BILL OF QUANTITIES

LAVADO COCOA PROCESSING PLANT KIRAKIRA

MAKIRA ULAWA PROVINCE

12-Sep-19

SOLOMON ISLANDS GOVERNMENT


MINISTRY OF COMMERCE, INDUSTRIES, LABOUR & IMMIGRATION
P.O. BOX 26
HONIARA
SOLOMON ISLANDS
SOLOMON ISLANDS GOVERNMENT
MINISTRY OF INFRASTRUCTURE & DEVELOPMENT
LAVADO COCOA PROCESSING PLANT
KIRAKIRA

ABSTRACT

Item Description Quantity $

1 Amount of Preliminaries 1/1-3 $ 384,600.00

2 Amount of Earthworks and Concrete 2/1-2 $ 439,380.00

3 Amount of Reinforsement Steel 3/1-3 $ 175,008.84

4 Amount of Metal Work 4/1 $ 427,418.08

5 Amount of Block Work 5/1 $ 155,869.00

6 Amount of Carpentry 6/1 $ 44,074.80

7 Amount of Joinery 7/1 $ 137,474.53

8 Amount of Sundry Hardware 8/1 $ 101,851.40

9 Amount of Roofing 9/1 $ 274,300.69

10 Amount of Plumbing 10/1 $ 36,249.60

11 Amount of Electrical Services 11/1-2 $ 230,364.00

SUB TOTAL $ 2,406,590.95

Amount of Contractor's Profit & Overhead


cost $ 240,659.09
AMOUNT OF TENDER $ 2,647,250.04
SOLOMON ISLANDS GOVERNMENT
MINISTRY OF COMMERCE, INDUSTRIES, LABOUR & IMMIGRATION
LAVADO COCOA PROCESSING PLANT KIRAKIRA

1.PRELIMINARIES

Item Description Qty Unit Rate $

A1.1 The Tenderer shall observe that throughout this Bill


of Quantities, all items, with the exception as
noted, are measured net as fixed in position and no
allowance has been made for waste NOTE

A1.2 Unit rates are deemed to include all labour and


materials, cartage, cutting and waste, hoisting,
setting, fixing in position, return of packagings, etc Note

A1.3 The Tenderer, in all trades without exception, is


referred to the Specification for further particulars
of the methods and other instructions not Note
particularly described herein.

A1.4 The following are the abbreviations used in this Bill


of Quantities:-

mm millimetres
m metres
m2 square metres
m3 cubic metres
kg kilograms
no number

A1.5 Dimesions are generally given in millimetres,


without the following mm note $ -

A1.6 Allow to accurately set out the works to the


approval of the site Engineer Item 1 $ 1,500.00 $ 1,500.00

A1.7 Allow to lay temporary water supply with all


necessary appliances, pay all fees and charges
connected therewith, maintain and remove on Item 1 $ 1,500.00 $ 1,500.00
completion

A1.8 Allow to install temporary electricity required for


plant, lighting, etc.., item 1 $ 1,500.00 $ 1,500.00
A1.9 Allow to protect and maintain all existing services
on site for the during of works. Make good damage
caused to the same and ensure continuity of the item 1 $ 1,200.00 $ 1,200.00
services to existing building

LAVADO COCOA PROCESSING PLANT, KIRAKIRA

A. Preliminaries

Item Description Quantity Unit

A1.10 Allow to provide temporary latrines for the use of


all engaged upon the works, all in accordance with
the local Authority and Health Department
Regulations, maintain and remove on completion item 1 $ 3,000.00 $ 3,000.00

A1.11 Allow to provide and erect site office, storage and


workmen's sheds item 1 $ 4,000.00 $ 4,000.00

A1.12 Allow to obtain all permits, give notices and pay all
fees and charges in connection therewith, for this note $ -
and all other sections

A1.13 Allow to afford facilities to any other parties


employed on the building, including all outside
contractors and unless otherwise specified, provide
for such parties proper, sufficient and if necessary note
special scaffolding, hoisting and ladders and supply
them with water, power, lighting, etc..,

