Download as pdf or txt
Download as pdf or txt
You are on page 1of 4

Objective

Faizan
Mursaleen Seeking a challenging position in the field of Mechanical
organization where I can utilize my abilities & experience
Ansari
Major Area of Interest

Designing and Installation of HVAC and Fire Protection System


for High Rise towers Shopping Malls, Residential projects,
Hospitals, Offices, Academic Buildings and Health Club Having
experience of state of the art technology used in HVAC
industry.

Skill Highlights

• Project management • Duct Size calculation by


• Manage/Execute the work Ductulator and
on site Manually
• Preparation of BOQ • Calculation Of Fan
• Preparation of Rate • Preparation of Shop
Contact analysis Drawings, As-Built
• Preparation of Quotation Drawings, Section
• Preparation of Bill Drawings, Isometric
Address:
• Preparation of Drawings, Elevation
House No. 1094, Street No. 22,
Measurement sheets Drawings, Schematic
Block ‘J’, Sector 11-1/2, Orangi
• Quantity Takeoff Drawings
Town, Karachi, Pakistan.
• Innovative • AutoCAD Beginner
• Service-focused Level
Phone:
• MS Office (Excel, Word
+92-341-7032074
& Power Point)
Email: Experience
Faizan.fma@gmail.com
HVAC Lead Engineer - January/2020 to Till Now
Languages AA Joyland Pvt. Ltd., Karachi
Following are the Works executed:
English ➢ Technical Inspection of whole HVAC works at newly
Urdu constructed project JOY CO.
➢ Prepare Documents for master service & Inspection
of AC units
➢ Make plan for preventive maintenance (annual
service & routine service)
➢ Technical inspection & Commissioning of Cold
storage (Freezer design temperature is 4 °C &
Chiller design temperature is -18 °C).
Experience
Faizan Site Engineer Cum QS – Aug./2016 to Dec./2019
Mursaleen Engineering Services, Karachi
Project Handle:
Ansari 2. Soorty Villa, Karachi
Following are the Works executed:
➢ Installation of Air Cooled Chiller
➢ Installation of Pumps on Inertia Foundation
➢ Installation of Air Handling Units
➢ Installation of Fan Coil Units
➢ Installation of VAVs,
➢ Installation of (Aquatherm – SDR-11) PPR pipe for
Chilled water with Aeroflex Insulation & Arma
check Cladding.
➢ Installation of GI Sheet Duct with Fiber glass
insulation, Canvas Cloth and Anti Fungus
Paint.
2. Bahria Town Icon Tower Retail Area,
karachi Following are the Works executed:
(FIRE SUPPRESSION)
➢ Installation of GI Pipe (Grooved-Coupling
Joint) for Fire Fighting
➢ Installation of Risers
Contact ➢ Installation of Fire Hose Cabinet
➢ Installation of Hydrant Valve/Landing Valve
➢ Installation of Zone Control Valve
Address: Assembly (ZCVA)
House No. 1094, Street No. 22, ➢ Installation of Ceiling Concealed &
Block ‘J’, Sector 11-1/2, Orangi Upright Sprinklers.
Town, Karachi, Pakistan.
(HVAC)
➢ Installation of Fresh Air Handling Units.
Phone: ➢ Installation of Air Handling Units.
+92-341-7032074 ➢ Installation of Fan coil Units & Cassette Type Units.
➢ Installation of VAVs.
Email: ➢ Installation of Electrostatic Precipitator for
Faizan.fma@gmail.com Purification of Kitchen Smoke.
➢ Installation of Kitchen Exhaust Fan.
➢ Installation of Kitchen Ventilation Fan.
Languages ➢ Installation of MS Pipe for Chilled water
with Aeroflex insulation.
English ➢ Installation of Condensate drain pipe
Urdu with Aeroflex Insulation.
➢ Installation of GI Duct For Fresh Air/Supply
Air/Return Air & Exhaust Air with Fiber Glass
Blanket Insulation.
➢ Installation of GI Duct For Smoke Exhaust
with Fiber Glass Board Insulation
➢ Installation of SS Duct For Kitchen Exhaust
along with Rockwool Insulation and Aluminum
Cladding.
➢ Prepare Bill
➢ Prepare Measurement Sheets
Experience
Faizan
Mursaleen (Plumbing)
➢ Installation of (Aquatherm – SDR-9) PPR Pipe
Ansari Riser for water Supply.
➢ Installation of PPR Pipe (Dadex) for Water
Supply.
➢ Installation of Push fit UPVC Pipe (Terrain-UK)
for Drainage
➢ Installation of UPVC Pipe (Dia-200 & Dia –
300) Cosmoplast for main Line of Drainage.
HVAC Engineer - March/2013 to
July/2016 Habibullah Associates, Karachi
Project Handle:
1- Dolmen City Corporate Offices, Karachi
Following are the Works executed:

