HSVC1 PP4-QA, QC Equipment Status Report - 20190904

You might also like

Download as xlsx, pdf, or txt
Download as xlsx, pdf, or txt
You are on page 1of 39

EQUIPMENT INSPECTION STATUS FOR PELLETIZER & ISBL

JOB NO. : G-17079


CLIENT : HYOSUNG VINA CHEMICALS CO., LTD.
PROJECT : HSVC1 PP4 PROJECT Date: 6/Aug/20

Miscellaneou
Description Vessel Column Heat Ex. Filter Reactor Agitator Fan & Blower Pump Package Total Ratio
s
Total Equipment 66 6 39 30 4 10 7 50 77 400 689
Last week

Foundation check 12 4 16 6 2 0 1 39 0 67 147 21.34%


7/Jul/19

Inspection Test
Mechanical

EQ installation 9 4 2 5 0 0 0 13 0 28 61 8.85%
Plan

Pre-alighment N/A N/A N/A N/A N/A N/A N/A 10 0 0 10 1.90%


Grouting 10 4 0 5 0 0 0 32 0 38 89 12.92%
Final inspection 0 0 0 0 0 0 0 0 0 0 0 0

Miscellaneou
This week (variation)

Description Vessel Column Heat Ex. Filter Reactor Agitator Fan & Blower Pump Package Total Ratio
s
Total Equipment 0 0 0 0 0 0 0 0 0 0 0
Foundation check 25 1 14 5 2 0 2 2 1 119 171
Inspection Test
Mechanical

EQ installation 15 1 23 4 0 0 1 28 0 106 178


Plan

Pre-alighment N/A N/A N/A N/A N/A N/A N/A 25 0 13 38


Grouting 3 0 15 2 2 0 1 9 0 88 120 0.2
Final inspection 0 0 0 0 0 0 0 0 0 0 0

Miscellaneou
Description Vessel Column Heat Ex. Filter Reactor Agitator Fan & Blower Pump Package Total Ratio
s
Total Equipment 66 6 39 30 4 10 7 50 77 400 689
Cumulation
6/Aug/20

Foundation check 37 5 30 11 4 0 3 41 1 186 318 46.15%


Inspection Test
Mechanical

EQ installation 24 5 25 9 0 0 1 41 0 134 239 34.69%


Plan

Pre-alighment N/A N/A N/A N/A N/A N/A N/A 35 0 13 48 9.11%


Grouting 13 4 15 7 2 0 1 41 0 126 209 30.33%
Final inspection 0 0 0 0 0 0 0 0 0 0 0 0
DETAIL EQUIPMENT INSPECTION STATUS FOR PELLETIZER & ISBL
JOB NO. G-17079
CLIENT HYOSUNG VINA CHEMICALS CO., LTD.
PROJECT HSVC1 PP4 PROJECT

R INSPECTION QUALITY CONTROL FLOW


No E ITEM NO. SERVICE QTY. SPECIFICATION P&ID REMARK REMARK
V FOUNDATION INSTALLATION PRE-ALIGHMENT GROUTING FINAL INSPECTION

689 318 242 187 209 0


45 2 D- 4802 INTERMEDIATE SURGE SILO 1 TYPE : VERTICAL
CAP. : 1176 M3 RFI-ME-0323 N/A
SIZE (OD X TL) : 8034 X 19000 MM
DETAIL EQUIPMENT INSPECTION STATUS FOR UTILITY AREA
JOB NO. :
CLIENT HYOSUNG VINA CHEMICALS CO., LTD.
PROJECT HSVC1 PP4 PROJECT

R INSPECTION QUALITY CONTROL FLOW


No E ITEM NO. SERVICE QTY. SPECIFICATION P&ID REMARK REMARK
V FOUNDATION INSTALLATION PRE-ALIGHMENT GROUTING FINAL INSPECTION

680 221 220 109 212 22


TANK 16 16 16 16 16 16
0 TK- 1001 PROPANE STORAGE TANK 1 TYPE : SPHERICAL 101
1 N/A N/A N/A N/A N/A
CAP. : 9,202.8 M3
0 TK- 1002 A-J PROPYLENE STORAGE TANKS 10 DIA: 26,000
TYPE MM
: SPHERICAL 103A/B/C/D/E
2 CAP. : 9,202.8 M3
N/A N/A N/A N/A N/A
1 TK- 1301 A/B FILTERED WATER TANKS 2 DIA: 26,000
TYPE : CONEMMROOF 132
3 CAP. : 1,166 M3 (WORKING)
N/A N/A N/A N/A N/A
0 TK- 1302 TREATED BOILER WATER TANK 1 SIZE (ID
TYPE X TL) ROOF
; CONE : 12,500 X 12,000 135
4 MM
CAP. : 1,008 M3 (WORKING)
N/A N/A N/A N/A N/A
1 TK- 1303 HIGH PURITY WATER TANK 1 SIZE (ID
TYPE X TL) ROOF
: CONE : 11,500 X 12,000 137
5 MM
CAP. : 1,300 M3 (WORKING)
N/A N/A N/A N/A N/A
2 TK- 1304 DOMESTIC WATER TANK 1 SIZE (ID
TYPE X TL) ROOF
: CONE : 13,000 X 12,000 138A
6 MM : 112 M3 (WORKING)
CAP
N/A N/A N/A N/A N/A
SIZE (ID X TL) : 5,100 X 7,000 MM
VESSEL 4 2 3 4 3 0
0 D- 1501 FUEL GAS KNOCKOUT DRUM FOR 1 TYPE : VERTICAL CYLINDRICAL 154
1 30TPH BOILER VOL : 1.3 M3
RFI-ME-0310 RFI-ME-0384 N/A
0 D- 1604 IA RECEIVER 1 SIZE
TYPE(ID X TL) : 800 X 2,400 MM
: HORIZONTAL 163 RFI-ME-0076 & RFI-
2 VOL : 159.5 M3
RFI-ME-0037 N/A
ME-0123
2 D- 1701 A/B COLD BLOW DOWN DRUM 2 SIZE (ID
TYPE X TL) : 3,800 X 12,800 MM
: VERTICAL 171 RFI-ME-0385(A- RFI-ME-0350(Anchor
3 CAP : 0.2 M3
N/A
Alignment) Box)
SIZE (ID X TL) : 500 X 1,000 MM
HEX 2 1 0 2 1 0
2 H- 1001 PROPANE VAPORIZER 1 TYPE : ELECTRIC HEATER 101
1 DUTY : 0.21 MCAL/H
N/A RFI-ME-0295 (base)
2 E- 1301 DEAERATOR PREHEATER 1 SIZE (ID
TYPE X L) :1000
: H-AFU, TWOX 4000
SHELLMM 137
2 DUTY : 859.948 KCAL/H
RFI-ME-0242 N/A
SIZE (ID X L) : 560 X 4000 MM
PUMP 31 AREA (EFF.) : 70.8 M2 29 18 16 23 3
NO. OF TUBES : U152
1 P- 1001 A/B PROPANE FEED PUMPS 2 TYPE : VERTICAL CAN PUMP 102
1 CAP. : 220 M3/H
RFI-ME-0373 RFI-ME-0333 (anchor)
1 P- 1002 A-D PROPYLENE FEED PUMPS 4 HEAD :: VERTICAL
TYPE 423M CAN PUMP 104A~B
2 SP.GR
CAP. : 120: 0.511(WINTER)
M3/H
RFI-ME-0365
HEAD 0.467(SUMMER)
1 P- 1003 A/B PROPYLENE EXPORT PUMPS 2 TYPE :: VERTICAL
SEAL TYPE
376M
: DUALCAN PUMP
MECH. SEAL 105
3 SP.GR
CAP. : : 0.525(WINTER)
420 M3/H
RFI-ME-0365
DRIVER :0.477(SUMMER)
ELECTRIC
0 P- 1004 A/B PROPYLENE TRANSFER PUMPS 2 HEAD :: VERTICAL
TYPE TYPE 170M
4 SEAL
SP.GR : DUALCAN
: 0.477
PUMP
MECH. SEAL 106
RFI-ME-0365
CAP. : 100
DRIVER M3/H
: ELECTRIC
SEAL
HEAD TYPE
: 100M : DUAL MECH. SEAL RFI-ME-0104(anchor)
1 P- 1101 A/B 2 TYPE : CENTRIFUGAL
DRIVER : ELECTRIC 111A
5 SP.GR
CAP. : 40 : 0.477
M3/H
RFI-ME-0044 RFI-ME-0139 RFI-ME-0123-1 & RFI-ME-
SEAL TYPE
HEAD : 599M : DUAL MECH. SEAL 0158A(base)
2 P- 1201 A~E COOLING WATER PUMPS 5 TYPE
DRIVER : CENTRIFUGAL
: ELECTRIC 123 RFI-ME-0356 (Anchor
6 SP.GR : 0.947
CAP. : 3,500 M3/H
RFI-ME-0322
Bolt)
SEAL
HEAD TYPE 55M : SINGLE MECH.
2 P- 1301 A/B/C RAW WATER POND PUMPS 3 TYPE
SEAL :: CENTRIFUGAL 131A RFI-ME-0299 (anchor)
7 SP.GR
CAP. : 550: 0.994
M3/H
RFI-ME-0298 RFI-ME-0339-1 RFI-ME-0339 RFI-ME-0405
DRIVER : ELECTRIC & RFI-ME-0340 (base)
SEAL TYPE 55 M: SINGLE MECH.
HEAD :: CENTRIFUGAL
1 P- 1303 A/B/C C.W MAKE UP PUMPS 3 TYPE
SEAL 133 RFI-ME-0256 (anchor)
8 SP.GR
CAP. : 450: 0.995
M3/H
RFI-ME-0242 RFI-ME-0340-1 RFI-ME-0315
DRIVER : ELECTRIC & RFI-ME-0325 (base)
SEAL TYPE
HEAD 40M : SINGLE MECH.
1 P- 1304 FILTERED WATER PUMP 1 TYPE
SEAL :: CENTRIFUGAL 133 RFI-ME-0256 (anchor)
9 SP.GR
CAP. : 20 : 0.995 RFI-ME-0242 RFI-ME-0340-1 RFI-ME-0315
DRIVER
SEAL TYPE : M3/H
ELECTRIC & RFI-ME-0325 (base)
1 P- 1305 A/B/C TREATED BOILER WATER PUMPS 3 HEAD
TYPE : 60M : SINGLE MECH.
: CENTRIFUGAL 135 RFI-ME-0256 (anchor)
10 SEAL : 0.995
SP.GR RFI-ME-0242 RFI-ME-0340-1 RFI-ME-0315
CAP. : 60: M3/H
DRIVER ELECTRIC & RFI-ME-0325 (base)
SEAL TYPE
HEAD : 57M : SINGLE MECH.
2 P- 1307 A/B DEAERATOR FEED PUMPS 2 TYPE
SEAL : :CENTRIFUGAL 137 RFI-ME-0256 (anchor)
11 SP.GR
CAP. 400.983
RFI-ME-0242 RFI-ME-0340-1 RFI-ME-0315
DRIVER
SEAL TYPE :M3/H
ELECTRIC & RFI-ME-0325 (base)
2 P- 1309 A/B DOMESTIC WATER PUMPS 2 HEAD
TYPE : 50M : SINGLE MECH.
: CENTRIFUGAL 138 RFI-ME-0334 (anchor)
12 SEAL : 0.983
SP.GR RFI-ME-0301 RFI-ME-0347 RFI-ME-0341
CAP.
DRIVER 12+MIN FLOW(4.5) M3/H
: ELECTRIC & RFI-ME-0342 (base)
SEAL
HEAD TYPE
: 40M : SINGLE MECH.
Boiler(PKG.) 22 SEAL : 0.995
SP.GR 8 9 20 7 0
DRIVER
SEAL TYPE : ELECTRICS
: SINGLE MECH.
Chemical Dosing(PKG.) 16 SEAL 16 16 16 16 0
DRIVER : ELECTRIC
Water Treatment(PKG.) 95 72 65 22 55 3

Waste Water Treatment(PKG.) 405 8 24 13 24 0

Air Compressor(PKG.) 66 66 66 0 66 0

Miscellaneous 23 3 3 0 1 0
DETAIL EQUIPMENT INSPECTION STATUS FOR UTILITY AREA
JOB NO. :
CLIENT HYOSUNG VINA CHEMICALS CO., LTD.
PROJECT HSVC1 PP4 PROJECT
P INSPECTION QUALITY CONTROL FLOW
R
A
No E ITEM NO. SERVICE QTY. SPECIFICATION P&ID REMARK FLUID
R
REMARK
V FOUNDATION INSTALLATION PRE-ALIGHMENT GROUTING FINAL INSPECTION
T

71 #REF! #REF! #REF! #REF! #REF!


0 P 2203 A/B ETHYLENE SHIP LOADING PUMPS 2 TYPE : VERTICAL CAN 223
RFI-ME-0332(Anchor
2 RFI-ME-0419 Box) & RFI-ME-
CAP. : 356.4 M3/H
HEAD :: VESSEL
100 M (VERTICAL)
0420(Anchor box)
2 Z 2203 A/B P-2203A/B SEAL PACKING FLUSHING 2 TYPE 223
4 SP.GR : 0.562
SEAL TYPE : DUAL MECH. SEAL
DRIVER : ELECTRIC
HSVC1 PP4 PROJECT

Client SUMMARY OF MECHANICAL INSPECTION SCHEDULE EPC Contractor

Update 6-Aug-2020

INSPECTION ATTENDEE
INSPECTION ITP No
S/N- SUB CON INSPECTION DATE INSPECTION ACTIVITY RFI No RESULT DOCUMENT STATUS REMARKS/ Reprot Number
LOCATION ITP Rev
SUB-CON eTEC HYOSUNG

May 3, 2019 Center line & Padding for Foundation Mr. Thai
1 YSE/PTSC Pelletizer area PP4-QC-PP-0010 Rev. A YSE-HSVC1 PP4-RFI-ME-0001 Acceptable DONE Mr. Phuc Mr. Dinh
08:00AM ZR-4801 & ZM-4801 (PTCS)

Center line & Padding for Foundation


Z-4804~4804, ZM-4804, ZR-4804, Z-
4803, Z-4801A, ZM-4801A, N2 Purge
May 7, 2019 Unit, E-4808A/B, F-4808A/B, P- Mr. Thai
2 YSE/PTSC Pelletizer area PP4-QC-PP-0010 Rev. A YSE-HSVC1 PP4-RFI-ME-0002 Acceptable DONE Mr. Cuong Mr. Dinh
08:00AM 4808A/B, Lube Oil Unit for Mixer (PTCS)
Motor, Lube Oil Unit for mixer G/R,
CCW Unit, Control Panel, Local
Start-up panel, Z-4808A/B, D-4808

Center line & Padding for Foundation


T-4302, D-4606
May 9, 2019 Mr. Thai
3 YSE/PTSC Pelletizer area, ISBL Lube oil unit for mizer motor, Lube PP4-QC-PP-0010 Rev. A YSE-HSVC1 PP4-RFI-ME-0003 Acceptable DONE Mr. Cuong Mr. Dinh
08:00AM (PTCS)
oil unit for mixer G/R, D-4830, Lube
oil unit for gear pump GR

May 14 2019 Center line & Padding for foundation Mr. Thai
4 YSE/PTSC ISBL PP4-QC-PP-0010 Rev. A YSE-HSVC1 PP4-RFI-ME-0004 Acceptable DONE Mr. Cuong Mr. Dinh
08:00AM of D-4304, T-4501, T-4701, D-4302 (PTCS)

Center line & Padding for foundation


May 15 2019 Mr. Thai
5 YSE/PTSC ISBL of T-4703A, T-4703B, T-4710, T- PP4-QC-PP-0010 Rev. A YSE-HSVC1 PP4-RFI-ME-0005 Acceptable DONE Mr. Cuong Mr. Dinh
08:00AM (PTCS)
4711

May 16 2019 Mr. Thai


6 YSE/PTSC ISBL Sika Grout 214-11 (200 bag) PP4-QC-PP-0010 Rev. A YSE-HSVC1 PP4-RFI-ME-0006 Acceptable DONE Mr. Cuong Mr. Dinh
08:00AM (PTCS)

Center line & Padding for foundation


May 17 2019 of D-4611, T-4705A, T-4705B Mr. Thai
7 YSE/PTSC ISBL PP4-QC-PP-0010 Rev. A YSE-HSVC1 PP4-RFI-ME-0007 Acceptable DONE Mr. Cuong Mr. Dinh
08:00AM Vertical alighment for D-4606, D- (PTCS)
4304

May 18 2019 Center line & Padding for foundation Mr. Thai
8 YSE/PTSC ISBL PP4-QC-PP-0010 Rev. A YSE-HSVC1 PP4-RFI-ME-0008 Acceptable DONE Mr. Cuong Mr. Dinh
08:00AM of C-4610, D-4009, D-4604 (PTCS)

May 21 2019 Mr. Thai


9 YSE/PTSC ISBL Vertical alighment for T-4302, E-4304 PP4-QC-PP-0010 Rev. A YSE-HSVC1 PP4-RFI-ME-0009 Acceptable DONE Mr. Cuong Mr. Dinh
08:00AM (PTCS)

Center line & Padding for foundation


May 22 2019 Mr. Thai
10 YSE/PTSC ISBL of E-4302, T-4502, F-4201A, F- PP4-QC-PP-0010 Rev. A YSE-HSVC1 PP4-RFI-ME-0010 Acceptable DONE Mr. Cuong Mr. Dinh P-4603AB inspected by 24/5
08:00AM (PTCS)
4201B, P-4603A, P-4603B

Vertical alighment for D-4604, D-


May 24 2019 4611 Mr. Thai
11 YSE/PTSC ISBL PP4-QC-PP-0010 Rev. A YSE-HSVC1 PP4-RFI-ME-0011 Acceptable DONE Mr. Cuong Mr. Dinh
08:00AM Center line & Padding for foundation (PTCS)
of F-4701
HSVC1 PP4 PROJECT

Client SUMMARY OF MECHANICAL INSPECTION SCHEDULE EPC Contractor

Update 6-Aug-2020

INSPECTION ATTENDEE
INSPECTION ITP No
S/N- SUB CON INSPECTION DATE INSPECTION ACTIVITY RFI No RESULT DOCUMENT STATUS REMARKS/ Reprot Number
LOCATION ITP Rev

Vertical alighment for T-4501, T-


May 27 2019 4502, T-4701 Mr. Thai
12 YSE/PTSC ISBL PP4-QC-PP-0010 Rev. A YSE-HSVC1 PP4-RFI-ME-0012 Acceptable DONE Mr. Cuong Mr. Dinh
08:00AM Center line & Padding for foundation (PTCS)
of D-4707, P-4701A/B, P-4304A/B

Center line & Padding for foundation


May 29 2019 Acceptable with Mr. Thai P-4106B & P-4502B was
13 YSE/PTSC ISBL of P-4105A/B, E-4305, P-4106A/B, P- PP4-QC-PP-0010 Rev. A YSE-HSVC1 PP4-RFI-ME-0013 SUBMITTED TO HSVC Mr. Cuong Mr. Dinh
08:00AM comment (PTCS) rejected
4601A/B, P-4501A/B, P-4502A/B,

- Center line & Padding for


May 30 2019 foundation of E-4703 Acceptable with Mr. Thai D-4302 hasn't tightened anchor
14 YSE/PTSC ISBL - Vertically and horizontally PP4-QC-PP-0010 Rev. A YSE-HSVC1 PP4-RFI-ME-0014 SUBMITTED TO HSVC Mr. Cuong Mr. Dinh
08:00AM comment (PTCS) bolts yet
alignment of E-4501, D-4302

- Center line & Padding for


May 31 2019 Mr. Thai
15 YSE/PTSC ISBL foundation of Z-4810, Z-4813 PP4-QC-PP-0010 Rev. A YSE-HSVC1 PP4-RFI-ME-0015 Acceptable SUBMITTED TO HSVC Mr. Cuong Mr. Dinh
08:00AM (PTCS)

- Center line & Padding for


May 31 2019 Mr. Thai
16 YSE/PTSC ISBL foundation of D-4114 PP4-QC-PP-0010 Rev. A YSE-HSVC1 PP4-RFI-ME-0016 Acceptable SUBMITTED TO HSVC Mr. Cuong Mr. Dinh
08:00AM (PTCS)

- Center line & Padding for


June 1, 2019 foundation of E-4710, E-4711, E- Mr. Thai
17 YSE/PTSC ISBL PP4-QC-PP-0010 Rev. A YSE-HSVC1 PP4-RFI-ME-0017 Acceptable SUBMITTED TO HSVC Mr. Cuong Mr. Dinh
08:00AM 4712, P-4113, P-4205, P-4206 (PTCS)

- Center line & Padding for


June 3, 2019 Mr. Khôi
18 YSE/PTSC ISBL foundation of E-4502A, E-4502B PP4-QC-PP-0010 Rev. A YSE-HSVC1 PP4-RFI-ME-0018 Acceptable SUBMITTED TO HSVC Mr. Cuong Mr. Dinh
08:00AM (PTCS)

-Grouting Anchor Bots and Base plate


of D-4302 Equipment. D-4302 grouting is kept until
June 3, 2019 Mr. Khôi
19 YSE/PTSC ISBL PP4-QC-PP-0010 Rev. A YSE-HSVC1 PP4-RFI-ME-0019 Acceptable SUBMITTED TO HSVC Mr. Cuong Mr. Dinh post-grouting check and
08:00AM (PTCS)
sample testing

- Centerline, Padding Inspection


* P-4106B, P-4502B
- Centerline Inspection
* D-4804, D-4805, D-4809
June 4, 2019 Mr. Khôi
20 YSE/PTSC ISBL - Levelling,Centerline, Elev, Grouting PP4-QC-PP-0010 Rev. A YSE-HSVC1 PP4-RFI-ME-0020 Acceptable SUBMITTED TO HSVC Mr. Cuong Mr. Dinh
08:00AM (PTCS)
Poket Inspection
ZR-4801, Z-4803

- Centerline, Padding Inspection


June 5, 2019 * P-4107A/B, P-4110A/B Mr. Khôi
21 YSE/PTSC ISBL P-4309A/B, T-4503A/B PP4-QC-PP-0010 Rev. A YSE-HSVC1 PP4-RFI-ME-0021 Acceptable SUBMITTED TO HSVC Mr. Cuong Mr. Dinh T-4503A/B were be rejected
08:00AM (PTCS)

- Centerline, Padding Inspection


* E-4610, P-4602, P-4103, D-4115, E-
4209, P-4303A, P-4605
P-4606A/B,
June 6, 2019 * D-4825 Mr. Khôi D-4707, D-4114 were be
22 YSE/PTSC ISBL PP4-QC-PP-0010 Rev. A YSE-HSVC1 PP4-RFI-ME-0022 Acceptable SUBMITTED TO HSVC Mr. Cuong Mr. Dinh
08:00AM - Anchor Pocket Grouting Inspection (PTCS) cancel
- D-4707,D-4114

- Anchor Pocket Grouting Inspection


June 6, 2019 - Z-4813 Mr. Khôi
23 YSE/PTSC
08:00AM
ISBL PP4-QC-PP-0010 Rev. A YSE-HSVC1 PP4-RFI-ME-0023 Cancel (PTCS)
Mr. Cuong Mr. Dinh
HSVC1 PP4 PROJECT

Client SUMMARY OF MECHANICAL INSPECTION SCHEDULE EPC Contractor

Update 6-Aug-2020

INSPECTION ATTENDEE
INSPECTION ITP No
S/N- SUB CON INSPECTION DATE INSPECTION ACTIVITY RFI No RESULT DOCUMENT STATUS REMARKS/ Reprot Number
LOCATION ITP Rev
-Centerline, Pading Inspection
June 7, 2019 - PK-4601, T-4503A/B Mr. Khôi
24 YSE/PTSC ISBL PP4-QC-PP-0010 Rev. A YSE-HSVC1 PP4-RFI-ME-0024 Acceptable SUBMITTED TO HSVC Mr. Cuong Mr. Dinh
08:00AM (PTCS)

- Grouting Anchor Bolt Pocket


- Z4804-Z4807 Z4804~4807 anchor bolt
June 7, 2019 Mr. Khôi
25 YSE/PTSC ISBL Permanent Rail PP4-QC-PP-0010 Rev. A YSE-HSVC1 PP4-RFI-ME-0025 Acceptable SUBMITTED TO HSVC Mr. Cuong Mr. Dinh grouting is kept until post-
08:00AM (PTCS)
grouting

- Grouting Anchor Bolt Pocket


* P-4601A/B, P-4106A/B, P-4206, D-
4114, D-4707
- Centerline,Pading Elevation Inspection * P-4601A/B, P-4106A/B, P-
June 8, 2019 * D-4004, F-4702A/B, PK-4301, E-4702 Mr. Khôi 4206, D-4114, D-4707 anchor
26 YSE/PTSC ISBL PP4-QC-PP-0010 Rev. A YSE-HSVC1 PP4-RFI-ME-0026 Acceptable SUBMITTED TO HSVC Mr. Cuong Mr. Dinh
08:00AM (PTCS) bolt grouting it kept until post
grouting

Sika Test (7 days)


June 10, 2019 (Foundation D-4302 ) Mr. Khôi
27 YSE/PTSC ISBL PP4-QC-PP-0010 Rev. A YSE-HSVC1 PP4-RFI-ME-0027 Acceptable Mr. Cuong Mr. Dinh
08:00AM (PTCS)

'- Centerline, Padding Inspection


June 10, 2019 * P-4808A/B Mr. Khôi
28 YSE/PTSC ISBL * D-4509, D-4510, P-4301A/B PP4-QC-PP-0010 Rev. A YSE-HSVC1 PP4-RFI-ME-0028 Acceptable SUBMITTED TO HSVC Mr. Cuong Mr. Dinh
08:00AM (PTCS)

- Centering,Elevation check and


June 10, 2019 Grounting 2nd layer Mr. Khôi
29 YSE/PTSC
08:00AM
ISBL - Z-4804 - Z-4807 PP4-QC-PP-0010 Rev. A YSE-HSVC1 PP4-RFI-ME-0029 Cancel (PTCS)
Mr. Cuong

- Centering,Elevation check and


Grounting Anchor Bolts
June 11, 2019 * P4105A, P4110A/B, P-4107A/B, P- Mr. Khôi
30 YSE/PTSC ISBL 4606A/B, P-4605, P-4808A/B, P-4303A PP4-QC-PP-0010 Rev. A YSE-HSVC1 PP4-RFI-ME-0030 Acceptable ETEC KEEPING Mr. Cuong Mr. Dinh
08:00AM (PTCS)

