Professional Documents
Culture Documents
Unit Exchange Spare For 3 Phase Locos: Electric Loco Shed / Visakhapatnam
Unit Exchange Spare For 3 Phase Locos: Electric Loco Shed / Visakhapatnam
Unit Exchange Spare For 3 Phase Locos: Electric Loco Shed / Visakhapatnam
TM Rotor
6FRA 6068(Rotor) 1122 7 79 66 51 15 77% Out of 15 Nos defective
(WAG-9/WAP7) (a) 11 nos HR ( wil be sent to NKRD)
(b) 03 nos at NKRD. TDC: Oct'20
1
(c) 1 - Saini - under warranty.
TM Stator
6FRA 6068(Stator) 1122 7 79 51 41 10 80% Out of 10 Nos.defective,
(WAG-9/WAP7) a) 4 nos HR ( will be sent to NKRD)
b) 5 nos at NKRD. TDC: Oct'20
c) 1 - Saini - under warranty.
** 6 no awating O/H
2
RSP status of TM RSP:-
assembly complete (a) 9 nos (G9/P7) by CLW ( BRSP No. 1181/19-20)
(b) 11nos (P7) by CLW (BRSP No. 1291/20-21)
(c) 2 nos (G9) by CLW (IRSP No. 60/16-17)
(d) 4 nos (IRSP No. 7/20-21)
Transformer 190
LOT 6500 KVA 142 2 3 0 0 0 --
LOT 6531 KVA 15 0 3 0 3 0% Out of 3 nos :
a) 2 nos Tank damaged due to exernal hitting. 1 no work
awarded to M/s Livewire, DP extended to 30.09.20, 1 no work
awarded to M/s Kalyani Engg. TDC: 20.08.20 (b) 1 no tank and
core damaged due to external hitting. Will be processed for
repair.
3
RSP:-
(a) 1 no by CLW ( BRSP No. 1167/19-20)
(b) 2nos by CLW ( BRSP No. 1301/20-21)
(c) 2nos (IRSP no. 5/20-21)
RSP:-
11 (a) Bogie with brake rigging - 2nos (BRSP No, 176/20-21) by
CLW.
(b) Motorised bogie - 5nos (BRSP No. 1197/19-20) by DMW.
(c) Bogie frame with brake rigging - 1no (IRSP no. 4/20-21)
RSP:-
11a
(a) Bogie frame with brake rigging - 1no (BRSP No. 173/17-18)
by CLW.
(b) Motorised bogie - 6 nos (BRSP No. 1198/19-20) by DMW.
Wheel Set
WAG9 (21:107) 924 59 2 57 3% Out of 57 Nos.
(a) 17 nos. under warranty (CLW) (MSU -9, Bullgear - 7, UST
failed-1)
(b) 6 nos sent to CLW for warranty attention
(c) 1 no under condmn. ( Axle scored)
d) 33 nos HR ( under dia- rediscing being done on need basis)
RSP:-
(a) 3 nos wheel sets (BRSP No. 1184/19-20) by TATA.
(b) 8 nos wheel sets ( BRSP No. 1297/20-21)
(c) 6 nos motorised wheel sets (BRSP No. 1197/18-19) by
DMW.
(d) 6 nos wheel sets (BRSP No. 1184/19-20) by TATA.
12
(e) 10 nos motorised wheel sets (BRSP No. 1201/19-20) by
DMW.
(f) 10nos motorised wheel sets (BRSP No. 1312/20-21) by
DMW.
(g) 6 nos wheel sets (IRSP No. 2/20-21)
COP(MPH) 384 31 29 2 94% 02 nos under warranty (SH-bearings will be supplied in 15 days)
14
MRB 384 56 10 46 18% Out of 46 Nos.
a) 40 nos H/R ( 30nos are included in next contract).
15 b) 06 under warranty (2 earthed- Ranjan, 2-bearings sound-SH
(15 days), 2-bearing sound-Ranjan)
SR blower 384 10 2 8 20% 08 nos earthed H/R ( for ABB SR). ( will be covered in next
21 contract qty of 10nos)
Pantograph
AM12/IR01/PAN01 498 28 28 0 100% **18 nos waiting for O/H
AM92 108 2 2 0 100%
22
IR03H 108 4 2 2 50% 2 nos awaiting for spares ( bearings )
WBL85 (Rev-1) 498 4 0 4 0% 4nos awaiting for material for CAM modification to Rev2 ( PO
placed, DP 26.11.20)