PP- Mr. Khôi
419 YSE/PTSC Silo Area YSE-HSVC1 PP4-RFI-ME-0412 acceptable Mr. Amado
09.30 AM * D-4904B 0011 (PTCS)
01 Sept 2019 - Anchor bolts inspection ITP No.: PP4-QC-PP-
420 YSE/PTSC Flare Stack YSE-HSVC1 PP4-RFI-ME-0413
10.00 AM * Flare stack 0010
01 Sept 2019 - Final inspection ITP No.: PP4-QC-PP-
421 YSE/PTSC Flare Stack YSE-HSVC1 PP4-RFI-ME-0414
10.00 AM * Flare stack 0010
01 Sept 2019 Mr. Khôi
422 YSE/PTSC Laydown Area - Insulation material inspection ITP No.: N/A YSE-HSVC1 PP4-RFI-ME-0415 acceptable Mr. Amado
02.30 PM (PTCS)
Update 6-Aug-2020
INSPECTION ATTENDEE
INSPECTION ITP No
S/N- SUB CON INSPECTION DATE INSPECTION ACTIVITY RFI No RESULT DOCUMENT STATUS REMARKS/ Reprot Number
LOCATION ITP Rev
Center line Inspection for
03 Sept 2019 ITP No.: PP4-QC-PP-
YSE/PTSC ISBL area E4310,S4502,F4303A/B,D4502,E YSE-HSVC1 PP4-RFI-ME-0183A
09.00 AM 0010
4401,R4401,Z4312
Grouting base C-4802A,C-4802B
02 Sept 2019 ITP No.: PP4-QC-PP-
YSE/PTSC ISBL area Inspection. YSE-HSVC1 PP4-RFI-ME-0422
14.00 PM 0010
Update 6-Aug-2020
INSPECTION ATTENDEE
INSPECTION ITP No
S/N- SUB CON INSPECTION DATE INSPECTION ACTIVITY RFI No RESULT DOCUMENT STATUS REMARKS/ Reprot Number
LOCATION ITP Rev
06 Sept 2019 - Grouting base plate inspection ITP No.: PP4-QC-PP-
YSE/PTSC Cooling water YSE-HSVC1 PP4-RFI-ME-0438
08.00 AM * PK-1201A/B/C 0011
- Alignment inspection
06 Sept 2019 * E-4404, F-4301, D-4612, D- ITP No.: PP4-QC-PP-
YSE/PTSC ISBL Area YSE-HSVC1 PP4-RFI-ME-0439
08.30 AM 4300, F-4301, D-4303, T-4401, E- 0010
4401
06 Sept 2019 - Center line & padding inspection ITP No.: PP4-QC-PP- Mr. Khôi
YSE/PTSC ISBL Area YSE-HSVC1 PP4-RFI-ME-0440 acceptable Mr. Amado
09.00 AM * D-4102, P-4102 0010 (PTCS)
Update 6-Aug-2020
INSPECTION ATTENDEE
INSPECTION ITP No
S/N- SUB CON INSPECTION DATE INSPECTION ACTIVITY RFI No RESULT DOCUMENT STATUS REMARKS/ Reprot Number
LOCATION ITP Rev
SUB-CON eTEC HYOSUNG
Pad Elevation Inspection, Centerline
June 7, 2019 Inspection. Mr. Lee
1 HYG Water Treatment, Utility F-1321A~C, F-1331A~C, TK-1321A~C PP4-QC-PP-0010 Rev. A HYG-HSVC1 PP4 - RFI-ME-WT-0001 Acceptable Mr. Cuong Mr. Dinh
08:00AM (HYG)
MATERIAL RECEIVING
June 18, 2019 INSPECTION SIKA 214-11 Mr. Lee
5 HYG Water Treatment, Utility PP4-QC-PP-0010 Rev. A HYG-HSVC1 PP4 - RFI -ME -WT - 0005 Acceptable Mr. Cuong Mr. Dinh
08:00AM (HYG)
Installation Inspection:
June 25, 2019 *D-1321A/B/C, D-1322, TK-1311, TK- Mr. Lee
10 HYG Water Treatment, Utility 1312 PP4-QC-PP-0010 Rev. A HYG-HSVC1 PP4-RFI-ME-WT-0010 Acceptable Mr. Cuong Mr. Dinh
08:00AM (HYG)
Update 6-Aug-2020
INSPECTION ATTENDEE
INSPECTION ITP No
S/N- SUB CON INSPECTION DATE INSPECTION ACTIVITY RFI No RESULT DOCUMENT STATUS REMARKS/ Reprot Number
LOCATION ITP Rev
HYOSUNG GROUNTING WORK INSPECTION
Jul,16,2019 Mr. Lee
14 GOODSPRING WT Area (COMPRESSIVE STRENGTH OF PP4-QC-PP-0010 HYG-HSVC1 PP4 - RFI - ME- WT - 0016 Acceptable Mr. Cuong Mr. Dinh
09:00 AM (HYG)
S.INC SIKA)
- ALIGNMENT INSPECTION
HYOSUNG
Jul,16,2019 REPORT (VERTICAL HYG-HSVC1 PP4-RFI- Mr. Lee
15 GOODSPRING WT Area PP4-QC-PP-0010 Acceptable Mr. Cuong Mr. Dinh
10:00 AM EQUIPMENT) ME-WT-0017 (HYG)
S.INC
* F-1322A/B/C
-Pad Elevation Inspection, Centerline
HYOSUNG Inspection.