A1.14 Allow to attend upon, cut away and make good


after all trades, including bui;ding in of any anchors,
bolts, holes, chases, and the like, except where item 1 $ 2,000.00 $ 2,000.00
specifically measured

A1.15 Allow to protect public and private property on and


adjoining site, including all weather protection and
the like and make good any damages caused by the item 1 $ 2,000.00 $ 2,000.00
works

A1.16 Allow to make all provisions for drying the building note $ -

A1.17 Allow to provide all gears such as scaffold, planks,


trestles, staging, etc.., tools and hoisting appliances
and other requisites whatsoever necessary for the
proper and effective carrying on and completion of item 1 $ 1,000.00 $ 1,000.00
the works, maintain and remove on completion
A1.18 Allow to provide and erect approximately 600 m2
of external scaffolding, grant use to other
tradesmen, erect and maintain to the satisfaction
of the Local authority and remove on completion N/A $ -

Lavado cocoa Processing Plant

A. PRELIMINARIES

Item Description Qty Unit Rate $


A1.19 Scaffolding has been measured over the external
face of the building and contractor shall allow for
any additional he deems necessary. Provide also for
the erection of all necessary gantries, chutes, etc item 1 $ 4,000.00 $ 4,000.00

A1.20 Allow to provide and erect any internal scaffolding


or erect trestles, staging, etc.., to suit all item 1 $ 3,000.00 $ 3,000.00
requirements.

A1.21 Allow to effect all insurance Policies as specified


and as required by the conditions of Contract item 1 $ 2,000.00 $ 2,000.00

A1.22 Allow to periodically clean up the site and remove


all rubbish as it is item 1 $ 1,000.00 $ 1,000.00

A1.23 Allow to keep all sumps, pits and excavated areas


dry and free from water, perform all pumping and
bailing and provide any temporary drainage during
the progress of the works. Maintain all excavations item 1 $ 2,100.00 $ 2,100.00
and remove all gear on completion

A1.24 Allow to provide and erect a fully painted sign


board size 1800 x 1200mm, maintain and remove item 1 $ 2,400.00 $ 2,400.00
on completion

A1.25 Allow the Provisional Sum for signwriting to the


foregoing board item 1 $ 2,400.00 $ 2,400.00

A1.26 Allow to freight all materials to project site item 1 $ 350,000.00 $ 350,000.00

Page 1/1
Page 1/2
Page 1/3
Total Preliminaries carried to Abstract $ 384,600.00
Preliminaries 1/3
SOLOMON ISLANDS GOVERNMENT
MINISTRY OF COMMERCE, INDUSTRIES, LABOUR & IMMIGRATION

LAVADO COCOA PROCESSING PLANT KIRAKIRA


2. EARTH WORKS AND CONCRETE
Item Description of Work Quantity Unit Rate Amount

EARTHWORK
A MIX GRAVEL M³ 55 250.00 13,750.00
B FINE SAND M³ 30 250.00 7,500.00
C QUARRY/HARD CORE M³ 20 350.00 7,000.00
D FORM WORKS (250mm) M³ 60 350.00 21,000.00
E CEMENT Bg 1112 68.00 75,616.00

EXCAVATION

F Excavation to pad footing M³ 8 350.00 2,800.00


G Excavation to strip footing M³ 8 350.00 2,800.00
H Excavation to tile beam M³ 12 350.00 4,200.00
I Gravel infill and compacted up to slab level M³ 8 350.00 2,800.00

CONCRETE WORK

J Concrete in pad footing M³ 8 $1,450.00 11,600.00


K concrete in strip footing M³ 9 $1,450.00 13,050.00
L Hard Corefill to u/s Slab M³ 7 $ 950.00 6,650.00
M Sand Blinding / to u/s slab M³ 2 $ 250.00 500.00
N Damp Proof Membrane (DPM) M² 5 $ 5.60 28.00
O Concrete in Encasement M³ 8 $1,450.00 11,600.00
P Concrete in Tie Beam (TB1) M³ 12 $1,450.00 17,400.00
Q Concrete in Edge Beam (EB1 - EB4) M³ 9 $1,450.00 13,050.00

