Professional Documents
Culture Documents
External Final06 01 20
External Final06 01 20
External Final06 01 20
External Services
11
1. Acceptance and Approval for On-the-Job Training
This service is under the Progression Division of the Air Traffic Planning &
Progression Department (ATPPD), ATS provided to University/College students
as part of their curriculum in school. Certificate of completion are given to
students who have completed the required number of hours as enforced by the
school.
Office or Division: Progression Division, Air Traffic Planning & Progression Department
Classification: Simple
Type of Transaction: G2C – Government-to-Citizen
Who May Avail: University/College students
CHECKLIST OF REQUIREMENTS WHERE TO SECURE
1. Endorsement letter from school To be submitted by the requesting party to
CAAP HRMD office
2. Participants’ ID (1 photocopy) Requesting party
3. School waiver University/College attended by the students
4. NBI clearance NBI Office
5. Bio-data Student
6. CAAP Security clearance (1 original) CAAP CSIS Office
CLIENT STEPS AGENCY ACTION FEES PROCESSING PERSON
TO BE TIME RESPONSIBLE
PAID
1. Submit 1. HRMD to check/verify None 10 Minutes Receiving staff
endorsement letter submitted documents HRMD Office
to HRMD
1.1. HRMD to record
request in the 5 Minutes
database
12
Admin for 3.1 Orient students of 15 Minutes Progression
orientation the ATS guidelines Division’s
and policies on Office, ATS
accepting OJT
trainees
13
clearance 5 Minutes
14
2. Amendment of the Philippine Civil Aviation Regulations (PCAR)
Coming from Stakeholder
1
Minimum of 1 day depending on the volume of proposed amendments.
2
Minimum of 1 day depending on the complexity of the proposed amendments.
3
Minimum of 1 day depending on the complexity of the proposed amendments/
4
Public Hearing is necessary when the RR-Committee finds that the petition is of public interest.
15
7. Finalization of the None 1 day Regulations
Memorandum Development
Circular Amendment
Section (RDAS) -
Civil Aviation
Regulations Officer
8. Regulations None 1 day Regulations Review
Review Committee
Committee’s
approval of the
Memorandum
Circular
9. Director General’s None 1 day Director General
approval of the
Memorandum
Circular
10. Board Approval5, if None 1 day6 CAAP Board
required Members
11. Publication of None 2 days Regulations
approved Maintenance
Memorandum Section (RMS) -
Circular7 Civil Aviation
Regulations Officer
12. Incorporation of None 5 days8 Regulations
Memorandum Maintenance
Circular to the Section (RMS) -
Philippine Civil Civil Aviation
Aviation Regulations Officer
Regulations
TOTAL:
5
All proposal/request for amendments or revisions shall, upon approval by the Director General, immediately be
submitted to the Board of Directors for approval, except ICAO-Council-approved regulations which are
ministerial on the part of CAAP.
6
Board meeting is conducted once a month, subject to availability of Board Members.
7
Approved Memorandum Circulars are published in a newspaper for general circulation and a copy filed at the
UP Law Center-Office of the National Administrative Register.
8
Philippine Civil Aviation Regulations is amended twice every year (January and July).
16
3. Application for On-the-Job Training (OJT) Program
Office or Division: Human Resource Management Division – AFS
Classification: Simple
Type of Transaction: G2C - Government to Citizen
Who May Avail: 1. Graduating College students eligible to undergo On-the-Job Training
• Preferably those in Aviation-related, Engineering, Management,
Accounting/Finance, Information Technology, Legal, Medical, or Human
Resources-related courses
CHECKLIST OF REQUIREMENTS WHERE TO SECURE
1. Recommendation from School
2. Updated Resume
3. Notarized waiver signed by parents or guardian
4. NBI or Police Clearance
5. Valid Enrollment / Registration Form
CLIENT STEPS AGENCY ACTION FEES PROCESSING PERSON
TO BE TIME RESPONSIBLE
PAID
1. Proceed to HRMD; Receive and review None 15 Minutes HRM Personnel
Submit all submitted documents
requirements
2. Coordinate with Office None 30 Minutes HRM Personnel
concerned regarding OJT
applicants
3. Attend interview Interview applicant None 30 Minutes HRMO and
Representative of
Office Concerned
4. Endorse application to office None 10 Minutes HRM Personnel
concern for acceptance
5. Receive call and Acceptance of OJT None 2 hours Office Concerned
accept OJT
confirmation
6. Upon acceptance, prepare None 15 Minutes HRM Personnel
endorsement to CSIS
7. Bring endorsement Issuance of Security None 2 hours CSIS
to CSIS Clearance and CSIS ID
8. Proceed to HRMD Receive Security Clearance None 30 Minutes HRM Personnel
for final processing and orient the client
9. Receive call and…. Provide instructions on None 30 Minutes HRM Personnel
policies and documents
required to receive
Certificate of Completion
TOTAL: None 6 Hours,
40 Minutes per
Applicant
Note:
• Applicants will be entertained on a first-come-first-served basis;
• All document should be made in photocopies, submitted copies will be the copy of the CAAP
17
4. Approval of Request to Conduct Product Presentation/
Demonstration
18
5. Approval of Request to Conduct Research/Interview
20
Prepare CAAP
Certification;
Forward documents
to Chief/Signatory for
signature
21
7. Authentication of CAAP Issued Certificates, Permits and Official
Receipts
Research
P20.00/same
22
type of
document
Photocopy
P3.00 per
page
3. Proceed to 1. Receive payment 4 Minutes Collecting Officer,
Collection Office and issue Official Collection Office
Receipt (OR) (Ground Floor,
Annex Bldg.)
4. Proceed back to 4.1 Check OR; None 7 Minutes Records Officer
CRAD; present OR
4.2 Record in the OPS
file;
23
8. Authentication of Documents (Client with Photocopy/ Machine
Copy of Document/s and Travel Order)
For TO:
Receiving and 5 Minutes Records Officer,
recording to logbook CRAD
2. Review of the 15 Minutes Chief, CRAD
document/s None
3. Authenticates/signs the 10 Minutes Chief, CRAD
machine copy/s of the None
document/s
For TO:
Authenticates/signs the none 5 Minutes Records Officer,
machine copy/s of the CRAD
Travel Order
TOTAL: none 40 Minutes
TO: 10 Minutes
24
9. Authentication of Documents (Client without Photocopy/
Machine Copy of Document/s and Travel Order)
For TO:
Review of the Travel 5 Minutes Records Officer,
Order CRAD
3. Photocopy of the None 15 Minutes Admin, Aide II/
document/s UW, CRAD
For TO:
Photocopy of the None 5 Minutes Admin, Aide II/
Travel Order UW, CRAD
4. Authenticates/signs the None 10 Minutes Chief, CRAD
machine copy/s of the
document/s
For TO:
Authenticates/signs the None 5 Minutes Records Officer,
machine copy/s of the CRAD
Travel Order
TOTAL: None 55 Minutes
TO: 20 Minutes
25
10. Authentication of Documents (Documents with Voluminous
Pages and/or in Bulk (Client with Machine Copy of Documents)
26
11. Bidder’s Purchase of Bid documents for Disposal of
Unserviceable CAAP Properties (Per Transaction)
27
12. Certification and Issuances of Aviation Records
28
Materials if
available, check
procedure with the
custodian on how to
borrow
(4) Retrieve the Record None 5 Minutes Designated
ARMD Personnel
(5) Print/Photocopy the 5 Minutes Designated
record and forward depending on ARMD Personnel
to Section Chief for the number of
initial pages to be
printed/ Section Chief
photocopied
(6) Forward the None 5 Minutes Chief ARMD
printed/photo copied
record to Chief
ARMD for Signature
(7) Issue Order of none 2 Minutes Designated
Payment Slip (OPS) ARMD Personnel
NOTE:
CAAP employees are
exempted for payment
3. Proceed to 1 hour
Collection for
payment
4. Proceed back to (8) Check Official none 2 Minutes Designated
ARMD and present Receipt (OR) and ARMD personnel
Official Receipt release Certified
copy of record to
client
TOTAL: 1 hour, 26
Minutes
Note: Applicable fees pending upon the approval of CAAP’s new fees and charges.