July,22,2019 Mr. Lee
16 GOODSPRING WT Area * P-1302A/B/C, D-1323, P- PP4-QC-PP-0010 HYG-HSVC1 PP4 - RFI - ME- WT - 0018 Acceptable Mr. Cuong Mr. Dinh
10:00 AM (HYG)
S.INC 1327A/B/C, D-1324, P-1306A/B/C,
SEW-1323, SEW-1324
HYOSUNG -Coupling Alignment Inspection
July,23,2019 Mr. Lee
17 GOODSPRINGS.I WT Area Report - Pump & Compressor. PP4-QC-PP-0010 HYG-HSVC1 PP4-RFI-ME-WT-0019 Acceptable Mr. Cuong Mr. Dinh
02:00 PM (HYG)
NC * P-1325A/B, P-1326A/B
HYOSUNG - Levelling Alignment Inspection
July,23,2019 Mr. Lee
18 GOODSPRINGS.I WT Area Report - Pump PP4-QC-PP-0010 HYG-HSVC1 PP4-RFI-ME-WT-0020 Acceptable Mr. Cuong Mr. Dinh
02:00 PM (HYG)
NC * P-1325A/B, P-1326A/B
HYOSUNG GROUTING WORK INSPECTION
July,24,2019 Mr. Lee
19 GOODSPRINGS.I WT Area (COMPRESSIVE STRENGTH OF PP4-QC-PP-0010 HYG-HSVC1 PP4-RFI-ME-WT-0021 Acceptable Mr. Cuong Mr. Dinh
09:00 AM (HYG)
NC SIKA)
HYOSUNG
Jul,25,2019 MATERIAL RECEIVING Mr. Lee
21 GOODSPRINGS.I WT Area PP4-QC-PP-0010 HYG-HSVC1 PP4-RFI-ME-WT-0023 Acceptable Mr. Cuong Mr. Dinh
09:00 AM INSPECTION (HYG)
NC
HYOSUNG
July,30,2019 GROUTING WORK INSPECTION Mr. Lee
27 GOODSPRINGS.I WT Area PP4-QC-PP-0010 HYG-HSVC1 PP4-RFI-ME-WT-0029 Acceptable Mr. Cuong Mr. Dinh
03:00 PM * * F-1311A/B/C (HYG)
NC
HYOSUNG
Jul,31,2019 MATERIAL RECEIVING Mr. Lee
28 GOODSPRINGS.I WT Area PP4-QC-PP-0010 HYG-HSVC1 PP4-RFI-ME-WT-0030 Acceptable Mr. Cuong Mr. Dinh
09:00 AM INSPECTION (HYG)
NC
HYOSUNG GROUTING WORK INSPECTION
Aug,1,2019 Mr. Lee
29 GOODSPRINGS.I WT Area (COMPRESSIVE STRENGTH OF PP4-QC-PP-0010 HYG-HSVC1 PP4-RFI-ME-WT-0031 Acceptable Mr. Cuong Mr. Dinh
09:00 AM (HYG)
NC SIKA)
HSVC1 PP4 PROJECT
Update 6-Aug-2020
INSPECTION ATTENDEE
INSPECTION ITP No
S/N- SUB CON INSPECTION DATE INSPECTION ACTIVITY RFI No RESULT DOCUMENT STATUS REMARKS/ Reprot Number
LOCATION ITP Rev
Coupling Alignment Inspection Report -
HYOSUNG
Aug,06,2019 Pump . Mr. Lee
30 GOODSPRINGS.I WT Area PP4-QC-PP-0010 HYG-HSVC1 PP4-RFI-ME-WT-0032 Acceptable Mr. Cuong Mr. Dinh
02:00 PM * P-1302A/B/C; P-1327A/B/; P- (HYG)
NC
1306A/B/C
Levelling Alignment Inspection Report -
HYOSUNG Pump
Aug,06,2019 Mr. Lee
31 GOODSPRINGS.I WT Area * P-1302A/B/C; P-1327A/B/; P- PP4-QC-PP-0010 HYG-HSVC1 PP4-RFI-ME-WT-0033 Acceptable Mr. Cuong Mr. Dinh
02:00 PM (HYG)
NC 1306A/B/C; C-1322A/B; C-
1321A/B/C/D/E/F
Pad Elevation Inspection, Centerline
HYOSUNG Inspection.