SLABS

R Concrete in Slabs/path 100mm M³ 28 $1,450.00 40,600.00


S Formwork to sides of Last ≤ 250mm M 20 $1,450.00 29,000.00
T Ditto to soffit ≥ 250mm M² 13 $1,450.00 18,850.00
U Concrete in ring beam M³ 9 $1,450.00 13,050.00
V Formwork to Last ≤ 250mm M 20 $ 80.00 1,600.00

COLUMN

W Concrete in Column M³ 15 $1,800.00 27,000.00

SUB TOTAL $ 341,444.00


LAVADO COCOA PROCESSING PLANT
ITEM DESCRIPTION Quantity Unit Rate Amount

X Allow for Labour for this section of works item 1 129,748.72

COLLECTION

page 2/1 341,444.00


page 2/2 97,936.00

Total of Earthworks Carried to Abstract 439,380.00


Earthworks and concrete '2/2 129,748.72
SOLOMON ISLANDS GOVERNMENT
MINISTRY OF COMMERCE, INDUSTRIES, LABOUR & IMMIGRATION

LAVADO COCOA PROCESSING PLANT, KIRAKIRA

Item Description of Work Unit Qty Rate Amount


3. REINFORCING STEEL

FOUNDATION

A N 20 6M Deformed Bars No 150 155.00 $ 23,250.00


B N 16 x M Deformed Bars No 252 100.00 $ 25,200.00
C N 12 x 6 M tie Stirrups No 213 58.00 $ 12,354.00
D Vertical with Horizontal Bars No 123 58.00 $ 7,134.00

FLOOR SLABS/PATH
E F62 arc Welded mesh 3.60m x 2.10 M³ 67 20.00 $ 1,340.00

RING BEAM

F N 16 x 6M deformed Bars No 364 100.00 $ 36,400.00


G R 610 x 6M Tie Stirrups 262
No 20.00 $ 5,240.00

COLUMN

H N 16 x 6M Deform Bars No 139 100.00 $ 13,900.00


I R 10 x 6M Tie Stirrups No 100 20.00 $ 2,000.00

SUB TOTAL: $ 126,818.00

Allow for all labour for this section of Works 1 item $ 48,190.84

COLLECTION

page 2/1

Total REINFORCING Carried to Abstract $ 175,008.84


Reinforcement 3/1
SOLOMON ISLANDS GOVERNMENT
MINISTRY OF COMMERCE, INDUSTRIES, LABOUR & IMMIGRATION

LAVADO COCOA PROCESSING PLANT KIRAKIRA


4. METAL WORKS

Item Description Unit Qty Rate Amount

Metal Works

A C200 16 rafters with complete welded steel No 60 $ 618.00 $ 37,080.00


plates pre drilled (R1)
B C150 16 Eaves bracing (EB) No 62 $ 492.00 $ 30,504.00
C 50 x 50 x 3 and 25 x 25 bracing web Rafters No 57 $ 360.00 $ 20,520.00
(T1)
D 50 x 50 5 EA roof cross bracing (RCB) No 46 $ 360.00 $ 16,560.00
E 50 x 50 EA roof bracing (RB1) No 32 $ 360.00 $ 11,520.00

F C150 x 16 Purlins Complete pre drilled for M 540 $ 180.00 $ 97,200.00


M10 bolts

G 80 dia x 6M G.I latteral braces (RB) No 27 $ 250.00 $ 6,750.00

H 50 HSH Structure pergola over entrance only No 32 $ 360.00 $ 11,520.00


I 50 x 50 x 3 rafter No 60 $ 240.00 $ 14,400.00

J 50 x 50 SHS Purlin (rack) No 154 $ 240.00 $ 36,960.00


K M12 x 125 dyna bolt No 288 $ 13.00 $ 3,744.00

L 50 SHS x 3M to sun screen 3 panel in 75 No 86 $ 320.00 $ 27,520.00


SHS frames

$ 314,278.00
SUB TOTAL:

Allow for supply all labour for this section of item 1 $ 113,140.08 $ 113,140.08
work

COLLECTION

page 4/1
Total of Metal Works carried to Abstract $ 427,418.08

METAL WORKS 4/1


SOLOMON ISLANDS GOVERNMENT
MINISTRY OF COMMERCE, INDUSTRIES, LABOUR & IMMIGRATION

LAVADO COCOA PROCESSING PLANT KIRAKIRA

5. BLOCKWORK

Item Description Unit Qty Rate Amount


HALLOW BLOCKS:

A 400 x 200 hollow blocks strip foundation/Tie


beam No 1286 $ 11.00 $ 14,146.00
B 400 x 200 blocks/Piers No 600 $ 11.00 $ 6,600.00
C 400 x 200 blocks/walls
No 6135 $ 11.00 $ 67,485.00
D 200 x 200 Vent blocks No 406 $ 10.00 $ 4,060.00
E D16 in Verticle bars No 136 $ 96.00 $ 13,056.00
F D12 in horizontal bars No 87 $ 50.00 $ 4,350.00
G Concrete fill to last 25mpa No 21 $ 78.00 $ 1,638.00

SUB TOTAL $ 111,335.00

H Supply all labour for this section of works 1 item $ 44,534.00

COLLECTION

page 5/1 $ 155,869.00

Total BLOCKWORK carried to Abstract $ 155,869.00

Blockwork 5/1
SOLOMON ISLANDS GOVERNMENT
MINISTRY OF COMMERCE, INDUSTRIES, LABOUR & IMMIGRATION

LAVADO COCOA PROCESSING PLANT KIRAKIRA


6. CARPENTRY

Item Description Unit Qty Rate Amount

Carpentry:

ROOF FRAMING

A 250 x 38 x 4.80 Fascia and barge boards M 98 $ 45.00 $ 4,410.00


B 2/175 x 38 x 4.80 fascia boards flashing fix to end M 72 $ 142.00 $ 10,224.00
purlins
C R4 x 50 M2 Wire Mesh No 54 $ 312.00 $ 16,848.00

SUB TOTAL $ 31,482.00

D Allow for supply of Labour for this section of


work 1 item $ 12,592.80

COLLECTION

page 6/1

Total CARPENTRY carried to Abstract $ 44,074.80

CARPENTRY 6/1
SOLOMON ISLANDS GOVERNMENT
MINISTRY OF COMMERCE, INDUSTRIES, LABOUR & IMMIGRATION
LAVADO COCOA PROCESSING PLANT KIRAKIRA

7. JOINERY

Item Description Unit QTY Rate Amount

JOINERY:

Window Frame

A 144 x 44 head and jamb M 31 $ 42.00 $ 1,302.00


B 144 x 44 mullion M 13 $ 42.00 $ 546.00
C 194 x 44 shaped cill M 34 $ 65.00 $ 2,210.00
D 20 x 20 weather stop M 46 $ 13.00 $ 598.00
E Galv wire mesh fly screen Roll No 41 $ 312.00 $ 12,792.00
F 40 x 20 batterns M 28 $ 6.13 $ 171.64
G Staple nail 5 kg No 5 $ 130.00 $ 650.00

DOOR FRAME (SINGLE)

H 144 x 44 Head and Jamb M 15 $ 42.00 $ 630.00


I 40 x 20 Door Stops M 12 $ 32.00 $ 384.00
J 900 x 2100 Solid T&G braced and ledged door
No 43 $ 840.00 $ 36,120.00
stop with hinges and locks

DOOR FRAME (DOUBLE)

