TUSUKA PACKAGING LTD.

NEELNAGAR, KONABARI, GAZIPUR


Date: 14.07.2020 (Night)

Steam pressure information for Packaging Machine


Main Receiver
Packaging Machine at Packaging floor
at Boiler room
Steam Steam Steam Gas Production
Time Steam Steam Steam Boiler Run by Adjustment
Pressure Pressure at Temperature
Temperature Pressure at Temperature C-Flute B-Flute Triplex Heater Valve Heating Plate Pressure Floor
at Boiler Packaging at Packaging
at Boiler room Packaging at Packaging Temperature Temperature Temperature Phaser Temperature
room Steam Steam
receiver Machine Machine
receiver Receiver Receiver

5Ton/h &2.5
Ton/hr and 3 EGB Boiler
9:00 PM 5.8 Kg 144⁰C 5.3 Kg 143⁰C 5.0 Kg 140⁰C 122⁰C 120⁰C 128⁰C 131⁰C 146⁰C 15 PSI ON
Ton/h Boiler Running
run by Gas
5Ton/h &2.5
Ton/hr and 3 EGB Boiler
10:00 PM 6.0 Kg 148⁰C 5.6 Kg 146⁰C 5.4 Kg 145⁰C 124⁰C 122⁰C 130⁰C 134⁰C 148⁰C 15 PSI ON
Ton/h Boiler Running
run by Gas
5Ton/h &2.5
Ton/hr and 3 EGB Boiler
11:00 PM 7.0 Kg 152⁰C 6.6 Kg 148⁰C 6.4 Kg 146⁰C 126⁰C 124⁰C 136⁰C 138⁰C 151⁰C 15 PSI ON
Ton/h Boiler Running
run by Gas
5Ton/h &2.5
Ton/hr and 3 EGB Boiler
12:00 AM 7.0 Kg 150⁰C 6.5 Kg 151⁰C 6.2 Kg 148⁰C 124⁰C 120⁰C 132⁰C 134⁰C 150⁰C 15 PSI ON
Ton/h Boiler Running
run by Gas
5Ton/h &2.5
Ton/hr and 3 EGB Boiler
1:00 AM 6.5 Kg 146⁰C 6.0 Kg 148⁰C 5.7 Kg 149⁰C 122⁰C 118⁰C 128⁰C 131⁰C 146⁰C 15 PSI ON
Ton/h Boiler Running
run by Gas
5Ton/h &2.5
Ton/hr and 3 EGB Boiler
2:00 AM 7.0 Kg 148⁰C 6.0 Kg 149⁰C 6.5 Kg 152⁰C 124⁰C 120⁰C 131⁰C 133⁰C 150⁰C 15 PSI ON
Ton/h Boiler Running
run by Gas
5Ton/h &2.5
Ton/hr and 3 EGB Boiler
3:00 AM 6.5 Kg 144⁰C 6.0 Kg 146⁰C 5.6 Kg 150⁰C 120⁰C 118⁰C 127⁰C 129⁰C 145⁰C 15 PSI ON
Ton/h Boiler Running
run by Gas
5Ton/h &2.5
Ton/hr and 3 EGB Boiler
4:00 AM 7.0 Kg 150⁰C 6.5 Kg 149⁰C 6.3 Kg 146⁰C 124⁰C 120⁰C 132⁰C 134⁰C 150⁰C 15 PSI ON
Ton/h Boiler Running
run by Gas

CHECKED BY ASSISTANT MANAGER MANAGER


MD. MUNZURUL KADER (MECHANICAL) (MAINTENANCE)

You might also like