CAUSES OF TIME OVERRUN IN DEBRE BEREHAN CITY BUILDING 2019
PROJECTS
ACKNOWLEDGEMENTS
ABSTRACT
Keywords:
TABLE OF CONTENTS
ACKNOWLEDGEMENTS .......................................................................................................................... ii
ABBREVIATIONS....................................................................................................................................viii
CHAPTER 1 .............................................................................................................................................. 1
INTRODUCTION ...................................................................................................................................... 1
CHAPTER 3 .............................................................................................................................................. 3
Appendix A ............................................................................................................................................. 7
Questionnaire ..................................................................................................................................... 7
Appendix B.............................................................................................................................................. 7
DECLARATION ......................................................................................................................................... 8
LIST OF TABLES
LIST OF FIGURES
ABBREVIATIONS
CHAPTER 1
INTRODUCTION
CHAPTER 2
LITERATURE REVIEW
CHAPTER 3
3.3 Population
CHAPTER 4
CHAPTER 5
5.1 Conclusions
5.2 Recommendations
References
Abeselom, A., 2008. Improving Cost Management Practices of National Contractors Focused
On Building Construction Projects, Addis Ababa: Addis Ababa University.
Al-Najjar, J. M., 2008. Factors Influencing Time and Cost Overruns on construction projects
in the Gaza Strip, Gaza: The Islamic University of Gaza.
Ameh, O. J., Soyingbe, A. A. and Odusami, K. T., 2010. Significant factors causing cost
overruns in telecommunication projects in Nigeria. Journal of Construction in Developing
Countries, Volume 15.
Anderson, S., Molenaar, K. & Schexnayder, C., 2007. Guidance for Cost Estimation and
Management for Highway Projects During Planning, Programming,and Preconstruction,
Washington, D.C.: National Cooperative highway Research Program.
Arcila, S. G., 2012. Avoiding cost overruns in construction projects in the United Kingdom,
United Kingdom: The University of Warwick.
Azhar, N., Farooqui, R. U. & Ahmed, S. M., 2008. Cost Overrun Factors In Construction
Industry of Pakistan. Karachi, Pakistan, First International Conference on Construction In
Developing Countries (ICCIDC–I).
Chang, A. S., 2002. Reasons for cost and schedule increases for engineering design projects
projects. Journal of Management and Engineering, pp. 29-36.
Chimwaso, K. D., 2001. An Evaluation of cost performance of public projects; case of
Botswana, Gaborone, Botswana: Department of Architecture and Building Services, Private
Bag 0025.
Creedy, G. D., 2006. Risk factors leading to cost overrun in the delivery of highway
construction projects, Australia: Queenland University of Technology.
Douglas, I., 1996. Review of the Florida department of transportation’s performance in
controlling cost overruns and delays when building roads and bridges, Florida: State of Florida
office of program policy analysis and government accountability.
Appendix A
Questionnaire
Appendix B
List of Questionnaire Respondents
DECLARATION
Candidate
ABEBE KEBEDE
Signature ....................................................................................