- Sika Test (7 days) Grouting for Z-4801,


June 11, 2019 Z4803 Mr. Khôi
31 YSE/PTSC ISBL PP4-QC-PP-0010 Rev. A YSE-HSVC1 PP4-RFI-ME-0031 Acceptable SUBMITTED TO HSVC Mr. Cuong Mr. Dinh
08:00AM (PTCS)

- Centerline, Padding Inspection


June 12, 2019 * F-4601, P-4109, P-4302A/B Mr. Khôi
32 YSE/PTSC ISBL P-4401, R-4201, R-4202 PP4-QC-PP-0010 Rev. A YSE-HSVC1 PP4-RFI-ME-0032 Acceptable SUBMITTED TO HSVC Mr. Cuong Mr. Dinh
08:00AM (PTCS)

- Centerline Inspection
June 13, 2019 * F-4812, Z-4811, W-4804, W-4805, W- Mr. Khôi - Foundation not yet done W-
33 YSE/PTSC ISBL 4809 PP4-QC-PP-0010 Rev. A YSE-HSVC1 PP4-RFI-ME-0033 Acceptable SUBMITTED TO HSVC Mr. Cuong Mr. Dinh
08:00AM (PTCS) 4804/4805/4809

- Base Grouting
June 13, 2019 * Z-4803, ZR-4801 Mr. Khôi
34 YSE/PTSC ISBL PP4-QC-PP-0010 Rev. A YSE-HSVC1 PP4-RFI-ME-0034 Acceptable SUBMITTED TO HSVC Mr. Cuong Mr. Dinh
08:00AM (PTCS)

- Base Grouting
June 14, 2019 * T-4501, T-4502, T-4701,D-4604, D- Mr. Khôi
35 YSE/PTSC ISBL 4606, D-4304, D-4611 PP4-QC-PP-0010 Rev. A YSE-HSVC1 PP4-RFI-ME-0035 Acceptable SUBMITTED TO HSVC Mr. Cuong Mr. Dinh
08:00AM (PTCS)
T-4302
- Grouting Sample test
June 14, 2019 * Z-4804-Z4807 Permanent Rail1 Mr. Khôi
36 YSE/PTSC ISBL PP4-QC-PP-0010 Rev. A YSE-HSVC1 PP4-RFI-ME-0036 Acceptable SUBMITTED TO HSVC Mr. Cuong Mr. Dinh
08:00AM (PTCS)
HSVC1 PP4 PROJECT

Client SUMMARY OF MECHANICAL INSPECTION SCHEDULE EPC Contractor

Update 6-Aug-2020

INSPECTION ATTENDEE
INSPECTION ITP No
S/N- SUB CON INSPECTION DATE INSPECTION ACTIVITY RFI No RESULT DOCUMENT STATUS REMARKS/ Reprot Number
LOCATION ITP Rev
- Centerline ,Padding Inspection
June 14, 2019 * D-1604 Mr. Khôi
37 YSE/PTSC Boiler, Utility PP4-QC-PP-0010 Rev. A YSE-HSVC1 PP4-RFI-ME-0037 Acceptable SUBMITTED TO HSVC Mr. Cuong Mr. Dinh
08:00AM (PTCS)

- Sika 214-11 Material receive


June 15, 2019 Mr. Khôi
38 YSE/PTSC ISBL PP4-QC-PP-0010 Rev. A YSE-HSVC1 PP4-RFI-ME-0038 Acceptable SUBMITTED TO HSVC Mr. Cuong Mr. Dinh
08:00AM (PTCS)

- Anchor bolt grouting


June 15, 2019 * ZM-4801 Mr. Khôi
39 YSE/PTSC ISBL PP4-QC-PP-0010 Rev. A YSE-HSVC1 PP4-RFI-ME-0039 Acceptable SUBMITTED TO HSVC Mr. Cuong Mr. Dinh
08:00AM (PTCS)

- Sika Test ( 7 days)


June 15, 2019 * P-4601A/B, P-4106A/B, P-4206, D- Mr. Khôi
40 YSE/PTSC ISBL 4114, D-4707 PP4-QC-PP-0010 Rev. A YSE-HSVC1 PP4-RFI-ME-0040 Acceptable SUBMITTED TO HSVC Mr. Cuong Mr. Dinh
08:00AM (PTCS)

- Centerline, Padding Inspection


June 15, 2019 * PK-1101 Mr. Khôi
41 YSE/PTSC Boiler, Utility PP4-QC-PP-0010 Rev. A YSE-HSVC1 PP4-RFI-ME-0041 Acceptable SUBMITTED TO HSVC Mr. Cuong Mr. Dinh
08:00AM (PTCS)

- Centerline, Padding Inspection


June 16, 2019 * E-4204, P-4203,P-4204, E-4205, E- Mr. Khôi
42 YSE/PTSC ISBL 4201 PP4-QC-PP-0010 Rev. A YSE-HSVC1 PP4-RFI-ME-0042 Acceptable SUBMITTED TO HSVC Mr. Cuong Mr. Dinh
08:00AM (PTCS)

- Alignment, Tightening Anchor Bolts


June 16, 2019 Inspection
43 YSE/PTSC
08:00AM
ISBL * R-4202 PP4-QC-PP-0010 Rev. A YSE-HSVC1 PP4-RFI-ME-0043 Cancel

- Centreline,Padding Inspection
June 18, 2019 -P-1101A/B, PK-1601A/B/C Mr. Khôi
44 YSE/PTSC ISBL and Boiler, Utility PK-1602A/B/C PP4-QC-PP-0010 Rev. A YSE-HSVC1 PP4-RFI-ME-0044 Acceptable Mr. Cuong Mr. Dinh
08:00AM (PTCS)
-PK-4501, PK4603, PK-4709A/B
'- Bolts Tightening and anchor bolts
June 18, 2019 tightening of ZR-4801, Z-4803 Mr. Khôi
45 YSE/PTSC ISBL PP4-QC-PP-0010 Rev. A YSE-HSVC1 PP4-RFI-ME-0045 Acceptable Mr. Cuong Mr. Dinh
08:00AM (PTCS)

- Grouting Anchor Bolts


- P-4603A/B, P-4304A/B, P-4502A/B, P-
4501A/B, P-4309A/B, P-4302A/B P-4309A/B, P-4302A/B to be
June 18, 2019 Mr. Khôi
46 YSE/PTSC ISBL PP4-QC-PP-0010 Rev. A YSE-HSVC1 PP4-RFI-ME-0046 Acceptable ETEC KEEPING Mr. Cuong Mr. Dinh cancel due to not enough sika
08:00AM (PTCS)
material

-Sika Test (7 days)


June 18, 2019 - P-4105A/B, P-4107A/B, P-4110A/B, P- Mr. Khôi
47 YSE/PTSC ISBL 4606A/B, P-4605, P-4304A PP4-QC-PP-0010 Rev. A YSE-HSVC1 PP4-RFI-ME-0047 Acceptable Mr. Cuong Mr. Dinh
08:00AM (PTCS)

-Sika 214-11 Inspection


June 18, 2019 Mr. Khôi
48 YSE/PTSC ISBL PP4-QC-PP-0010 Rev. A YSE-HSVC1 PP4-RFI-ME-0048 Acceptable Mr. Cuong Mr. Dinh
08:00AM (PTCS)

- Check Level Rail Overhead Crane


June 19, 2019 Maintenance shop & Mr. Khôi Out of tolerance but there is
49 YSE/PTSC YSE-HSVC1 PP4-RFI-ME-0049 Acceptable Mr. Cuong Mr. Dinh
08:00AM spare Warehouse (PTCS) technical confirm

- Pre-aligment before grouting


June 19, 2019 * P-4601A/B Mr. Khôi
50 YSE/PTSC ISBL PP4-QC-PP-0010 Rev. A YSE-HSVC1 PP4-RFI-ME-0050 Acceptable Mr. Cuong Mr. Dinh
08:00AM (PTCS)

- Grout Anchor Bolt


June 19, 2019 * P-4701A/B, P-4113, P-4205, P-4206
51 YSE/PTSC
08:00AM
ISBL * Z-4808A/B, D-4808, F-4808A/B, E- PP4-QC-PP-0010 Rev. A YSE-HSVC1 PP4-RFI-ME-0051 Cancel
4808A/B
HSVC1 PP4 PROJECT

Client SUMMARY OF MECHANICAL INSPECTION SCHEDULE EPC Contractor

Update 6-Aug-2020

INSPECTION ATTENDEE
INSPECTION ITP No
S/N- SUB CON INSPECTION DATE INSPECTION ACTIVITY RFI No RESULT DOCUMENT STATUS REMARKS/ Reprot Number
LOCATION ITP Rev
- Sika Test (7 days)
June 21, 2019 + Z-4803, ZR-4801 Mr. Khôi
52 YSE/PTSC ISBL * T-4501, T-4502, T-4701, D-4604, D- PP4-QC-PP-0010 Rev. A YSE-HSVC1 PP4-RFI-ME-0052 Acceptable Mr. Cuong Mr. Dinh
08:00AM (PTCS)
4606, D-4304, D-4611, T-4302."
- Sika 214-11 (200 bags)
June 21, 2019 Mr. Khôi
53 YSE/PTSC ISBL PP4-QC-PP-0010 Rev. A YSE-HSVC1 PP4-RFI-ME-0053 Acceptable Mr. Cuong Mr. Dinh
08:00AM (PTCS)

- Grouting Anchor Bols


"- Z-4808A/B, D-4808, F-4808A/B, E-
4808A/B
June 21, 2019 - P4701A/B, P4113, P4205, P4309A/B,
54 YSE/PTSC
08:00AM
ISBL PP4-QC-PP-0010 Rev. A YSE-HSVC1 PP4-RFI-ME-0054 Cancel condition is not ready
P4302A/B"

- Grouting Anchor Bols


"- Z-4808A/B, D-4808, F-4808A/B, E-
4808A/B
June 22, 2019 - P4701A/B, P4113, P4205, P4309A/B, Mr. Khôi
55 YSE/PTSC ISBL PP4-QC-PP-0010 Rev. A YSE-HSVC1 PP4-RFI-ME-0054A Acceptable ETEC KEEPING Mr. Cuong Mr. Dinh
08:00AM P4302A/B" (PTCS)

- Alignment of Mixer Motor and Mixer


June 22, 2019 Gear Reducer Mr. Khôi
56 YSE/PTSC Pelletizer ZM-4801 & ZR-4801 PP4-QC-PP-0010 Rev. A YSE-HSVC1 PP4-RFI-ME-0055 Acceptable Mr. Cuong Mr. Dinh
09:00 AM (PTCS)

- Grout Base Plate Mixer Motor


June 22, 2019 * ZM-4801 Mr. Khôi ZM-4801 base grouting to be
57 YSE/PTSC Pelletizer PP4-QC-PP-0010 Rev. A YSE-HSVC1 PP4-RFI-ME-0056 Acceptable ETEC KEEPING Mr. Cuong Mr. Dinh
09:00 AM (PTCS) kept until post-grout

- Sika Test Anchor Bolts


June 22, 2019 (7 days) Mr. Khôi
58 YSE/PTSC Pelletizer * ZM-4801 PP4-QC-PP-0010 Rev. A YSE-HSVC1 PP4-RFI-ME-0057 Acceptable Mr. Cuong Mr. Dinh
09:00 AM (PTCS)

- Centerline, Padding Inspection


June 22, 2019 * PK-4702A, PK-4701, PK-4502 Mr. Khôi
59 YSE/PTSC ISBL, Boiler * E-1101, Z-1101 PP4-QC-PP-0010 Rev. A YSE-HSVC1 PP4-RFI-ME-0058 Acceptable Mr. Cuong Mr. Dinh
10:00 AM (PTCS)

- Checking centerline and Grouting


June 24, 2019 Achor Bolts Mr. Khôi PK-4611 anchor box grouting
60 YSE/PTSC ISBL * PK-4601 PP4-QC-PP-0010 Rev. A YSE-HSVC1 PP4-RFI-ME-0059 Acceptable ETEC KEEPING Mr. Cuong Mr. Dinh
8:00 AM (PTCS) to be kept until post-grout

- Centerline, Padding Inspection


June 25, 2019 * D-1102, D-1103 Chemical Dosing Mr. Khôi
61 YSE/PTSC ISBL, Boiler System PP4-QC-PP-0010 Rev. A YSE-HSVC1 PP4-RFI-ME-0060 Acceptable Mr. Cuong Mr. Dinh
8:00 AM (PTCS)
* D-4807

- Sika Test ( 7 days)


June 25, 2019 P-4603A/B, P-4304A/B, P-4502A/B, P- Mr. Khôi
62 YSE/PTSC Lab 4501A/B PP4-QC-PP-0010 Rev. A YSE-HSVC1 PP4-RFI-ME-0061 Acceptable Mr. Cuong Mr. Dinh
8:00 AM (PTCS)

- Grouting Anchor Bols.


June 25, 2019 * D-4509, D-4510, T-4503A/B, F-4201, ITP No.: PP4-QC-PP- Mr. Khôi DOC of anchor box grouting
63 YSE/PTSC ISBL P-4109, F-4702A/B, F-4701 YSE-HSVC1 PP4-RFI-ME-0062 Acceptable ETEC KEEPING Mr. Cuong Mr. Dinh
8:00 AM 0011 (PTCS) to be kept until post-grout

- Alignment Plumbing Vertical .


June 25, 2019 * T-4705A/B, T-4710. T-4711, T- Mr. Khôi ask construction confirm about
64 YSE/PTSC ISBL 4703A/B PP4-QC-PP-0010 Rev. A YSE-HSVC1 PP4-RFI-ME-0063 Acceptable Mr. Cuong Mr. Dinh
8:00 AM (PTCS) project of T-4710, T-4711

- Pre-Alignment Shaft before Grouting .


June 26, 2019 * P-4106A/B, P-4606A/B, P-4605, P- ITP No.: PP4-QC-PP- Acceptable with Mr. Khôi P-4106A/B didn't check pre-
65 YSE/PTSC ISBL 4303, P-4501A/B YSE-HSVC1 PP4-RFI-ME-0064 Mr. Cuong Mr. Dinh
8:00 AM 0011 comment (PTCS) alignment
HSVC1 PP4 PROJECT

Client SUMMARY OF MECHANICAL INSPECTION SCHEDULE EPC Contractor

Update 6-Aug-2020

INSPECTION ATTENDEE
INSPECTION ITP No
S/N- SUB CON INSPECTION DATE INSPECTION ACTIVITY RFI No RESULT DOCUMENT STATUS REMARKS/ Reprot Number
LOCATION ITP Rev
- Centerline, Padding Inspection.
June 26, 2019 * Support PK-1101, SP-2 ITP No.: PP4-QC-PP- Mr. Khôi
66 YSE/PTSC Boiler YSE-HSVC1 PP4-RFI-ME-0065 Acceptable Mr. Cuong Mr. Dinh
8:00 AM 0011 (PTCS)

- Checking Anchor Bolt and Tightening


June 26, 2019 of Mixer Motor. ITP No.: PP4-QC-PP- Mr. Khôi
67 YSE/PTSC Pelletizer * ZM-4801 YSE-HSVC1 PP4-RFI-ME-0066 Acceptable Mr. Cuong Mr. Dinh
8:00 AM 0011 (PTCS)

- Checking Alignment After Grouting of


June 26, 2019 Mixer Motor. ITP No.: PP4-QC-PP- Mr. Khôi
68 YSE/PTSC Pelletizer * ZM-4801 YSE-HSVC1 PP4-RFI-ME-0067 Acceptable Mr. Cuong Mr. Dinh
8:00 AM 0011 (PTCS)

- Sika Inspection
June 26, 2019 * Sika 214-11 ITP No.: PP4-QC-PP- Mr. Khôi
69 YSE/PTSC ISBL * Sika dur 42mp YSE-HSVC1 PP4-RFI-ME-0068 Acceptable Mr. Cuong Mr. Dinh
8:00 AM 0011 (PTCS)

- Checking Centerline and Base Grouting.


June 27 2019 * T-4705A/B, T-4710. T-4711, T- ITP No.: PP4-QC-PP- Mr. Khôi DOC of grouting to be kept
70 YSE/PTSC ISBL Area 4703A/B YSE-HSVC1 PP4-RFI-ME-0069 Acceptable ETEC KEEPING Mr. Cuong Mr. Dinh
08.00AM 0011 (PTCS) until post-grout

- Checking Leveling and Distance Rail of


June 27 2019 Maintenance Shop & Overhead Crance. Mr. Khôi
71 YSE/PTSC * Z-1501, Z-1502 YSE-HSVC1 PP4-RFI-ME-0070 Acceptable Mr. Cuong Mr. Dinh
08.00AM Spare Warehouse (PTCS)

- Pre-Alignment shaft before grouting.


June 27 2019 * P-4205, P-4206 ITP No.: PP4-QC-PP- Mr. Khôi
72 YSE/PTSC ISBL Area YSE-HSVC1 PP4-RFI-ME-0071 Acceptable Mr. Cuong Mr. Dinh
08.00AM 0011 (PTCS)

- Centerline, Padding Inspection.


June 27 2019 * Z-1107 ITP No.: PP4-QC-PP- Mr. Khôi
73 YSE/PTSC Utility Area YSE-HSVC1 PP4-RFI-ME-0072 Acceptable Mr. Cuong Mr. Dinh
08.00AM 0011 (PTCS)

- Alignment, Plumbing Vertical


June 27 2019 Inspection. ITP No.: PP4-QC-PP- Mr. Khôi
74 YSE/PTSC ISBL Area * D-4707, D-4114 YSE-HSVC1 PP4-RFI-ME-0073 Acceptable Mr. Cuong Mr. Dinh
08.00AM 0011 (PTCS)

- Base Grouting.
June 27 2019 * D-4707, D-4114 ITP No.: PP4-QC-PP- Mr. Khôi DOC g to be kept until post-
75 YSE/PTSC ISBL Area YSE-HSVC1 PP4-RFI-ME-0074 Acceptable ETEC KEEPING Mr. Cuong Mr. Dinh
08.00AM 0011 (PTCS) grout

- Centerline, Padding Inspection.


June 28 2019 * C-4502A/B, C-4401, LUBE OIL UNIT, ITP No.: PP4-QC-PP- Acceptable with Mr. Khôi C-4502B silence anchor bolt is
76 YSE/PTSC ISBL Area SEAL GAS UNIT YSE-HSVC1 PP4-RFI-ME-0075 Mr. Cuong Mr. Dinh
8:00AM 0011 comment (PTCS) wrong location

- Grouting Anchor Bolt.


June 28 2019 * E-1101, D-1102, D-1103 ITP No.: PP4-QC-PP- Mr. Khôi DOC of anchor box grouting
77 YSE/PTSC ISBL Area D-1604 YSE-HSVC1 PP4-RFI-ME-0076 Acceptable ETEC KEEPING Mr. Cuong Mr. Dinh
8:00AM 0011 (PTCS) to be kept until post-grout

- Checking Elevation, rientation,


June 28 2019 leveling. ITP No.: PP4-QC-PP- Mr. Khôi
78 YSE/PTSC ISBL Area * PK-4601 YSE-HSVC1 PP4-RFI-ME-0077 Acceptable Mr. Cuong Mr. Dinh
8:00AM 0011 (PTCS)

- Alignment, Tightening Anchor Bolts


July 01 2019 Inspection ITP No.: PP4-QC-PP- Mr. Khôi
79 YSE/PTSC ISBL Area * R-4202 YSE-HSVC1 PP4-RFI-ME-0043A Acceptable Mr. Cuong Mr. Dinh
3:00PM 0011 (PTCS)
HSVC1 PP4 PROJECT

Client SUMMARY OF MECHANICAL INSPECTION SCHEDULE EPC Contractor

Update 6-Aug-2020

INSPECTION ATTENDEE
INSPECTION ITP No
S/N- SUB CON INSPECTION DATE INSPECTION ACTIVITY RFI No RESULT DOCUMENT STATUS REMARKS/ Reprot Number
LOCATION ITP Rev
- Sika 214-11 Test (7 days).
* Z-4808A/B, D-4808, F-4808A/B, E-
4808A/B
June 29 2019 * P-4701A/B, P-4113, P-4205, P- ITP No.: PP4-QC-PP- Mr. Khôi
80 YSE/PTSC ISBL Area 4309A/B, P-4302A/B YSE-HSVC1 PP4-RFI-ME-0078 Acceptable Mr. Cuong Mr. Dinh
8:00AM 0011 (PTCS)
'- SikaDUR 42MP Test (7 days)
* ZM-4801

- Grouting Anchor Bolts.


June 29 2019 * ZR-4804, Z-4801A ITP No.: PP4-QC-PP- Mr. Khôi DOC g to be kept until post-
81 YSE/PTSC ISBL Area YSE-HSVC1 PP4-RFI-ME-0079 Acceptable ETEC KEEPING Mr. Cuong Mr. Dinh
8:00AM 0011 (PTCS) grout

- Leveling and Base Grouting .


-P-4303A. P-4606A/B. P-
* P-4303A. P-4606A/B. P-4605. P-
4605.PK-4601 have check by
June 29 2019 4110A/B. P -4107A/B. P-4105A/B. P- ITP No.: PP4-QC-PP- Acceptable with Mr. Khôi
82 YSE/PTSC ISBL Area YSE-HSVC1 PP4-RFI-ME-0080 Mr. Cuong Mr. Dinh other RFI
8:00AM 4109, PK-4601 0011 comment (PTCS)
P-4110A/B. P -4107A/B are
not ready
-Sika 214-11 Inspection
June 29 2019 ITP No.: PP4-QC-PP- Mr. Khôi
83 YSE/PTSC ISBL Area YSE-HSVC1 PP4-RFI-ME-0081 Acceptable Mr. Cuong Mr. Dinh
8:00AM 0011 (PTCS)

- Sika Test 214-11 (7 days)


July 01 2019 * PK-4601 ITP No.: PP4-QC-PP- Mr. Khôi
84 YSE/PTSC ISBL Area YSE-HSVC1 PP4-RFI-ME-0082 Acceptable Mr. Cuong Mr. Dinh
3:00PM 0011 (PTCS)

- Sika Test (28 days).* D-4302


July 01 2019 ITP No.: PP4-QC-PP- Mr. Khôi
85 YSE/PTSC ISBL Area YSE-HSVC1 PP4-RFI-ME-0083 Acceptable Mr. Cuong Mr. Dinh
3:00PM 0011 (PTCS)

- Alignment, Tightening Anchor Bolts


July 01 2019 Inspection ITP No.: PP4-QC-PP- Mr. Khôi
86 YSE/PTSC ISBL Area * R-4201, R-4200 YSE-HSVC1 PP4-RFI-ME-0084 Acceptable Mr. Cuong Mr. Dinh
3:00PM 0011 (PTCS)

- Sika Test (7 days)


July 02 2019 * T-4705A/B, T-4710, T-4711, T- ITP No.: PP4-QC-PP- Mr. Khôi
87 YSE/PTSC ISBL Area 4703A/B, D-4707, D-4114 YSE-HSVC1 PP4-RFI-ME-0085 Acceptable Mr. Cuong Mr. Dinh
9:00 AM 0011 (PTCS)

- Elevation, Orientation and Leveling


Inspection. ITP No.: PP4-QC-PP-
Jul 03 2019 Mr. Khôi
88 YSE/PTSC ISBL Area * F-4702A/B, F-4701, F4201A/B, D- 0010 YSE-HSVC1 PP4-RFI-ME-0086 Acceptable Mr. Cuong
08.00AM (PTCS)
4509, D-4510, T-4503A/B Rev A

- Checking Centerline and Grouting


Anchor Bolts. ITP No.: PP4-QC-PP-
Jul 03 2019
89 YSE/PTSC
09.00AM
ISBL Area * P-4301A/B, E-4208, E-4209, 0011 YSE-HSVC1 PP4-RFI-ME-0087 Cancel
E4502A/B, E-4411, P-4401 Rev A

- Elevation, Orientation and Leveling


Inspection. ITP No.: PP4-QC-PP-
Jul 03 2019 Mr. Khôi
90 YSE/PTSC Utility Area * D-1102, D-1103, D-1604, E-1101 0010 YSE-HSVC1 PP4-RFI-ME-0088 Acceptable Mr. Cuong
09.30AM (PTCS)
Rev A

- Leveling Inspection (Gear Pump Gear


Reducer). ITP No.: PP4-QC-PP-
Jul 03 2019 Mr. Khôi
91 YSE/PTSC Pelletizer Area * ZR-4804, Z-4801A 0010 YSE-HSVC1 PP4-RFI-ME-0089 Acceptable Mr. Cuong Z-4801A leveling is cancel
10.00AM (PTCS)
Rev A

- Base Grouting.
* ZR-4804, ITP No.: PP4-QC-PP-
Jul 03 2019 Mr. Khôi
92 YSE/PTSC Pelletizer Area 0010 YSE-HSVC1 PP4-RFI-ME-0090 Acceptable ETEC KEEPING Mr. Cuong
10.00AM (PTCS)
Rev A

- Sika Test (214-11)


Jul 03 2019 D-4509, D-4510, T-4503A/B, F-4201,P- Mr. Khôi
93 YSE/PTSC Lab Room 4109, F-4702A/B, F-4701 ITP No.: N/A YSE-HSVC1 PP4-RFI-ME-0091 Acceptable Mr. Cuong
01.30PM (PTCS)
HSVC1 PP4 PROJECT

Client SUMMARY OF MECHANICAL INSPECTION SCHEDULE EPC Contractor

Update 6-Aug-2020

INSPECTION ATTENDEE
INSPECTION ITP No
S/N- SUB CON INSPECTION DATE INSPECTION ACTIVITY RFI No RESULT DOCUMENT STATUS REMARKS/ Reprot Number
LOCATION ITP Rev
- Check Ceterline and Grouting Anchor
Bolts. ITP No.: PP4-QC-PP-
04 Jul 2019 Mr. Khôi
94 YSE/PTSC Utility Area * Z-1107, Chemical Dosing System For 0011 YSE-HSVC1 PP4-RFI-ME-0092 Acceptable ETEC KEEPING Mr. Cuong
08.00AM (PTCS)
PK-1101, PK-1101, P-1101A/B Rev A

- Grouting Base Plate.