(FIRE SUPPRESSION)
➢ Installation MS Pipe For Fire Fighting
➢ Installation of Ceiling Concealed/Side Wall
Sprinkler
➢ Installation of Fire Hose Cabinet
➢ Installation of Landing Valve/Hydrant Valve
➢ Installation of Zone Control Valve
Contact Assembly (ZCVA)

(HVAC)
Address: ➢ Installation of Air Handling Units
House No. 1094, Street No. 22, ➢ Installation of MS Pipe for Chilled water with
Block ‘J’, Sector 11-1/2, Orangi thermopore insulation & Venture Cladding
Town, Karachi, Pakistan. ➢ Installation of Linear Diffusers
➢ Installation of Motorized Fire Damper
Phone: ➢ Installation of Volume Control Damper
+92-341-7032074
2- Habib Bank Plaza
Following are the Works executed:
Email: ➢ Calculation for the Kitchen Exhaust duct as
Faizan.fma@gmail.com per Existing Kitchen Hood
➢ Calculation for the Supply Air Duct
Languages ➢ Calculation of S.A.Diffusers/R.A.Grill
➢ Prepare Rate Analysis for the Materials
➢ Prepare Quotations
English ➢ Prepare Bill
Urdu ➢ Prepare Measurement Sheets
3- National institute of Child Health (NICH), Karachi
Following are the Works executed:
➢ Quantity Takeoff for Ducts & Pipe
➢ Prepare Rate Analysis for the Materials
➢ Prepare Quotations
➢ Prepare Bill
➢ Prepare Measurement Sheets
Experience
Faizan
Mursaleen 4- State Bank of Pakistan, Karachi
Following are the Works executed:
Ansari ➢ Pump Head Calculation
➢ Quantity Takeoff for Ducts & Pipes
➢ Prepare Quotations
➢ Prepare Rate Analysis
➢ Prepare Bill
➢ Prepare Measurement Sheets
5- PNSC Building, Karachi
Following are the Works executed:
➢ Installation of Fan Coil Unit
➢ Installation of Chilled Water Piping
With Thermopore Insulation
➢ Prepare Quotations
➢ Prepare Rate Analysis
➢ Prepare Bill
➢ Prepare Measurement Sheets
6- Civil Hospital, Karachi
Following are the Works executed:
➢ Installation of Roof top Package Unit
➢ Installation of GI Duct with Fiber Glass Insulation
➢ Installation of Diffusers
Contact ➢ Prepare Bill
➢ Prepare Measurement Sheets
Address: Trainee Engineer – September/2012 to
House No. 1094, Street No. 22, February/2013 FND Consulting Engineers
Block ‘J’, Sector 11-1/2, Orangi
Town, Karachi, Pakistan.
Six Months as a Trainee Engineer
Phone:
Acquired the Knowledge of Designing of Ducting, Piping
+92-341-7032074
Air Devices, Pumps, Fans.
Email:
Faizan.fma@gmail.com Education
• B.tech (4 years) in Mechanical from Indus University,
Languages Karachi
• Diploma of Associate Engineer (D.A.E) in Mechanical
Technology From “Sindh Board of Technical Education
English
Karachi”
Urdu
• Intermediate (Pre Engineering) From Karachi board
• Matriculation (Science) From Karachi board

Certifications
• One year Diploma in Refrigeration and Air
Conditioning from Amantech (City and Guilds)
• Six months Certification Course in Refrigeration and
Air Conditioning from Amantech (City and Guilds)

You might also like