Aug,06,2019 Mr. Lee
32 GOODSPRINGS.I * P-1311A/B; C-1311A/B; D-1311; F- PP4-QC-PP-0010 HYG-HSVC1 PP4-RFI-ME-WT-0034 Acceptable Mr. Cuong Mr. Dinh
10:00 AM Domestic Area (HYG)
NC 1341A/B; P-1341A/B; D-1341; P-
1342A/B
HYOSUNG GROUTING WORK INSPECTION
Aug,7,2019 Mr. Lee
33 GOODSPRINGS.I WT Area (COMPRESSIVE STRENGTH OF PP4-QC-PP-0010 HYG-HSVC1 PP4-RFI-ME-WT-0035 Acceptable Mr. Cuong Mr. Dinh
09:00 AM (HYG)
NC SIKA)
GROUTING WORK INSPECTION
HYOSUNG (Grouting base: P-1302A/B/C, P-
Aug,10,2019 Mr. Lee
34 GOODSPRINGS.I WT Area 1327A/B, P-1306A/B/C, C- PP4-QC-PP-0010 HYG-HSVC1 PP4 - RFI-ME-WT-0036 Acceptable Mr. Cuong Mr. Dinh
09:00 AM (HYG)
NC 1321A/B/C/D/E/F, C-1322A/B, D-1323,
D-1324, SEW-1323, SEW-1324)
HYOSUNG
Aug,10,2019 MATERIAL RECEIVING Mr. Lee
35 GOODSPRINGS.I WT Area PP4-QC-PP-0010 HYG-HSVC1 PP4-RFI-ME-WT-0037 Acceptable Mr. Cuong Mr. Dinh
09:00 AM INSPECTION (HYG)
NC
Update 6-Aug-2020
INSPECTION ATTENDEE
INSPECTION ITP No
S/N- SUB CON INSPECTION DATE INSPECTION ACTIVITY RFI No RESULT DOCUMENT STATUS REMARKS/ Reprot Number
LOCATION ITP Rev
HYOSUNG Coupling Alignment Inspection Report -
Aug,23,2019 Mr. Lee
44 GOODSPRINGS.I WT Area Pump . PP4-QC-PP-0010 HYG-HSVC1 PP4-RFI-ME-WT-0046 Acceptable Mr. Cuong
02:00 PM (HYG)
NC * P-1341A/B, P-1311A/B
HYOSUNG Levelling Alignment Inspection Report -
Aug,23,2019 Mr. Lee
45 GOODSPRINGS.I WT Area Pump PP4-QC-PP-0010 HYG-HSVC1 PP4-RFI-ME-WT-0047 Acceptable Mr. Cuong
03:00 PM (HYG)
NC * P-1341A/B, P-1311A/B
HYOSUNG Levelling Alignment Inspection Report -
Aug,23,2019 Mr. Lee
46 GOODSPRINGS.I DOMESTIC Area Pump PP4-QC-PP-0010 HYG-HSVC1 PP4-RFI-ME-WT-0048 Acceptable Mr. Cuong
03:00 PM (HYG)
NC *D-1341 & P1342A/B
HYOSUNG
Aug,23,2019 MATERIAL RECEIVING Mr. Lee
47 GOODSPRINGS.I Domestic Area PP4-QC-PP-0010 HYG-HSVC1 PP4-RFI-ME-WT-0049 Acceptable Mr. Son
3:00 PM INSPECTION (HYG)
NC
HYOSUNG GROUTING WORK INSPECTION
Aug,23,2019
48 GOODSPRINGS.I Domestic Area Grouting base : P-1341 A/B, PP4-QC-PP-0010 HYG-HSVC1 PP4-RFI-ME-WT-0050 pending
04:30 PM
NC P-1311 A/B, C-1311 A/B)
GROUTING WORK INSPECTION
(COMPRESSIVE STRENGTH OF
HYOSUNG SIKA)
Aug,27,2019 Mr. Lee
49 GOODSPRINGS.I Laboratory (7 DAY) PP4-QC-PP-0010 HYG-HSVC1 PP4-RFI-ME-WT-0051 Acceptable Mr. Son
09:00 AM (HYG)
NC (GROUTING BASE : P-1302A/B/C, P-
1327A/B, P-1306A/B/C)
HYOSUNG
Sep,04,2019 BOX-UP INSPECTION F-1323A/B/C;
GOODSPRINGS.I WT Area PP4-QC-PP-0010 HYG-HSVC1 PP4-RFI-ME-WT-0057