* F-4702A/B, F-4701, F-4201A/B, D- ITP No.: PP4-QC-PP-
04 Jul 2019 Mr. Khôi
95 YSE/PTSC
08.30AM
ISBL Area 4509, T-4503 0011 YSE-HSVC1 PP4-RFI-ME-0093 Cancel (PTCS)
Mr. Cuong
Rev A

- Sika Test 214-11 (7 days) Grouting


04 Jul 2019 Base Plate. Mr. Khôi
96 YSE/PTSC Lab Room * T-4705A/B, T-4710, T-4711, T- ITP No.: N/A YSE-HSVC1 PP4-RFI-ME-0094 Acceptable Mr. Cuong
03.30PM (PTCS)
4703A/B, D-4707, D-4114
- Checking Leveling.
* P-4107A/B, P-4113, P-4701A/B, P- ITP No.: PP4-QC-PP-
04 Jul 2019 4110A/B, P-4309A/B, P-4302A/B, P- Mr. Khôi
97 YSE/PTSC ISBL Area 0010 YSE-HSVC1 PP4-RFI-ME-0095 Acceptable Mr. Cuong
09.00AM 4304A/B, P-4603A/B, P4502A/B, P- (PTCS)
Rev: A
4106A/B
- Grouting Anchor Bolts.
* P-4301A/B, E-4208, E-4209, ITP No.: PP4-QC-PP-
05 Jul 2019 Mr. Khôi
98 YSE/PTSC ISBL Area E4502A/B, E-4411, P-4401 0011 YSE-HSVC1 PP4-RFI-ME-0087A Acceptable ETEC KEEPING Mr. Cuong
08.30AM (PTCS)
Rev A

- Grouting Base Plate.


* F-4702A/B, F-4701, F-4201A/B, D- ITP No.: PP4-QC-PP-
05 Jul 2019 Mr. Khôi
99 YSE/PTSC ISBL Area 4509, T-4503A/B D-4510 0011 YSE-HSVC1 PP4-RFI-ME-0093A Acceptable ETEC KEEPING Mr. Cuong
08.00AM (PTCS)
Rev A

- Sika Test 214-11 (7 days)


05 Jul 2019 * E-1101, D-1102, D-1103, D-1604 Mr. Khôi
100 YSE/PTSC Lab Room ITP No.: N/A YSE-HSVC1 PP4-RFI-ME-0096 Acceptable Mr. Cuong
01.30PM (PTCS)

- Sika Test 214-11 (28 days)


05 Jul 2019 * Z-4804, Z-4807 Mr. Khôi
101 YSE/PTSC Lab Room ITP No.: N/A YSE-HSVC1 PP4-RFI-ME-0097 Acceptable Mr. Cuong
01.30PM (PTCS)

- Leveling Inspection.
* Z-4801A ITP No.: PP4-QC-PP-
05 Jul 2019 Mr. Khôi
102 YSE/PTSC Pelletizer Area 0010 YSE-HSVC1 PP4-RFI-ME-0098 Acceptable ETEC KEEPING Mr. Cuong
08.30AM (PTCS)
Rev: A

- Grouting Base Plate.


* Z-4801A ITP No.: PP4-QC-PP-
05 Jul 2019 Mr. Khôi
103 YSE/PTSC Pelletizer Area 0011 YSE-HSVC1 PP4-RFI-ME-0099 Acceptable Mr. Cuong
08.30AM (PTCS)
Rev: A

- Sika Test 214-11 (7 days)


05 Jul 2019 * ZR-4804, Z-4801A Mr. Khôi
104 YSE/PTSC Utility Area ITP No.: N/A YSE-HSVC1 PP4-RFI-ME-0100 Acceptable Mr. Cuong
01.30PM (PTCS)

- Sika Test 214-11 (28 days)


05 Jul 2019 * P-4601A/B, P-4206, D-4114, D-4707 Mr. Khôi
105 YSE/PTSC Utility Area ITP No.: N/A YSE-HSVC1 PP4-RFI-ME-0101 Acceptable Mr. Cuong
01.30PM (PTCS)

- Leveling Inspection.
* PK-1101 ITP No.: PP4-QC-PP-
05 Jul 2019 Mr. Khôi
106 YSE/PTSC Utility Area 0010 YSE-HSVC1 PP4-RFI-ME-0102 Acceptable Mr. Cuong
01.30PM (PTCS)
Rev A

- Grouting Base Plate.


* PK-1101 ITP No.: PP4-QC-PP-
05 Jul 2019 Mr. Khôi
107 YSE/PTSC Utility Area 0011 YSE-HSVC1 PP4-RFI-ME-0103 Acceptable ETEC KEEPING Mr. Cuong
01.30PM (PTCS)
Rev A

- Grouting Anchor Bolts


* P-1101A/B, Chemical Dosing System ITP No.: PP4-QC-PP-
05 Jul 2019
108 YSE/PTSC Utility Area For PK-1101 0011 YSE-HSVC1 PP4-RFI-ME-0104 Acceptable ETEC KEEPING
01.30PM
Rev A
HSVC1 PP4 PROJECT

Client SUMMARY OF MECHANICAL INSPECTION SCHEDULE EPC Contractor

Update 6-Aug-2020

INSPECTION ATTENDEE
INSPECTION ITP No
S/N- SUB CON INSPECTION DATE INSPECTION ACTIVITY RFI No RESULT DOCUMENT STATUS REMARKS/ Reprot Number
LOCATION ITP Rev
- Grouting Base Plate. P-4603A/B, P-4304A/B, P-
* P-4603A/B, P-4304A/B, P-4502A/B, P- ITP No.: PP4-QC-PP- 4502A/B cancel
05 Jul 2019 Mr. Khôi
109 YSE/PTSC Utility Area 4501A/B, P-4605, P-4606A/B 0011 YSE-HSVC1 PP4-RFI-ME-0105 Acceptable Mr. Cuong
01.30PM (PTCS)
Rev A

- Sample Test for Hicon Non-Shrinking


06 Jul 2019 Mixing. (Trial Test) Mr. Khôi
110 YSE/PTSC ISBL Area ITP No.: N/A YSE-HSVC1 PP4-RFI-ME-0106 Acceptable Mr. Cuong
08.00AM (PTCS)

- Grouting Base Plate.


07 Jul 2019 * PK-4601 ITP No.: PP4-QC-PP- Mr. Khôi
111 YSE/PTSC ISBL Area YSE-HSVC1 PP4-RFI-ME-0107 Acceptable Mr. Cuong
08.00AM 0011 Rev: A (PTCS)

- Elevation, Orientation, Leveling


08 Jul 2019 Inspection. ITP No.: PP4-QC-PP- Mr. Khôi
112 YSE/PTSC Pelletizer Area * Z-4808A/B, D-4808, F-4808A/B, E- YSE-HSVC1 PP4-RFI-ME-0108 Acceptable Mr. Cuong
08.00AM 0010 Rev: A (PTCS)
4808A/B, P-4808A/B
- Input material Hicon Non-Shrinking
07 Jul 2019 Inspection Mr. Khôi
113 YSE/PTSC ISBL Area ITP No.: N/A YSE-HSVC1 PP4-RFI-ME-0109 Acceptable Mr. Cuong
07.30AM (PTCS)

- Centerline, Pading Inspection.


09 Jul 2019 * E-2201A, E-2201B, E-2201C, E- ITP No.: PP4-QC-PP- Mr. Khôi
114 YSE/PTSC Jetty Area YSE-HSVC1 PP4-RFI-ME-0110 Acceptable Mr. Cuong
08.00AM 2201D, E-2201E, E-2201F, E- 0010 Rve: A (PTCS)
2201G, E-2201H, E-2201I
- Centerline, Pading Inspection.
09 Jul 2019 * F-4108, P-4610A/B, E-4404, E- ITP No.: PP4-QC-PP- Mr. Khôi
115 YSE/PTSC ISBL Area YSE-HSVC1 PP4-RFI-ME-0111 Acceptable Mr. Cuong
09.00AM 4503, D-4801, D-4508, E-4303, E- 0010 Rve: A (PTCS)
4308, E-4309
- Sika Test 214-11 (28 days).
09 Jul 2019 * P-4105A/B, P-4107A/B, P- Mr. Khôi
116 YSE/PTSC Lab Room ITP No.: N/A YSE-HSVC1 PP4-RFI-ME-0112 Acceptable Mr. Cuong
01.30PM 4110A/B, P-4606A/B, P-4605, P- (PTCS)
4304A
- Grouting Anchor Bolts.
ITP No.: PP4-QC-PP-
09 Jul 2019 * E-4710, E-4711, E-4712, E-4610, E- Mr. Khôi
117 YSE/PTSC ISBL Area 0011 YSE-HSVC1 PP4-RFI-ME-0113 Acceptable Mr. Cuong
09.30AM 4204, E-4201, E-4205, P-4203, P- (PTCS)
Rev: A
4204

ITP No.: PP4-QC-PP-


09 Jul 2019 - Base Grouting Mr. Khôi
118 YSE/PTSC ISBL Area 0011 YSE-HSVC1 PP4-RFI-ME-0114 Acceptable Mr. Cuong
09.30AM *P-4601 (PTCS)
Rev: A

- Leveling and Coupling alignment ITP No.: PP4-QC-PP-


09 Jul 2019 Mr. Khôi
119 YSE/PTSC Pelletizer Area before anchor bolts Grouting. 0010 YSE-HSVC1 PP4-RFI-ME-0115 Acceptable Mr. Cuong
10.00AM (PTCS)
* ZM-4804 Rev: A

ITP No.: PP4-QC-PP-


09 Jul 2019 - Anchor bolts Grouting. Mr. Khôi
120 YSE/PTSC Pelletizer Area 0011 YSE-HSVC1 PP4-RFI-ME-0116 Acceptable Mr. Cuong
10.00AM * ZM-4804 (PTCS)
Rev: A

ITP No.: PP4-QC-PP-


09 Jul 2019 - Grouting Base Plate Permanent Rail. Mr. Khôi
121 YSE/PTSC Pelletizer Area 0011 YSE-HSVC1 PP4-RFI-ME-0117 Acceptable Mr. Cuong
10.00AM * Z-4804 ~ Z-4807 (PTCS)
Rev: A

- Centerline, Pading Inspection. ITP No.: PP4-QC-PP-


09 Jul 2019 Mr. Khôi
122 YSE/PTSC ISBL Area * E-4502A/B, E-4208, E-4209, E- 0010 YSE-HSVC1 PP4-RFI-ME-0118 Acceptable Mr. Cuong
02.00PM (PTCS)
4411 Rev: A

ITP No.: PP4-QC-PP-


10 Jul 2019 - Leveling Inspection. Mr. Khôi
123 YSE/PTSC ISBL Area 0010 YSE-HSVC1 PP4-RFI-ME-0119 Acceptable Mr. Cuong
08.00AM * P-4301A/B, P-4401 (PTCS)
Rev: A
HSVC1 PP4 PROJECT

Client SUMMARY OF MECHANICAL INSPECTION SCHEDULE EPC Contractor

Update 6-Aug-2020

INSPECTION ATTENDEE
INSPECTION ITP No
S/N- SUB CON INSPECTION DATE INSPECTION ACTIVITY RFI No RESULT DOCUMENT STATUS REMARKS/ Reprot Number
LOCATION ITP Rev
- Grouting Base Plate.
ITP No.: PP4-QC-PP-
10 Jul 2019 * P-4603A/B, P-4304A/B, P- Mr. Khôi
124 YSE/PTSC ISBL Area 0011 YSE-HSVC1 PP4-RFI-ME-0120 Acceptable Mr. Cuong P-4302A/B, P-4808A/B cancel
08.30AM 4502A/B, P-4309A/B, P-4302A/B, P- (PTCS)
Rev: A
4808A/B, R-4201 R-4202.

10 Jul 2019 - Sikadur 42MP Test (7 days) Mr. Khôi


125 YSE/PTSC Lab Room ITP No.: N/A YSE-HSVC1 PP4-RFI-ME-0121 Acceptable Mr. Cuong
01.30PM * ZR-4804 (PTCS)

- Elevation, Orientation and Leveling


11 Jul 2019 Inspection. ITP No.: PP4-QC-PP- Mr. Khôi
126 YSE/PTSC Utility Area YSE-HSVC1 PP4-RFI-ME-0122 Acceptable Mr. Cuong
08.00AM * Z-1107, Chemical Dosing System 0010 Rev: A (PTCS)
for PK-1101
- Grouting Base Plate.
11 Jul 2019 * D-1102, D-1103, E-1101, Z-1107, ITP No.: PP4-QC-PP- Mr. Khôi
127 YSE/PTSC Utility Area YSE-HSVC1 PP4-RFI-ME-0123 Acceptable Mr. Cuong
08.30AM Chemical Dosing System for PK- 0011 Rev: A (PTCS)
1101, D-1604

- Sika Test 214-11 (28 days).


12 Jul 2019 Mr. Khôi
128 YSE/PTSC Lab Room * T-4501, T4502, T-4701, D-4604, D- ITP No.: N/A YSE-HSVC1 PP4-RFI-ME-0124 Acceptable Mr. Cuong
01.30PM (PTCS)
4606, D-4304, D-4611, T-4302.

12 Jul 2019 - Sika Test ( Sikadur 42MP, 28 days). Mr. Khôi


129 YSE/PTSC Lab Room ITP No.: N/A YSE-HSVC1 PP4-RFI-ME-0125 Acceptable Mr. Cuong
01.30PM * Z-4803, ZR-4801 (PTCS)

- Sika Test 214-11 (7 days).


* P-4301A/B,E-4208, E-4209, E-
12 Jul 2019 Mr. Khôi
130 YSE/PTSC Lab Room 4502A/B, E-4411, E-4401, F- ITP No.: N/A YSE-HSVC1 PP4-RFI-ME-0126 Acceptable Mr. Cuong
01.30PM (PTCS)
4702A/B, F-4701, F-4201A/B, D-
4509, D-4510, T-4503A/B

- Sika Test 214-11 (7 days).


12 Jul 2019 Mr. Khôi
131 YSE/PTSC Lab Room * PK-1101, P-1101AB, Chemical ITP No.: N/A YSE-HSVC1 PP4-RFI-ME-0127 Acceptable Mr. Cuong
01.30PM (PTCS)
dosing system for PK-1101.

12 Jul 2019 - Sika Test (Sikadur 42MP 7 days). Mr. Khôi


132 YSE/PTSC Lab Room ITP No.: N/A YSE-HSVC1 PP4-RFI-ME-0128 Acceptable Mr. Cuong
01.30PM * Z-4801A (PTCS)

ITP No.:PP4-QC-PP-
12 Jul 2019 - Centerline, Pading Inspection. Mr. Khôi
133 YSE/PTSC Jetty Area 0010 YSE-HSVC1 PP4-RFI-ME-0129 Acceptable Mr. Cuong
08.00AM * C-2401A/B (PTCS)
Rev: A

ITP No.:PP4-QC-PP-
12 Jul 2019 - Grouting Anchor Bolts. Mr. Khôi
134 YSE/PTSC ISBL Area 0011 YSE-HSVC1 PP4-RFI-ME-0130 Acceptable Mr. Cuong
09.00AM * PK-4501, E-4305, E-4703, D-4115 (PTCS)
Rev: A

ITP No.:PP4-QC-PP-
12 Jul 2019 - Grouting Base Plate. Mr. Khôi
135 YSE/PTSC ISBL Area 0011 YSE-HSVC1 PP4-RFI-ME-0131 Acceptable Mr. Cuong
09.00AM * P-4301A/B (PTCS)
Rev: A

- Alignment Steel Structure Column. ITP No.:PP4-QC-PP-


12 Jul 2019 Mr. Khôi
136 YSE/PTSC Boiler Area 0006 YSE-HSVC1 PP4-RFI-ME-0132 Acceptable Mr. Cuong
09.30AM * A1~A7, AD~AE, Rev: A
(PTCS)

- Bolts Tightening Steel Structure ITP No.:PP4-QC-PP-


12 Jul 2019
137 YSE/PTSC
01.30PM
Boiler Area Column PK-1101. 0010 YSE-HSVC1 PP4-RFI-ME-0133 Cancel
* A1~A7, AD~AE, Rev: A
HSVC1 PP4 PROJECT

Client SUMMARY OF MECHANICAL INSPECTION SCHEDULE EPC Contractor

Update 6-Aug-2020

INSPECTION ATTENDEE
INSPECTION ITP No
S/N- SUB CON INSPECTION DATE INSPECTION ACTIVITY RFI No RESULT DOCUMENT STATUS REMARKS/ Reprot Number
LOCATION ITP Rev
- Grouting Base Plate Column (steel ITP No.:PP4-QC-PP-
12 Jul 2019
138 YSE/PTSC
01.30PM
Boiler Area structure PK-1101). 0011 YSE-HSVC1 PP4-RFI-ME-0134 Cancel
* A1~A7, AD~AE, Rev: A

ITP No.:PP4-QC-PP-
12 Jul 2019 - Grouting Base Plate. Mr. Khôi
139 YSE/PTSC Pelletizer Area 0011 YSE-HSVC1 PP4-RFI-ME-0135 Acceptable Mr. Cuong
08.30AM * ZM-4804 (PTCS)
Rev: A

- Elevation, Orientation and Leveling


Inspection. ITP No.:PP4-QC-PP-
13 Jul 2019 Mr. Khôi
140 YSE/PTSC ISBL Area * E-4710, E-4711, E-4712, D-4115, 0010 YSE-HSVC1 PP4-RFI-ME-0136 Acceptable Mr. Cuong
08.00AM (PTCS)
E-4703, E-4305, E-4302, E-4204, E- Rev: A
4201, E-4205

13 Jul 2019 - Sika test 214-11 (28 days) Mr. Khôi


141 YSE/PTSC Lab room ITP No.:N/A YSE-HSVC1 PP4-RFI-ME-0137 Acceptable Mr. Cuong
01.30PM * ZM-4801 (PTCS)

- Test Hicon Non-shringking (7 days)


14 Jul 2019 Mr. Khôi
142 YSE/PTSC Lab room * PK4601, P-4606A/B, P-4605, P- ITP No.:N/A YSE-HSVC1 PP4-RFI-ME-0138 Acceptable Mr. Cuong
01.30PM (PTCS)
4501A/B, P-4303A

13 Jul 2019 - Leveling Inspection. ITP No.: PP4-QC-PP- Mr. Khôi


143 YSE/PTSC Utility Area YSE-HSVC1 PP4-RFI-ME-0139 Acceptable Mr. Cuong
09.00AM * P-1101A/B 0010 Rev: A (PTCS)

'- Grouting Base Plate.


15 Jul 2019 * P-4205, P-4206, P-4113, P- ITP No.: PP4-QC-PP- Mr. Khôi
144 YSE/PTSC ISBL Area YSE-HSVC1 PP4-RFI-ME-0140 Acceptable Mr. Cuong
08.00AM 4106A/B, P-4701A/B, P-4105A/B, P- 0011 Rev: A (PTCS)
4107A/B, P-4110A/B, P-4109

15 Jul 2019 - Grouting Anchor Bols. ITP No.: PP4-QC-PP- Mr. Khôi
145 YSE/PTSC ISBL Area YSE-HSVC1 PP4-RFI-ME-0141 Acceptable Mr. Cuong
08.00AM * P-4602, P-4103, F-4601 0011 Rev: A (PTCS)

13 Jul 2019 - Test Sample Hicon Non-shrinking (7 Mr. Khôi


146 YSE/PTSC Lab Room ITP No.: N/A YSE-HSVC1 PP4-RFI-ME-0142 Acceptable Mr. Cuong
01.30PM days) (PTCS)

13 Jul 2019 - Centerline Inspection. ITP No.: PP4-QC-PP-


147 YSE/PTSC ISBL Area YSE-HSVC1 PP4-RFI-ME-0143 Acceptable
09.30AM * D-4202, D-4601, D-4602, D-4603 0010 Rev: A

15 Jul 2019 - Grouting Anchor Bolts. ITP No.: PP4-QC-PP- Mr. Khôi
148 YSE/PTSC Pelletizer Area YSE-HSVC1 PP4-RFI-ME-0144 Acceptable Mr. Cuong
01.30PM * Z-4804~Z4807, Z-4810, Z-4813 0011 Rev: A (PTCS)

15 Jul 2019 - Grouting Base Plate. ITP No.: PP4-QC-PP- Mr. Khôi
149 YSE/PTSC Pelletizer Area YSE-HSVC1 PP4-RFI-ME-0145 Acceptable Mr. Cuong P-4302A/B is cancel
01.30PM * P-4808A/B, P-4302A/B 0011 Rev: A (PTCS)

15 Jul 2019 - Grouting Base Plate. ITP No.: PP4-QC-PP- Mr. Khôi
150 YSE/PTSC ISBL Area YSE-HSVC1 PP4-RFI-ME-0146 Acceptable Mr. Cuong
02.00PM * P-4302A/B 0011 Rev: A (PTCS)

15 Jul 2019 - Grouting Base Plate. ITP No.: PP4-QC-PP- Mr. Khôi
151 YSE/PTSC Utility Area YSE-HSVC1 PP4-RFI-ME-0147 Acceptable Mr. Cuong
02.30PM * Steel Structure PK-1101 0011 Rev: A (PTCS)
HSVC1 PP4 PROJECT

Client SUMMARY OF MECHANICAL INSPECTION SCHEDULE EPC Contractor

Update 6-Aug-2020

INSPECTION ATTENDEE
INSPECTION ITP No
S/N- SUB CON INSPECTION DATE INSPECTION ACTIVITY RFI No RESULT DOCUMENT STATUS REMARKS/ Reprot Number
LOCATION ITP Rev
- Leveling, Alighnment Inspection
16 Jul 2019 before Base Grout ITP No.: PP4-QC-PP- Mr. Khôi
152 YSE/PTSC ISBL Area YSE-HSVC1 PP4-RFI-ME-0148 Acceptable Mr. Cuong P-4602, P-4103 are cancel
08.00AM * P-4203, P-4204, P-4602, P-4103, 0010 Rev: A (PTCS)
PK-4501

16 Jul 2019 - Bolts Tightening of Flange Joint. ITP No.: PP4-QC-PP- Mr. Khôi
153 YSE/PTSC ISBL Area YSE-HSVC1 PP4-RFI-ME-0149 Acceptable Mr. Cuong
08.30AM * PK-4601 0010 Rev: A (PTCS)

- Sika test (7 days Hicon Non-


16 Jul 2019 shrinking) Mr. Khôi
154 YSE/PTSC Lab Room ITP No.: N/A YSE-HSVC1 PP4-RFI-ME-0150 Acceptable Mr. Cuong
01.30PM * P-4603A/B, P-4304A/B, P- (PTCS)
4502A/B, P-4309A/B, P-4401

- Sika test 214-11 (28 days)


16 Jul 2019 Mr. Khôi
155 YSE/PTSC Lab Room * P-4603A/B, P-4304A/B, P- ITP No.: N/A YSE-HSVC1 PP4-RFI-ME-0151 Acceptable Mr. Cuong
01.30PM (PTCS)
4502A/B, P-4501A/B.

16 Jul 2019 - Hicon EPOXY STARCRETE Mr. Khôi


156 YSE/PTSC Warehouse 2 ITP No.: N/A YSE-HSVC1 PP4-RFI-ME-0152 Acceptable Mr. Cuong
09.00AM GROUTING Inspection. (PTCS)

16 Jul 2019 - Centerline Inspection. ITP No.: PP4-QC-PP- Mr. Khôi


157 YSE/PTSC
10.00AM
ISBL Area
* F-4504, T-4401, E-4301 0010 Rev: A
YSE-HSVC1 PP4-RFI-ME-0153 Pending (PTCS)
Mr. Cuong

- Sample Test for Hicon Epoxy


16 Jul 2019 Mr. Khôi
158 YSE/PTSC 09.00AM
ISBL Area STARCRETE GROUTING. (Trial ITP No.: N/A YSE-HSVC1 PP4-RFI-ME-0154 Acceptable
(PTCS)
Mr. Cuong
Test)

17 Jul 2019 - Test Hicon Non-shrinking (7 days). Mr. Khôi


159 YSE/PTSC Lab Room ITP No.: N/A YSE-HSVC1 PP4-RFI-ME-0155 Acceptable Mr. Cuong
01.30PM * R-4201,R-4202 (PTCS)

- Test Sikadur 42MP (7 days).


17 Jul 2019 Mr. Khôi
160 YSE/PTSC Lab Room * Permanent Rail ITP No.: N/A YSE-HSVC1 PP4-RFI-ME-0156 Acceptable Mr. Cuong
01.30PM (PTCS)
Z4804~Z4807

17 Jul 2019 - Grouting Anchor Bolts. ITP No.: PP4-QC-PP- Mr. Khôi
161 YSE/PTSC Utility Area YSE-HSVC1 PP4-RFI-ME-0157 Acceptable Mr. Cuong
08.00AM * PK-1601A/B/C, PK-1602A/B/C. 0011 Rev: A (PTCS)

17 Jul 2019 - Grouting Base Plate. ITP No.: PP4-QC-PP-


162 YSE/PTSC Utility Area YSE-HSVC1 PP4-RFI-ME-0158 Cancel
08.30AM * P-1101A/B 0011 Rev: A

- Alighment, Elevation,Leveling
17 Jul 2019 ITP No.: PP4-QC-PP- Mr. Khôi
163 YSE/PTSC ISBL Area Inspection. YSE-HSVC1 PP4-RFI-ME-0159 Acceptable Mr. Cuong
09.30AM 0010 Rev: A (PTCS)
* E-4610, F-4108, F-4601

18 Jul 2019 - Alighment Steel Structure ITP No.: PP4-QC-PP- Mr. Khôi
164 YSE/PTSC Utility Area YSE-HSVC1 PP4-RFI-ME-0160 Acceptable Mr. Cuong
08.00PM * A1 ~A7, AA~AC 0006 Rev: A (PTCS)

- Grouting Base Plate.


* E-4610, F-4601, PK-4501, E-4302, E-
4305, E-4710, E-4711, E-4712, D-4115, F-4601; PK-4501; P-4203; P-
18 Jul 2019 E-4703,P-4203, P-4204, E-4204, E-4201, ITP No.: PP4-QC-PP- Acceptable with Mr. Khôi
165 YSE/PTSC ISBL Area YSE-HSVC1 PP4-RFI-ME-0161 Mr. Cuong 4204; E-4204, E-4201; E-4205
08.30AM E-4205, F-4108 0011 Rev: A comment (PTCS)
are balance
HSVC1 PP4 PROJECT

Client SUMMARY OF MECHANICAL INSPECTION SCHEDULE EPC Contractor

Update 6-Aug-2020

INSPECTION ATTENDEE
INSPECTION ITP No
S/N- SUB CON INSPECTION DATE INSPECTION ACTIVITY RFI No RESULT DOCUMENT STATUS REMARKS/ Reprot Number
LOCATION ITP Rev
- Test Hicon Non-shrinking (7days).
18 Jul 2019 Mr. Khôi
166 YSE/PTSC Lab Room * P-4603A/B, P-4304A/B, P- ITP No.: N/A YSE-HSVC1 PP4-RFI-ME-0162 Acceptable Mr. Cuong
01.30PM (PTCS)
4502A/B, P-4309A/B, P-4401

19 Jul 2019 - Centerline Inspection. ITP No.: PP4-QC-PP- Mr. Khôi


167 YSE/PTSC Utility Area YSE-HSVC1 PP4-RFI-ME-0163 Acceptable Mr. Cuong
08.00AM * D-1101 0010 (PTCS)

19 Jul 2019 - Test Hicon Epoxy Starcrete Grout. Mr. Khôi


168 YSE/PTSC Lab Room ITP No.: N/A YSE-HSVC1 PP4-RFI-ME-0164 Acceptable Mr. Cuong
01.30PM * Trial Test (PTCS)

ITP No.: PP4-QC-PP-


19 Jul 2019 - Grouting Permanent Rail. Mr. Khôi
169 YSE/PTSC Pelletizer Area 0011 YSE-HSVC1 PP4-RFI-ME-0165 Acceptable Mr. Cuong
08.30AM * Z-4804~Z4807 (PTCS)
Rev: A

- Grouting Anchor Bolts.