K 144 x 44 Head and Jamb No 69 $ 42.00 $ 2,898.00


L 40 x 20 door stop No 44 $ 42.00 $ 1,848.00
M 900 x 1800 solid T&G braced and ledge door No 38 $ 1,200.00 $ 45,600.00
stop with hinges and locks

SUB TOTAL $ 105,749.64

Supply of Labour for this section of work 1 item $ 31,724.89

COLLECTION
page 7/1 $ 137,474.53

Total JOINERY carried to Abstract $ 137,474.53


JOINERY 7/1
SOLOMON ISLANDS GOVERNMENT
MINISTRY OF COMMERCE, INDUSTRIES, LABOUR & IMMIGRATION
LAVADO COCOA PROCESSING PLANT KIRAKIRA

8. SUNDRY HARDWARE
Item Description Unit QTY Rate Amount

SUNDRY HARDWARE:

LOCK:

A Double Lockwood dead bolts No 24 $ 151.00 $ 3,624.00


B Double 125mm padbolts No 24 $ 210.00 $ 5,040.00

Hinges
C 100mm butt brass (heavy duty) No 26 $ 98.00 $ 2,548.00
D 100mm butt brass hinges No 26 $ 98.00 $ 2,548.00
E 31 x 0.8g Brass Screws (pieces) No 72 $ 2.00 $ 144.00
F 31 x 0.8g louvre screws round head alumin coated
(Pieces) No 24 $ 2.00 $ 48.00

Nails

G 150mm (6") jolt head kg 18 $ 104.00 $ 1,872.00


H 100mm (4") jolt head (CTN) No 20 $ 280.00 $ 5,600.00
I 75mm (3") jolt head kg 22 $ 280.00 $ 6,160.00
J 25mm (1") Fibro clouts kg 9 $ 27.00 $ 243.00
K 25mm self screwed tacking kg 12 $ 27.00 $ 324.00

Paints

L 4 litre high gloss white (tins) No 20 $ 430.00 $ 8,600.00


M 4 litres high gloss green (tins) No 16 $ 430.00 $ 6,880.00
N 4 litres metal paint (grey) No 8 $ 420.00 $ 3,360.00
O 4 litres undercoat (selected) No 20 $ 540.00 $ 10,800.00
P 4 litres concrete paint (Selected) No 20 $ 430.00 $ 8,600.00
Q 4 litres thinner….tins No 12 $ 380.00 $ 4,560.00
R Spark filler container x 5kg No 8 $ 78.00 $ 624.00
S Silicon Tube 75gm container No 12 $ 98.00 $ 1,176.00

SUB TOTAL $ 72,751.00

Allow to supply all labour for this section of work 1 item $ 29,100.40

COLLECTION
page 8/1 $ 101,851.40

Total SUNDRY HARDWARE carried to Abstract $ 101,851.40


SUNDRY HARDWARE 8/1
SOLOMON ISLANDS GOVERNMENT
MINISTRY OF COMMERCE, INDUSTRIES, LABOUR & IMMIGRATION

LAVADO COCOA PROCESSING PLANT KIRAKIRA

9. ROOFING

Item Description Unit QTY Rate Amount

ROOFING:

A 50 x50 R4 bird wire mesh M² 921 $ 12.18 $ 11,215.73


$ -
B Double Sided sizalation building paper x 75 M² M² 890 $ 8.67 $ 7,713.33
$ -
C 24 gauge 6 Rib Colour bond M² 1230 $ 89.00 $ 109,470.00
$ -
D GMS Colour bond ridge capping M 915 $ 64.00 $ 58,560.00
$ -
E GMS barge rool/flashing M 78 $ 65.00 $ 5,070.00
$ -
14 gauge x 65 type screw high grip with sealing
F washer Ctn 6 $ 650.00 $ 3,900.00