29
13. Certification of Type Validation
Classification: Simple
30
included during fee
preparation of travel
order
15 minutes Collection/
4.3 Issue Order of Accounting
Payment Slip
Officer
Applicable 15 minutes Collection Officer
on the new
4.4 Issue Official Receipt
fees and
charges
Php10,000. 2 hour, 20
00 + minutes
Inspection
Total duration of activities Fee +
Php600.00
Admin
fee
31
PHASE TWO (PRE-INSPECTION PROCESS FOR CERTIFICATION
OF TYPE VALIDATION)
Classification: Complex
32
to EARD
33
PHASE THREE (INSPECTION PHASE)
Classification: Simple
34
PHASE FOUR (POST INSPECTION PROCESS FOR CERTIFICATION
OF TYPE VALIDATION)
35
2. Acknowledge the 2.1 Scan the signed type none 15 minutes AESI, AWD,
signed type validation certificate Ground Floor,
validation together with official FSIS building
certificate receipt and send thru
email for advance copy
none 12 days, 4
Total duration of activities hours, 30
minutes
Total duration of whole 23 days, 5
activities (Certification minutes
of type validation)
36
14. Check Preparation
37
8. Countersigning of None 1 Minute Please refer to
check attached
Delegation of
Authorities
9. Encoding of duplicate None 1 Minute per Cashier IV
copies of checks in the check
Check Disbursements
Record (CDR) and
Report of Checks
Issued and Cancelled
(RCI)
10.Safekeeping of None Cashier IV/
unreleased checks Cashiering
together with Assistant
processed vouchers
TOTAL: none 14 Minutes
38
15. Compliance to International Commitment
Receipt of State Letters Coming from the International Civil Aviation Organization (ICAO) Head
Office, (Montreal), Regional Office (Bangkok), Regional Sub-Office (Beijing) and other Regional
Offices
Office or Division: Office of the International Civil Aviation Coordinating Staff (ICACS)
Classification: Simple
Type of Transaction: Government to Citizen (G2C); Government to Business (G2B);
Government to Government (G2G); Government to Government
(International)
Who May Avail: Airport Authorities, Airline Operators/Stakeholders/Other Government
Agencies and CAAP Personnel
CHECKLIST OF REQUIREMENTS WHERE TO SECURE
1. State Letter(s)/ Invitation(s) /Proposal(s)/
1. ICAO Headquarters/Regional Office/ICAO
Survey(s)
Portal
2. Correspondence(s)/document(s) addressed to
2. Clients
CAAP Officer(s) or Employee(s)
CLIENT STEPS AGENCY ACTION FEES PROCESSING PERSON
TO BE TIME RESPONSIBLE
PAID
PHASE I
1. Send Letters/ 1. Receive/download and None 15 Minutes Admin. Asst. I
invites/ proposals/ acknowledge receipt
survey/ notices/
ICAO documents/
Annexes and other
matters from other
international
organizations via
ICAO Portal or e-
mail
2. Record entries in the None 5 Minutes Admin. Asst. I
incoming logbook
3. Review and identify None 30 Minutes Chief/ICA
which CAAP office/s is Coordinator
involved in the
undertaking
4. Photocopy and forward None 10 Minutes Utility Worker II
to concerned office/s
for appropriate action
39
training/seminar/
workshop:
Forward to HRMD
5. Received document None 5 Minutes ICACS Staff
from the concerned
office/s
6. Prepare Indorsement/ None 30 Minutes Admin. Asst. I/
Reply Letter and ICA Coordinator
forward to Chief ICACS
for review
7. Review and Initial None 30 Minutes Chief
Indorsement/ Reply
Letter
8. Forward to the Director None 5 Minutes Utility Worker II
General for Signature
9. Scan signed None 15 Minutes Admin. Asst./
documents and send to ICACS Staff
ICAO thru email
10. Forward documents to None 10 Minutes Utility Worker II
Central Records for
mailing
TOTAL DURATION FOR None 2 days and 35
PHASE I: Minutes
PHASE II
1. Send a follow-up None 15 Minutes Admin. Asst. I/
through letter to ICAO ICA Coordinator
or thru email for the
Official Confirmation
Letter for training/
seminar/ workshop or
meeting
1. Send Confirmation 2. Receive confirmation None 5 Minutes Admin. Asst. I
Letter letter and record
entries in the logbook
3. Forward copies of None 10 Minutes UW II
confirmation letter to
the office/s if
participant/s
TOTAL DURATION FOR None 30 Minutes
PHASE II:
TOTAL DURATION OF None 10 Days,
ACTIVITY (including 3 Hours,
10 days period*) 5 Minutes
40
16. Conduct of Board Meetings
41
11. Send copy of the 3 Minutes
agenda to the
presenters
6. Preparation of 12. Follow up on the None 5 Minutes Information
Board Materials presenters’ materials Officer II or Admin
13. Submission of Board 3 Days Assistant II
materials
14. Sent out Board 2 Hours Liaison Officer
materials to the
Board members thru
delivery
7. Dry Run 15. Schedule the dry run None 2 Days Board Secretary II
16. Prepare the venue 5 Minutes Admin Asst. II
and materials for the
dry run
17. Inform the presenters 3 Minutes Information
of the schedule of the Officer II
dry run
8. Conduct of Board 18. Attendance of the None 3 Minutes Board Secretary II
Meeting Board Members
19. Board Meeting proper 3 Hours Corporate Board
Secretary
Total none 21 days, 2
hours, 48
minutes
42
17. Height Clearance Permit and Height Limitation Applications
43
verification Applications/
Structures)
4.3 Conduct technical None 2 Days (5-10 OSD Evaluator
assessment based on Applications/
Obstacle Restriction Structures)
and Limitation
4. 4 Validate technical None 2 Days (5-10 OSD Supervisor
assessment Applications/
Structures)
4.5 Prepare None 1 Day (5-15 OSD Staff and
HCP/Denial/HL Applications/ Supervisor
recommendation Structures)
(encode, check, code
tagging & print);
endorse to Service
Chief, ADMS
4.6 Review and sign None 1 Day Service Chief
HCP/Denial/HL
recommendation
4.7 Log and endorse None 5 Minutes ADMS Staff
application to Air
Traffic Service (ATS)
4.8 Conduct technical None 2 Days (8-32 AFPDD
assessment (effect on Applications/ Evaluator
instrument and visual Structures)
flight procedure)
4.9 Validate technical None AFPDD
assessment; endorse Supervisor
to Service Chief, ATS
4.10 Review and sign None Service Chief,
HCP/ Denial/HL ATS
recommendation
4.11 Log and endorse None 5 Minutes ATS Staff
application to Air
Navigation Service
(ANS)
4.12 Conduct technical None 2 Days (15 QMD Evaluator
assessment on effect Applications/
to equipment Structure
(communications,
navigation &
surveillance)
4.13 Validate technical None 2 Days (15 QMD
assessment; endorse Applications/ Supervisor
to Service Chief, Structure
ANS
4.14 Review and sign None 1 Day Service Chief,
HCP/Denial/HL ANS
recommendation
4.15 Log and endorse None 5 Minutes ANS Staff
44
application to the
Director General
4.16 Approve/Sign None 2 Days Director
HCP/Denial/ HL General/
Authorize
Representative
4.17 Dry-sealing signed None 15 Minutes ODG Staff
HCP/Denial/HL; log
and forward
application to ADMS
4.18 Scan and photocopy None 10 Minutes OSD staff
signed and dry-
sealed
HCP/Denial/HL for
record purposes
(bookkeeping of
processed
applications)
5. Proceed to ADMS 5. Release None 2 Minutes OSD Staff
HCP/Denial/HL
TOTAL: Php50.00/ 19 Days,
application/ 1 Hour,
structure 10 Minutes
45
18. Facility/Site Visit, Interview and Research & Survey
This service is under the Progression Division of the Air Traffic Planning &
Progression Department (ATPPD), Air Traffic Service provided to Citizens and
Government entities who wished to avail facility/site visit, interview and
research/survey for their research studies, educational briefings and the likes.
Office or Division: Progression Division, Air Traffic Planning & Progression Department
Classification: Simple
Type of Transaction: G2C – Government to Citizen; G2G – Government to Government
Who May Avail: University/College Students, Private Companies & Other Government
Entities
CHECKLIST OF REQUIREMENTS WHERE TO SECURE
1. Letter request indicating intents/purposes, date To be submitted by the requesting party
and time of activity, subject/scope, name and to CAAP CCS Office
number of participants and specific ATS facility/ies
to be visited (1 original)
2. Participants’ ID (1 photocopy) Requesting party
3. CAAP Security Clearance (1 original) CAAP CSIS Office
CLIENT STEPS AGENCY ACTION FEES PROCESSING PERSON
TO BE TIME RESPONSIBLE
PAID
1. Submit letter request 1. CCS to check/verify None 10 Minutes Receiving staff
to CCS submitted documents
CCS Office
1.1 CCS to record 5 Minutes
request in the
database
47
19. Flight Check of CNS & Visual Aids Facilities; Flight Validation of
Instrument Flight Procedures
48
20. Issuance of Accounting Certificate for De-Registration and
Transfer of Registration (Per Transaction)
49
21. Issuance of Accounting Certificate for Original Certificate of
Registration and Certificate of Airworthiness (Per Transaction)
50
22. Issuance of Accounting Certificate for Overfly, Entry-Exit, Exit-
Entry, Exit and Entry Permits (Per Transaction)
51
23. Issuance of Aerodrome Registration
1. Download form
from CAAP
website
www.caap.gov.ph
Forms are also
available at
AANSOO
2. Submit Letter of 2.1 Receive; and record None 3 Minutes AANSOO Staff
Intent and entries in database
application form to
AANSOO 2.2 Endorse pre- None 20 Minutes Chief, AANSOO
application
52
meeting application phase None 2 Minutes Assigned
actions in database Inspector
53
number of
days of
inspection,
and UNDP
rate
54
Manual of Standards
55
Registration
Certificate/Temporary
Registration
Certificate/Extension
Registration by Chief,
AANSOO
56
24. Issuance of Air Operator Certificate
57
Specific)