* Lube Oil Unit for Mixer Motor,
ITP No.: PP4-QC-PP-
19 Jul 2019 Lube Oil Unit for Mixer Gear Mr. Khôi
170 YSE/PTSC Pelletizer Area 0011 YSE-HSVC1 PP4-RFI-ME-0166 Mr. Cuong
08.30AM Reducer, CCW Unit, Lube Oil Unit (PTCS)
Rev: A
for Gear Pump Gear Reducer, Z-4810,
Z4813

- Flange Joint Inspection for Bend Piece ITP No.: PP4-QC-PP-


19 Jul 2019 Mr. Khôi
171 YSE/PTSC ISBL Area of Bottom Loop Reactor. 0010 YSE-HSVC1 PP4-RFI-ME-0167 Acceptable Mr. Cuong
09.00AM (PTCS)
* R-4201, R-4202 Rev: A

- Test Hicon Non-Shrinking (7days).


* P-4301A/B, D-1102,D-1103, Z-
19 Jul 2019 Mr. Khôi
172 YSE/PTSC Lab Room 1107, Chemical Dosing system for ITP No.: N/A YSE-HSVC1 PP4-RFI-ME-0168 Acceptable Mr. Cuong
01.30PM (PTCS)
PK-1101, D-1604.
PK-4501, E-4305, E-4703, D-4115

18 Jul 2019 - Grouting Anchor Bolts. ITP No.: PP4-QC-PP- Mr. Khôi
173 YSE/PTSC Jetty Area YSE-HSVC1 PP4-RFI-ME-0169 Acceptable Mr. Cuong
02.30PM * C-2401A/B 0011 Rev: A (PTCS)

19 Jul 2019 - Grouting Base ITP No.: PP4-QC-PP- Mr. Khôi


174 YSE/PTSC Jetty Area YSE-HSVC1 PP4-RFI-ME-0170 Acceptable Mr. Cuong
02.30PM * C-2401A/B 0011 Rev: A (PTCS)

20 Jul 2019 - Centerline, Padding Inspection ITP No.: PP4-QC-PP- Mr. Khôi
175 YSE/PTSC Jetty Area YSE-HSVC1 PP4-RFI-ME-0171 Acceptable Mr. Cuong
08.00AM * PK-2501, P-2602A/B 0010 Rev: A (PTCS)
- Elevation,Orientation, Leveling
20 Jul 2019 ITP No.: PP4-QC-PP- Mr. Khôi
176 YSE/PTSC ISBL Area Inspection. YSE-HSVC1 PP4-RFI-ME-0172 Acceptable Mr. Cuong
09.00AM 0010 Rev: A (PTCS)
* E-4208, E-4209, E-4502A/B
- Elevation,Orientation, Leveling
Inspection.
20 Jul 2019 * Lube Oil Unit for Mixer Gear ITP No.: PP4-QC-PP- Mr. Khôi
177 YSE/PTSC Pelletizer Area YSE-HSVC1 PP4-RFI-ME-0173 Acceptable Mr. Cuong
09.30AM Reducer, Lube Oil Unit for Motor, 0010 Rev: A (PTCS)
Lube Oil Unit for Gear Pump G/R, D-
4830, CCW Unit
- Test Hicon Non-shrinking (7 days).
* P-4301A/B, D-1102, D-1103, Z-
20 Jul 2019 Mr. Khôi
178 YSE/PTSC Lab Room 1107, Chemical Dosing system for ITP No.: N/A YSE-HSVC1 PP4-RFI-ME-0174 Acceptable Mr. Cuong
01.30PM (PTCS)
PK-1101, D-1604.
PK 4501, E-4305, E-4703, D-4115
22 Jul 2019 - Levelling Inspection. ITP No.: PP4-QC-PP- Mr. Khôi
179 YSE/PTSC ISBL Area YSE-HSVC1 PP4-RFI-ME-0174 Acceptable Mr. Cuong
08.00AM * P-4602, P-4103 0010 Rev: A (PTCS)
- Grouting Base Plate.
22 Jul 2019 ITP No.: PP4-QC-PP- Mr. Khôi
180 YSE/PTSC ISBL Area * P-4113, P-4106A/B, P-4602, P- YSE-HSVC1 PP4-RFI-ME-0174 Acceptable Mr. Cuong
08.30AM 0011 Rev: A (PTCS)
4103.
HSVC1 PP4 PROJECT

Client SUMMARY OF MECHANICAL INSPECTION SCHEDULE EPC Contractor

Update 6-Aug-2020

INSPECTION ATTENDEE
INSPECTION ITP No
S/N- SUB CON INSPECTION DATE INSPECTION ACTIVITY RFI No RESULT DOCUMENT STATUS REMARKS/ Reprot Number
LOCATION ITP Rev
22 Jul 2019 - Grouting Anchor Bolts. ITP No.: PP4-QC-PP- Mr. Khôi
181 YSE/PTSC ISBL Area YSE-HSVC1 PP4-RFI-ME-0174 Acceptable Mr. Cuong
08.30AM * C-4610 0011 Rev: A (PTCS)
- Test Sika 214-11 (28 days).
20 Jul 2019 * Z-4808A/B, D-4808, F-4808A/B, E- Mr. Khôi
182 YSE/PTSC Lab Room ITP No.: N/A YSE-HSVC1 PP4-RFI-ME-0174 Acceptable Mr. Cuong
01.30PM 4808A/B, P-4701A/B, P-4113, P- (PTCS)
4205, P-4309A/B, P-4302A/B
20 Jul 2019 - Test Sikadur 42MP (28 days). Mr. Khôi
183 YSE/PTSC Lab Room ITP No.: N/A YSE-HSVC1 PP4-RFI-ME-0179 Acceptable Mr. Cuong
01.30PM * ZM-4801 (PTCS)
21 Jul 2019 - Test Sikadur 42MP (7 days). Mr. Khôi
184 YSE/PTSC Lab Room ITP No.: N/A YSE-HSVC1 PP4-RFI-ME-0180 Acceptable Mr. Cuong
01.30PM * ZM-4804 (PTCS)
- Test Hicon Non-shrinking (7 days).
* A1~A7, AD~AE of PK-1101, P-
4205. P-4206. P-4701A/B. P-
22 Jul 2019 Mr. Khôi
185 YSE/PTSC Lab Room 4105A/B. P-4107A/B. P-4110A/B. P- ITP No.: N/A YSE-HSVC1 PP4-RFI-ME-0181 Acceptable Mr. Cuong
01.30PM (PTCS)
4109. P-4302A/B. P-4808A/B, P-
4103, F-4601, Z-4810, Z-4813, Z-
4804~Z4807
22 Jul 2019 - Test Sika 214-11 (28 days). Mr. Khôi
186 YSE/PTSC Lab Room ITP No.: N/A YSE-HSVC1 PP4-RFI-ME-0182 Acceptable Mr. Cuong
01.30PM * PK-4601 (PTCS)
- Centerline Inspection.
22 Jul 2019 ITP No.: PP4-QC-PP- Mr. Khôi
187 YSE/PTSC ISBL Area * E-4401, R-4401, S-4502, D-4502, YSE-HSVC1 PP4-RFI-ME-0183 Acceptable Mr. Cuong
09.00AM 0010 Rev: A (PTCS)
E-4310, F-4302A/B, T-4301.
- Grouting Base Plate.
22 Jul 2019 ITP No.: PP4-QC-PP- Mr. Khôi
188 YSE/PTSC ISBL Area * PK-4501, F-4601, P-4203,P-4204, YSE-HSVC1 PP4-RFI-ME-0184 Acceptable Mr. Cuong
08.00AM 0011 Rev: A (PTCS)
E-4204, E-4201, E-4205
- Elevation,Orientation, Leveling
23 Jul 2019 ITP No.: PP4-QC-PP- Mr. Khôi
189 YSE/PTSC ISBL Area Inspection. YSE-HSVC1 PP4-RFI-ME-0185 Acceptable Mr. Cuong
08.00AM 0010 Rev: A (PTCS)
* E-4411.
- Elevation,Orientation, Leveling
23 Jul 2019 ITP No.: PP4-QC-PP- Mr. Khôi
190 YSE/PTSC Pelletizer Area Inspection. YSE-HSVC1 PP4-RFI-ME-0186 Acceptable Mr. Cuong
08.30AM 0010 Rev: A (PTCS)
* D-4804, D-4805, D-4809.
23 Jul 2019 - Test Hicon Epoxy (7 days). Mr. Khôi
191 YSE/PTSC Lab Room ITP No.: N/A YSE-HSVC1 PP4-RFI-ME-0187 Acceptable Mr. Cuong
01.30PM * Trial Test (PTCS)
24 Jul 2019 - Grouting Base Plate. ITP No.: PP4-QC-PP- Mr. Khôi
192 YSE/PTSC Utility Area YSE-HSVC1 PP4-RFI-ME-0158A Acceptable Mr. Cuong
09.00AM * P-1101A/B 0011 Rev: A (PTCS)
- Centerline Inspection.
24 Jul 2019 * E-4203, D-4110A/B/C, D-4113A/B, ITP No.: PP4-QC-PP- Mr. Khôi
193 YSE/PTSC ISBL Area YSE-HSVC1 PP4-RFI-ME-0188 Acceptable Mr. Cuong
08.00AM D-4105A/B, D-4112, F-4106, D-4701, 0010 (PTCS)
E-4704, E-4701.
- Elevation, Orientation, Levelling
24 Jul 2019 ITP No.: PP4-QC-PP- Mr. Khôi
194 YSE/PTSC Utility Area Inspection. YSE-HSVC1 PP4-RFI-ME-0189 Acceptable Mr. Cuong
09.00AM 0010 (PTCS)
* PK-1601A/B/C, PK-1602A/B/C.
24 Jul 2019 - Centerline Inspection. ITP No.: PP4-QC-PP- Mr. Khôi
195 YSE/PTSC Utility Area YSE-HSVC1 PP4-RFI-ME-0190 Acceptable Mr. Cuong
09.00AM * C-1101 0010 (PTCS)
24 Jul 2019 - Test Hicon Non-shrinking (7 days). Mr. Khôi
196 YSE/PTSC Lab Room ITP No.: N/A YSE-HSVC1 PP4-RFI-ME-0190 Acceptable Mr. Cuong
01.30PM * PK1601ABC, PK1602ABC (PTCS)
- Test Sika 214-11 (28 days).
24 Jul 2019 Mr. Khôi
197 YSE/PTSC Lab Room * D-4509, D-4510, T-4503A/B, F- ITP No.: N/A YSE-HSVC1 PP4-RFI-ME-0190 Acceptable Mr. Cuong
01.30PM (PTCS)
4201, P-4109, F-4702A/B, F-4701
24 Jul 2019 - Grouting Anchor Bolts. ITP No.: PP4-QC-PP- Mr. Khôi
198 YSE/PTSC Utility Area YSE-HSVC1 PP4-RFI-ME-0193 Acceptable Mr. Cuong
02.00PM * C-1101 0011 Rev: A (PTCS)
- Grouting Base Plate.
24 Jul 2019 * Z-4804~Z-4807 (layer 4), Lube oil ITP No.: PP4-QC-PP- Mr. Khôi
199 YSE/PTSC Pelletizer Area Unit for Mixer Gear Reducer, Lube YSE-HSVC1 PP4-RFI-ME-0194 Acceptable Mr. Cuong
08.30AM 0011 Rev: A (PTCS)
oil Unit for Gear Pump Gear
Reducer.
- Test Hicon Non-shrinking (7 days).
25 Jul 2019 * E-4610, E-4302, E-4305, E-4710, E- Mr. Khôi
200 YSE/PTSC Lab Room ITP No.: N/A YSE-HSVC1 PP4-RFI-ME-0195 Acceptable Mr. Cuong
01.30PM 4711, E-4712, D-4115, E-4703, F- (PTCS)
4108.C-2401A/B
- Test Sika 214-11 (28 days).
25 Jul 2019 Mr. Khôi
201 YSE/PTSC Lab Room * T-4705A/B, T-4710, T-4711, T- ITP No.: N/A YSE-HSVC1 PP4-RFI-ME-0196 Acceptable Mr. Cuong
01.30PM (PTCS)
4703A/B, D-4707, D-4114
HSVC1 PP4 PROJECT

Client SUMMARY OF MECHANICAL INSPECTION SCHEDULE EPC Contractor

Update 6-Aug-2020

INSPECTION ATTENDEE
INSPECTION ITP No
S/N- SUB CON INSPECTION DATE INSPECTION ACTIVITY RFI No RESULT DOCUMENT STATUS REMARKS/ Reprot Number
LOCATION ITP Rev
- Grouting Base Plate. ITP No.: PP4-QC-PP-
24 Jul 2019 Mr. Khôi
202 YSE/PTSC Pelletizer Area * Lube oil unit mixer motor, 0011 YSE-HSVC1 PP4-RFI-ME-0197 Acceptable Mr. Cuong
02.00PM (PTCS)
Hydraulic oil unit D-4830. Rev: A
- Elevation, orientation, Leveling ITP No.: PP4-QC-PP-
25 Jul 2019 Mr. Khôi
203 YSE/PTSC Utility Area Inspection. 0010 YSE-HSVC1 PP4-RFI-ME-0198 Acceptable Mr. Cuong
08.00AM (PTCS)
* C-1101. Rev: A
- Grouting Base Plate.
ITP No.: PP4-QC-PP-
25 Jul 2019 * PK-1601A/B/C, PK-1602A/B/C, C- Mr. Khôi
204 YSE/PTSC Utility Area 0011 YSE-HSVC1 PP4-RFI-ME-0199 Acceptable Mr. Cuong
08.30AM 1101, Support Duct SP01/SP02/SP03, (PTCS)
Rev: A
E-1101.

- Post-Pour Inspection.
* D-4606, T-4302, D-4304, T-4501,
T-4502, D-4611, T-4503A/B, F-4601,
ITP No.: PP4-QC-PP-
25 Jul 2019 D-4509, D-4510, E-4610, F-4201A/B, Mr. Khôi
205 YSE/PTSC ISBL Area 0011 YSE-HSVC1 PP4-RFI-ME-0200 Acceptable Mr. Cuong
09.00AM E-4302, E-4305, F-4701, T-4703A/B, (PTCS)
Rev: A
T-4705A/B, F-4702A/B, D-4114, D-
4115, D-4707, T-4701, E-4703, D-
4604.
26 Jul 2019 - Test Sika 214-11 (28 days). Mr. Khôi
206 YSE/PTSC Lab Room ITP No.: N/A YSE-HSVC1 PP4-RFI-ME-0201 Acceptable Mr. Cuong
01.30PM * E-1101, D-1102, D-1103, D-1604. (PTCS)
- Test Hicon Non-shrinking (7 days).
* -permanent rail Z4804~Z4807 (part
3)
26 Jul 2019 Mr. Khôi
207 YSE/PTSC Lab Room Lube oil unit for mixer motor, Lube ITP No.: N/A YSE-HSVC1 PP4-RFI-ME-0202 Acceptable Mr. Cuong
01.30PM (PTCS)
oil unit for mixer gear reducer, CCW
unit,Lube oil unit for gear pump gear
reducer, Z-4810, Z-4813.
- Test Hicon Epoxy (7 days).
26 Jul 2019 Mr. Khôi
208 YSE/PTSC Lab Room * Permanent rail Z4804~Z4807(Base ITP No.: N/A YSE-HSVC1 PP4-RFI-ME-0203 Acceptable Mr. Cuong
01.30PM (PTCS)
middle of Rail (part 2)
- Centerline, Padding Inspection. ITP No.: PP4-QC-PP-
26 Jul 2019 Mr. Khôi
209 YSE/PTSC Flare Stack Area * Z-1701(F-2), Z-1701 (F1-1), Z- 0010 YSE-HSVC1 PP4-RFI-ME-0204 Acceptable Mr. Cuong
08.00AM (PTCS)
1701(F1-2), Z-1701(F1-3) Rev: A

- Bolts Tightening Steel Structure of ITP No.: PP4-QC-PP-


26 Jul 2019 Mr. Khôi
210 YSE/PTSC Utility Area 0006 YSE-HSVC1 PP4-RFI-ME-0205 Acceptable Mr. Cuong
09.00AM Line AA~AC, A2~A6. Rev: A
(PTCS)

- Grouting Base Plate steel structure. ITP No.: PP4-QC-PP-


26 Jul 2019 Mr. Khôi
211 YSE/PTSC Utility Area 0011 YSE-HSVC1 PP4-RFI-ME-0206 Acceptable Mr. Cuong
01.30PM * AA~CC, A2~A6. Rev: A
(PTCS)

ITP No.: PP4-QC-PP-


26 Jul 2019 - Alignment Inspection. Mr. Khôi Z-1105 doesn't have centerline
212 YSE/PTSC Utility Area 0010 YSE-HSVC1 PP4-RFI-ME-0207 Acceptable Mr. Cuong
09.30AM * Z-1105, D-1101 (PTCS) inspection
Rev: A
- Test Hicon Epoxy Starcrete-EP (7
27 Jul 2019 Mr. Khôi
213 YSE/PTSC Lab Room days). ITP No.: N/A YSE-HSVC1 PP4-RFI-ME-0208 Acceptable Mr. Cuong
01.30PM (PTCS)
* C-2401A/B.
- Test Sika 214-11 (28 days)
27 Jul 2019 Mr. Khôi
214 YSE/PTSC Lab Room * Grouting Anchor Bolts ZR-4804, Z- ITP No.: N/A YSE-HSVC1 PP4-RFI-ME-0209 Acceptable Mr. Cuong
01.30PM (PTCS)
4801A.
- Test Hicon Non-Shrinking (7 days)
* P-4113, P-4106A/B, P-4602, P-
29 Jul 2019 Mr. Khôi
215 YSE/PTSC Lab Room 4103, PK-4501, F-4601, P-4203, P- ITP No.: N/A YSE-HSVC1 PP4-RFI-ME-0210 Acceptable Mr. Cuong
01.30PM (PTCS)
4204, E-4205, E-4204, E-4201
C-4601
- Elevation, Orientation, Leveling ITP No.: PP4-QC-PP-
27 Jul 2019 Mr. Khôi
216 YSE/PTSC ISBL Area Inspection. 0010 YSE-HSVC1 PP4-RFI-ME-0211 Acceptable Mr. Cuong
08.00AM (PTCS)
* C-4610. Rev: A
- Elevation, orientation and Leveling ITP No.: PP4-QC-PP-
27 Jul 2019 Mr. Khôi
217 YSE/PTSC Jetty Area Inspection 0010 YSE-HSVC1 PP4-RFI-ME-0212 Acceptable Mr. Cuong
08.30AM (PTCS)
* C-2401A/ C-2401B Rev: A
ITP No.: PP4-QC-PP-
27/07/2019 - Grouting Anchor Bolts for Motor Mr. Khôi
218 YSE/PTSC Jetty Area 0011 YSE-HSVC1 PP4-RFI-ME-0213 Acceptable Mr. Cuong
'09:00AM '* C-2401A/ C-2401B (PTCS)
Rev: A
HSVC1 PP4 PROJECT

Client SUMMARY OF MECHANICAL INSPECTION SCHEDULE EPC Contractor

Update 6-Aug-2020

INSPECTION ATTENDEE
INSPECTION ITP No
S/N- SUB CON INSPECTION DATE INSPECTION ACTIVITY RFI No RESULT DOCUMENT STATUS REMARKS/ Reprot Number
LOCATION ITP Rev
- Bolts tightening of Derrick Block 2 ITP No.: PP4-QC-PP-
27/07/2019 Mr. Khôi
219 YSE/PTSC Flare Stack Area and 3 for Flare stack 0006 YSE-HSVC1 PP4-RFI-ME-0214 Acceptable Mr. Cuong
'09:30AM (PTCS)
'* Z-1701 Rev: A
27/07/2019 - Grouting Sole plate of Motor PP4-QC-PP-0011 Mr. Khôi
220 YSE/PTSC Jetty Area YSE-HSVC1 PP4-RFI-ME-0215 Acceptable Mr. Cuong
13:30 PM '* C-2401A & C-2401B Rev: A (PTCS)

27/07/2019 - Alignment Inspection for Motor PP4-QC-PP-0010 Mr. Khôi


221 YSE/PTSC Jetty Area YSE-HSVC1 PP4-RFI-ME-0216 Acceptable Mr. Cuong
14:00 PM '* C-2401A & C-2401B Rev: A (PTCS)

ITP No.: PP4-QC-PP-


30/7/2019 - Alignment Inspection for Equipment Mr. Khôi
222 YSE/PTSC Pettellizer Area 0010 YSE-HSVC1 PP4-RFI-ME-0217 Acceptable Mr. Cuong
' 09 H 00 AM '* Z-4811 + Z-4810 + Z-4813 (PTCS)
Rev: A
ITP No.: PP4-QC-PP-
30/7/2019 - Alignment Inspection for Equipment Mr. Khôi
223 YSE/PTSC Boiler Area 0010 YSE-HSVC1 PP4-RFI-ME-0218 Acceptable Mr. Cuong
' 08 H 30 AM '* Z-1101 (PTCS)
Rev: A
ITP No.: PP4-QC-PP-
29/7/2019 Grouting Anchor Bolts Mr. Khôi
224 YSE/PTSC ISBL Area 0011 YSE-HSVC1 PP4-RFI-ME-0219 Acceptable Mr. Cuong
14h00 '* PK-4301 (PTCS)
Rev: A
Test Sikadur 42MP (28 days).
31/7/2019 Mr. Khôi
225 YSE/PTSC Lab Room * ZR-4804 ITP No.: N/A YSE-HSVC1 PP4-RFI-ME-0220 Acceptable Mr. Cuong
13h30 (PTCS)

31/7/2019 Mr. Khôi


226 YSE/PTSC Lab Room Test Hicon Epoxy Starrete (7days) ITP No.: N/A YSE-HSVC1 PP4-RFI-ME-0221 Acceptable Mr. Cuong
13h45 (PTCS)
Test Hicon - Non Shrinking (7days)
* Grouting Base Z4804~Z4807
Permanent Rail (Layer 4), Lube oil
31/7/2019 unit for Mixer Gear Reducer,Lube oil Mr. Khôi
227 YSE/PTSC Lab Room ITP No.: N/A YSE-HSVC1 PP4-RFI-ME-0222 Acceptable Mr. Cuong
14h00 unit for Gear pump gear reducer,Lube (PTCS)
oil unit for mixer motor,Hydrauic oil
unit D4803
Anchor Bolts C1101.

Centerline, Padding Inspection


'* PK-2601 ITP No.:
Mr. Khôi
228 YSE/PTSC 31/7/2019 Jetty Area *D-2301 PP4-QC-PP-0010 YSE-HSVC1 PP4-RFI-ME-0223 Acceptable Mr. Cuong
(PTCS)
* Z-2301 Rev: A
* P-2601A/2601B
31 Jul 2019 - Hi-con Non-Shrinking Inspection Mr. Khôi
229 YSE/PTSC Warehouse 02 ITP No.: N/A YSE-HSVC1 PP4-RFI-ME-0224 Acceptable Mr. Cuong
09.30AM (PTCS)
- Alignment Liquid Seal drum
ITP No.: PP4-QC-PP-
01st August 2019 Equipment Mr. Khôi
230 YSE/PTSC Flare Stack Area 0010 YSE-HSVC1 PP4-RFI-ME-0225 Acceptable Mr. Cuong
08h.30AM * Z-1701 (PTCS)
Rev: A

- Levelness and dimension internal


ITP No.: PP4-QC-PP-
01st August 2019 tray Inspection Mr. Khôi
231 YSE/PTSC ISBL Area 0010 YSE-HSVC1 PP4-RFI-ME-0226 Acceptable Mr. Cuong
09h.00AM * T-4501 (PTCS)
Rev: A

- Test SIKA 214-11 (28 days)


01. Grouting Anchor Bolts
* P4301AB,E-4208,E-4209, ITP No.: PP4-QC-PP-
02 August 2019 Mr. Khôi
232 YSE/PTSC
13h30
LAB ROOM E-4502AB,E-4411,P-4401 0011 YSE-HSVC1 PP4-RFI-ME-0227 Acceptable
(PTCS)
Mr. Cuong
02. Grouting Base Rev: A
* F4702AB,F4701,F4201AB,
D4509,D4510,T4503AB
- Test SIKADUR 42MP (28 days) ITP No.: PP4-QC-PP-
02 August 2019 Mr. Khôi
233 YSE/PTSC LAB ROOM Grouting Base plate 0011 YSE-HSVC1 PP4-RFI-ME-0228 Acceptable Mr. Cuong
13h30 (PTCS)
*Z-4801A Rev: A

- Test SIKA 214-11 (28 days)


ITP No.: PP4-QC-PP-
2nd August 2019 *Grouting base PK1101, Mr. Khôi
234 YSE/PTSC LAB ROOM 0011 YSE-HSVC1 PP4-RFI-ME-0229 Acceptable Mr. Cuong
13h30 Anchor bolts P1101AB, (PTCS)
Rev: A
Chemical dosing system for PK1101.
HSVC1 PP4 PROJECT

Client SUMMARY OF MECHANICAL INSPECTION SCHEDULE EPC Contractor

Update 6-Aug-2020

INSPECTION ATTENDEE
INSPECTION ITP No
S/N- SUB CON INSPECTION DATE INSPECTION ACTIVITY RFI No RESULT DOCUMENT STATUS REMARKS/ Reprot Number
LOCATION ITP Rev
- Grouting Anchor Bolts
*PK-2501
Jetty Area ITP No.: PP4-QC-PP-
02 August 2019 - Grouting Anchor Bolts Lube oil Unit Mr. Khôi
235 YSE/PTSC ISBL Area 0011 YSE-HSVC1 PP4-RFI-ME-0230 Acceptable Mr. Cuong
08h30AM C-4401, Seal Gas Unit (PTCS)
Petellizer Rev: A
- Grouting base
*Z-4810 + Z-4813
ITP No.: PP4-QC-PP-
02 August 2019 - Grouting base for compressor Mr. Khôi
236 YSE/PTSC 0011 YSE-HSVC1 PP4-RFI-ME-0231 Acceptable Mr. Cuong
08h30AM ISBL Area *PK-4301 (PTCS)
Rev: A
-Grouting base for Derrick + Liquid ITP No.: PP4-QC-PP-
02-Aug-2019 Mr. Khôi
237 YSE/PTSC Seal Drum 0011 YSE-HSVC1 PP4-RFI-ME-0232 Acceptable Mr. Cuong
10h00AM Flare stack Area (PTCS)
*Z-1701 Rev: A
-Alignment Inspection for Derrick ITP No.: PP4-QC-PP-
02-Aug-2019 Mr. Khôi
238 YSE/PTSC Block 01 0010 YSE-HSVC1 PP4-RFI-ME-0233 Acceptable Mr. Cuong
09h00AM Flare stack Area (PTCS)
*Z-1701 Rev: A
-Bolts tightening Inspection for ITP No.: PP4-QC-PP-
02-Aug-2019 Mr. Khôi
239 YSE/PTSC Derrick Block 01 0010 YSE-HSVC1 PP4-RFI-ME-0234 Acceptable Mr. Cuong
09h30AM Flare stack Area (PTCS)
*Z-1701 Rev: A
- Centerline, Padding Inspection. ITP No.: PP4-QC-PP-
3 Aug 2019 Mr. Khôi
240 YSE/PTSC Silo Area * D-4901G, D-4901H, D-4904G, D- 0010 YSE-HSVC1 PP4-RFI-ME-0235 Cancel Mr. Cuong
08.00AM (PTCS)
4904H. Rev: A
3 Aug 2019 - Trial Test HICON Non-shrinking Mr. Khôi
241 YSE/PTSC Lab Room ITP No.: N/A YSE-HSVC1 PP4-RFI-ME-0236 Acceptable Mr. Cuong
01.30PM (28 days). (PTCS)

- Test Hicon Non-Shrinking (7 days).


