Download as pdf or txt
Download as pdf or txt
You are on page 1of 1

COSTAIN ABU DHABI COMPANY W.L.L.

WEEKLY HOUSEKEEPING AND WORKPLACE INSPECTION CHECKLIST


PROJECT: HP FEED GAS DATE:
INSPECTED BY: SIGNATURE:

Items to check Yes No Action to be taken Completion date


PEOPLE
• Are the work areas tidy
• Are they observing other people
• Did they clean up after job completion
• Have they returned tools & unused spares
LOCATION
• Is the lighting satisfactory
• Are there unused pieces of equipment
cluttering the area
• Are the walkways clear
• Are there any oil spills or contamination
• Are the scaffoldings/excavations taped off
and/or clearly marked
• Are drums stored correctly
• Are waste bins overflowing
• Is there correct waste segregation
• Are there combustibles under working
positions
• Are there adequate means of escape
EQUIPMENT
• Are all cylinders stored in an upright position
• Are there any leads/hoses obstructing
walkways
• Are hoses coiled around cylinders
• Is all equipments in good conditions
• Are all fire extinguishers within reach

CADCO-HSE-003

You might also like