9.3 Operations Manual Part C (Route)
9.4 Operations Manual Part D (Training)
9.5 Flight Crew Operating Manual
9.6 Quick Reference Handbook
9.7 Airplane Flight Manual
9.8 Safety Management System Manual
9.9 Quality Management System Manual
9.10 Cabin Crew Safety Manual
9.11 Cabin Crew Training Manual
9.12 Flight Dispatcher Manual
9.13 Aircraft Checklist (Normal,
Abnormal and Emergency)
9.14 Passenger Briefing Card
9.15 Operations Flight Plan
9.16 Maintenance Control Manual
9.17 Maintenance Program/Schedule
Manual
9.18 Ground Handling Manual
9.19 Emergency Response Manual
9.20 Minimum Equipment List
9.21 Master Minimum Equipment List
10. Lease Contract
10.1 Operations Contract
10.2 Maintenance Contract
10.3 Aircraft Lease
10.4 Servicing Contract
10.5 Training Contract
11. Aircraft Document
11.1 Certificate of Registration
11.2 Certificate of Airworthiness
11.3 Radio License
11.4 Aircraft Insurance
1 Submit Pre- 1.1 Receive Pre-application none 2 minutes FSIS one stop
application Statement of Intent shop, Ground
Statement of (PASI) submitted for floor, FSIS
Intent (PASI) review of the FSIS building
technical staff
1.2 Review PASI None 4 minutes FSIS Technical
Staff
1.3 Forward to FOD
NONE 4 minutes FSIS Receiving
Staff, Ground
Floor, FSIS
building
58
1.4 Received PASI and
forward to Chief FOD NONE 10 min FOD Receiving
Staff, 2nd Floor,
FSIS building
1.5 Create Certification
Team Members NONE 3 hours FOD Chief
1.6 Prepare Memorandum None 10 minutes FOD Staff
of Certification Team
1.7 Endorse memorandum none 5 minutes Chief FOD
to ADG II, FSIS
1.8 Forward to ADG II, none 5 minutes FSIS one stop
FSIS for signature shop
1.9 Review memorandum none 5 minutes FSIS technical
staff
1.10Approve memorandum none 5 minutes ADG II, FSIS
1.11 Return approve none 5 minutes FSIS Admin staff
memorandum
1.12 Receive and none 25 minutes FOD staff/
disseminate approved Certification team
memorandum
1.13 Certification team none 4 hours Certification
conduct meeting for Project Manager
AOC process (CPM)
1.14 Prepare invitation none 10 minutes Aviation
letter of Pre - Technical
application meeting Assistant (ATA)
1.15 Forward to CPM for none 5 minutes CPM
signature
1.16 Return and release/ none 10 minutes ATA
sent to client
2. Submit letter of 2. Receive confirmation none 10 minutes ATA
confirmation letter of pre application
3. Proceed to FOD 3.1 Conduct pre- none 4 hours Certification
for the pre- application meeting Team and Client
application Team
meeting
3.2 Prepare minutes of the none 1 hour, 30 ATA
meeting minutes
3.3 Forward to CPM for none 30 minutes CPM
signature
3.4 Return and file sign none 5 mins ATA
minutes of the meeting
3.5 Conduct CAAP Team none 2 hours CPM and
debriefing in Certification
preparation for Phase Team
II
Total duration of activities none 2 days, 2
hours,6 mins
59
PHASE II – FORMAL APPLICATION
60
rejecting letter of formal
application
3.6 Forward to CPM for none 10 mins CPM
signature
4. Receive 4.1 Return and none 5 mins ATA
accepting/ release/send to client
rejecting letter
4.2 Conduct CAAP Team none 2 hours CPM and
debriefing in preparation Certification
for Phase III Team
TOTAL DURATION OF 2 days
ACTIVITY 1 hour
5mins
61
office for signature Floor, Main
building
1.7 Forward to Admin for none Admin
numbering Department, 3rd
Floor, Main
building
1.8 Forward to Central none Central Records,
Records for Certified 2nd Floor, Main
true copy building
1.9 Return approve travel none FOD staff
order and disseminate
2. Applicant must 2.1 Evaluate applicable none 30 days *if all Certification team,
present and Training Manuals manual FOD, 2nd Floor,
defend their comply w/ FSIS building
company PCAR RCC
compliance with 7,8 & 9
the PCAR
through RCC
7,8,9
2.2 Operations Contracts/ none 4 hours Certification team
Agreements (Each Inspector
2.3 Maintenance Contracts/ None 4 hours involve)
Agreements
2.4 Servicing Contracts/ None 4 hours
Agreements
2.5 Aircraft Lease none 4 hours
2.6 Training Contracts 4 hours
- (if applicable)
2.7 Demonstration Flight None 10 hours
*depends on Certification
the schedule Team, FOD, 2nd
of applicant floor, FSIS
building,
.3. Applicant must 3.1 Forward to Finance none 10 minutes CPM
present and Depart. for review of
defend their Financial Assessment
company
compliance with
the PCAR
through RCC
7,8,9
3.2 Review Financial None 2 days Finance Depart.,
Assessment 3rd floor, Main
building
3.3 Return Financial None 10 minutes CPM
Assessment with report
62
4. Applicant must 4.1 Final Regulation None 5 days *if all Certification
present and Compliance Checklist manual Team
defend their comply w/
company PCAR RCC
compliance with 7,8 & 9
the PCAR
through RCC
7,8,9
4.2 Prepare Operations none 1 day ATA
Specifications
4.3 Forward to CPM for None CPM
initial
4.4 Forward to Chief FOD None Chief FOD
for initial and endorse
to FSIS
4.5 Forward to FSIS for None FSIS technical
review and endorse to staff
ADG II FSIS
4.6Forward to ADG II FSIS None ADG II FSIS
for Signature
4.7 Return approve None ATA
operations
specification
5. Receive 5.1 Release/send none 5 minutes ATA
operations operations
specifications specifications
6. Submission of 6.1 Receive by the ATA None 10 days Certification
final approval of and review by the Team, FOD, 2nd
the Client’s Certification Team for Floor.
Technical Acceptance and FSIS building
Manual approval by the
Authority
6.2 Conduct CAAP Team None 4 hours CPM and
debriefing in Certification
preparation for Phase Team
IV
TOTAL DURATION OF Php500.00 64 days
ACTIVITY admin fee 2 hours
and 25 mins
Rate of per
diem as
indicated on
MC no. 13-
15
63
PHASE IV – DEMONSTRATION AND INSPECTION
1. Submit Official 1.1 Prepare DSA Php500.00 10 days FOD staff, 2nd
Receipt documentation and Travel admin fee Floor, FSIS
Order and building
Rate of per
diem as
indicated on
MC no. 13-
15
Internationa
l UNDP rate
(foreign)
*depends
on the
location
1.2 Forward to Chief FOD
for signature and NONE FOD Chief
endorse to FSIS
1.3 Forward to FSIS for none FSIS technical
review and endorse to staff
ADG II FSIS
1.4 Forward to ADG II for none ADG II FSIS, 2nd
signature and endorse Floor, FSIS
building
1.5 Forward to DDG/DG none DDG/DG, 4th
office for signature floor, Main
building
1.6 Forward to Admin for none Admin
numbering Department, 2nd
floor, Main
building
1.7 Forward to Central none Central Records,
Records for Certified 2nd floor, Main
true copy building
1.8 Return approve travel none FOD staff
order and disseminate
2. Present the 2.1 Inspect Main 5 days Certification
Facility and Operations Base Team (Operations
Equipment’s set- Inspector)
up
2.2 Staffing and none
Organization
2.3 Appropriate Manual None
Library
2.4 Dispatch/Flight None
64
Following
2.5 Recordkeeping none
a) Crew member
Training Records
b) Pilot Qualification
Records
c) Crew member Flight
and Rest Time
d) Flight and Trip
Records
e) Crew member
Medical Records
2.6 Inspect applicant who None Certification
will be Conducting Team (Operations
2.6.1Training Inspector)
a) Training Facilities –
OPS
b) Training
Schedules – OPS
2.6.2 Flight Crew Nonenon Certification
Member Training Team (Operations
1. Basic Inspector)
Indoctrination
2. Emergency
Training
3. Ground Training
4. Flight Training
5. Differences
Training
6. DCP/Instructor
2.6.3 Cabin Crew None Certification
Training Team (Operations
a) Basic Inspector)
Indoctrination
b) Emergency
Training
c) Ground Training
Instructor
2.6.4 Flight Operations None Certification
Officer/Dispatch Team (Operations
Training Inspector)
a) Dispatcher/Flight
Following
b) Dangerous
Goods
c) Security Training
2.7 Inspect DCP/ None Certification
Certification Team (Operations
a) Pilot Inspector)
b) Flight Engineers
65
c) Dispatchers
d) Cabin Crew
2.8 Staffing and none 5 days Certification
Organization Team
(separation of (Airworthiness
maintenance and Inspector)
inspection
department)
2.8.1Staffing and
Organization
2.8.2 Equipment (Tools,
Jacks, Hoist, etc.)
2.8.3 Hangar and Work
Shop
2.8.4 Special Tools and
Test Equipment
2.8.5 Stores (Aircraft Parts)
2.9 Recordkeeping
a) Aircraft Record
b) Maintenance
Personnel Training
c) Inspector Training
d) Inspector
Qualification and
Notification
e) Tool Calibration
(PME)
f) Approved Parts
Purchasing
2.10Maintenance Training
a) Mechanics/
Specialists
b) Inspection
Personnel
c) Ground
Handling/Servicing
d) Station Personnel
e) Training Facilities –
AWD
f) Training Schedules -
AWD
2.11 Conduct Aircraft 3 days Certification
Conformity inspection Team
a) Approved Type Data (Airworthiness
Sheet Inspector)
b) Approved Weight
and Balance
c) Approved
Equipment List
d) Major Repair and
66
Alteration
e) Emergency
Equipment
2.12 Conduct Line/Station 5 days Certification
Facilities inspection *depends on Team
a) Staffing and the aircraft (Airworthiness
Organization location* Inspector)
b) Appropriate Manuals
for Maintenance and
or Operations
c) Proper Equipment
for Maintenance and
Operations
d) Special Tools and
Test Equipment
e) Spare Parts
f) Dispatching/Flight
Control
g) Recordkeeping as
Required by the
Operator’s Manual
h) Servicing Equipment
1. Coordinate with 3. Conduct Coordination 6 hours
CAAP prior to Meeting prior to Certification
Emergency Emergency Evacuation/ Team and Client
Evacuation/Ditchi Ditching Demonstration
ng Demo.