* Steel structure line AA~CC,
A2~A6.
3 Aug 2019 Mr. Khôi
242 YSE/PTSC Lab Room PK-1601A/B/C, PK- ITP No.: N/A YSE-HSVC1 PP4-RFI-ME-0237 Acceptable Mr. Cuong
01.30PM (PTCS)
1602A/B/C,Support Duct
SP01/SP02/SP03.
C-2401A/B, C2401A/B.

-Test Hicon Non-shrinking (28 days).


04 Aug 2019 Mr. Khôi
243 YSE/PTSC Lab Room * PK-4601, P-4606A/B, P-4605, P- ITP No.: N/A YSE-HSVC1 PP4-RFI-ME-0238 Acceptable Mr. Cuong
13.30PM (PTCS)
4501A/B, P-4303A

05 Aug 2019 -Test Hicon Non-shrinking (7 days). Mr. Khôi


244 YSE/PTSC Lab Room ITP No.: N/A YSE-HSVC1 PP4-RFI-ME-0239 Acceptable Mr. Cuong
13.30PM * PK-4301 (PTCS)
ITP No.: PP4-QC-PP-
05 Aug 2019 -Grouting Foundation. Mr. Khôi
245 YSE/PTSC Pelletizer Area 0011 YSE-HSVC1 PP4-RFI-ME-0240 Acceptable Mr. Cuong
08.00AM * ZM-4801 (PTCS)
Rev: A
- Elevation, Orientation, Leveling ITP No.: PP4-QC-PP-
05 Aug 2019 Mr. Khôi
246 YSE/PTSC ISBL Area Inspection. 0010 YSE-HSVC1 PP4-RFI-ME-0241 Acceptable Mr. Cuong
09.00AM (PTCS)
* D-4601, D-4602 Rev: A
- Centerline, Padding Inspection. ITP No.: PP4-QC-PP-
05 Aug 2019 Mr. Khôi
247 YSE/PTSC Water Tank Area * P-1303A/B/C, P-1304, P- 0010 YSE-HSVC1 PP4-RFI-ME-0242 Acceptable Mr. Cuong
08.00AM (PTCS)
1305A/B/C, P-1307A/B, E-1301. Rev: A
ITP No.: PP4-QC-PP-
05 Aug 2019 - Internal Tray Inspection. Mr. Khôi
248 YSE/PTSC ISBL Area 0010 YSE-HSVC1 PP4-RFI-ME-0243 Acceptable Mr. Cuong
08.00AM * T-4502 (PTCS)
Rev: A
-Test Hicon Non-Shirinking
(28 days) of Grouting Anchor Bolts ITP No.: PP4-QC-PP-
06 Aug 2019 Mr. Khôi
249 YSE/PTSC *E4710,E4711,E4712,E4610,E4204,E 0011 YSE-HSVC1 PP4-RFI-ME-0244 Acceptable Mr. Cuong
13h30 LAB ROOM (PTCS)
4205,P4203,P4204,E4201,ZM4804 Rev: A
* Base P4601A/B
Alignment Inspection for:
ITP No.: PP4-QC-PP- E-4404 is rejected
06 Aug 2019 * E-4309;E-4308;E-4303; Acceptable with Mr. Khôi
250 YSE/PTSC 0010 YSE-HSVC1 PP4-RFI-ME-0245 Mr. Cuong D-4003 doesn't have centerline
08h30AM ISBL AREA E-4503;E-4404 comment (PTCS)
Rev: A inspection
* D-4508;D-4801;D-4003
07 Aug 2019 -Test Hicon non-shrinking (28 days) Mr. Khôi
251 YSE/PTSC Lab room ITP No.: N/A YSE-HSVC1 PP4-RFI-ME-0246 Acceptable Mr. Cuong
01.30PM * R-4201,R-4202 (PTCS)
07 Aug 2019 -Test Sikadur 42MP (28 days) Mr. Khôi
252 YSE/PTSC Lab room ITP No.: N/A YSE-HSVC1 PP4-RFI-ME-0247 Acceptable Mr. Cuong
01.30PM *Permanent Rail Z-4804~Z-4807 (PTCS)
HSVC1 PP4 PROJECT

Client SUMMARY OF MECHANICAL INSPECTION SCHEDULE EPC Contractor

Update 6-Aug-2020

INSPECTION ATTENDEE
INSPECTION ITP No
S/N- SUB CON INSPECTION DATE INSPECTION ACTIVITY RFI No RESULT DOCUMENT STATUS REMARKS/ Reprot Number
LOCATION ITP Rev
07 Aug 2019 Mr. Khôi
253 YSE/PTSC Warehouse 2 Area -Sika 214-11 Inspection. ITP No.: N/A YSE-HSVC1 PP4-RFI-ME-0248 Acceptable Mr. Cuong
08.00AM (PTCS)
ITP No.: PP4-QC-PP-
07 Aug 2019 - Grouting Base plate Mr. Khôi
254 YSE/PTSC Utility Area 0011 YSE-HSVC1 PP4-RFI-ME-0249 Acceptable Mr. Cuong
08.30AM * C-1101, E-1101, Z-1101 (PTCS)
Rev: A
ITP No.: PP4-QC-PP-
07 Aug 2019 - Grouting Base plate Mr. Khôi
255 YSE/PTSC Flare Stack 0011 YSE-HSVC1 PP4-RFI-ME-0250 Acceptable Mr. Cuong
08.30AM * Z-1701 (PTCS)
Rev: A

- Grouting Anchor Bolts & Base Plate. ITP No.: PP4-QC-PP-


07 Aug 2019 Mr. Khôi
256 YSE/PTSC ISBL Area * C- 4401, Lube Oil Unit 0011 YSE-HSVC1 PP4-RFI-ME-0251 Acceptable Mr. Cuong
08.30AM (PTCS)
* C-4610 Rev: A

- Grouting Anchor Bolts ITP No.: PP4-QC-PP-


07 Aug 2019 Mr. Khôi
257 YSE/PTSC Jetty Area * PK- 2501, PK-2601 0011 YSE-HSVC1 PP4-RFI-ME-0252 Acceptable Mr. Cuong
09.00AM (PTCS)
P-2601A/B, P-2602A/B Rev: A
ITP No.: PP4-QC-PP-
07 Aug 2019 - Internal tray Inspection. Mr. Khôi
258 YSE/PTSC ISBL Area 0010 YSE-HSVC1 PP4-RFI-ME-0253 Acceptable Mr. Cuong
09.00AM * T-4302 (PTCS)
Rev: A
D-4504 is rejected
08 Aug 2019 - Agliment Equipment. PP4-QC-PP-0010 Acceptable with Mr. Khôi
259 YSE/PTSC ISBL Area YSE-HSVC1 PP4-RFI-ME-0254 Mr. Cuong E-4409 doesn't have centerline
08.00AM * E-4409, D-4504, D-4505 Rev: A comment (PTCS)
report
08 Aug 2019 - Center line Inspection PP4-QC-PP-0010 Mr. Khôi
260 YSE/PTSC ISBL Area YSE-HSVC1 PP4-RFI-ME-0255 Acceptable Mr. Cuong
08.00AM * D-4504, D-4505 Rev: A (PTCS)
- Grouting anchor bolts
08 Aug 2019 PP4-QC-PP-0011 Mr. Khôi
261 YSE/PTSC Utility Area * P-1303A/B/C, P-1304, P- YSE-HSVC1 PP4-RFI-ME-0256 Acceptable Mr. Cuong
08.00AM Rev: A (PTCS)
1305A/B/C, P-1307A/B

- Test Hicon non-shrinking (28 days)


08 Aug 2019 Mr. Khôi
262 YSE/PTSC Lab room * P-4603A/B, P-4304A/B, P- N/A YSE-HSVC1 PP4-RFI-ME-0257 Acceptable Mr. Cuong
01.30PM (PTCS)
4502A/B, P-4309A/B,P-4401

- Grouting base plate ITP No.: PP4-QC-PP-


09 Aug 2019 Mr. Khôi
263 YSE/PTSC ISBL Area * E-4208, E-4209, E-4502A/B, E- 0011 YSE-HSVC1 PP4-RFI-ME-0258 Acceptable Mr. Cuong
08.00AM (PTCS)
4411 Rev: A
ITP No.: PP4-QC-PP-
09 Aug 2019 - Grouting anchor bolt Mr. Khôi
264 YSE/PTSC Peletizer Building 0011 YSE-HSVC1 PP4-RFI-ME-0259 Acceptable Mr. Cuong
08.00AM * Local Startup panel (PTCS)
Rev: A
ITP No.: PP4-QC-PP-
09 Aug 2019 - Bolt tightening Inspection Mr. Khôi
265 YSE/PTSC ISBL Area 0010 YSE-HSVC1 PP4-RFI-ME-0260 Acceptable Mr. Amado
08.30AM * T-4502, E-4606 (PTCS)
Rev: A

- Test Hicon Non-shrinking (28 days)


* P-4301A/B, D-1102, D-1103, Z-
09 Aug 2019 Mr. Khôi
266 YSE/PTSC Lab room 1107,Chemical Dosing system for PK- ITP No.: N/A YSE-HSVC1 PP4-RFI-ME-0261 Acceptable Mr. Cuong
08.30AM (PTCS)
1101,D-1604, PK-4501,E-4305,E-
4703,D-4115

09 Aug 2019 - Test Hicon Non-shrinking (7 days) Mr. Khôi


267 YSE/PTSC Lab room ITP No.: N/A YSE-HSVC1 PP4-RFI-ME-0262 Acceptable Mr. Cuong
09.00AM * Z-4813, Z-1701 (PTCS)

09 Aug 2019 - Test Epoxy Starconcre - EP (7 days) Mr. Khôi


268 YSE/PTSC Lab room ITP No.: N/A YSE-HSVC1 PP4-RFI-ME-0263 Acceptable Mr. Cuong
09.00AM * Z-4810, PK-4301 (PTCS)

10 Aug 2019 - Center line Inspection PP4-QC-PP-0010 Mr. Khôi


269 YSE/PTSC Peletizer Building YSE-HSVC1 PP4-RFI-ME-0264 Acceptable Mr. Cuong
08.00AM * Z-4809 Rev: A (PTCS)
10 Aug 2019 - Aligment Inspection PP4-QC-PP-0010 Mr. Khôi
270 YSE/PTSC Peletizer Building YSE-HSVC1 PP4-RFI-ME-0265 Cancel Mr. Cuong
08.00AM * Z-4809, D-4807 Rev: A (PTCS)
10 Aug 2019 - Test Sikadur 42MP (28 days)
271 YSE/PTSC Lab room N/A YSE-HSVC1 PP4-RFI-ME-0266 Mr. Cuong
09.00AM * ZM-4804
10 Aug 2019 - Internal Tray Inspection PP4-QC-PP-0010 Mr. Khôi
272 YSE/PTSC ISBL Area YSE-HSVC1 PP4-RFI-ME-0267 Acceptable Mr. Cuong
08.30AM * T-4701 Rev: A (PTCS)
11 Aug 2019 - Aligment equipment Inspecction PP4-QC-PP-0010 Mr. Khôi
273 YSE/PTSC Jetty Area YSE-HSVC1 PP4-RFI-ME-0268 Acceptable Mr. Cuong
08.00AM * PK-2501, PK-2601 Rev: A (PTCS)
11 Aug 2019 - Grouting base plate PP4-QC-PP-0011 Mr. Khôi
274 YSE/PTSC Jetty Area YSE-HSVC1 PP4-RFI-ME-0269 Acceptable Mr. Cuong
08.30AM * PK-2501, PK-2601 Rev: A (PTCS)
HSVC1 PP4 PROJECT

Client SUMMARY OF MECHANICAL INSPECTION SCHEDULE EPC Contractor

Update 6-Aug-2020

INSPECTION ATTENDEE
INSPECTION ITP No
S/N- SUB CON INSPECTION DATE INSPECTION ACTIVITY RFI No RESULT DOCUMENT STATUS REMARKS/ Reprot Number
LOCATION ITP Rev
- Test Hicon non-shrinking (28 days)
* A1~A7, AD~AE of PK-1101, P-
12 Aug 2019 4205, P-4206, P-4701A/B, P- Mr. Khôi
275 YSE/PTSC Lab room N/A YSE-HSVC1 PP4-RFI-ME-0270 Acceptable Mr. Cuong
09.00AM 4105A/B, P-4107A/B, P-4110A/B, P- (PTCS)
4109, P-4302A/B, P-4808A/B, P-
4103, F-4601,Z -4804~Z-4807

12 Aug 2019 - Test Hicon non-shrinking (7 days) Mr. Khôi


276 YSE/PTSC Lab room N/A YSE-HSVC1 PP4-RFI-ME-0271 Acceptable Mr. Cuong
09.00AM * ZM-4801A (PTCS)
10 Aug 2019 Mr. Khôi
277 YSE/PTSC Ware House 2 - Sika 214-11 Inspection ITP No.: N/A YSE-HSVC1 PP4-RFI-ME-0272 Acceptable Mr. Cuong
01.30PM (PTCS)

13 Aug 2019 - Test Hicon Epoxy Stacrete (28 days) Mr. Khôi
278 YSE/PTSC Lab room ITP No.: N/A YSE-HSVC1 PP4-RFI-ME-0273 Acceptable Mr. Cuong
08.00AM * Trial test (PTCS)

ITP No.: PP4-QC-PP-


13 Aug 2019 - Bolt tightening inspection Mr. Khôi
279 YSE/PTSC Flare Stack 0010 YSE-HSVC1 PP4-RFI-ME-0274 Acceptable Mr. Cuong
08.30AM * Derrick Block 5 of Z-1701 (PTCS)
Rev: A
ITP No.: PP4-QC-PP-
13 Aug 2019 - Center line, padding inspection Mr. Khôi
280 YSE/PTSC Jetty Area 0010 YSE-HSVC1 PP4-RFI-ME-0275 Acceptable Mr. Cuong
09.00AM * P-2201A/B/C, P-2203A/B (PTCS)
Rev: A
- Test Sika 214-11 (7 days)
14 Aug 2019 * C-1101, E-1101, Z-1101, C-4610, Mr. Khôi
281 YSE/PTSC Lab room N/A YSE-HSVC1 PP4-RFI-ME-0276 Acceptable Mr. Cuong
08.00AM CT-2601, C-4401, PK-2501, PK- (PTCS)
2601, P-2601A/B.

14 Aug 2019 - Test Hicon non-shrinking (28 days) Mr. Khôi


282 YSE/PTSC Lab room N/A YSE-HSVC1 PP4-RFI-ME-0277 Acceptable Mr. Cuong
08.00AM * PK-1601A/B/C, PK-1602A/B/C (PTCS)

14 Aug 2019 - Leveling inspection PP4-QC-PP-0010 Mr. Khôi


283 YSE/PTSC ISBL Area YSE-HSVC1 PP4-RFI-ME-0278 Acceptable Mr. Cuong
09.00AM * C-4401 Rev: A (PTCS)
14 Aug 2019 - Center line inspection PP4-QC-PP-0010 Mr. Khôi
284 YSE/PTSC Jetty Area YSE-HSVC1 PP4-RFI-ME-0279 Acceptable Mr. Cuong
09.00AM * CT-2601 Rev: A (PTCS)
14 Aug 2019 - Aligment column inspection PP4-QC-PP-0010 Mr. Khôi
285 YSE/PTSC Jetty Area YSE-HSVC1 PP4-RFI-ME-0280 Acceptable Mr. Cuong
09.30AM * CT-2601 Rev: A (PTCS)
14 Aug 2019 - Bolt tightening Inspection PP4-QC-PP-0010 Mr. Khôi
286 YSE/PTSC Jetty Area YSE-HSVC1 PP4-RFI-ME-0281 Acceptable Mr. Cuong
09.30AM * CT-2601 Rev: A (PTCS)
14 Aug 2019 - Bolts tightening Inspection PP4-QC-PP-0010 Mr. Khôi
287 YSE/PTSC Flare Stack YSE-HSVC1 PP4-RFI-ME-0282 Acceptable Mr. Cuong
01.30PM * Derrick block 4 of Z-1701 Rev: A (PTCS)

- Test Hicon non-shrinking (28 days)


15 Aug 2019 * E- 4610, E-4302, E-4305, E-4710, Mr. Khôi
288 YSE/PTSC Lab room N/A YSE-HSVC1 PP4-RFI-ME-0283 Acceptable Mr. Cuong
08.00AM E-4711, E-4712, D-4115, E-4703, F- (PTCS)
4108, C-2401A/B

- Test Sika 214-11 (7 days)


15 Aug 2019 Mr. Khôi
289 YSE/PTSC Lab room * Z1701, P-1303A/B/C, P-1304, P- N/A YSE-HSVC1 PP4-RFI-ME-0284 Acceptable Mr. Cuong
08.00AM (PTCS)
1305A/B/C, P-1307A/B
ITP No.: PP4-QC-PP-
15 Aug 2019 - Pre Aligment inspection Mr. Khôi
290 YSE/PTSC ISBL Area 0010 YSE-HSVC1 PP4-RFI-ME-0285 Acceptable Mr. Cuong
09.00AM * C-4401 (PTCS)

- Elevation, orientation, level ITP No.: PP4-QC-PP-


15 Aug 2019 Mr. Khôi
291 YSE/PTSC ISBL Area inspection 0010 YSE-HSVC1 PP4-RFI-ME-0286 Acceptable Mr. Cuong
09.00AM (PTCS)
* D-4009, D-4004
- Elevation, orientation, level
ITP No.: PP4-QC-PP-
15 Aug 2019 inspection Mr. Khôi
292 YSE/PTSC ISBL Area 0010 YSE-HSVC1 PP4-RFI-ME-0287 Acceptable Mr. Cuong
09.30AM * PK-4502, PK-4701, PK-4702, PK- (PTCS)
4603
- Grouting and Anchor bolts
* D-4009, PK-4603, ITP No.: PP4-QC-PP-
15 Aug 2019 Mr. Khôi
293 YSE/PTSC ISBL Area - Base plate 0011 YSE-HSVC1 PP4-RFI-ME-0288 Acceptable Mr. Cuong
01.30PM (PTCS)
* PK-4502, , D-4004, PK-4701, PK-
4702
HSVC1 PP4 PROJECT

Client SUMMARY OF MECHANICAL INSPECTION SCHEDULE EPC Contractor

Update 6-Aug-2020

INSPECTION ATTENDEE
INSPECTION ITP No
S/N- SUB CON INSPECTION DATE INSPECTION ACTIVITY RFI No RESULT DOCUMENT STATUS REMARKS/ Reprot Number
LOCATION ITP Rev
ITP No.: PP4-QC-PP-
15 Aug 2019 - Grouting Base plate Mr. Khôi
294 YSE/PTSC ISBL Area 0011 YSE-HSVC1 PP4-RFI-ME-0289 Acceptable Mr. Cuong
01.30PM * C-4401 (PTCS)

15 Aug 2019 N/A Mr. Khôi


295 YSE/PTSC Ware house 2 - Sika 214-11 inspection YSE-HSVC1 PP4-RFI-ME-0290 Acceptable Mr. Cuong
01.30PM (PTCS)

- Test Hicon non-shrinking (28 days)


* permanent rail Z4804~Z4807 part 3,
16 Aug 2019 lube oil unit for mixer motor, Lube oil N/A Mr. Khôi
296 YSE/PTSC Lab room YSE-HSVC1 PP4-RFI-ME-0291 Acceptable Mr. Cuong
09.00 AM unit for mixer gear reducer, CCW (PTCS)
unit, Lube oil unit for gear pump gear
reducer, Z-4810, Z-4813.

- Test Hicon Epoxy Starcrete (28


16 Aug 2019 days) N/A Mr. Khôi
297 YSE/PTSC Lab room YSE-HSVC1 PP4-RFI-ME-0292 Acceptable Mr. Cuong
09.00 AM * permanent rail Z-4804~Z-4807 (PTCS)
(Base middle of Rail part 2)
- Test Sika 214-11 (7 days)
16 Aug 2019 N/A Mr. Khôi
298 YSE/PTSC Lab room * E-4208, E- 4209 ,E-4502A/B ,E- YSE-HSVC1 PP4-RFI-ME-0293 Acceptable Mr. Cuong
09.00 AM (PTCS)
4411, Local startup panel
- Test Sika 214-11 (7 days)
16 Aug 2019 N/A Mr. Khôi
299 YSE/PTSC Lab room * E-4208, E- 4209 ,E-4502A/B ,E- YSE-HSVC1 PP4-RFI-ME-0294 Acceptable Mr. Cuong
09.00 AM (PTCS)
4411, Local startup panel
16 Aug 2019 - Grouting foundation inspection PP4-QC-PP-0011 Mr. Khôi
300 YSE/PTSC Propane tank Area YSE-HSVC1 PP4-RFI-ME-0295 Acceptable Mr. Cuong
08.30 AM * H-1001 (PTCS)
16 Aug 2019 - Grouting anchor bolts inspection PP4-QC-PP-0011 Mr. Khôi
301 YSE/PTSC ISBL Area YSE-HSVC1 PP4-RFI-ME-0296 Cancel Mr. Cuong
08.30 AM * PK-4709A/B (PTCS)
16 Aug 2019 - Center line & padding inspection PP4-QC-PP-0010 Mr. Khôi
302 YSE/PTSC Silo Area YSE-HSVC1 PP4-RFI-ME-0297 Acceptable Mr. Cuong
09.30 AM * D-4901C, D-4901D, D-4904C (PTCS)
16 Aug 2019 - Center line inspection PP4-QC-PP-0010 Mr. Khôi
303 YSE/PTSC Raw water Pond Area YSE-HSVC1 PP4-RFI-ME-0298 Acceptable Mr. Cuong
02.30 PM * P-1301A/B/C (PTCS)

16 Aug 2019 - Grouting anchor bolts inspection PP4-QC-PP-0011 Mr. Khôi


304 YSE/PTSC Raw water Pond Area YSE-HSVC1 PP4-RFI-ME-0299 Acceptable Mr. Cuong
03.00 PM * P-1301A/B/C (PTCS)

- Visual infill & distributor pipe ITP No.: PP4-QC-PP-


16 Aug 2019 Mr. Khôi
305 YSE/PTSC Jetty Area inspection 0010 YSE-HSVC1 PP4-RFI-ME-0300 Acceptable Mr. Cuong
03.00 PM (PTCS)
* CT-2601
ITP No.: PP4-QC-PP-
16 Aug 2019 - Center line & padding inspection Mr. Khôi
306 YSE/PTSC Raw Water pond Area 0010 YSE-HSVC1 PP4-RFI-ME-0301 Acceptable Mr. Cuong
03.00 PM * P-1309A/B (PTCS)

ITP No.: PP4-QC-PP-


16 Aug 2019 - Center line inspection Mr. Khôi
307 YSE/PTSC Peletizer Building 0010 YSE-HSVC1 PP4-RFI-ME-0302 Acceptable Mr. Cuong
03.30 PM * C-4809 (PTCS)

- Grouting anchor bolts inspection ITP No.: PP4-QC-PP-


16 Aug 2019 Mr. Khôi
308 YSE/PTSC ISBL Area * Lube oil unit, Sea gas unit (PK- 0011 YSE-HSVC1 PP4-RFI-ME-0303 Acceptable Mr. Cuong
03.30 PM (PTCS)
4401)
ITP No.: PP4-QC-PP-
17 Aug 2019 - Grouting anchor bolts inspection Mr. Khôi
309 YSE/PTSC Peletizer building 0011 YSE-HSVC1 PP4-RFI-ME-0304 Acceptable Mr. Cuong
09.30 AM * ZM-4801A, C-4809 (PTCS)

ITP No.: PP4-QC-PP-


17 Aug 2019 - Pre Aligment inspection Mr. Khôi
310 YSE/PTSC Peletizer building 0010 YSE-HSVC1 PP4-RFI-ME-0304-1 Acceptable Mr. Cuong
09.00 AM * ZM-4801A (PTCS)

- Elevation, orientation, leveling ITP No.: PP4-QC-PP-


17 Aug 2019 Mr. Khôi
311 YSE/PTSC ISBL Area inspection 0010 YSE-HSVC1 PP4-RFI-ME-0305 Acceptable Mr. Cuong
08.00 AM (PTCS)
* PK-4709A/B
- Grouting base plate inspection
* D-4009, PK-4603, PK-4502 ITP No.: PP4-QC-PP-
17 Aug 2019 Mr. Khôi
312 YSE/PTSC ISBL Area * Grouting anchor bolts inspection : 0011 YSE-HSVC1 PP4-RFI-ME-0306 Acceptable Mr. Cuong
08.30 AM (PTCS)
PK-4709A/B

