Professional Documents
Culture Documents
Energy Isolation High Voltage Electricity Work at Height Floor/Handrail Removal Confined Space Hot Work Excavation/Penetration Lifting/Craneage
Energy Isolation High Voltage Electricity Work at Height Floor/Handrail Removal Confined Space Hot Work Excavation/Penetration Lifting/Craneage
Energy Isolation High Voltage Electricity Work at Height Floor/Handrail Removal Confined Space Hot Work Excavation/Penetration Lifting/Craneage
Location of Task
Description of the
Person in charge Date task conducted
Task:
Laboratory
Blood Spill
1 of 4
Job Hazard Analysis (JHA) JHA #
C
L
S o
i R
n
t s
k is
e Required Controls e k
Job / Task Step Existing / Potential Hazards e
p For each hazard identified list the control/s required l S
(List the tasks in the sequence they are (Against each step list the hazards from the q
to effectively manage the hazard. u
i c
carried out) energy source that could cause injury/damage) h o
Eliminate, Substitute, Engineer/Isolate, Admin, PPE e
N n
o r
o o e
c
d
e
Contain the area Someone might step on the spillage Put barrier sign on the spillage area
Disinfect the the spillage Contamination of the face from aerosol PPE:
generating procedure Wear faceshield and gloves during the
4 procedure to avoid skin contamaniation 3 2 6
scoop the gel form blood Might contaminate the staff wear appropriate PPE
back strain
5 3 2 6
Put in the infectious waste plastic Might contaminate the staff Educate on proper waste disposal and
and discard handling of waste.
6 7. Replace the spill kit 3 2 6
2 of 4
Job Hazard Analysis (JHA) JHA #
Manager review and authorisation required if risk rating greater than medium
3 of 4
Job Hazard Analysis (JHA) JHA #
Monitoring and Review
Variances to JHA
Date: Variance Reason
n/a n/a
Reviewer: Signature:
Was the JHA adequate for the job? Yes □ No □ If No, why?
Is a procedure or work instruction required to be developed or amended as a result of this JHA? Yes □ No □
Details:
Any other actions required for follow up from this task? Yes □ No □ If yes, please comment. Record all actions in INX.
4 of 4