2. Demonstrate the 2.1 Conduct Emergency 6 hours Certification
actual evacuation Team and Client
Emergency/Evac Demonstration
uation Ditching
2.2 Ditching 4 hours
demonstration
3. Coordinate with 5. Conduct coordination 6 hours
CAAP prior to Meeting prior to
Demonstration Demonstration Flight
Flight
6.Demonstration 6.1.1 Flight Deck Ramp 10 hours Certification
Flight (Actual) Inspection *depends on Team
6.1.2 Cabin Ramp the schedule
Inspection of applicant
6.1.3 AW Ramp Inspection
6.1.4 Demonstration Flight
6.1.5 Flight Deck Enroute
Inspection
6.1.6 Cabin Enroute
Inspection
7. Debriefing with 7. Conduct CAAP team 1 day Certification team
the Client debriefing in preparation
67
regarding the for Phase V
results of the
Demonstration
TOTAL DURATION OF Php500.00 33 days
ACTIVITY admin fee
and
Rate of per
diem as
indicated on
MC no. 13-
15 and
Internationa
l UNDP rate
(foreign)
*depends
on the
location
PHASE V – CERTIFICATION
5 days Certification
1. 1 Prepare Certification
Team, FOD, 2nd
Report
floor, FSIS
building
1.2 Report assembled:
a) Pre-application NONE FOD Chief, 2nd
statement of intent Floor, FSIS
b) Formal application building
letter
c) Schedule of events
d) Emergency
evacuation
demonstration report
e) Ditching
demonstration report
f) Demonstration Flight
evaluation report
g) Completed
Certification job aids
h) Summary of Closure
of all findings/Safety
Concerns
i) Summary of
difficulties
j) Final Regulations
68
Compliance
Checklist (RCC)
k) Copy of certificate
and
l) operations
specifications
m) Suggestions to
improve certification
process
n) Recommendation
Letter for AOC
Approval
1.3 Report distribute and none ATA
filed
1.4 Post certification 1 day Certification
surveillance and Team
inspection program
develop
Payment prior to 2.1 Collect payment prior to Php6,000.0 15 mins Collection
issuance of AOC issuance of AOC 0 annual Section, 2nd Floor,
fee Annex building
Coordinate with 3.1 Conduct CAAP None 3hours Certification team,
CAAP prior to Coordination Meeting FOD, 2nd Floor,
issuance of AOC prior to issuance of FSIS building
AOC
3.2 Prepare minutes of the None 1 hours ATA, FOD, 2nd
meeting 30 mins Floor, FSIS
building
3.4 Forward to CPM for none 30 mins CPM, FOD, 2nd
signature floor, FSIS
building
3.5 Return and file sign None 5 mins ATA, FOD, 2nd
minutes of the Floor, FSIS
meeting building
3.6 Prepare AOC & None 4hours ATA
Operations
Specifications
3.7 Forward to CPM for None 2 hours CPM
Signature on AOC
and Operations
Specification
3.8Forward to Chief FOD None 1 hour Chief FOD, 2nd
for signature and Floor, FSIS
endorse to the FSIS building
3.9 Review AOC Working None 2 days FSIS technical
binder to endorse to staff
the ADG II FSIS
3.10 Forward to ADG II None 1 hour ADG II FSIS, 2nd
FSIS for Signature floor, FSIS
and endorse to the building
69
DG
3.11 Forward to the DG for None 30 mins Director General,
signature 4th Floor, Main
building
3.12 Return approve AOC None 10 mins ATA
and Operations
Specifications
Coordinate with 3.2 AOC and Operations None 1 day Certification team
CAAP for Final Specifications to
Debriefing and certificate holder
acceptance of Air presented
Operator 3.3 Conduct CAAP Team
Certificate Final Debriefing
conduct
4.3 Issue AOC to
Management
Personnel / Applicant
Total duration of activities Php6,000.0 10 days
0 annual 6 hours
fee
Total duration of activities 112 days,
(Air Operator 3 hours &
Certificate) 36mins
2. Php500.00 admin fee and rate of of per diem as indicated on MC no. 13-15
and International UNDP rate (foreign) depends on the location
70
25. Issuance of Approved Contract of Agreement
71
26. Issuance of Approved Notice to Proceed
72
27. Issuance of Approved Training Organization Certificate (New
and Re Certification)
73
l) Proposed Training and Procedures
Manual
m) Proposed Training Program
curriculums and syllabus of instructions
(may be included in the T & P Manual
or as separate volume(s)
n) Proposed Quality Assurance Manual
o) Proposed Safety Management System
Manual
p) Proposed PCAR Part 3 regulatory
compliance checklist
q) Contracts or MOA of Facility (if building
is subject of lease agreement)
r) Latest Financial Statement
s) Other Government Office requirements
such as Security and Exchange
Commission Certificate (SEC) or
Department of Trade and Industry
(DTI), business or Mayor’s Permit,
Sanitary or Health Clearance and
Bureau of Internal Revenue permit
t) Note: *Other requirements with
Subcontracting Arrangements*
a) Letter of Intent
b) Completed ATO application Form
513B(1)2017
c) Organizational Structure
d) Management Personnel with
qualifications (Accountable Manager,
Quality Manager, Head of Training and
Safety Manager)
e) List of Instructors with qualification
records (Aviation Maintenance
Technician and Avionics Maintenance
Specialist)
f) Description of facilities, to also include
Management Office, Classrooms,
Operations Facilities, Computer Room,
Library, Tool Room and Floor Plan/Lay
out
g) List of equipment
h) At least, one aircraft of a type for
maintenance training purposes only
i) Certificate of no pending case and
liabilities from CAAP Legal Office and
FSIC (for re instatement of old ATO
74
Certificate
j) Proposed Training and Procedures
Manual
k) Proposed Training curriculums and
syllabus of instruction (may be included
in the T&P Manual or as separate
volume (s)
l) Proposed Quality Assurance Manual
m) Proposed Safety Management System
Manual
n) Proposed PCAR Part 3 regulatory
compliance checklist
o) Contracts of MOA of Facility (if building
is subject of lease agreement)
p) Latest Financial Statement
q) Proposed certificates/forms
(Graduation Certificate, Checklist,
OTR/ Diploma, etc)
r) Other government Offices
requirements such as Security and
Exchange Commission Certificate
(SEC) or Department of Trade and
Industry (DTI), Business or Mayor’s
permit, Sanitary of Health Clearance
and Bureau of Internal Revenue Permit
Note: *Other Requirements with
subcontracting arrangements*
75
2. Attend the none 20 minutes Assigned TOCID
schedule pre- 2.1 Discuss the pre- Inspector, Ground
application application meeting Floor, FSIS
meeting building
76
1.2 Prepare Letter of none 2 minutes Certification
Endorsement to Phase Project Manager
77
2.8 Forward to CRAD for none 1 hour CRAD Staff
recording; release
Travel Order
3. Organize
Transportation for
Certification team
Php500.00 39 days, 3
Total duration of activity admin fee, hours, 54
phase III UNDP rate minutes
/ day
78
payment of ATOC
AVIATION SCHOOLS:
79
FREQUENCY- ANNUALLY
80
21. Flight Instructor (FI) Course for Helicopter (H) Php15,000.00
B. AVIATION MAINTENANCE:
Php38,000.00
81
28. Issuance of Approved Training Organization Certificate
(Renewal)
1. Submit Letter of 1.1 Check and reviews none 2 minutes TOCID Staff On
Intent and completeness of Duty
application form documents
82
3. Proceed to none 1 minute TOCID Staff on
3.1 Check Official Receipt
TOCID and duty
present OR
3.2 Prepare DSA none 2 hours TOCID Staff
documents and travel
order
4. Organize
transportation for
Inspection team
5. Present the 5.1 Conduct none 3 days Inspection team
School set up comprehensive excluding
travel time TOCID, LCD
inspection in
Ground Floor,
conformance with
FSIS building
PCAR 3 and other
83
PCAR requirements
none 19 days, 4
Total duration of activity hours, 38
minutes
84
29. Issuance of Authorization for Third (3rd) Party Procedure
85
recommendation by 1 Hour Chief, AANSOO
Chief, AANSOO None
86
30. Issuance of Aviation Medical Certificate
87
Diagnostics and acuity and color
Specific vision examination
Examinations
2. Laboratory 1 Hour Medical
Forms/ Conduct Technologist On-
laboratory test Duty
for:
Urine Php100.00
Hgb-Hct Php 200.00
Drug test Php 300.00
3. Dental Form/Conduct 10 Minutes Dentist On-Duty
Php 200.00
dental examination
4. ECG Form/TST Php 250.00 15 Minutes
Form/ Conduct ECG (Procedure)
test Php100.00 Medical
(Reading) Equipment
Treadmill Stress Test Php 1,500.00 1 Hour and Technician On-
(TST) when (Procedure) 30 Minutes Duty
necessary Php 500.00
(Reading)
5. CXR Form/Conduct Php 250.00 15 Minutes Radiologic
Chest Radiography Technologist On-
Duty
5. Proceed back to 1. CAAP form Php 500.00 30 Minutes Designated
Airmen’s 548[0]2011 (Back Aviation Medical
Examination Page)/ Conduct Examiner On-
Room physical/mental Duty
examination,
interpret tests results
and make
recommendation/s
2. Check and review 5 Minutes Aero medical
completeness of Staff on duty
medical reports and
prepare information
letter
3. Evaluate medical None 5 Minutes Chief OFSAM,
reports and render Ground Floor,
decision Annex building
4. Encode medical 10 Minutes
Aeromedical
reports and decision
Staff On-Duty
in the CASORT
Ground Floor,
5. CAAP Form 551/ Php 200.00 5 Minutes
Annex building
Print Medical Card
6. Present valid ID 1. Release medical None 5 Minutes Aeromedical
or Authorization card and sign Staff On-Duty
Letter clearance of and Chief
applicant OFSAM
TOTAL: 4 Hours,
7 Minutes
88
31. Issuance of Billing Statement:
1) Certificate of Airworthiness (Original)
2) Approved Maintenance Organization (AMO)
3) Approved Material Distribution Certificate (AMDC)
4) Type Validation Certificate
5) Daily Subsistence Allowance (DSA)
(Per Transaction)
Forward to
FSIS/AANSOO
TOTAL: None 2 Hours,
47 Minutes
89
32. Issuance of CAAP Identification (ID)
90
33. Issuance of Certificate of Airworthiness (Original/Renewal)
Office or Division: General Aviation Certification Inspection Division and Commercial Air
Transport Certification Inspection Division (GACID/CATCID)
Classification: Simple
4. Proceed to
Collection Unit Received payment and
Collection Officer,
issue the official receipt
2nd Floor, Annex
5 min
91
building
Office or Division: General Aviation Certification Inspection Division and Commercial Air
Transport Certification Inspection Division (GACID/CATCID)
Classification: Simple
1. Submit notarized
Form 1029-2 and 1. 1 Receive, encoding of
requirements at tracking no. on the CofA None 15 minutes Owner
the window (4) four application;
of FSIS. Forward documents to /Operator and
FSIS FSIS Receiving
Staff
92
5. Document evaluation
and initial review of the None 3 hours Airworthiness
CofA Package; Inspector
93
PHASE THREE (INSPECTION PHASE)
Office or Division: General Aviation Certification Inspection Division and Commercial Air
Transport Certification Inspection Division (GACID/CATCID)
Classification: Simple
Office or Division: General Aviation Certification Inspection Division and Commercial Air
Transport Certification Inspection Division (GACID/CATCID)
94
CLIENT STEPS AGENCY ACTION FEES TO PROCESSIN PERSON
BE PAID G TIME RESPONSIBLE
95
Total duration of activities none 4 days, 4
hours & 15
minutes
96
AIRWORTHINESS DEPARTMENT
CAAP Central Office
fig. 1
97
34. Issuance of Certificate of Registration
98
weight,
intended
use, type of
engine
and type of
aircraft.