17 Aug 2019 - Test Hicon Epoxy Starcrete Mr. Khôi


313 YSE/PTSC Lab room ITP No.: N/A YSE-HSVC1 PP4-RFI-ME-0307 Acceptable Mr. Cuong
09.30 AM * C-2401 (PTCS)
HSVC1 PP4 PROJECT

Client SUMMARY OF MECHANICAL INSPECTION SCHEDULE EPC Contractor

Update 6-Aug-2020

INSPECTION ATTENDEE
INSPECTION ITP No
S/N- SUB CON INSPECTION DATE INSPECTION ACTIVITY RFI No RESULT DOCUMENT STATUS REMARKS/ Reprot Number
LOCATION ITP Rev
17 Aug 2019 ITP No.: N/A Mr. Khôi
314 YSE/PTSC Ware house 2 - Sika 214-11 inspection YSE-HSVC1 PP4-RFI-ME-0308 Acceptable Mr. Cuong
01.30PM (PTCS)
ITP No.: PP4-QC-PP-
17 Aug 2019 - Grouting anchor bolts inspection Mr. Khôi
315 YSE/PTSC ISBL Area 0011 YSE-HSVC1 PP4-RFI-ME-0309 Acceptable Mr. Cuong
09.00AM * PK-4301 (PTCS)

ITP No.: PP4-QC-PP-


18 Aug 2019 - Center line inspection Mr. Khôi
316 YSE/PTSC Utility Area 0010 YSE-HSVC1 PP4-RFI-ME-0310 Acceptable Mr. Cuong
08.00AM * D-1501 (PTCS)

- Aligment inspection
ITP No.: PP4-QC-PP-
18 Aug 2019 * E-2201A, E-2201B, E-2201C, E- Mr. Khôi
317 YSE/PTSC Jetty Area 0010 YSE-HSVC1 PP4-RFI-ME-0311 Acceptable Mr. Cuong
08.30AM 2201D, E-2201E, E-2201F, E-2201G, (PTCS)
E-2201H, E-2201I (Vaporizer)
- Grouting base plate inspection
ITP No.: PP4-QC-PP-
18 Aug 2019 * E-2201A, E-2201B, E-2201C, E- Mr. Khôi
318 YSE/PTSC Jetty Area 0011 YSE-HSVC1 PP4-RFI-ME-0312 Acceptable Mr. Cuong
09.00AM 2201D, E-2201E, E-2201F, E-2201G, (PTCS)
E-2201H, E-2201I (Vaporizer)
ITP No.: PP4-QC-PP-
18 Aug 2019 - Grouting base plate inspection Mr. Khôi
319 YSE/PTSC Peletizer building 0011 YSE-HSVC1 PP4-RFI-ME-0313 Acceptable Mr. Cuong
09.30AM *C-4809 (PTCS)

ITP No.: PP4-QC-PP-


18 Aug 2019 -Coupling aligment inspection Mr. Khôi
320 YSE/PTSC Jetty Area 0010 YSE-HSVC1 PP4-RFI-ME-0314 Acceptable Mr. Cuong
09.00AM * CT-2601 (PTCS)

- Pre aligment inspection ITP No.: PP4-QC-PP-


19 Aug 2019 Mr. Khôi
321 YSE/PTSC Utility Area * P-1303A/B/C, P-1304, P- 0010 YSE-HSVC1 PP4-RFI-ME-0315 Acceptable Mr. Cuong
08.00AM (PTCS)
1305A/B/C, P-1307A/B
ITP No.: PP4-QC-PP-
19 Aug 2019 - Pre aligment inspection Mr. Khôi
322 YSE/PTSC ISBL Area 0010 YSE-HSVC1 PP4-RFI-ME-0317 Acceptable Mr. Cuong
08.30AM * PK-4301 (PTCS)

- Test Hicon non-shrinking (28 days)


* P-4113, P-4106A/B, P-4602, P-
19 Aug 2019 ITP No.: N/A Mr. Khôi
323 YSE/PTSC Lab room 4103, PK-4501, F-4601, P-4203, P- YSE-HSVC1 PP4-RFI-ME-0318 Acceptable Mr. Cuong
01.30PM (PTCS)
4204, E-4205, E-4204, E-4201, C-
4601
19 Aug 2019 - Test Sika 214-11 (7 days) ITP No.: N/A Mr. Khôi
324 YSE/PTSC Lab room YSE-HSVC1 PP4-RFI-ME-0319 Acceptable Mr. Cuong
01.30PM * PK-2501 (PTCS)
20 Aug 2019 - Grouting base plate inspection PP4-QC-PP-0011 Mr. Khôi
325 YSE/PTSC Peletizer building YSE-HSVC1 PP4-RFI-ME-0320 Acceptable Mr. Cuong
02.00PM * ZM-4801A (PTCS)
19 Aug 2019 - Grouting base plate inspection PP4-QC-PP-0011 Mr. Khôi
326 YSE/PTSC ISBL Area YSE-HSVC1 PP4-RFI-ME-0321 Acceptable Mr. Cuong
02.30PM * PK-4301 (Motor) (PTCS)
20 Aug 2019 - Center line inspection PP4-QC-PP-0010 Mr. Khôi
327 YSE/PTSC Cooling water area YSE-HSVC1 PP4-RFI-ME-0322 Acceptable Mr. Cuong
08.00AM * P-1201A/B/C/D/E (PTCS)
20 Aug 2019 - Center line inspection PP4-QC-PP-0010 Mr. Khôi
328 YSE/PTSC Peletizer building YSE-HSVC1 PP4-RFI-ME-0323 Acceptable Mr. Cuong F-4825 is cancelled
08.00AM * D-4802, F-4825, F-4860 (PTCS)
- Elevation, orientation, leveling
20 Aug 2019 PP4-QC-PP-0010 Mr. Khôi
329 YSE/PTSC Peletizer building inspection YSE-HSVC1 PP4-RFI-ME-0324 Acceptable Mr. Cuong
08.30AM (PTCS)
* C-4809
- Grouting base plate inspection
20 Aug 2019 PP4-QC-PP-0011 Mr. Khôi
330 YSE/PTSC Utility Area * P-1303A/B/C, P-1304, P- YSE-HSVC1 PP4-RFI-ME-0325 Acceptable Mr. Cuong
08.30AM (PTCS)
1305A/B/C, P-1307A/B
20 Aug 2019 - Aligment inspection PP4-QC-PP-0010 Mr. Khôi
331 YSE/PTSC Peletizer building YSE-HSVC1 PP4-RFI-ME-0326 Acceptable Mr. Cuong
09.00AM * ZM-4801A (PTCS)
20 Aug 2019 - Aligment inspection PP4-QC-PP-0010 Mr. Khôi
332 YSE/PTSC ISBL Area YSE-HSVC1 PP4-RFI-ME-0327 Acceptable Mr. Cuong
09.00AM * PK-4301 (PTCS)
20 Aug 2019 - Test Sika 214-11 (7 days) N/A Mr. Khôi
333 YSE/PTSC Lab room YSE-HSVC1 PP4-RFI-ME-0328 Acceptable Mr. Cuong
01.30PM * PK-2601 (PTCS)
20 Aug 2019 - Bolts tightening Inspection Mr. Khôi
334 YSE/PTSC Jetty Area PP4-QC-PP-0010 YSE-HSVC1 PP4-RFI-ME-0329 Acceptable Mr. Cuong
02.30PM * Hub fan of CT-2601 (PTCS)
20 Aug 2019 - Fan pitch-Angle Inspection Mr. Khôi
335 YSE/PTSC Jetty Area PP4-QC-PP-0010 YSE-HSVC1 PP4-RFI-ME-0330 Acceptable Mr. Cuong
02.30PM * CT-2601 (PTCS)
20 Aug 2019 - Fan blade tip clerance Inspection Mr. Khôi
336 YSE/PTSC Jetty Area PP4-QC-PP-0010 YSE-HSVC1 PP4-RFI-ME-0331 Acceptable Mr. Cuong
02.30PM * CT-2601 (PTCS)
HSVC1 PP4 PROJECT

Client SUMMARY OF MECHANICAL INSPECTION SCHEDULE EPC Contractor

Update 6-Aug-2020

INSPECTION ATTENDEE
INSPECTION ITP No
S/N- SUB CON INSPECTION DATE INSPECTION ACTIVITY RFI No RESULT DOCUMENT STATUS REMARKS/ Reprot Number
LOCATION ITP Rev
21 Aug 2019 - Grouting anchor bolts inspection Mr. Khôi
337 YSE/PTSC Jetty Area PP4-QC-PP-0011 YSE-HSVC1 PP4-RFI-ME-0332 Acceptable Mr. Cuong
08.00 AM * P-2203A/B (PTCS)
21 Aug 2019 - Grouting anchor bolts inspection Mr. Khôi
338 YSE/PTSC Propane tank Area PP4-QC-PP-0011 YSE-HSVC1 PP4-RFI-ME-0333 Acceptable Mr. Cuong
08.00 AM * P-1001A/B (PTCS)
21 Aug 2019 - Grouting anchor bolts inspection Mr. Khôi
339 YSE/PTSC Raw water pond Area PP4-QC-PP-0011 YSE-HSVC1 PP4-RFI-ME-0334 Acceptable Mr. Cuong
08.30 AM * P-1309A/B (PTCS)
- Center line inspection
21 Aug 2019 Mr. Khôi
340 YSE/PTSC ISBL Area * PK-4101, D-4106A/B, E-4101A/B, PP4-QC-PP-0010 YSE-HSVC1 PP4-RFI-ME-0335 Acceptable Mr. Cuong
09.00 AM (PTCS)
D-4107
Aligment inspection
* D-4110A/B/C, D-4113A/B, F-4106, D-4110A/B/C; D-4106A/B; D-
21 Aug 2019 ITP No.: PP4-QC-PP-
341 YSE/PTSC ISBL Area D-4105A/B, D-4112, PK-4101, E- YSE-HSVC1 PP4-RFI-ME-0336 Acceptable 4105A/B;D-4112; T-4401 to
09.30 AM 0010
4101A/B, D-4107, D-4106A/B, T- be cancelled
4301, T-4401

21 Aug 2019 - Test Hicon Epoxy starcrete (28 days) Mr. Khôi
342 YSE/PTSC Lab room N/A YSE-HSVC1 PP4-RFI-ME-0337 Acceptable Mr. Cuong
01.30 PM * P-1101A/B (PTCS)

- Test Hicon non-shrinking (28 days)


* Z-4804~Z-4807 Permanent Rail
(Layer 4), Lube oil unit for Mixer
21 Aug 2019 Mr. Khôi
343 YSE/PTSC Lab room Gear Reducer, Lube oil unit for Gear N/A YSE-HSVC1 PP4-RFI-ME-0338 Acceptable Mr. Cuong
01.30 PM (PTCS)
pump gear reducer, Lube oil unit for
mixer motor, Hydrauic oil unit D4803,
C-1101.

21 Aug 2019 - Pre-aligment inspection ITP No.: PP4-QC-PP- Mr. Khôi


344 YSE/PTSC Raw water pond YSE-HSVC1 PP4-RFI-ME-0339 Acceptable Mr. Cuong
01.30 PM * P-1301A/B/C 0010 (PTCS)
21 Aug 2019 - Grouting base plate inspection ITP No.: PP4-QC-PP- Mr. Khôi
345 YSE/PTSC Raw water pond YSE-HSVC1 PP4-RFI-ME-0340 Acceptable Mr. Cuong
01.30 PM * P-1301A/B/C 0011 (PTCS)
- Leveling, elevation, orientation
21 Aug 2019 ITP No.: PP4-QC-PP- Mr. Khôi
346 YSE/PTSC Raw water pond inspection YSE-HSVC1 PP4-RFI-ME-0339-1 Acceptable Mr. Cuong
01.30 PM 0010 (PTCS)
* P-1301A/B/C
- Leveling, elevation, orientation
21 Aug 2019 inspection ITP No.: PP4-QC-PP- Mr. Khôi
347 YSE/PTSC Utility Area YSE-HSVC1 PP4-RFI-ME-0340-1 Acceptable Mr. Cuong
02.30 PM * P-1303A/B/C, P-1304, P- 0010 (PTCS)
1305A/B/C, P-1307A/B
22 Aug 2019 - Pre-aligment inspection ITP No.: PP4-QC-PP- Mr. Khôi
348 YSE/PTSC Raw water pond YSE-HSVC1 PP4-RFI-ME-0341 Acceptable Mr. Cuong
08.00 AM * P-1309A/B 0010 (PTCS)
22 Aug 2019 - Grouting base plate inspection ITP No.: PP4-QC-PP- Mr. Khôi
349 YSE/PTSC Raw water pond YSE-HSVC1 PP4-RFI-ME-0342 Acceptable Mr. Cuong
08.30 AM * P-1309A/B 0011 (PTCS)
- Leveling, elevation, orientation
22 Aug 2019 ITP No.: PP4-QC-PP- Mr. Khôi
350 YSE/PTSC ISBL Area inspection YSE-HSVC1 PP4-RFI-ME-0343 Acceptable Mr. Cuong
09.00 AM 0010 (PTCS)
* Lube oil unit, Sea gas unit
- Grouting base plate inspection
22 Aug 2019 ITP No.: PP4-QC-PP- Mr. Khôi
351 YSE/PTSC ISBL Area * PK-4709A/B, Lube oil unit, Sea gas YSE-HSVC1 PP4-RFI-ME-0344 Acceptable Mr. Cuong
09.30 AM 0011 (PTCS)
unit
22 Aug 2019 - Aligment inspection ITP No.: PP4-QC-PP- Mr. Khôi
352 YSE/PTSC ISBL Area YSE-HSVC1 PP4-RFI-ME-0345 Acceptable Mr. Son
09.30 AM * D-4505 0010 (PTCS)
22 Aug 2019 - Test Sika 214-11 (7 days) Mr. Khôi
353 YSE/PTSC Lab room ITP No.: N/A YSE-HSVC1 PP4-RFI-ME-0346 Acceptable Mr. Son
01.30 PM * PK-4603, D-4009 (PTCS)
- Leveling, orientation, elevation
22 Aug 2019 ITP No.: PP4-QC-PP- Mr. Khôi
354 YSE/PTSC Raw water pond inspection YSE-HSVC1 PP4-RFI-ME-0347 Acceptable Mr. Son
08.00 AM 0010 (PTCS)
* P-1309A/B
- Center line inspection
23 Aug 2019 ITP No.: PP4-QC-PP- Mr. Khôi
355 YSE/PTSC Jetty Area * Z-2301A (Blower) , Z-2301B YSE-HSVC1 PP4-RFI-ME-0348 Acceptable Mr. Son
08.00 AM 0010 (PTCS)
(Blower), D-2302
- Aligment inspection
23 Aug 2019 * D-2301, Z-2301, Z-2301A ITP No.: PP4-QC-PP- Mr. Khôi
356 YSE/PTSC Jetty Area YSE-HSVC1 PP4-RFI-ME-0349 Acceptable Mr. Son
08.30 AM (Blower) , Z-2301B (Blower), D- 0010 (PTCS)
2302
23 Aug 2019 - Grouting anchor bolts inspection ITP No.: PP4-QC-PP- Mr. Khôi
357 YSE/PTSC Propane tank Area YSE-HSVC1 PP4-RFI-ME-0350 Acceptable Mr. Son
08.30 AM * D-1701A 0011 (PTCS)
HSVC1 PP4 PROJECT

Client SUMMARY OF MECHANICAL INSPECTION SCHEDULE EPC Contractor

Update 6-Aug-2020

INSPECTION ATTENDEE
INSPECTION ITP No
S/N- SUB CON INSPECTION DATE INSPECTION ACTIVITY RFI No RESULT DOCUMENT STATUS REMARKS/ Reprot Number
LOCATION ITP Rev
23 Aug 2019 - Grouting anchor bolts inspection ITP No.: PP4-QC-PP-
358 YSE/PTSC Utility Area YSE-HSVC1 PP4-RFI-ME-0351 Pending
08.30 AM * E-1301 0011
23 Aug 2019 Mr. Khôi
359 YSE/PTSC Ware house 2 - Hicon non-shrinking inspection ITP No.: N/A YSE-HSVC1 PP4-RFI-ME-0352 acceptable Mr. Son
09.00 AM (PTCS)
- Test Sika 214-11 (7 days)
23 Aug 2019 Mr. Khôi
360 YSE/PTSC Lab room * P-1301A/B/C, Lube oil unit, Seal ITP No.: N/A YSE-HSVC1 PP4-RFI-ME-0353 acceptable Mr. Son
01.30 PM (PTCS)
gas unit, PK-4502, D-4004, PK-4702
- Final grouting full skid inspection
23 Aug 2019 ITP No.: PP4-QC-PP-
361 YSE/PTSC Utility Area * P-1303A/B/C, P-1304, P- YSE-HSVC1 PP4-RFI-ME-0354
01.30 PM 0011
1305A/B/C, P-1307A/B
- Bolt tightening inspection
23 Aug 2019 ITP No.: PP4-QC-PP- Mr. Khôi
362 YSE/PTSC Flare stack * Connect derrick block 1~5 YSE-HSVC1 PP4-RFI-ME-0355 acceptable Mr. Son
02.30 PM 0010 (PTCS)

- Grouting anchor bolts inspection


24 Aug 2019 ITP No.: PP4-QC-PP- Mr. Khôi
363 YSE/PTSC Cooling water * P-1201A/B/C/D/E YSE-HSVC1 PP4-RFI-ME-0356 acceptable Mr. Son
08.00 AM 0011 (PTCS)

- Center line inspection


24 Aug 2019 * C-4801A, C-4801B, E-4800, F- ITP No.: PP4-QC-PP- Mr. Khôi
364 YSE/PTSC ISBL Area YSE-HSVC1 PP4-RFI-ME-0357 acceptable Mr. Son
08.30 PM 4801A, F-4801B, E-4801 0010 (PTCS)

- Test Sika 214-11 (7 days)


24 Aug 2019 Mr. Khôi
365 YSE/PTSC Lab room * PK 4301(Motor), C-4809, H1001 ITP No.: N/A YSE-HSVC1 PP4-RFI-ME-0358 acceptable Mr. Son
01.30 PM (PTCS)

23 Aug 2019 - Center line inspection ITP No.: PP4-QC-PP- Mr. Khôi
366 YSE/PTSC ISBL Area YSE-HSVC1 PP4-RFI-ME-0359 acceptable Mr. Son
02.30 PM * C-4801A, C-4801B 0010 (PTCS)
- Leveling, orientation, elevation
23 Aug 2019 ITP No.: PP4-QC-PP- Mr. Khôi
367 YSE/PTSC ISBL Area inspection YSE-HSVC1 PP4-RFI-ME-0360 acceptable Mr. Son
02.30 PM 0010 (PTCS)
* C-4801A, C-4801B
23 Aug 2019 -Grouting base plate inspection ITP No.: PP4-QC-PP- Mr. Khôi
368 YSE/PTSC ISBL Area YSE-HSVC1 PP4-RFI-ME-0361 acceptable Mr. Son
04.00 PM * C-4801A, C-4801B 0011 (PTCS)
-Test sika 214-11 (7 days)
* ZM-4801A, D-4009, PK-4502, PK-
25 Aug 2019 Mr. Khôi
369 YSE/PTSC Lab room 4701, E-2201A, E-2201B, E-2201C ITP No.: N/A YSE-HSVC1 PP4-RFI-ME-0362 acceptable Mr. Son
01.30 PM (PTCS)
,E-2201D, E-2201E, E-2201F, E-
2201G, E-2201H, E-2201I
25 Aug 2019 -Grouting anchor bolts inspection ITP No.: PP4-QC-PP- Mr. Khôi
370 YSE/PTSC ISBL Area YSE-HSVC1 PP4-RFI-ME-0363 acceptable Mr. Son
08.00 AM * P-4610A, P-4610B 0011 (PTCS)
25 Aug 2019 -Grouting anchor bolts inspection ITP No.: PP4-QC-PP- Mr. Khôi
371 YSE/PTSC Jetty Area YSE-HSVC1 PP4-RFI-ME-0364 acceptable Mr. Son
08.30 AM * P-2602A, P-2602B 0011 (PTCS)
- Center line & padding inspection
25 Aug 2019 ITP No.: PP4-QC-PP- Mr. Khôi
372 YSE/PTSC Ball tank Area * P-1002 A/B/C/D, P-1003A/B, P- YSE-HSVC1 PP4-RFI-ME-0365 acceptable Mr. Son
09.00 AM 0012 (PTCS)
1004A/B
-Test hicon non-shrinking (28 days)
* Steel structure line AA~CC,
24 Aug 2019 A2~A6, PK-1601A/B/C, PK- Mr. Khôi
373 YSE/PTSC Lab room ITP No.: N/A YSE-HSVC1 PP4-RFI-ME-0366 acceptable Mr. Son
01.30 PM 1602A/B/C,Support Duct (PTCS)
SP01/SP02/SP03, Motor for C-
2401A/B, Motor of C2401A/B.
-Test sika 214-11 (7 days)
26 Aug 2019 Mr. Khôi
374 YSE/PTSC Lab room * C-4401, PK-4603, PK-4301(Base ITP No.: N/A YSE-HSVC1 PP4-RFI-ME-0367 acceptable Mr. Son
01.30 PM (PTCS)
motor), PK-4709A/B
26 Aug 2019 -Test Hicon non-shrinking (28 days) Mr. Khôi
375 YSE/PTSC Lab room ITP No.: N/A YSE-HSVC1 PP4-RFI-ME-0368 acceptable Mr. Son
01.30 PM * Compressor PK4301 (PTCS)
- Leveling, elevation, orientation
21 Aug 2019 inspection ITP No.: PP4-QC-PP- Mr. Khôi
376 YSE/PTSC Utility Area YSE-HSVC1 PP4-RFI-ME-0369 Acceptable Mr. Cuong
02.30 PM * P-1303A/B/C, P-1304, P- 0010 (PTCS)
1305A/B/C, P-1307A/B

- Leveling, orientation, elevation


27 Aug 2019 ITP No.: PP4-QC-PP- Mr. Khôi
377 YSE/PTSC Silo Area inspection YSE-HSVC1 PP4-RFI-ME-0370 Acceptable
(PTCS)
Mr. Son
08.00 AM 0010
* D-4901A, D-4904A, D-4901B
HSVC1 PP4 PROJECT

Client SUMMARY OF MECHANICAL INSPECTION SCHEDULE EPC Contractor

Update 6-Aug-2020

INSPECTION ATTENDEE
INSPECTION ITP No
S/N- SUB CON INSPECTION DATE INSPECTION ACTIVITY RFI No RESULT DOCUMENT STATUS REMARKS/ Reprot Number
LOCATION ITP Rev
- Center line & paddding
27 Aug 2019 ITP No.: PP4-QC-PP- Mr. Khôi
378 YSE/PTSC Silo Area inspection YSE-HSVC1 PP4-RFI-ME-0371 Acceptable
(PTCS)
Mr. Son
08.30 AM 0010
* D-4904D
- Grouting base plate inspection
27 Aug 2019 ITP No.: PP4-QC-PP- Mr. Khôi
379 YSE/PTSC Jetty Area * Z-2301, BL-2301A, BL-2301B, YSE-HSVC1 PP4-RFI-ME-0372 Acceptable
(PTCS)
Mr. Son
09.00 AM 0011
D-2301, D-2302
- Leveling, orientation, elevation
27 Aug 2019 ITP No.: PP4-QC-PP- Mr. Khôi
380 YSE/PTSC Propane tank inspection YSE-HSVC1 PP4-RFI-ME-0373 Acceptable Mr. Son
09.30 AM 0010 (PTCS)
* P-1001A, P-1001B
- Test Hicon Epoxy Starcrete (7
27 Aug 2019 Mr. Khôi
381 YSE/PTSC Lab room days) ITP No.: N/A YSE-HSVC1 PP4-RFI-ME-0374 Acceptable Mr. Son
01.30 PM (PTCS)
* ZM-4801A
- Center line inspection
27 Aug 2019 ITP No.: PP4-QC-PP- Mr. Khôi
382 YSE/PTSC Peletizer Building * F-4805, C-4802A, C-4802B, E- YSE-HSVC1 PP4-RFI-ME-0375 Acceptable
(PTCS)
Mr. Son
02.30 PM 0010
4805

27 Aug 2019 - Grouting anchor bolts inspection ITP No.: PP4-QC-PP- Mr. Khôi
383 YSE/PTSC Jetty Area YSE-HSVC1 PP4-RFI-ME-0376 Acceptable Mr. Son
01.30 PM * P-2201A/B/C 0011 (PTCS)

- Bolt tightening gas seal


27 Aug 2019 ITP No.: PP4-QC-PP- Mr. Khôi
384 YSE/PTSC Flare stack Area inspection YSE-HSVC1 PP4-RFI-ME-0377 Acceptable Mr. Son
01.30 PM 0010 (PTCS)
Z-1701

- Test sika 214-11 (7 days)


* C-4809, P-1304, P-1303A, P-
28 Aug 2019 1303C, P-1305A, P-1305B ,P- Mr. Khôi
385 YSE/PTSC Lab room ITP No.: N/A YSE-HSVC1 PP4-RFI-ME-0378 Acceptable
(PTCS)
Mr. Son
01.30 PM 1305C, P- 1301A, P1301-B, P-
1301C, P-2203A/B, P-1001A/B,
P-1309A/B
28 Aug 2019 - Grouting base plate inspection ITP No.: PP4-QC-PP-
386 YSE/PTSC Silo Area YSE-HSVC1 PP4-RFI-ME-0379 Pending
08.00 AM * P-2201A/B/C 0011
28 Aug 2019 - Internal Tray inspection ITP No.: PP4-QC-PP- Mr. Khôi
387 YSE/PTSC ISBL Area YSE-HSVC1 PP4-RFI-ME-0380 Mr. Amado
08.30 AM * T-4301 0010 (PTCS)

- Leveling, orientation, elevation


28 Aug 2019 ITP No.: PP4-QC-PP- Mr. Khôi
388 YSE/PTSC ISBL Area inspection YSE-HSVC1 PP4-RFI-ME-0381 acceptable Mr. Son
09.00 AM 0010 (PTCS)
* D-4110A/B/C

28 Aug 2019 - Center line & padding inspection ITP No.: PP4-QC-PP- Mr. Khôi
389 YSE/PTSC Cooling water YSE-HSVC1 PP4-RFI-ME-0382 acceptable Mr. Son
01.30 PM * PK-1201A/B/C 0010 (PTCS)

- Test Sika 214-11 (7 days)