8:00 AM F-1331A/B/C; F-1324A/B/C
NC
HSVC1 PP4 PROJECT
Update 6-Aug-2020
INSPECTION ATTENDEE
INSPECTION ITP No
S/N- SUB CON INSPECTION DATE INSPECTION ACTIVITY RFI No RESULT DOCUMENT STATUS REMARKS/ Reprot Number
LOCATION ITP Rev
SUB-CON eTEC HYOSUNG
- Padding Elevation
Aug,3,2019
HYOSUNG - Centerline inspection
2 (Saturday) WWT- TANKS AREA PP4-QC-PP-0011 HYG-HSVC1 PP4-RFI-ME WWT-0002 Acceptable
GOODSPRING * TK-1403; TK-1404; TK-1421; TK-
08:30 am
1422; D-1401
- Elevation
Aug,9,2019
HYOSUNG WWT-CHEMICAL & - Centerline inspection
4 (Friday) EQ-001-01 _ REV A HYG-HSVC1 PP4-RFI-ME WWT-0004 Acceptable
GOODSPRING BIOLOGLCAL * C1401A/B; C-1421A/B; TK-1405; Tk-
8:30 AM 1406; F-1401A/B
- Elevation
Aug,9,2019
HYOSUNG WWT-CHEMICAL & - Centerline inspection
5 (Friday) EQ-001-01 _ REV A HYG-HSVC1 PP4-RFI-ME WWT-0005 Acceptable
GOODSPRING BIOLOGLCAL * P-1423A/B; P-1424A/B; P-1425A/B;
8:30 AM
TK-1401; J-1401
- Elevation
Aug,12,2019 - Centerline inspection
HYOSUNG WWT-CHEMICAL & EQ-001-01
6 (Monday) * P-1408A/B., P-1421A/B/C., P- HYG-HSVC1 PP4-RFI-ME WWT-0006 Acceptable
GOODSPRING BIOLOGLCAL REV A
8:30 AM 1401A/B., P-1403A/B., P-1404A/B
- Elevation
Aug,16,2019
HYOSUNG WWT-CHEMICAL & - Centerline inspection
11 (Friday) EQ-001-01 REV A HYG-HSVC1 PP4-RFI-ME WWT-011 Acceptable
GOODSPRING BIOLOGLCAL * F-1421A/B, Z-1406, Z-1425A/B, A-
9:30 AM
1401, A-1402, A-1403
HSVC1 PP4 PROJECT
Update 6-Aug-2020
INSPECTION ATTENDEE
INSPECTION ITP No
S/N- SUB CON INSPECTION DATE INSPECTION ACTIVITY RFI No RESULT DOCUMENT STATUS REMARKS/ Reprot Number
LOCATION ITP Rev
Aug,21,2019
- ALIGNMENT INSPECTION REPORT
HYOSUNG (Wednesday) WWT-CHEMICAL &
12 (VERTICAL EQUIPMENT) PP4-QC-PP-0011 HYG-HSVC1 PP4-RFI-ME-WWT-012 Acceptable
GOODSPRING 8:30 AM BIOLOGLCAL
* E-1421A/B/C, F-1401A/B. TK-1401
Aug,21,2019
HYOSUNG WWT-CHEMICAL & - BASE GROUTING OF EQUIPMENT
13 (Wednesday) PP4-QC-PP-0011 HYG-HSVC1 PP4-RFI-ME-WWT-013 Acceptable
GOODSPRING BIOLOGLCAL * E-1421A/B/C, F-1401A/B. TK-1401
9:30 AM
- Padding Elevation
HYOSUNG 8:45 AM WWT-CHEMICAL & - Centerline inspection
15 PP4-QC-PP-0011 HYG-HSVC1 PP4-RFI-ME-WWT-015 Acceptable
GOODSPRING 23-AUG-2019 BIOLOGLCAL (D-1402., D-1403., P-
1407A/B)
Update 6-Aug-2020
INSPECTION ATTENDEE
INSPECTION ITP No
S/N- SUB CON INSPECTION DATE INSPECTION ACTIVITY RFI No RESULT DOCUMENT STATUS REMARKS/ Reprot Number
LOCATION ITP Rev