Refer
to figure 1.
Classification: Simple
2. Letter of Intent.
99
Identification Plate (made of fireproof material),
Aircraft Data Plate, Engine Data Plate, and
Propeller Data Plate.
100
2.1 Receive, log and none
encode application in
the database; 15 minutes Aircraft
Registration Staff
2.2 Forward application to
Chief, AWD
none
3. Check, assign and
endorse application to 15 minutes Chief, EARD,
Aircraft Registration Ground floor,
Officer
FSIS building
4.1 Conduct technical none
evaluation and
assessment; 14 working Aircraft
days Registration
4.2 Encode information in Officer, Ground
the CASORT; Floor, FSIS
building
4.3 Prepare Certificate of
Registration; endorse
to Chief, AWD
none
6. Review, sign and
endorse application 20 minutes Dept Manager,
package to ADG II, Airworthiness
FSIS Department
(AWD)
1 hour Technical
7. Review and endorse Consultants,
the application AWD, Ground
package to ADG II,
FSIS floor, FSIS
building
8. Sign and endorse
application package to
1
Additional three (3) days will be added in the processing time if legal review is needed
101
the Director General 2 hours ADG II, FSIS, 2nd
Floor, FSIS
building
5 minutes Aircraft
10. Inform applicant re: Registration Staff,
status of application is AWD, Ground
completed and ready
for pick-up Floor, FSIS
building
2. Present valid ID or
2.1 Log, encode and
authorization letter
release Certificate of 15 minutes Aircraft
Registration Registration
Officer
Total duration of 15 days, 6
activities hours, 30
mins
102
NOTE: ALL SUBMITTED DOCUMENTS MUST BE CERTIFIED TRUE COPY (CTC)
or ORIGINAL CAAP reserves the right to deny, withhold or revoke any application
with a false or incomplete data/information for the purpose of issuance of aircraft
registration certificate. Note: False or incomplete data/information, which appears on
the application with all other documents submitted patently false and material for
approval of registration. The handling inspector is authorized to determine this
aspect.
fig. 1
103
104
35. Issuance of Common Office Supplies / Equipment
(Per Transaction) Based on Approved Annual Procurement Plan
105
36. Issuance of GSIS Loan Payments and Premium Contribution
Certificate (Per Transaction)
106
37. Issuance of Import/Export Permit
Classification: Simple
107
Php400.00 1 hour,25
Total duration of activity Per airway minutes
bill
Classification: Simple
108
1.4 Evaluate and examine none 15 minutes AWD Manager
the letter of intent for
import/export assign to
the designated AWD
Staff
3. Present valid ID 3. Release and Dry Seal none 20 minutes AWD Staff
or authorization the import/ export
letter clearance permit
109
AIRWORTHINESS DEPARTMENT
CAAP Central Office
fig. 1
110
38. Issuance of Income Tax Return (ITR) – Per Transaction
111
39. Issuance of Knowledge Test Report (TR)
112
Knowledge Test
Report
7. Endorse Temporary
Knowledge Test
Report to Chief, AEB
for Signature Chief, AEB
5. Present valid ID 8. Release Temporary
Knowledge Test
Report
TOTAL: None 24 Minutes
PHASE II
113
40. Issuance of Noise Certificate
Classification: Simple
114
PHASE TWO (ISSUANCE OF NOISE CERTIFICATE)
Classification: Simple
115
2. Submit additional 2.1 Document evaluation none 5 hours AESI
documents/ and review for
evidence prior preparation of noise
request of noise certificate
certificate
2.2 Endorse to EARD none 30 minutes AWD Staff/Chief
division chief for quality EARD
review of the prepared
noise certificate
2.4 Sign and approved the none 1 day ADG II, FSIS
noise certificate
116
AIRWORTHINESS DEPARTMENT
CAAP Central Office
fig. 1
117
41. Issuance of Official Receipt for Payment of CAAP Fees and
Charges
TOTAL: 5 Minutes
118
42. Issuance of Official Receipt for Payment Received Through
Telegraphic Transfers and UCPB Collection Facility
119
43. Issuance of Order of Payment Slip (Per Transaction)
120
44. Issuance of Pag-Ibig Loan Payments and Premium Contribution
Certificate (Per Transaction)
121
45. Issuance of Pass Control
122
46. Issuance of Permit-to-Operate / Temporary PTO
123
application
2.3 Inform applicant of None 5 Minutes Assigned
the scheduled date of Inspector
pre-application
meeting
3. Attend the 3.1 Discuss the pre- none 20 Minutes Assigned
scheduled pre- application contents Inspector
application meeting
3.2 Record pre- None 2 Minutes Assigned
application phase Inspector
actions in database
3.3 Inform applicant of none 5 Minutes Assigned
the scheduled formal Inspector
meeting
4. Attend the 4.1 Discuss details of None 5 Minutes Assigned
scheduled formal Formal Application Inspector
meeting
4.2 Conduct Initial None 5 Minutes Assigned
Application Review Inspector
4.3 Conduct Formal None 1 Hour Assigned
Application Review Inspector
4.4 Discuss the none 30 Minutes Assigned
Operations Manual Inspector
Information
4.5 Review and evaluate None 3 Working Safety
the requirements Days Inspection
submitted and Team
prepare letter
4.6 Determine number of none 2 Minutes Lead Safety
days of inspection Inspector
4.7 Prepare Pro-Forma P500.00 2 Minutes AANSOO Staff
Invoice and Forward (Admin Fee);
to Accounting P5,000.00
Division (Inspection
Fee);
DSA – Daily
Subsistence
Allowance
(Computations
are based on
the locations,
number of
days of
inspection,
and UNDP
Rate)
4.8 Process Billing None 2 Days Accounting Staff
4.9 Inform the Operator 3 Minutes AANSOO Staff
for Payment of DSA
5. Proceed to 5. Prepare Order None 10 Minutes Accounting Staff
124
Accounting Division Payment Slip
6. Proceed to 6.1 Receive payment 2 Minutes Collection Staff
Collection On-Duty
6.2 Issue Official Receipt None 2 Minutes Collection Staff
On-Duty
7. Proceed to ARCID- 7.1 Check OR None 1 Minute AANSOO Staff
AANSOO and
present Official
Receipt
7.2 Prepare DSA None 2 Hours AANSOO Staff
documents, Notice of
Inspection and Travel
Order/s
7.3 Review and None 1 Hour Chief, ARCID
endorsement by
Chief, ARCID
7.4 Review and none 1 Hour Chief, AANSOO
recommendation by
Chief, AANSOO
7.5 Review and approval None 2 Days Deputy Director
by Deputy Director General for
General for Operations, 4th
Operations Floor, Main
building
7.6 Forward to CRAD for None 1 Hour CRAD Staff
recording; release
Travel Order
7.7 Forward the Notice none 10 Minutes Safety
and Coordinate with Inspection
Operator regarding Team
conduct of
inspections
8. Organize
Transportation for
the Safety
Inspection Team
9. Present 9.1 Conduct initial safety None 3 Days Safety
helipad/airstrip inspection in Excluding Inspection
compliance with Travel Time Team
Manual of Standards
9.2 Prepare Safety None 22 Working Safety
Inspection report Days Inspection
Team
9.3 Review and None 1 Hour Chief, ARCID
Endorsement by
Chief, ARCID
9.4 Review and notation None 1 Hour Chief, AANSOO
by Chief, AANSOO
9.5 Forward the report to none 10 Minutes AANSOO Staff
125
the operator
9.6 Conduct meeting and None 1 Hour Safety
prepare Inspection
PTO/Temporary Team
PTO/ Extension PTO
9.7 Coordinate with none 5 Minutes AANSOO Staff
applicant regarding
payment of PTO
9.8 Prepare Pro-forma None 2 Minutes AANSOO Staff
Invoice
9.9 Signature and None 3 Minutes Chief, AANSOO
endorsement of Pro-
forma Invoice by
Chief, AANSOO
9.10 Process Billing None 2 Days Accounting Staff
10. Proceed to 10.1 Prepare Order None 10 Minutes Accounting Staff
Accounting Division Payment Slip
11. Proceed to 11.1 Receive payment 2 Minutes Collection Staff
Collection On-Duty
11.2 Issuance of Official None 2 Minutes Collection Staff
Receipt On-Duty
12. Proceed back to 12.1 Check Official None 1 Minute AANSOO Staff
ARCID-AANSOO Receipt
12.2 Review and None 1 Hour Chief, ARCID
endorsement by
Chief, ARCID
12.3 Review and None 1 Hour Chief, AANSOO
recommendation by
Chief, AANSOO
12.4 Review and approval None 3 Days Director
by Director General General/ Deputy
(DG)/ Deputy Director Director General
General for for Operations
Operations (DDG-O)
13. Present valid ID or 13.1 Release PTO/ none 15 Minutes AANSOO Staff
authorization letter Temporary PTO/
Extension PTO
TOTAL: Php500.00 38 Days,
admin fee 5 Hours,
Php5,000.00 39 Minutes
DSA –
(Computations
are based on
the locations,
number of
days of
inspection,
and UNDP
Rate)
126
47. Issuance of Philhealth Certification (Per Transaction)
127
48. Issuance of Property Clearance (Applicant with Property
Accountability) Purpose: Application for Leave
(Vacation/Maternity) /Travel Abroad (Per Transaction)
128
49. Issuance of Property Clearance (Applicant with Property
Accountability) Purpose: Retirement / Resignation / End of
Contract (Per Transaction)
129
50. Issuance of Property Clearance – Applicant without Property
Accountability (per transaction)
130
51. Issuance of Supplies/Equipment and Property Accountability
(For Goods Delivered/Received On-Site Based on Contract
Agreement)
131
52. Issuance of Supplies/Equipment and Property Accountability for
Goods Received a Main Office Based on Contract Agreement
(Per Transaction)
132
53. Lease of the CAAP Multi-Purpose Covered Court
Office or
Administrative and Finance Service
Division:
Classification: Simple
Type of
G2C - Government to Citizen
Transaction:
Who May Avail: Colleges / Universities / Students / Airline Companies / Stakeholders / Other
Government Agencies / Others
CHECKLIST OF REQUIREMENTS WHERE TO SECURE
1. Letter of Request Administrative Department, 3rd floor, Main
2. Valid ID and/or NBI/Police Clearance building
134
54. License Authentication for DFA Requirement
Office or Division: Aviation Records and Management Division (ARMD)
Classification: Simple
Type of Transaction: G2C – Government to Citizen
Who May Avail: Airmen/Mechanic License Holder
CHECKLIST OF REQUIREMENTS WHERE TO SECURE
1. Request form signed by the Chief, ARMD for the 3. ARMD, 2nd floor, Annex
issuance of the copy of record: building
a. Transmitted Airmen licenses originated from
Licensing and Certification Department
2. Submit Affidavit of Lost – for lost license/document
8. Submit Authorization Letter for representative
FEES: Applicable fees pending upon the approval of CAAP
new fees and charges
CLIENT STEPS AGENCY ACTION FEES PROCESSING PERSON
TO BE TIME RESPONSIBLE
PAID
1. Proceed to ARMD 1. Fill-up Request Form 2 Minutes ARMD personnel
for the Request 2nd floor, Annex
None
Form building
135
55. License Authentication for Promotion
136
Payment Slip (OPS) Personnel
NOTE:
CAAP employees are
exempted for payment
3. Proceed to 1 hour
Collection for
payment
4. Proceed back to (8) Check Official 2 Minutes ARMD
ARMD and present Receipt (OR) and Personnel
Official Receipt (OR) release
Authenticated Copy
of license to client
TOTAL: 1 hour, 19
Minutes
Note: Applicable fees pending upon the approval of CAAP’s new fees and charges.