29 Aug 2019 Mr. Khôi
390 YSE/PTSC Lab room * lube oil unit, seal gas unit, P- ITP No.: N/A YSE-HSVC1 PP4-RFI-ME-0383 acceptable
(PTCS)
Mr. Son
01.30 PM
1303B ,P-1307A/B
- Leveling, orientation, elevation
29 Aug 2019 ITP No.: PP4-QC-PP-
391 YSE/PTSC Utility Area inspection YSE-HSVC1 PP4-RFI-ME-0384
08.30 AM 0010
* D-1501, E-1301
- Leveling, orientation, elevation
29 Aug 2019 ITP No.: PP4-QC-PP- Mr. Khôi
392 YSE/PTSC Propane tank Area inspection YSE-HSVC1 PP4-RFI-ME-0385 acceptable Mr. Son
09.00 AM 0010 (PTCS)
* D-1701A
- Leveling, orientation, elevation
29 Aug 2019 ITP No.: PP4-QC-PP- Mr. Khôi
393 YSE/PTSC Flare Stack Area inspection YSE-HSVC1 PP4-RFI-ME-0386 acceptable
(PTCS)
Mr. Son
09.00 AM 0010
* Z-1701
HSVC1 PP4 PROJECT

Client SUMMARY OF MECHANICAL INSPECTION SCHEDULE EPC Contractor

Update 6-Aug-2020

INSPECTION ATTENDEE
INSPECTION ITP No
S/N- SUB CON INSPECTION DATE INSPECTION ACTIVITY RFI No RESULT DOCUMENT STATUS REMARKS/ Reprot Number
LOCATION ITP Rev
29 Aug 2019 - Bagging System inspection ITP No.: PP4-QC-PP-
394 YSE/PTSC Auto Warehouse YSE-HSVC1 PP4-RFI-ME-0387
09.30 AM 0010

28 Aug 2019 - Grouting base plate inspection ITP No.: PP4-QC-PP- Mr. Khôi
395 YSE/PTSC Propane tanl Area YSE-HSVC1 PP4-RFI-ME-0388 acceptable Mr. Son
01.30 PM * P-1001A, P-1001B 0011 (PTCS)

- Internal cleaning and final box


up inspection
28 Aug 2019
396 YSE/PTSC Utility Area * D-1101, D-1102, D-1103, D- ITP No.: N/A YSE-HSVC1 PP4-RFI-ME-0389 pending
02.30 PM
1104, D-1105, chemical dosing
system, PK-1101, Gas duct.
30Aug 2019 - Center line inspection ITP No.: PP4-QC-PP- Mr. Khôi
397 YSE/PTSC ISBL Area YSE-HSVC1 PP4-RFI-ME-0390 acceptable Mr. Son
08.00 AM * D-4002 0010 (PTCS)
30Aug 2019 - Aligment inspection ITP No.: PP4-QC-PP- Mr. Khôi
398 YSE/PTSC ISBL Area YSE-HSVC1 PP4-RFI-ME-0391 acceptable Mr. Son
08.00 AM * D-4002 0010 (PTCS)

30Aug 2019 - Grouting base plate inspection ITP No.: PP4-QC-PP- Mr. Khôi
399 YSE/PTSC Propane tank Area YSE-HSVC1 PP4-RFI-ME-0392 acceptable Mr. Amado
08.30 AM * D-1701A 0011 (PTCS)
30Aug 2019 - Grouting base plate inspection ITP No.: PP4-QC-PP- Mr. Khôi
400 YSE/PTSC Utility Area YSE-HSVC1 PP4-RFI-ME-0393 acceptable
(PTCS)
Mr. Amado
08.30 AM * E-1301 0011
30Aug 2019 - Aligment inspection ITP No.: PP4-QC-PP- Mr. Khôi
401 YSE/PTSC Silo Area YSE-HSVC1 PP4-RFI-ME-0394 acceptable
(PTCS)
Mr. Amado
09.00 AM * D-4904B 0010
- Center line inspection
30Aug 2019 ITP No.: PP4-QC-PP- Mr. Khôi
402 YSE/PTSC Jetty Area * Damp-001/ Damp-002/ E-2401 ( YSE-HSVC1 PP4-RFI-ME-0395 acceptable
(PTCS)
Mr. Son
09.30 AM 0010
of PK-2401A)
- Center line inspection
30Aug 2019 ITP No.: PP4-QC-PP- Mr. Khôi
403 YSE/PTSC Jetty Area * Damp-001/ Damp-002/ E-2401 ( YSE-HSVC1 PP4-RFI-ME-0396 acceptable
(PTCS)
Mr. Son
09.30 AM 0010
of PK-2401B )
- Aligment inspection
30Aug 2019 ITP No.: PP4-QC-PP-
404 YSE/PTSC Jetty Area * Damp-001/ Damp-002/ E-2401 ( YSE-HSVC1 PP4-RFI-ME-0397
09.30 AM 0010
of PK-2401A )
- Aligment inspection
30Aug 2019 ITP No.: PP4-QC-PP-
405 YSE/PTSC Jetty Area * Damp-001/ Damp-002/ E-2401 ( YSE-HSVC1 PP4-RFI-ME-0398
09.30 AM 0010
of PK-2401B )
- Test Hicon non-shrinking (7
30 Aug 2019 days) Mr. Khôi
406 YSE/PTSC Lab room ITP No.: N/A YSE-HSVC1 PP4-RFI-ME-0399 acceptable Mr. Son
01.30 PM * PK-4709A/B, P-1309A/B, C- (PTCS)
4801A/B, D-1701A
- Test Hicon non-shrinking (28
30 Aug 2019 Mr. Khôi
407 YSE/PTSC Lab room days) ITP No.: N/A YSE-HSVC1 PP4-RFI-ME-0400 acceptable
(PTCS)
Mr. Son
01.30 PM
* Z-4813, Derrick of Z-1701
- Test Hicon Epoxy Starcrete (28
30 Aug 2019 Mr. Khôi
408 YSE/PTSC Lab room days) ITP No.: N/A YSE-HSVC1 PP4-RFI-ME-0401 acceptable
(PTCS)
Mr. Son
01.30 PM
* Z-4810, PK-4301

31 Aug 2019 - Grouting Base Plate. ITP No.: PP4-QC-PP- Mr. Khôi
409 YSE/PTSC Silo Area YSE-HSVC1 PP4-RFI-ME-0402 acceptable Mr. Amado
08.00 AM * D-4901A, D-4901B, D-4904A 0011 (PTCS)

- Internal Rondom Packing


31 Aug 2019 ITP No.: PP4-QC-PP- Mr. Khôi
410 YSE/PTSC ISBL Area Inspection. YSE-HSVC1 PP4-RFI-ME-0403 acceptable Mr. Amado
08.30 AM 0010 (PTCS)
* T-4401
HSVC1 PP4 PROJECT

Client SUMMARY OF MECHANICAL INSPECTION SCHEDULE EPC Contractor

Update 6-Aug-2020

INSPECTION ATTENDEE
INSPECTION ITP No
S/N- SUB CON INSPECTION DATE INSPECTION ACTIVITY RFI No RESULT DOCUMENT STATUS REMARKS/ Reprot Number
LOCATION ITP Rev
- Bolts Tightening Flange Joint
31 Aug 2019 ITP No.: PP4-QC-PP- Mr. Khôi
411 YSE/PTSC ISBL Area Inspection of. YSE-HSVC1 PP4-RFI-ME-0404 acceptable
(PTCS)
Mr. Amado
09.00 AM 0010
* E-4825 & F-4825
31 Aug 2019 - Final Alignment Inspection. ITP No.: PP4-QC-PP- Mr. Khôi
412 YSE/PTSC Water Pond Area YSE-HSVC1 PP4-RFI-ME-0405 acceptable Mr. Amado
09.30 AM * P-1301A, P-1301B, P-1301C 0010 (PTCS)
01 Sept 2019 - Test Hicon Non-shrink (7 days) Mr. Khôi
413 YSE/PTSC Lab Room ITP No.: N/A YSE-HSVC1 PP4-RFI-ME-0406 acceptable
(PTCS)
Mr. Son
13.30 PM * P-4610A/P-4610B
- Leveling, elevation, orientation
01 Sept 2019 inspection ITP No.: PP4-QC-PP-
414 YSE/PTSC ISBL Area YSE-HSVC1 PP4-RFI-ME-0407
08.00 AM * D-4105A/D-4105B, D- 0010
4106A/D-4106B
01 Sept 2019 - Aligment inspection ITP No.: PP4-QC-PP-
415 YSE/PTSC ISBL Area YSE-HSVC1 PP4-RFI-ME-0408
08.00 AM * E-4301 0010

01 Sept 2019 - Grouting anchor bolts inspection ITP No.: PP4-QC-PP- Mr. Khôi
416 YSE/PTSC Cooling Water Area YSE-HSVC1 PP4-RFI-ME-0409 acceptable Mr. Son
08.30 AM * PK-1201A/B/C 0011 (PTCS)

- Pre-aligment inspection
01 Sept 2019 ITP No.: PP4-QC-PP- Mr. Khôi
417 YSE/PTSC Jetty Area * P-2601A/P-2601B, P-2602A/P- YSE-HSVC1 PP4-RFI-ME-0410 acceptable
(PTCS)
Mr. Amado
09.00 AM 0010
2602B
- Grouting base plate inspection
01 Sept 2019 ITP No.: PP4-QC-PP- Mr. Khôi
418 YSE/PTSC Jetty Area * P-2601A/P-2601B, P-2602A/P- YSE-HSVC1 PP4-RFI-ME-0411 acceptable
(PTCS)
Mr. Amado
09.30 AM 0011
2602B
01 Sept 2019 - Grouting base plate inspection ITP No.: PP4-QC-PP- Mr. Khôi
419 YSE/PTSC Silo Area YSE-HSVC1 PP4-RFI-ME-0412 acceptable Mr. Amado
09.30 AM * D-4904B 0011 (PTCS)
01 Sept 2019 - Anchor bolts inspection ITP No.: PP4-QC-PP-
420 YSE/PTSC Flare Stack YSE-HSVC1 PP4-RFI-ME-0413
10.00 AM * Flare stack 0010
01 Sept 2019 - Final inspection ITP No.: PP4-QC-PP-
421 YSE/PTSC Flare Stack YSE-HSVC1 PP4-RFI-ME-0414
10.00 AM * Flare stack 0010
01 Sept 2019 Mr. Khôi
422 YSE/PTSC Laydown Area - Insulation material inspection ITP No.: N/A YSE-HSVC1 PP4-RFI-ME-0415 acceptable Mr. Amado
02.30 PM (PTCS)

02 Sept 2019 -Test hicon non-shrinking (7 days) Mr. Khôi


423 YSE/PTSC Lab room ITP No.: N/A YSE-HSVC1 PP4-RFI-ME-0416 acceptable
(PTCS)
Mr. Son
01.30 PM * P-1201A/B/C/D/E, P-2602A/B

-Test hicon non-shrinking (28


02 Sept 2019 Mr. Khôi
424 YSE/PTSC Lab room days) ITP No.: N/A YSE-HSVC1 PP4-RFI-ME-0417 acceptable
(PTCS)
Mr. Son
01.30 PM
* ZM-4801A

03 Sept 2019 -Test hicon non-shrinking (7 days) Mr. Khôi


YSE/PTSC Lab room ITP No.: N/A YSE-HSVC1 PP4-RFI-ME-0418 acceptable
(PTCS)
Mr. Son
01.30 PM * Z-2301, BL-2301A/B, D-2301

- Leveling, elevation, orientation


01 Sept 2019 ITP No.: PP4-QC-PP- Mr. Khôi
YSE/PTSC Jetty area inspection YSE-HSVC1 PP4-RFI-ME-0419 acceptable
(PTCS)
Mr. Son
02.00 PM 0010
* P-2201A/B/C, P-2203A/B
01 Sept 2019 - Grouting base plate inspection ITP No.: PP4-QC-PP- Mr. Khôi
YSE/PTSC Jetty area YSE-HSVC1 PP4-RFI-ME-0420 acceptable Mr. Son
02.30 PM * P-2201A/B/C, P-2203A/B 0011 (PTCS)
02 Sept 2019 - Elevation Inspection. ITP No.: PP4-QC-PP- Mr. Khôi
YSE/PTSC ISBL area YSE-HSVC1 PP4-RFI-ME-0421 acceptable Mr. Amado
08.00 AM * C-4802A, C-4802B 0010 (PTCS)

03 Sept 2019 Center line Inspection for ITP No.: PP4-QC-PP-


YSE/PTSC ISBL area YSE-HSVC1 PP4-RFI-ME-0153A
08.30 AM E4301,T4401,F4504. 0010
HSVC1 PP4 PROJECT

Client SUMMARY OF MECHANICAL INSPECTION SCHEDULE EPC Contractor

Update 6-Aug-2020

INSPECTION ATTENDEE
INSPECTION ITP No
S/N- SUB CON INSPECTION DATE INSPECTION ACTIVITY RFI No RESULT DOCUMENT STATUS REMARKS/ Reprot Number
LOCATION ITP Rev
Center line Inspection for
03 Sept 2019 ITP No.: PP4-QC-PP-
YSE/PTSC ISBL area E4310,S4502,F4303A/B,D4502,E YSE-HSVC1 PP4-RFI-ME-0183A
09.00 AM 0010
4401,R4401,Z4312
Grouting base C-4802A,C-4802B
02 Sept 2019 ITP No.: PP4-QC-PP-
YSE/PTSC ISBL area Inspection. YSE-HSVC1 PP4-RFI-ME-0422
14.00 PM 0010

Center line Inspection for


03 Sept 2019 ITP No.: PP4-QC-PP-
YSE/PTSC ISBL area F4300,D4612,D4300,D4612,F430 YSE-HSVC1 PP4-RFI-ME-0423
10.00 AM 0010
1,D4303

Alignment Equipment Inspection


03 Sept 2019 for ITP No.: PP4-QC-PP-
YSE/PTSC ISBL area YSE-HSVC1 PP4-RFI-ME-0424
10.30 AM F4504,R4401,E4310,S4502,F4303 0010
A/B,F4302A/B,E4405,E4403.

Grouting Anchor bolts Pump


03 Sept 2019 ITP No.: PP4-QC-PP- Mr. Khôi
YSE/PTSC Ball tank area P1002A,P1002B,P1002C,P1002D, YSE-HSVC1 PP4-RFI-ME-0425 acceptable
(PTCS)
Mr. Amado
11.00 AM 0010
P1003A,P1003B,P1004A,P1004B

- Center line & padding inspection


04 Sept 2019 ITP No.: PP4-QC-PP-
YSE/PTSC Silo Area * D-4901E/F/G/H, D- YSE-HSVC1 PP4-RFI-ME-0426
08.00 AM 0010
4904E/F/G/H

- Test Sika 214-11 (28 days)


04 Sept 2019 * C-1101, E-1101, Z-1101, C- Mr. Khôi
YSE/PTSC Lab room ITP No.: N/A YSE-HSVC1 PP4-RFI-ME-0427 acceptable Mr. Amado
01.30 PM 4610, CT-2601, C-4401, PK-2501, (PTCS)
PK-2601, P-2601A/B.
04 Sept 2019 - Test Sika 214-11 (7 days) Mr. Khôi
YSE/PTSC Lab room ITP No.: N/A YSE-HSVC1 PP4-RFI-ME-0428 acceptable Mr. Amado
01.30 PM * P-1001A/B, P-2201A,C (PTCS)

05 Sept 2019 - Pre-Aligment inspection ITP No.: PP4-QC-PP-


YSE/PTSC Cooling water Area YSE-HSVC1 PP4-RFI-ME-0429
08.00 AM * P-1201A/B/C/D/E 0010
05 Sept 2019 - Aligment inspection ITP No.: PP4-QC-PP- Mr. Khôi
YSE/PTSC Peletizer building YSE-HSVC1 PP4-RFI-ME-0430 acceptable Mr. Amado
08.00 PM * PK-1201A/B/C 0010 (PTCS)

04 Sept 2019 - Fill layer inspection ITP No.: PP4-QC-PP-


YSE/PTSC Cooling water Area YSE-HSVC1 PP4-RFI-ME-0431
01.30 PM * CT-1201A/B/C/D/E 0010
- Water distribution layer
04 Sept 2019 ITP No.: PP4-QC-PP-
YSE/PTSC Cooling water Area inspection YSE-HSVC1 PP4-RFI-ME-0432
01.30 PM 0010
* CT-1201A/B/C/D/E
- Aligment inspection
04 Sept 2019 ITP No.: PP4-QC-PP- Mr. Khôi
YSE/PTSC Peletizer building * F-4801A, F-4801B, E-4800, E- YSE-HSVC1 PP4-RFI-ME-0433 acceptable Mr. Amado
02.00 PM 0010 (PTCS)
4801
04 Sept 2019 -Grouting base plate inspection ITP No.: PP4-QC-PP- Mr. Khôi
YSE/PTSC Peletizer building YSE-HSVC1 PP4-RFI-ME-0434 acceptable
(PTCS)
Mr. Amado
02.30 PM * F-4801A, F-4801B 0011
05 Sept 2019 - Test Sika 214-11 (7 days) Mr. Khôi
YSE/PTSC Lab room ITP No.: N/A YSE-HSVC1 PP4-RFI-ME-0435 acceptable
(PTCS)
Mr. Son
01.30 PM * D-2302, P-2201B
- Test Sika 214-11 (28 days)
05 Sept 2019 * Liquip Seal Drump Z-1701, P- Mr. Khôi
YSE/PTSC Lab room ITP No.: N/A YSE-HSVC1 PP4-RFI-ME-0436 acceptable Mr. Son
01.30 PM 1303A/B/C, P-1304, P- (PTCS)
1305A/B/C, P-1307A/B
06 Sept 2019 - Grouting base plate inspection ITP No.: PP4-QC-PP-
YSE/PTSC Cooling water YSE-HSVC1 PP4-RFI-ME-0437
08.00 AM * P-1201A/B/C/D/E 0011
HSVC1 PP4 PROJECT

Client SUMMARY OF MECHANICAL INSPECTION SCHEDULE EPC Contractor

Update 6-Aug-2020

INSPECTION ATTENDEE
INSPECTION ITP No
S/N- SUB CON INSPECTION DATE INSPECTION ACTIVITY RFI No RESULT DOCUMENT STATUS REMARKS/ Reprot Number
LOCATION ITP Rev
06 Sept 2019 - Grouting base plate inspection ITP No.: PP4-QC-PP-
YSE/PTSC Cooling water YSE-HSVC1 PP4-RFI-ME-0438
08.00 AM * PK-1201A/B/C 0011
- Alignment inspection
06 Sept 2019 * E-4404, F-4301, D-4612, D- ITP No.: PP4-QC-PP-
YSE/PTSC ISBL Area YSE-HSVC1 PP4-RFI-ME-0439
08.30 AM 4300, F-4301, D-4303, T-4401, E- 0010
4401

06 Sept 2019 - Center line & padding inspection ITP No.: PP4-QC-PP- Mr. Khôi
YSE/PTSC ISBL Area YSE-HSVC1 PP4-RFI-ME-0440 acceptable Mr. Amado
09.00 AM * D-4102, P-4102 0010 (PTCS)

- Test sika 214-11 (28 days)


06 Sept 2019 Mr. Khôi
YSE/PTSC Lab room * E-4208, E-4209, E-4502A/B, E- ITP No.: N/A YSE-HSVC1 PP4-RFI-ME-0441 acceptable
(PTCS)
Mr. Amado
01.30 PM
4411, Local startup panel
HSVC1 PP4 PROJECT

Client SUMMARY OF MECHANICAL INSPECTION SCHEDULE EPC Contractor

Update 6-Aug-2020

INSPECTION ATTENDEE
INSPECTION ITP No
S/N- SUB CON INSPECTION DATE INSPECTION ACTIVITY RFI No RESULT DOCUMENT STATUS REMARKS/ Reprot Number
LOCATION ITP Rev
SUB-CON eTEC HYOSUNG
Pad Elevation Inspection, Centerline
June 7, 2019 Inspection. Mr. Lee
1 HYG Water Treatment, Utility F-1321A~C, F-1331A~C, TK-1321A~C PP4-QC-PP-0010 Rev. A HYG-HSVC1 PP4 - RFI-ME-WT-0001 Acceptable Mr. Cuong Mr. Dinh
08:00AM (HYG)

Pad Elevation Inspection, Centerline


June 12, 2019 Inspection. Mr. Lee
2 HYG Water Treatment, Utility F-1323A~C, F-1324A~C PP4-QC-PP-0010 Rev. A HYG-HSVC1 PP4 - RFI -ME -WT - 0002 Acceptable Mr. Cuong Mr. Dinh
08:00AM (HYG)

Alignment report (vertical)


June 12, 2019 F-1321A~C, F-1331A~C, TK-1321A~C Mr. Lee
3 HYG Water Treatment, Utility PP4-QC-PP-0010 Rev. A HYG-HSVC1 PP4 - RFI -ME -WT - 0003 Acceptable Mr. Cuong Mr. Dinh
08:00AM (HYG)

Pad Elevation Inspection, Centerline


June 14, 2019 Inspection. Mr. Lee
4 HYG Water Treatment, Utility TK-1322, TK-1323 PP4-QC-PP-0010 Rev. A HYG-HSVC1 PP4 - RFI -ME -WT - 0004 Acceptable Mr. Cuong Mr. Dinh
08:00AM (HYG)

MATERIAL RECEIVING
June 18, 2019 INSPECTION SIKA 214-11 Mr. Lee
5 HYG Water Treatment, Utility PP4-QC-PP-0010 Rev. A HYG-HSVC1 PP4 - RFI -ME -WT - 0005 Acceptable Mr. Cuong Mr. Dinh
08:00AM (HYG)

Pad Elevation Inspection, Centerline


June 18, 2019 Inspection. D-1322, P-1325A/B, P- Mr. Lee
6 HYG Water Treatment, Utility 1326A/B, C-1322A/B, TK-1311, TK- PP4-QC-PP-0010 Rev. A HYG-HSVC1 PP4 - RFI -ME -WT - 0006 Acceptable Mr. Cuong Mr. Dinh
08:00AM (HYG)
1322
GROUTING WORK INSPECTION
June 18, 2019 + F-1321A/B/C, D-1321A/B/C, F- Mr. Lee
7 HYG Water Treatment, Utility 1331A/B/C PP4-QC-PP-0010 Rev. A HYG-HSVC1 PP4 - RFI -ME -WT - 0007 Acceptable Mr. Cuong Mr. Dinh
08:00AM (HYG)

ALIGNMENT INSPECTION REPORT


(VERTICAL EQUIPMENT)
F-1323A/B/C, F-1324A/B/C,
June 21, 2019 TK-1322, TK-1323 Mr. Lee
8 HYG Water Treatment, Utility PP4-QC-PP-0010 Rev. A HYG-HSVC1 PP4-RFI-ME-WT-0008 Acceptable Mr. Cuong Mr. Dinh
08:00AM (HYG)

7 days Specimen test


June 25, 2019 * F-1321A/B/C, D-1321A/B/C, F- Mr. Lee
9 HYG Water Treatment, Utility 1331A/B/C PP4-QC-PP-0010 Rev. A HYG-HSVC1 PP4-RFI-ME-WT-0009 Acceptable Mr. Cuong Mr. Dinh
08:00AM (HYG)

Installation Inspection:
June 25, 2019 *D-1321A/B/C, D-1322, TK-1311, TK- Mr. Lee
10 HYG Water Treatment, Utility 1312 PP4-QC-PP-0010 Rev. A HYG-HSVC1 PP4-RFI-ME-WT-0010 Acceptable Mr. Cuong Mr. Dinh
08:00AM (HYG)

GROUNTING WORK INSPECTION


July,03,2019 (COMPRESSIVE STRENGTH OF Mr. Lee
11 HYG WT Area SIKA) PP4-QC-PP-0010 HYG-HSVC1 PP4-RFI-ME-WT-0013 Acceptable Mr. Cuong Mr. Dinh
09:00 AM (HYG)

Pad Elevation Inspection, Centerline


HYOSUNG
July,10,2019 Inspection Mr. Lee
12 GOODSPRING WT Area PP4-QC-PP-0010 HYG-HSVC1 PP4 - RFI-ME-WT-0014 Acceptable Mr. Cuong Mr. Dinh
08:00 AM *F-1322A/B/C, P-1322A/B/C/D/E/F, (HYG)
S.INC
C-1321A/B/C/D/E/F

HYOSUNG Coupling Alignment Inspection


15 Jul 2019
13 GOODSPRING
08.00AM
WT Area Report - Pump & Compressor. PP4-QC-PP-0010 HYG-HSVC1 PP4 - RFI - ME- WT - 0015 Cancel
S.INC P-1325A/B, P-1326A/B
HSVC1 PP4 PROJECT

Client SUMMARY OF MECHANICAL INSPECTION SCHEDULE EPC Contractor

Update 6-Aug-2020

INSPECTION ATTENDEE
INSPECTION ITP No
S/N- SUB CON INSPECTION DATE INSPECTION ACTIVITY RFI No RESULT DOCUMENT STATUS REMARKS/ Reprot Number
LOCATION ITP Rev
HYOSUNG GROUNTING WORK INSPECTION
Jul,16,2019 Mr. Lee
14 GOODSPRING WT Area (COMPRESSIVE STRENGTH OF PP4-QC-PP-0010 HYG-HSVC1 PP4 - RFI - ME- WT - 0016 Acceptable Mr. Cuong Mr. Dinh
09:00 AM (HYG)
S.INC SIKA)

- ALIGNMENT INSPECTION
HYOSUNG
Jul,16,2019 REPORT (VERTICAL HYG-HSVC1 PP4-RFI- Mr. Lee
15 GOODSPRING WT Area PP4-QC-PP-0010 Acceptable Mr. Cuong Mr. Dinh
10:00 AM EQUIPMENT) ME-WT-0017 (HYG)
S.INC
* F-1322A/B/C
-Pad Elevation Inspection, Centerline
HYOSUNG Inspection.
July,22,2019 Mr. Lee
16 GOODSPRING WT Area * P-1302A/B/C, D-1323, P- PP4-QC-PP-0010 HYG-HSVC1 PP4 - RFI - ME- WT - 0018 Acceptable Mr. Cuong Mr. Dinh
10:00 AM (HYG)
S.INC 1327A/B/C, D-1324, P-1306A/B/C,
SEW-1323, SEW-1324
HYOSUNG -Coupling Alignment Inspection
July,23,2019 Mr. Lee
17 GOODSPRINGS.I WT Area Report - Pump & Compressor. PP4-QC-PP-0010 HYG-HSVC1 PP4-RFI-ME-WT-0019 Acceptable Mr. Cuong Mr. Dinh
02:00 PM (HYG)
NC * P-1325A/B, P-1326A/B
HYOSUNG - Levelling Alignment Inspection
July,23,2019 Mr. Lee
18 GOODSPRINGS.I WT Area Report - Pump PP4-QC-PP-0010 HYG-HSVC1 PP4-RFI-ME-WT-0020 Acceptable Mr. Cuong Mr. Dinh
02:00 PM (HYG)
NC * P-1325A/B, P-1326A/B
HYOSUNG GROUTING WORK INSPECTION
July,24,2019 Mr. Lee
19 GOODSPRINGS.I WT Area (COMPRESSIVE STRENGTH OF PP4-QC-PP-0010 HYG-HSVC1 PP4-RFI-ME-WT-0021 Acceptable Mr. Cuong Mr. Dinh
09:00 AM (HYG)
NC SIKA)

GROUTING WORK INSPECTION


(Grouting anchor bolts: P-
HYOSUNG 1322A/B/C/D/E/F, C-1321A/B/C/D/E/F,
Jul,25,2019 Mr. Lee
20 GOODSPRINGS.I WT Area P-1327A/B, PP4-QC-PP-0010 HYG-HSVC1 PP4-RFI-ME-WT-0022 Acceptable Mr. Cuong Mr. Dinh
09:00 AM (HYG)
NC P-1302A/B/C, P-1306A/B/C.
Grouting Base : P-1325A/B, P-1326A/B,
C-1322A/B, F-1322A/B/C.)

