CADAM2D - Geometry report

Project: Project engineer:


Dam: Analysis performed by:
Owner: Date: 5/18/2020
Dam location: Units: Metric

Geometry Lift Joint Material Properties


L1= 50.051 m Concrete strength Peak friction Residual friction Minimal compressive
L2= 2.946 m Material f'c ft Cohesion Angle Cohesion Angle stress for cohesion
L3= 6.401 m name (kPa) (kPa) (kPa) (deg) (kPa) (deg) (kPa)
L4= 6.401 m Base joint 30000 0 120 35 100 45 0
Elev. A= 341.376 m masonry 12000 0 120 35 100 35 0
Elev. B= 341.376 m
Elev. C= 341.376 m Lift Joint(s)
Elev. D= 341.376 m Usptream end Downstream end
Elev. E= 385.572 m Joint material Elevation Position x Elevation Position x Length Inertia
Elev. F= 398.069 m id name (m) (m) (m) (m) (m) (m^4)
Elev. G= 405.574 m 1 masonry 398.069 2.946 398.069 9.347 6.401 21.8555749334167
Elev. H= 345.000 m 2 masonry 380.000 2.575 380.000 22.320 19.746 641.541435537443
Elev. I = 345.000 m 3 masonry 360.000 1.241 360.000 36.680 35.438 3708.8009142629
Base Base joint 341.376 0.000 341.376 50.051 50.051 10448.7057086593
Concrete Volumetric Mass
r= 2400 kg/m³ Pre-Cracked Lift Joint(s)
Usptream end Downstream end
L4 Joint material Crack length Crack length
G id name (m) (%) (m) (%)
1 masonry - - - -
F 2 masonry - - - -
L3
L2 3 masonry - - - -
Base Base joint - - - -
DOWNSTREAM

E
UPSTREAM

D I
H C
B
A
L1

Water Volumetric Mass Reservoirs


r= 9.810 kg/m³ Upstream side Downstream side
Normal operating level: 399.900 m 352.810 m
Ice cover Flood level: 405.465 m 354.180 m
Load= 0 kN Crest overtopping pressure 100.00 % 50.00 %
Thickness= 0.000 m
Elevation= 399.900 m Drainage system
Gallery position from heel of dam= 6.700 m
Silts Gallery elevation= 342.900 m
Elevation= 381.000 m Drain Efficiency= 0.6667
g'= 7 kN/m³ Highest drained elevation= 342.900 m
f= 20 deg Modelisation: USBR 1987
Assumption= at rest

Uplift pressures: Uplift pressures are considered as an external load (linearisation of effective stresses)

Pseudo-dynamic (Chopra's method)


Dam only
Earthquake return period= 2500 years Dam divisions for analysis= 201 divisions
Dam damping on rigid foundation without reservoir= 0.035 of critical
Horizontal Peak Ground Acceleration (HPGA)= 0.0800 g Concrete Young's modulus (dynamic)= 26500 MPa
Vertical Peak Ground Acceleration (VPGA)= 0.0600 g
Horizontal Peak Spectral Acceleration (HPSA)= 0.0074 g Reservoir only
Wave reflection coefficient= 0.5
Horizontal Sustained Acceleration (HSA)= 0.0800 g Velocity of pressure waves in water= 1440 m/sec
Vertical Sustained Acceleration (VSA)= 0.0600 g
Vertical Sustained Spectral Acceleration (VSSA)= 0.0074 g Foundation only
Foundation constant hysteretic damping= 0.1
Modal combination: SRSS combination Foundation Young's modulus (dynamic)= 45000 MPa

Dam-reservoir-foundation system
Period of vibration= 0.18904897 sec
Damping= 0.09070051 of critical

Input Data 08/07/2020 / 07:05:56 Page 1 / 2


CADAM2D - Geometry report
Project: Project engineer:
Dam: Analysis performed by:
Owner: Date: 5/18/2020
Dam location: Units: Metric

Cracking options
Tensile strength
cracking considered for all combinations: No Usual Flood Seismic Post-seismic
Crack initiation= ft / 3.000 ft / 3.000 ft / 3.000 ft / 3.000
Numerical options Crack propagation= ft /10.000 ft /10.000 ft /10.000 ft /10.000
Convergence method: Bi-section Seismic magnification= 1.500
Accuracy= Medium (1E-6) Uplift pressures
Static analysis: Full uplift pressures applied to the crack section
Dynamic analysis: Uplift pressures remain unchanged
Post-seismic analysis: Full uplift pressures applied to the crack section
D/S closed crack: Restore uncracked uplift condition
Drain effectiveness: No drain effectiveness under any cracking condition

Input Data 08/07/2020 / 07:05:56 Page 2 / 2