137
56. Liquidation of Cash Advance (Pert Transaction)
(Petty Cash Fund, Local & Foreign Travel)
Forward to assigned
Accounting personnel
2. Validate supporting None 1 Hour Accounting
documents; process Personnel
and prepare JEV and
record on SL on
process
3. Conduct Final Audit None 30 Minutes Chief,
Disbursement
Section
4. Sign the documents None 15 Minutes Chief Accountant
5. Documents numbering None 5 Minutes Accounting
Personnel
6. Indexing None 30 Minutes Accounting
Personnel
7. For submission to COA Outgoing Officer
TOTAL: None 2 Hours,
23 Minutes
LIQUIDATION OF CASH ADVANCES
General Guidelines
The accountable officer shall liquidate cash advances within the following period:
138
Travelling Expenses – within 30 days after the return of the official/employee
concerned to his official station for local travel and within 60 days after return of
the official/employee concerned to the Philippines in the case of foreign travel.
Special Purpose – as soon as the purpose of the cash advance has been served
TRAVELLING EXPENSES
Local Travel
1. Paper/electronic plane, boat or bus tickets, boarding pass, terminal fee
2. Certificate of appearance/attendance
3. Copy of previously approved itinerary of travel
Revised or supplemental Office Order or any proof supporting the change of
schedule
4. Revised itinerary of travel, if the previous approved itinerary was not followed
5. Certification by the Head of the Agency as to the absolute necessity of the
expenses together with the corresponding bills or receipts, if the expenses
incurred for official travel exceeded the prescribed rate per day (certification or
affidavit of loss shall not be considered as an appropriate replacement for the
required hotel/lodging bills and receipts)
6. Liquidation Report
7. Reimbursement Expense Receipt
8. OR in case or refund of excess cash advance
9. Certificate of Travel Completed
10. Hotel room/lodging bills with official receipts in case of official travel to places
within 50-kilometer radius from the last city or municipality covered by the
Metro Manila Area, or the city or municipality where their permanent official
station is located in the case of those outside the Metro Manila Area, if the
travel allowances being claimed include the hotel room/lodging rate
139
Foreign Travel
1. Paper/electronic plane, boat or bus tickets, boarding pass, terminal fee/ copy
of passport
2. Certificate of appearance/attendance for training/seminar/participation
3. Bills/receipts for non-commutable representation expenses approved by the
President under Section 16 of EO NO. 77
4. For reimbursement of actual travel expense in excess of the prescribed rate
(EO No. 77):
4.1 Approval by the President
4.2 Certification from the Head of the Agency that is absolutely necessary
4.3 Hotel room bills with official receipts (Certification or affidavit of loss shall
not be considered as an appropriate replacement for the required
hotel/lodging bills and receipts)
4.4 Revised Itinerary of Travel, if applicable
4.5 Narrative report on trip undertaken/report on Participation
4.6 OR in case of refund of excess cash advance
4.7 Certificate of Travel Completed
4.8 Liquidation Report
140
57. Liquidation of Cash Advance for DSA
(Per Transaction)
Forward to assigned
Accounting personnel
2. Validate supporting None 10 Minutes Accounting
documents; process Personnel
and prepare JEV and
record on SL on
process
3. Conduct Final Audit None 1 Hour Chief,
Disbursement
Section
4. Sign the documents None 15 Minutes Chief Accountant
5. Documents numbering None 5 Minutes Accounting
Personnel
6. Indexing None 5 Minutes Accounting
Personnel
7. For submission to COA Outgoing Officer
TOTAL: None 1 Hour,
38 Minutes
141
58. Mandatory and Voluntary Reports
142
7. Conduct continues analysis of None Minimum of Designated
reports 1 Day aviation Safety
Analyst
8. Continue encoding of results of None Within 15 Minutes Designated
investigation, inspection and as it happens aviation Safety
analysis Analyst
9. Conduct analysis base on None Minimum of Designated
possible trends 1 Day (Done aviation Safety
Monthly/ Quarterly) Analyst
10. Preparation of summary and None Within 2-3 Days Designated
graphical chart illustration base (Done Monthly/ Aviation Safety
on trends, statistics and analysis Quarterly) Upon Analyst together
Receipt of Follow- with Supervising
up and Closure Analyst
Reports
11. Provides technical advice/ None Within 2-3 Days Designated
recommendations base on (Done Monthly/ Aviation Safety
analysis of safety data and trends Quarterly and/or Analyst together
When Necessary with Supervising
for Safety in Civil Analyst
Aviation
12. Submission of quarterly summary None Within 5 Days Designated
reports, graphical illustration and (Done Monthly/ Aviation Safety
analysis Quarterly Analyst and for
Signature /
Approval of
Division Chief III
13. For recommendation and None Within 1 Day (Done Division Chief III
concurrence of monthly/ quarterly Monthly/ Quarterly to DM III, RSD,
summary of reports, graphical FSIS for
illustration and analysis to ADG II, Concurrence/
FSIS/DG Signature
14. Final coded reports are entered None Within 2 Days Designated
and available in ASAD Excel Aviation Safety
database or thru the ECCAIRS Analyst and for
(once available) ASAD uses Signature /
information it receives to promote Approval of
aviation safety Division chief III
15. For final encoded reports that None Within 3 Days Designated
requires amendment of Aviation Safety
regulations, a copy is forwarded Analyst, DC III,
to RSDD-RSD. ODG approves ASAD and DM III,
amendment prior to publication RSD, FSIS for
Signature and
Endorsement and
DG for Approval
TOTAL:
143
59. Online Scheduling of Examinations and Payment Queuing
144
on type of
exam and
rate per
subject
PHASE II
145
60. Online Scheduling of Examinations and Payment Queuing (02)
146
61. Original Issuance of Airman License
Classification: Complex
1. Original
1.1 Nos. 1 requirement
1.2 Photocopy of Class II Aviation Medical
Certificate
1.3 NBI clearance
1.4 Notarized Consent form for Minor
(Applicants Below 18 years old)
1. Original
1.1 Nos 1 to 8 requirements
1.2 Photocopy of Student Pilot
Authorization (SPA)
1.3 Photocopy of Class II Aviation Medical
Certificate
1.4 Certificate of Pre-solo completion
1. Original
147
1.1 Nos. 1 to 8 requirements
1.2 Photocopy of current Private Pilot
License
1.3 Photocopy of Class I Aviation Medical
Certificate
1. Original
1.1 Nos 1 to 8 requirements
1.2 Photocopy of current Commercial Pilot
License with Instrument Rating (CPL
with IR)
1.3 Photocopy of Class I Aviation Medical
Certificate
1.4 Certificate of Simulator Time/ Zero
Flight Time
1.5 Work permit (for foreigners)
1. Original
1.1 Nos 1 to 8 requirements
1.2 Photocopy of current Commercial Pilot
License with Instrument Rating (CPL
with IR)
1.3 Photocopy of Class I Aviation Medical
Certificate
1.4 Flight Training Syllabus
1. Original
1.1 Nos. 1 to 8 requirements
1.2 Photocopy of current pilot license
1.3 Photocopy of current Medical
Certificate
1. Original
1.1 Nos. 1, 4, 6 and 7 requirements
1.2 Photocopy of Class III Aviation Medical
Certificate
1.3 Training Certificate
1.4 Diploma
1.5 Transcript of Records
148
For Ground Instructor License
1. Original
1.1 Nos. 1,4, 6, 7 requirements
1.2 Photocopy of Current Aviation Medical
Certificate
1.3 Lesson Plan
1. Original
1.1 Nos. 1, 4, 6 and 7 requirements
1.2 Photocopy of Class II Aviation Medical
Certificate
1.3 Flight Dispatcher Training Certificates
1.4 Diploma
1.5 Transcript of Records
AMT/AMS:
1. Original
1.1 Nos. 1,2,3,5 and 6 requirements
1. Original
1.1 Nos. 1,2,3,5 and 6 requirements
149
1. Original
1.1 Nos. 1,2,3,5,6 and 7 requirements
1.2 One (1) year practical experience for
AMS
1. Original
1.1 Nos. 1,4,5,6,7
1.2 Three (3) years practical experience for
Non-BS or Associate Avionics AMS;
Two (2) and a half (2 ½) years for AMT
with One (1) rating; and
Five (5) years for AMT with two (2)
ratings
1. Original
1.1 Nos. 1,4,5,6 and 7 requirements
1.2 Endorsement letter from the
Commander
1.3 Statement of Service
1.4 AFP ID
1.5 Discharged Order (if resigned or
retired)
CLIENT STEPS AGENCY ACTION FEES PROCESSING PERSON
TO BE TIME RESPONSIBLE
PAID
1. Submit application None 15 Minute Licensing Officer,
form and Ground floor,
complete 1.1 Review and evaluate FSIS building
requirements at application and
window complete
requirements
150
Receipt 3.2 Log payment
151
License 0 .00 7.60 00
Aviation Maintenance
Technician License
- Airframe Rating
only Php490.00 Php490.0 Php140.00 Php134.40
- Power plant 0
Rating only
- Airframe and Php490.0