HYOSUNG
Jul,25,2019 MATERIAL RECEIVING Mr. Lee
21 GOODSPRINGS.I WT Area PP4-QC-PP-0010 HYG-HSVC1 PP4-RFI-ME-WT-0023 Acceptable Mr. Cuong Mr. Dinh
09:00 AM INSPECTION (HYG)
NC

HYOSUNG - ALIGNMENT INSPECTION REPORT


Jul,25,2019 Mr. Lee
22 GOODSPRINGS.I WT Area (VERTICAL EQUIPMENT) PP4-QC-PP-0010 HYG-HSVC1 PP4-RFI-ME-WT-0024 Acceptable Mr. Cuong Mr. Dinh
10:00 AM (HYG)
NC * D-1323. D-1324

HYOSUNG Pad Elevation Inspection, Centerline


July,27,2019 Mr. Lee
23 GOODSPRINGS.I Inspection. PP4-QC-PP-0010 HYG-HSVC1 PP4 - RFI - ME- WT - 0025 Acceptable Mr. Cuong Mr. Dinh
10:00 AM Domestic Area (HYG)
NC * F-1311A/B/C
HYOSUNG Coupling Alignment Inspection Report -
July,29,2019 Mr. Lee
24 GOODSPRINGS.I WT Area Pump . PP4-QC-PP-0010 HYG-HSVC1 PP4 - RFI - ME- WT - 0026 Acceptable Mr. Cuong Mr. Dinh
02:00 PM (HYG)
NC * P-1322A/B/C/D/E/F
HYOSUNG Levelling Alignment Inspection Report -
July,29,2019 Mr. Lee
25 GOODSPRINGS.I WT Area Pump PP4-QC-PP-0010 HYG-HSVC1 PP4 - RFI - ME- WT - 0027 Acceptable Mr. Cuong Mr. Dinh
02:00 PM (HYG)
NC * P-1322A/B/C/D/E/F

HYOSUNG ALIGNMENT INSPECTION REPORT


Jul,30,2019 Mr. Lee
26 GOODSPRINGS.I Domestic Area (VERTICAL EQUIPMENT) PP4-QC-PP-0010 HYG-HSVC1 PP4-RFI-ME-WT-0028 Acceptable Mr. Cuong Mr. Dinh
02:00 PM (HYG)
NC * F-1311A/B/C

HYOSUNG
July,30,2019 GROUTING WORK INSPECTION Mr. Lee
27 GOODSPRINGS.I WT Area PP4-QC-PP-0010 HYG-HSVC1 PP4-RFI-ME-WT-0029 Acceptable Mr. Cuong Mr. Dinh
03:00 PM * * F-1311A/B/C (HYG)
NC
HYOSUNG
Jul,31,2019 MATERIAL RECEIVING Mr. Lee
28 GOODSPRINGS.I WT Area PP4-QC-PP-0010 HYG-HSVC1 PP4-RFI-ME-WT-0030 Acceptable Mr. Cuong Mr. Dinh
09:00 AM INSPECTION (HYG)
NC
HYOSUNG GROUTING WORK INSPECTION
Aug,1,2019 Mr. Lee
29 GOODSPRINGS.I WT Area (COMPRESSIVE STRENGTH OF PP4-QC-PP-0010 HYG-HSVC1 PP4-RFI-ME-WT-0031 Acceptable Mr. Cuong Mr. Dinh
09:00 AM (HYG)
NC SIKA)
HSVC1 PP4 PROJECT

Client SUMMARY OF MECHANICAL INSPECTION SCHEDULE EPC Contractor

Update 6-Aug-2020

INSPECTION ATTENDEE
INSPECTION ITP No
S/N- SUB CON INSPECTION DATE INSPECTION ACTIVITY RFI No RESULT DOCUMENT STATUS REMARKS/ Reprot Number
LOCATION ITP Rev
Coupling Alignment Inspection Report -
HYOSUNG
Aug,06,2019 Pump . Mr. Lee
30 GOODSPRINGS.I WT Area PP4-QC-PP-0010 HYG-HSVC1 PP4-RFI-ME-WT-0032 Acceptable Mr. Cuong Mr. Dinh
02:00 PM * P-1302A/B/C; P-1327A/B/; P- (HYG)
NC
1306A/B/C
Levelling Alignment Inspection Report -
HYOSUNG Pump
Aug,06,2019 Mr. Lee
31 GOODSPRINGS.I WT Area * P-1302A/B/C; P-1327A/B/; P- PP4-QC-PP-0010 HYG-HSVC1 PP4-RFI-ME-WT-0033 Acceptable Mr. Cuong Mr. Dinh
02:00 PM (HYG)
NC 1306A/B/C; C-1322A/B; C-
1321A/B/C/D/E/F
Pad Elevation Inspection, Centerline
HYOSUNG Inspection.
Aug,06,2019 Mr. Lee
32 GOODSPRINGS.I * P-1311A/B; C-1311A/B; D-1311; F- PP4-QC-PP-0010 HYG-HSVC1 PP4-RFI-ME-WT-0034 Acceptable Mr. Cuong Mr. Dinh
10:00 AM Domestic Area (HYG)
NC 1341A/B; P-1341A/B; D-1341; P-
1342A/B
HYOSUNG GROUTING WORK INSPECTION
Aug,7,2019 Mr. Lee
33 GOODSPRINGS.I WT Area (COMPRESSIVE STRENGTH OF PP4-QC-PP-0010 HYG-HSVC1 PP4-RFI-ME-WT-0035 Acceptable Mr. Cuong Mr. Dinh
09:00 AM (HYG)
NC SIKA)
GROUTING WORK INSPECTION
HYOSUNG (Grouting base: P-1302A/B/C, P-
Aug,10,2019 Mr. Lee
34 GOODSPRINGS.I WT Area 1327A/B, P-1306A/B/C, C- PP4-QC-PP-0010 HYG-HSVC1 PP4 - RFI-ME-WT-0036 Acceptable Mr. Cuong Mr. Dinh
09:00 AM (HYG)
NC 1321A/B/C/D/E/F, C-1322A/B, D-1323,
D-1324, SEW-1323, SEW-1324)
HYOSUNG
Aug,10,2019 MATERIAL RECEIVING Mr. Lee
35 GOODSPRINGS.I WT Area PP4-QC-PP-0010 HYG-HSVC1 PP4-RFI-ME-WT-0037 Acceptable Mr. Cuong Mr. Dinh
09:00 AM INSPECTION (HYG)
NC

HYOSUNG ALIGNMENT INSPECTION REPORT


Aug,14,2019 Mr. Lee
36 GOODSPRINGS.I Domestic Area (VERTICAL EQUIPMENT) PP4-QC-PP-0010 HYG-HSVC1 PP4-RFI-ME-WT-0038 Acceptable Mr. Cuong Mr. Dinh
10:00 AM (HYG)
NC * F-1341A/B, D-1311, D-1341

HYOSUNG GROUTING WORK INSPECTION


Aug,14,2019 Mr. Lee
37 GOODSPRINGS.I Domestic Area (Grouting Anchor bolts : P-1311A/B, C- PP4-QC-PP-0010 HYG-HSVC1 PP4-RFI-ME-WT-0039 Cancel Mr. Cuong
09:00 AM (HYG)
NC 1311A/B, P-1341A/B)
HYOSUNG
Aug,14,2019 MATERIAL RECEIVING Mr. Lee
38 GOODSPRINGS.I WT Area PP4-QC-PP-0010 HYG-HSVC1 PP4-RFI-ME-WT-0040 Acceptable Mr. Cuong
09:00 AM INSPECTION (HYG)
NC
GROUTING WORK INSPECTION
HYOSUNG (Grouting Anchor bolts : P-1311A/B, C-
Aug,20,2019 Mr. Lee
39 GOODSPRINGS.I WT & Domestic Area 1311A/B, P-1341A/B) PP4-QC-PP-0010 HYG-HSVC1 PP4-RFI-ME-WT-0041 Acceptable Mr. Cuong
09:00 AM (HYG)
NC (Grouting base : P-1302A/B/C, P-
1327A/B, P-1306A/B/C)
HYOSUNG
Aug,20,2019 MATERIAL RECEIVING Mr. Lee
40 GOODSPRINGS.I WT & Domestic Area PP4-QC-PP-0010 HYG-HSVC1 PP4-RFI-ME-WT-0042 Acceptable Mr. Cuong
09:00 AM INSPECTION (HYG)
NC
GROUTING WORK INSPECTION
HYOSUNG
Aug,20,2019 (COMPRESSIVE STRENGTH OF Mr. Lee
41 GOODSPRINGS.I WT Area PP4-QC-PP-0010 HYG-HSVC1 PP4-RFI-ME-WT-0043 Acceptable Mr. Cuong
09:00 AM SIKA) (HYG)
NC
(7 DAY)

GROUTING WORK INSPECTION


(COMPRESSIVE STRENGTH OF
SIKA)
HYOSUNG (Grouting anchor bolts: P-
Aug,23,2019 Mr. Lee
42 GOODSPRINGS.I WT Area 1322A/B/C/D/E/F, C-1321A/B/C/D/E/F, PP4-QC-PP-0010 HYG-HSVC1 PP4-RFI-ME-WT-0044 Acceptable Mr. Cuong
09:00 AM (HYG)
NC P-1327A/B,
P-1302A/B/C, P-1306A/B/C.
Grouting Base : P-1325A/B, P-1326A/B,
C-1322A/B, F-1322A/B/C.)

- GROUTING WORK INSPECTION


HYOSUNG
Aug,22,2019 "Domestic SKID(D-1341, P-1342A/B), Acceptable with Mr. Lee
43 GOODSPRINGS.I Domestic Area PP4-QC-PP-0010 HYG-HSVC1 PP4-RFI-ME-WT-0045 Mr. Cuong C-1311 cancel
03:30 PM F-1341A/B, D-1311, C-1311A/B" comment (HYG)
NC
HSVC1 PP4 PROJECT

Client SUMMARY OF MECHANICAL INSPECTION SCHEDULE EPC Contractor

Update 6-Aug-2020

INSPECTION ATTENDEE
INSPECTION ITP No
S/N- SUB CON INSPECTION DATE INSPECTION ACTIVITY RFI No RESULT DOCUMENT STATUS REMARKS/ Reprot Number
LOCATION ITP Rev
HYOSUNG Coupling Alignment Inspection Report -
Aug,23,2019 Mr. Lee
44 GOODSPRINGS.I WT Area Pump . PP4-QC-PP-0010 HYG-HSVC1 PP4-RFI-ME-WT-0046 Acceptable Mr. Cuong
02:00 PM (HYG)
NC * P-1341A/B, P-1311A/B
HYOSUNG Levelling Alignment Inspection Report -
Aug,23,2019 Mr. Lee
45 GOODSPRINGS.I WT Area Pump PP4-QC-PP-0010 HYG-HSVC1 PP4-RFI-ME-WT-0047 Acceptable Mr. Cuong
03:00 PM (HYG)
NC * P-1341A/B, P-1311A/B
HYOSUNG Levelling Alignment Inspection Report -
Aug,23,2019 Mr. Lee
46 GOODSPRINGS.I DOMESTIC Area Pump PP4-QC-PP-0010 HYG-HSVC1 PP4-RFI-ME-WT-0048 Acceptable Mr. Cuong
03:00 PM (HYG)
NC *D-1341 & P1342A/B
HYOSUNG
Aug,23,2019 MATERIAL RECEIVING Mr. Lee
47 GOODSPRINGS.I Domestic Area PP4-QC-PP-0010 HYG-HSVC1 PP4-RFI-ME-WT-0049 Acceptable Mr. Son
3:00 PM INSPECTION (HYG)
NC
HYOSUNG GROUTING WORK INSPECTION
Aug,23,2019
48 GOODSPRINGS.I Domestic Area Grouting base : P-1341 A/B, PP4-QC-PP-0010 HYG-HSVC1 PP4-RFI-ME-WT-0050 pending
04:30 PM
NC P-1311 A/B, C-1311 A/B)
GROUTING WORK INSPECTION
(COMPRESSIVE STRENGTH OF
HYOSUNG SIKA)
Aug,27,2019 Mr. Lee
49 GOODSPRINGS.I Laboratory (7 DAY) PP4-QC-PP-0010 HYG-HSVC1 PP4-RFI-ME-WT-0051 Acceptable Mr. Son
09:00 AM (HYG)
NC (GROUTING BASE : P-1302A/B/C, P-
1327A/B, P-1306A/B/C)

GROUTING WORK INSPECTION


HYOSUNG
Aug,28,2019 (COMPRESSIVE STRENGTH OF SIKA Mr. Lee
50 GOODSPRINGS.I Laboratory PP4-QC-PP-0010 HYG-HSVC1 PP4-RFI-ME-WT-0052 Acceptable Mr. Son
10:00 AM 28 DAY) (HYG)
NC
F-1311A/B/C
GROUTING WORK INSPECTION
HYOSUNG
Aug,28,2019 (COMPRESSIVE STRENGTH OF SIKA Mr. Lee
51 GOODSPRINGS.I Laboratory PP4-QC-PP-0010 HYG-HSVC1 PP4-RFI-ME-WT-0053 Acceptable Mr. Son
10:00 AM 7 DAY) (HYG)
NC
P-1311A/B, C-1311A/B, P-1341A/B

GROUTING WORK INSPECTION


(COMPRESSIVE STRENGTH OF SIKA
HYOSUNG 7 DAY)
Aug,30,2019 Mr. Lee
52 GOODSPRINGS.I Laboratory GROUTING BASE : P-1311A/B, C- PP4-QC-PP-0010 HYG-HSVC1 PP4-RFI-ME-WT-0054 Acceptable Mr. Son
10:00 AM (HYG)
NC 1311A/B, P-1341A/B,
F-1341A/B, D-1311, SKID( D-1341, P-
1342A/B)
HYOSUNG
Aug,30,2019 Mr. Lee
53 GOODSPRINGS.I Domestic Area BOX-UP INSPECTION F-1311A PP4-QC-PP-0010 HYG-HSVC1 PP4-RFI-ME-WT-0055 Acceptable Mr. Amado
9:00 AM (HYG)
NC

Coupling Alignment Inspection Report -


HYOSUNG
Sep,3,2019 Pump . P-1302A/B/C; P-1322A/B/C/D/E;
GOODSPRINGS.I WT Area PP4-QC-PP-0010 HYG-HSVC1 PP4-RFI-ME-WT-0056 Final Alignment
02:00 PM P-1325A/B; P-1326A/B; P-1327A/B; P-
NC
1306A/B/C; P-1341A/B; P-1342A/B

HYOSUNG
Sep,04,2019 BOX-UP INSPECTION F-1323A/B/C;
GOODSPRINGS.I WT Area PP4-QC-PP-0010 HYG-HSVC1 PP4-RFI-ME-WT-0057
8:00 AM F-1331A/B/C; F-1324A/B/C
NC
HSVC1 PP4 PROJECT

Client SUMMARY OF MECHANICAL INSPECTION SCHEDULE EPC Contractor

Update 6-Aug-2020

INSPECTION ATTENDEE
INSPECTION ITP No
S/N- SUB CON INSPECTION DATE INSPECTION ACTIVITY RFI No RESULT DOCUMENT STATUS REMARKS/ Reprot Number
LOCATION ITP Rev
SUB-CON eTEC HYOSUNG

July 25,2019 - Padding Elevation ,


HYOSUNG WWT Area Centerline inspection PP4-QC-PP-0010
1 (Thursday) HYG-HSVC1 PP4-RFI-ME WWT-0001 Acceptable
GOODSPRING (Control Building- 2 FL) REV.A
13: 30 PM * S-1401A/B; TK-1402

- Padding Elevation
Aug,3,2019
HYOSUNG - Centerline inspection
2 (Saturday) WWT- TANKS AREA PP4-QC-PP-0011 HYG-HSVC1 PP4-RFI-ME WWT-0002 Acceptable
GOODSPRING * TK-1403; TK-1404; TK-1421; TK-
08:30 am
1422; D-1401

Aug,7,2019 - Padding Elevation


HYOSUNG WWT-CHEMICAL & - Centerline inspection EQ-001-03
3 (Wednesday) HYG-HSVC1 PP4-RFI-ME WWT-0003 Acceptable
GOODSPRING BIOLOGLCAL REV A
8:30 AM * E-1421A/B/C

- Elevation
Aug,9,2019
HYOSUNG WWT-CHEMICAL & - Centerline inspection
4 (Friday) EQ-001-01 _ REV A HYG-HSVC1 PP4-RFI-ME WWT-0004 Acceptable
GOODSPRING BIOLOGLCAL * C1401A/B; C-1421A/B; TK-1405; Tk-
8:30 AM 1406; F-1401A/B

- Elevation
Aug,9,2019
HYOSUNG WWT-CHEMICAL & - Centerline inspection
5 (Friday) EQ-001-01 _ REV A HYG-HSVC1 PP4-RFI-ME WWT-0005 Acceptable
GOODSPRING BIOLOGLCAL * P-1423A/B; P-1424A/B; P-1425A/B;
8:30 AM
TK-1401; J-1401

- Elevation
Aug,12,2019 - Centerline inspection
HYOSUNG WWT-CHEMICAL & EQ-001-01
6 (Monday) * P-1408A/B., P-1421A/B/C., P- HYG-HSVC1 PP4-RFI-ME WWT-0006 Acceptable
GOODSPRING BIOLOGLCAL REV A
8:30 AM 1401A/B., P-1403A/B., P-1404A/B

- Mixing grout material & Placement


* TK-1403, TK-1404, TK1421, TK-1422,
HYOSUNG 8:00AM-17:00PM WWT-CHEMICAL & D-1401.,E-1421A/B/C., F-1401A/B., TK-
7 PP4-QC-PP-0011 HYG-HSVC1 PP4-RFI-ME-WWT-007 Acceptable
GOODSPRING 14-AUG-2019 BIOLOGLCAL 1401., P-1423A/B., P-1424A/B., P-
1425A/B

- Mixing grout material & Placement


HYOSUNG 8:00AM-17:00PM WWT-CHEMICAL &
8 * P-1408A/B., P-1421A/B/C., P- PP4-QC-PP-0011 HYG-HSVC1 PP4-RFI-ME-WWT-008 Acceptable
GOODSPRING 15-AUG-2019 BIOLOGLCAL
1401A/B., P-1403A/B.,P-1404A/B

- ALIGNMENT INSPECTION REPORT


HYOSUNG 8:00AM-17:00PM WWT-CHEMICAL & (VERTICAL EQUIPMENT)
9 PP4-QC-PP-0011 HYG-HSVC1 PP4-RFI-ME-WWT-009 Acceptable
GOODSPRING 16-AUG-2019 BIOLOGLCAL * TK-1403, TK-1404, TK-1421, Tk-
1422, D-1401

- BASE GROUTING OF EQUIPMENT


HYOSUNG 8:00AM-17:00PM WWT-CHEMICAL &
10 * TK-1403, TK-1404, TK-1421, Tk- PP4-QC-PP-0011 HYG-HSVC1 PP4-RFI-ME-WWT-010 Acceptable
GOODSPRING 16-AUG-2019 BIOLOGLCAL
1422, D-1401

- Elevation
Aug,16,2019
HYOSUNG WWT-CHEMICAL & - Centerline inspection
11 (Friday) EQ-001-01 REV A HYG-HSVC1 PP4-RFI-ME WWT-011 Acceptable
GOODSPRING BIOLOGLCAL * F-1421A/B, Z-1406, Z-1425A/B, A-
9:30 AM
1401, A-1402, A-1403
HSVC1 PP4 PROJECT

Client SUMMARY OF MECHANICAL INSPECTION SCHEDULE EPC Contractor

Update 6-Aug-2020

INSPECTION ATTENDEE
INSPECTION ITP No
S/N- SUB CON INSPECTION DATE INSPECTION ACTIVITY RFI No RESULT DOCUMENT STATUS REMARKS/ Reprot Number
LOCATION ITP Rev

Aug,21,2019
- ALIGNMENT INSPECTION REPORT
HYOSUNG (Wednesday) WWT-CHEMICAL &
12 (VERTICAL EQUIPMENT) PP4-QC-PP-0011 HYG-HSVC1 PP4-RFI-ME-WWT-012 Acceptable
GOODSPRING 8:30 AM BIOLOGLCAL
* E-1421A/B/C, F-1401A/B. TK-1401

Aug,21,2019
HYOSUNG WWT-CHEMICAL & - BASE GROUTING OF EQUIPMENT
13 (Wednesday) PP4-QC-PP-0011 HYG-HSVC1 PP4-RFI-ME-WWT-013 Acceptable
GOODSPRING BIOLOGLCAL * E-1421A/B/C, F-1401A/B. TK-1401
9:30 AM

HYOSUNG 9:00AM WWT-CHEMICAL & Testing of Sample


14 PP4-QC-PP-0011 HYG-HSVC1 PP4-RFI-ME-WWT-014 Acceptable
GOODSPRING 23-AUG-2019 BIOLOGLCAL for 7 days

- Padding Elevation
HYOSUNG 8:45 AM WWT-CHEMICAL & - Centerline inspection
15 PP4-QC-PP-0011 HYG-HSVC1 PP4-RFI-ME-WWT-015 Acceptable
GOODSPRING 23-AUG-2019 BIOLOGLCAL (D-1402., D-1403., P-
1407A/B)

- Levelling inspection of pump (P-


14:00 AM WWT-CHEMICAL & 1404AB.,P-1403AB., P-1406AB.,P-
16 HYG PP4-QC-PP-0011 HYG-HSVC1 PP4-RFI-ME-WWT-016 Pending
26-AUG-2019 BIOLOGLCAL 1401AB., P-1421ABC., P-1408AB., P-
1423AB., P-1424AB., P-1425., P-1425A)

- Coupling Pre- Ailgnment inspection of


pump (P-1404AB.,P-1403AB., P-
14:00 AM WWT-CHEMICAL &
17 HYG 1406AB.,P-1401AB., P-1421ABC., P- PP4-QC-PP-0011 HYG-HSVC1 PP4-RFI-ME-WWT-017 Pending
26-AUG-2019 BIOLOGLCAL
1408AB., P-1423AB., P-1424AB., P-
1425., P-1425A)

- Base grouting of Pump equipment (P-


13:30 AM WWT-CHEMICAL & 1404AB.,P-1403AB., P-1406AB.,P-
18 HYG PP4-QC-PP-0011 HYG-HSVC1 PP4-RFI-ME-WWT-018 Pending
26-AUG-2019 BIOLOGLCAL 1401AB., P-1421ABC., P-1408AB., P-
1423AB., P-1424AB., P-1425., P-1425A)

13:30 AM WWT-CHEMICAL & - Base grouting of equipment


19 HYG PP4-QC-PP-0011 HYG-HSVC1 PP4-RFI-ME-WWT-019 Acceptable
26-AUG-2019 BIOLOGLCAL F-1421A/B
HYOSUNG
3:30 PM WWT-CHEMICAL & -ALIGNMENT INSPECTION REPORT
20 GOODSPRINGS.I PP4-QC-PP-0011 HYG-HSVC1 PP4-RFI-ME-WWT-020 Acceptable
26-AUG-2019 BIOLOGLCAL (VERTICAL EQUIPMENT) F-1421A/B
NC
HYOSUNG
8:00AM WWT-CHEMICAL & ALIGNMENT INSPECTION REPORT
21 GOODSPRINGS.I PP4-QC-PP-0011 HYG-HSVC1 PP4-RFI-ME-WWT-021 Acceptable
28-AUG-2019 BIOLOGLCAL (VERTICAL EQUIPMENT)
NC
HYOSUNG
Aug,28,2019 WWT-CHEMICAL &
22 GOODSPRINGS.I BIOLOGLCAL
BASE GROUTING OF EQUIPMENT PP4-QC-PP-0011 HYG-HSVC1 PP4-RFI-ME-WWT-022 Acceptable
9:30 AM
NC
ALIGNMENT INSPECTION REPORT
23 HYG 30-Dec-99 0 PP4-QC-PP-0011 HYG-HSVC1 PP4-RFI-ME-WWT-023 Acceptable
(VERTICAL EQUIPMENT) TK-1402
Aug,30,2019 WWT-CHEMICAL & MIXING GROUT ANCHOR BOX OF
24 HYG PP4-QC-PP-0011 HYG-HSVC1 PP4-RFI-ME-WWT-024 Acceptable
14:30 AM BIOLOGLCAL EQUIPMENT TK-1402
Aug,31,2019 WWT-CHEMICAL & MIXING GROUT ANCHOR BOX OF
25 HYG PP4-QC-PP-0011 HYG-HSVC1 PP4-RFI-ME-WWT-025 Acceptable
8:30 AM BIOLOGLCAL EQUIPMENT TK-1402

14:00AM WWT-CHEMICAL & Testing of Sample


HYOSUNG GOODSPINGS.INC PP4-QC-PP-0011 HYG-HSVC1 PP4-RFI-ME-WWT-027
05-SEP-2019 BIOLOGLCAL for 28 days
HSVC1 PP4 PROJECT

Client SUMMARY OF MECHANICAL INSPECTION SCHEDULE EPC Contractor

Update 6-Aug-2020

INSPECTION ATTENDEE
INSPECTION ITP No
S/N- SUB CON INSPECTION DATE INSPECTION ACTIVITY RFI No RESULT DOCUMENT STATUS REMARKS/ Reprot Number
LOCATION ITP Rev