SUB TOTAL $ 195,929.07

G Allow to supply labour for this section of work 1 item $ 78,371.63

COLLECTION

page 9/1 $ 274,300.69

Total of ROOFING carried to Abstract $ 274,300.69

ROOFING 9/1
SOLOMON ISLANDS GOVERNMENT
MINISTRY OF COMMERCE, INDUSTRIES, LABOUR & IMMIGRATION

LAVADO COCOA PROCESSING PLANT KIRAKIRA

9. PLUMBING

Item Description Unit QTY Rate

PLUMBING:

150 x 100 standard (5.8m) marley gutter complete/ends No 4 $ 380.00


A and spouts

B Marley Standard bracket No 56 $ 25.00

C 100mm dia down pipes No 4 $ 12.00

D 100mm straps/ screws with fixing screws No 8 $ 320.00

Drainage

E 200 x 150 concrete drain complete with metal frame and No 1 $ 680.00
cover

Construct 75 thick reinforced concrete sides, base and No 3 $ 5,600.00


cover; inspection box 450 square x 300 deep (inside
dimentions) having one 60 inlet and one 60 outlet all as
F detailed in dwg No.H-04

3000L Rotomol Tanks with complete concrete support M³ 4 $ 1,800.00


G slabs

SUB TOTAL

H Allow to supply all labour for this section of work 1 item

COLLECTION

page 10/1
Total of PLUMBING carried to Abstract

PLUMBING 10/1
TION

Amount

$ 1,520.00

$ 1,400.00

$ 48.00

$ 2,560.00

$ 680.00

$ 16,800.00

$ 7,200.00

$ 30,208.00

$ 6,041.60

$ 36,249.60
$ 36,249.60
SOLOMON ISLANDS GOVERNMENT
MINISTRY OF COMMERCE, INDUSTRIES, LABOUR & IMMIGRATION

LAVADO COCOA PROCESSING PLANT KIRAKIRA

11. ELECTRICAL SERVICES

Item Description Unit QTY Rate Amount

ELECTRICAL SERVICES:

Circuit Breaker

A Approved type circuit breaker complete with switches, No 3 $ 68.00 $ 204.00


fuses etc..

Lights

B Connect up circuit for four liht points controlled by No 16 $ 65.00 $ 1,040.00


single light switch

C Connect up circuits for eight light points controlled by No 38 $ 65.00 $ 2,470.00


double gang light switch day lite switch

D Connect up circuits for twelve light points controlled No 44 $ 54.00 $ 2,376.00


by single light switch

E 600 long x 20w fluorescent light fitting complete with No 84 $ 210.00 $ 17,640.00
tube

F 1200 long x 40w fluorescent light fitting complete with No 148 $ 420.00 $ 62,160.00
tube

GPO

G Connect up circuit for double power points No 102 $ 86.00 $ 8,772.00


H Double power point fitting (GPO) No 134 $ 64.00 $ 8,576.00
I 40mm x 3m orange/white conduits set into saddle No 88 $ 64.00 $ 5,632.00
J 19mm x 3m white conduit set into saddle No 132 $ 120.00 $ 15,840.00
K Light cables 1.5mm Roll No 40 $ 650.00 $ 26,000.00
L Power cables 2.5mm Roll No 38 $ 640.00 $ 24,320.00
M 50mm dia x 3m large conduit for external meter only No 44 $ 210.00 $ 9,240.00
N Standard meter box as per Solomon Power No 1 $ 2,300.00 $ 2,300.00
specification fixed 1500mm above ground level
complete with base

SOLOMON ISLANDS GOVERNMENT


MINISTRY OF COMMERCE, INDUSTRIES, LABOUR & IMMIGRATION
LAVADO COCOA PROCESSING PLANT, KIRAKIRA

10. ELECTRICAL SERVICES

Item Description Unit QTY Rate Amount

Allow for all other misc as deem necessary (Site 1 item 5400 $ 5,400.00
O
Specific)

SUB TOTAL: $ 191,970.00

P Allow to supply labour for this section of work 1 item $ 38,394.00

Collection
page 11/1
page 11/2

Total Electrical Services carried to Abstract $ 230,364.00


Electrical Services 11/2