Php490.00 0 Php140.00 Php134.40
Power plant
Rating
Php700.0
Php700.00 0 Php140.00 Php134.40
152
62. Payment of Cash Advance, Reimbursement of Travel Expenses
(Per Transaction)
Chief, Finance
for check
payment
153
9. Forward to checking for None 5 Minutes Outgoing Officer
ADA/ Check preparation
TOTAL: None 4 Hours,
5 Minutes
CASH ADVANCES
TRAVELLING ALLOWANCES
Local Travel
1. Office Order/Travel Order approved in accordance with Section 3 of EO
No. 77
2. Duly approved itinerary of travel
3. Certification from the accountant that the previous cash advance has been
liquidated and accounted for in the books
Foreign Travel
1. Duly approved itinerary of travel
2. Letter of invitation of host/sponsoring country/agency/organization
3. For plane fare, quotation of three travel agencies or its equivalent
4. Flight itinerary issued by the airline/ticketing office/travel agency
5. Copy of the UNDP rate for the daily subsistence allowance for the country of
destination for the computation of DSA to be claimed
6. Document to show the dollar to peso exchange rate at the date of grant of
cash advance
7. Where applicable, authority from the OP to claim representation expenses
8. In case of seminars/trainings
8.1 Invitation addressed to the agency inviting participants (issued by the
foreign country)
8.2 Acceptance of the nominees as participants (issued by the foreign
country)
8.3 Program me Agenda and Logistics Information
154
9. Certification from the accountant that the previous cash advance has been
liquidated and accounted for in the books
10. Travel authority
Local Travel
1. Appendix A (Itinerary of Travel)
2. Appendix B (Certificate of Travel Completed)
3. CASORT
4. Travel Order
5. Certificate of Appearance (Original Copy)
6. E-ticket (If travelled by air)
7. Boarding Pass – Original Copy (if travelled by air)
8. Conforme Letter
9. Proforma Invoice
10. Billing Statement
11. Official Receipt
12. BAP Dollar Rate
13. Letter from Operator
Foreign Travel
1. Appendix A (Itinerary of Travel)
2. Appendix B (Certificate of Travel Completed)
3. Post Travel Report
4. Travel Order
5. E-ticket
6. Boarding Pass – Original Copy
7. Photocopy of Passport with stamp of Arrival/Departure
8. Conforme Letter
9. Proforma Invoice
10. Billing Statement
11. Official Receipt
12. UNDP DSA Rate
13. BAP Dollar Rate
14. Letter from Operator
155
PAYMENT OF DSA EXTENSION (FSIS/AANSOO ISNPECTORS)
1. Appendix A (Itinerary of Travel)
2. Appendix B (Certificate of Travel Completed)
3. Certification of Extension
4. Proforma Invoice
5. Billing Statement
6. Official Receipt
7. UNDP DSA Rate (For foreign travel)
8. BAP Dollar Rate
9. Photocopy of Previous Payment of DSA & Check Stub
156
63. Payment of DSA/Traveling, Training Expenses (Cash Advance)
157
64. Payment of Flying Pay
158
65. Payment of Goods
159
66. Payment of Infra Projects, Repairs
160
67. Payment of Infrastructure Project(s), Goods and Utilities (Per
Transaction)
Forward to concerned
personnel
2. Validate completeness None 2 Hours Accounting
of documents Personnel
submitted
161
for payment
9. Forward to checking None 30 Minutes Outgoing Officer
for Check preparation
TOTAL: None 1 Day,
28 Minutes
* May take longer processing time for INFRA Projects due to the volume of
documents
INFRASTRUCTURE
ADVANCE PAYMENT
162
and the results of such inspection; (c) a detailed estimate the unit
cost of such items of work for new unit costs including those
expressed in volume/area/lump-sum/lot
1.4 Copy the approved/revised PERT/CPM Network Diagram which
shall be color coded, reflecting the effect of additional/deductive
time on the contract period and the corresponding detailed
computations for the additional/deductive time for the subject
Change Order/Extra Work Order
1.5 Copy of the approved detailed breakdown of contract cost for the
variation order
1.6 Copy of the COA Technical Evaluation Report for the original
contract
1.7 If the Variation Order to be reviewed is not the 1st variation order, all
of the above requirements for all previously approved variation
order, if not yet reviewed, otherwise, copy of the COA Technical
Evaluation Report for the previously approved variation orders
1.8 Additional performance security in the prescribed from and amount
if variation order exceed 10 percent of the original contract cost
1.9 Such other documents peculiar to the contract and/or to the mode
of procurement and considered necessary in auditorial review and
in the technical evaluation thereof.
PROGRESS PAYMENT
General Guidelines
FINAL PAYMENT
163
RELEASE OF RETENTION MONEY
164
68. Payment of Job Order, Consultant, Contract of Service
165
69. Payment of Magna Carta, Hazard Pay, RATA
166
70. Payment of Night Differential/Overtime Service
167
71. Payment of Salaries, Allowances, Bonuses and Other Personnel
Benefits (Per Transaction)
Forward to assigned
Accounting personnel
2. Validate supporting None 2 Hours Accounting
documents; process and Personnel
prepare Disbursement
Voucher (DV) and record
in index of payment
3. Conduct Final Audit None 1 Hour Chief,
Disbursement
Section
4. Assign Journal Entry None 5 Minutes Accounting
Voucher (JEV) and DV Personnel
number for check payment
168
9. Forward to Checking for None 5 Minutes Outgoing Officer
ADA/ Check preparation
TOTAL: None 4 Hours,
5 Minutes
CHECKLIST:
Last Salary
1. Clearance from money, property and legal accountabilities
2. Approved DTR
169
72. Preparation of Authority to Debit Account for Fund Transfer to
CAAP Area Centers
170
73. Processing of Acquiring Philippine Bidding Document
171
74. Processing of Contracts of Lease for Renewal
173
5.2 If by BDD:
5.2.1 Forward signed
Agreement to 3rd
party
6. Return Notarized 6.1 Received notarized None 15 Minutes BDD Admin
Agreement to the BDD Agreement and Staff
release one (1)
original copy to the
following:
a. Client
b. Airport (via courier)
c. Commission on
Audit
TOTAL: none 1 Day, 6 Hours,
5 Minutes
174
75. Processing of Final Billing and Payment
175
1.10 Technical validation None 2 Hours DC III, PMD
of billing documents
prior to concurrence
of Contractor
2. Pick-up billing None 5 Minutes Contractor
documents
3. Review and concur None 1 Day Contractor
billing documents
4. Submit concurred 4.1 Approval and None 15 Minutes DC III, PMD
billing documents to endorsement of billing
PMD documents to DM III,
AED
4.2 Final review and None 1 Hour DM III, AED
checking of billing
documents
5. Approval and None 15 Minutes DM III, AED
endorsement of billing
documents to ADG II,
ADMS
6. Approval and None 15 Minutes ADG II, ADMS
endorsement of billing
documents to Budget
Division
TOTAL: None 12 Days,
1 Hour,
27 Minutes
176
76. Processing of Foreign Training/Meeting
177
77. Processing of Issuance of Final Acceptance After 1-Year
Defects Liability Period (DLP)
178
Evaluation Report
(TIER) to Project In-
Charge
TOTAL DURATION None 3 Days,
WITHOUT 5 Hours,
RECTIFICATION: 36 Minutes
(may vary)
Note:
Proceed with the steps below if rectification is applicable
12. Furnishing a Copy of None 5 Minutes Project In-
approved TIER to Charge
Contractor for
immediate rectification
2. Pick-up of approved None 5 Minutes Contractor
Technical
Inspection
Evaluation Report
for final acceptance
3. Rectification 2 Days Contractor
process (may vary)
13. Schedule ocular None 10 Minutes Project In-
inspection with TIT and Charge
contractor
representative for
validation on the
rectified structure
14. Ocular inspection and None 3 Days Project In-
evaluation (may vary) Charge, TIT and
Contractor
15. Prepare Technical None 4 Hours Project In-
Inspection Validation Charge
Report (TIVR)
proposing for release
of withheld retention
money
16. Checking of Technical None 15 Minutes Assigned PMD
Inspection Validation Staff
Report (TIVR)
17. Review of Technical None 15 Minutes DC III, PMD
Inspection Validation
Report (TIVR)
18. Final review of None 15 Minutes DM III, AED
Technical Inspection
Validation Report
(TIVR)
19. Approval and None 5 Minutes ADG II, ADMS
endorsement of
Technical Inspection
Validation Report to
Project In-Charge for
179
issuance of Certificate
of Final Acceptance
and processing of
release of withheld
retention money
TOTAL: None 9 Days,
2 Hours,
46 Minutes
(may vary)
180
78. Processing of Issuance of Notice for Liquidated Damages
181
79. Processing of Issuance of Notice of Delay
182
80. Processing of Issuance of Notice of Time Extension
183
Time Extension
TOTAL: None 1 Day, 1 Hour,
56 Minutes
184
81. Processing of Issuance of Work Resumption
185
82. Processing of Issuance of Work Suspension
186
83. Processing of New Concession Applications Submitted to
Airport (Stage One)
187
5. Acknowledge and None 5 Minutes Airport Admin
endorse documents to Staff
the Office of the Area
Manager
6. Approval/disapproval of None 1 Day Area Manager
the endorsed
Concession Application
7. Forward Endorsement/ None 5 minutes Airport Admin
Recommendation letter Staff
to the BDD via courier
8. Acknowledge receipt of None 5 minutes BDD Admin
the documents and Staff
endorse to the BDD
Chief
9. Conduct initial None 2 hours BDD Chief
assessment of the
Concession Application
10.Discuss and deliberate
initial recommendation
with assigned BDD
Analyst
11.Forward Concession
Application to assigned
BDD Analyst
12.Prepare response None 30 Minutes BDD Analyst
letter to Client based
on the submitted
recommendations
13. Release response
letter to Client
14. If approved, proceed to
Phase Two
TOTAL: none 2 Days,
2 Hours,
45 Minutes
188
84. Processing of New Concession Applications Submitted to
Airport (Stage Two)
190
BDD release one (1)
original copy to the
following:
a. Client
b. Airport (via courier)
c. Commission on Audit
5.2 Prepare and endorse None 10 Minutes BDD Analyst
Notice to Proceed
(NTP) to BDD Chief
5.3 Affix signature on the None 5 Minutes BDD Chief
NTP
6. Receive Notice 6.1 Release Notice to
to Proceed Proceed to client None 5 Minutes BDD Analyst
6.2 Proceed to Stage Three
TOTAL: None 3 Days
191
85. Processing of New Concession Applications Submitted to
Airport (Stage Three)
192
86. Processing of New Concession Applications Submitted to the
Business Development Division (Stage One)
Office or
Business Development Division (BDD)
Division:
Classification: Simple
Type of G2B - Government to Business; G2C - Government to Citizen; G2G -
Transaction: Government to Government
Who May Avail: Any requesting party
CHECKLIST OF REQUIREMENTS WHERE TO SECURE
Initial Requirements
1. Application Form CLIENTS
2. Letter of Intent
3. Business Plan
a. Executive Summary
b. Company Description
c. Market Analysis
d. Management and Organization Structure
e. Products and Services (with pricing)
f. Projected Financial Statement for 1 calendar
year with Capital Investment
g. Architectural Plan/Layout/Design of
proposed concession
4. Endorsement/Recommendation Letter From Local Airport / Area Manager to be
coordinate with the BDD upon submission of
complete initial requirements
5. Undertaking of No Pending Case Certification CLIENTS
6. Declaration of No Relationship
CLIENT STEPS AGENCY ACTION FEES TO PROCESSING PERSON
BE PAID TIME RESPONSIBLE
1. Submit 1. Receive and checks
complete Initial completeness of submitted
BDD Admin
requirements documents None 5 Minutes
Staff
2. Forward application to BDD
Chief
3. Conduct initial assessment
of the Concession
Application.
4. Discuss and deliberate initial
recommendation with None 2 Hours BDD Chief
assigned BDD Analyst.
5. Forward Concession
Application to assigned BDD
Analyst
6. Forward Concession None 5 Minutes BDD Analyst
Application to Airport
Concession-in-Charge
(ACIC) for further evaluation
193
7. Acknowledge receipt of the
forwarded Concession
Application
8. Determine space
requirements and
availability based on
concession zoning and
future airport development
Airport
plans
None 1 Day Concession-in-
9. Prepare comments and
Charge
recommendation for
concurrence of the Airport
Manager
10. Endorse Concession
Application documents with
recommendation for
concurrence of the Area
Manager via email
11.Acknowledge and endorse None 5 Minutes Airport Admin
documents to the Office of Staff
the Area Manager
12. Approval/disapproval of None 1 Day Area Manager
the endorsed Concession
Application
13. Forward Endorsement / None 5 Minutes Airport Admin
Recommendation Letter to Staff
the BDD via courier
14. Acknowledge receipt of the None 5 Minutes BDD Admin
documents and endorse to Staff
assigned BDD Analyst
15. Prepare response letter to
Client based on the
submitted recommendation
16. Release response letter to None 30 Minutes BDD Analyst
Client via email and courier
17.If approved, proceed to
Phase Two
TOTAL: none 2 Days,
3 Hours
194
87. Processing of New Concession Applications Submitted to the
Business Development Division (Stage Two)
196
party
7. Return Notarized 14. Received notarized None 15 Minutes BDD Admin
Agreement to the Agreement and release Staff
BDD one (1) original copy to
the following:
a. Client
b. Airport (via courier)
c. Commission on Audit
15. Prepare and endorse None 10 Minutes BDD Analyst
Notice to Proceed (NTP)
to BDD Chief
16. Affix signature on the None 5 Minutes BDD Chief
NTP
8. Receive Notice 17. Release Notice to None 5 Minutes BDD Analyst
to Proceed Proceed to client
18. Proceed to Stage Three
TOTAL: none 3 Days
197
88. Processing of New Concession Applications Submitted to the
Business Development Division (Stage Three)
198
89. Processing of Payment of Salaries, PERA & Government
Share
199
90. Processing of Program of Work, Purchase Request
200
91. Processing of Progress Billing and Payment
201
PMD documents to DM III,
AED
11. Final review and None 1 Hour DM III, AED
checking of billing
documents
12. Approval and None 15 Minutes DM III, AED
endorsement of billing
documents to ADG II,
ADMS
13. Approval and None 15 Minutes ADG II, ADMS
endorsement of billing
documents to Budget
Division
TOTAL: None 2 Days,
5 Hours,
41 Minutes
202
92. Processing of Release of Withheld Retention Money
203
93. Processing of Technical Inspection Evaluation and Validation
Report for Final Billing
204
(TIER)
11. Approval and None 5 Minutes ADG II, ADMS
endorsement of
Technical Inspection
Evaluation Report
(TIER) to Project in-
Charge
TOTAL DURATION None 3 Days,
WITHOUT 5 Hours,
RECTIFICATION: 36 Minutes
(may vary)
Note:
Proceed with the steps below if rectification is applicable
12. Furnishing a Copy of None 5 Minutes Project In-
approved TIER to Charge
Contractor for
immediate rectification
2. Pick-up of None 5 Minutes Contractor
approved
Technical
Inspection
Evaluation Report
3. Rectification 2 Days Contractor
process (may vary)
13. Schedule ocular None 10 Minutes Project In-
inspection with TIT Charge
and contractor
representative for
validation
14. Ocular inspection and None 3 Days Project In-
evaluation (may vary) Charge, TIT and
Contractor
15. Prepare Technical None 4 Hours Project In-
Inspection Validation Charge
Report (TIVR)
proposing for project
completion and final
payment
16. Checking of Technical None 15 Minutes Assigned PMD
Inspection Validation Staff
Report (TIVR)
17. Review of Technical None 15 Minutes DC III, PMD
Inspection Validation
Report (TIVR)
18. Final review of None 15 Minutes DM III, AED
Technical Inspection
Validation Report
(TIVR)
19. Approval and None 5 Minutes ADG II, ADMS
endorsement of
205
Technical Inspection
Validation Report to
Project in-Charge for
preparation of Final
Payment
TOTAL: None 9 Days,
2 Hours,
46 Minutes
(may vary)
206
94. Processing of Variation Order
207
8. Checking of prepared None 15 Minutes Assigned PMD
Variation Order Staff
documents as per
document checklist
9. Technical review and None 1 Day Assigned PMD
checking of Variation Staff
Order documents
10. Technical validation of None 1 Day DC-III, PMD
Violation Order
documents prior to
concurrence of
Contractor
2. Pick-up Variation None 5 Minutes Contractor
Order documents
3. Review and concur None 1 Day Contractor
Variation Order
documents
4. Submit concurred 11. Approval and None 15 Minutes DC-III, PMD
Variation Order endorsement of
documents to PMD Variation Order
documents to DM III,
AED
12. Final review and None 1 Day DM-III, AED
checking of Variation
Order documents
13. Approval and None 15 Minutes DM-III, AED
endorsement of
Variation Order
documents to ADG II,
ADMS
14. Approval and None 15 Minutes ADG II, ADMS
endorsement of
Variation Order
documents to Budget
Division
TOTAL: None 9 Days,
5 Hours,
50 Minutes
208
95. Purchasing of AIP Manual Subscription for Local Subscribers
(Walk-in)
209
2.5 Issue release date
(claim stub) for
claiming of the AIP
Manual (either for
pick-up or mailing)
3. Claiming of 3. Preparation of AIP None 14 Calendar Days
AIP Manual Manual 10 Minutes
For mailing:
2 Months or
the next
scheduled AIRAC
mailing date
210
96. Purchasing of AIP Manual Subscription for Local Subscribers
(Walk-in)
211
payment (O.R.)
2.5 Issue release date
(claim stub) for
claiming of the AIP
Manual (either for pick-
up or mailing)
3. Claiming of 3. Preparation of AIP Manual AIS Officer
AIP Manual 3.1 For pick-up : AIS-OPS Station
present proof of
payment and/ or
claim stub
3.2 For mailing: wait
for the next
scheduled AIRAC
mailing date
TOTAL: Php3,400 2 Hours,
+ 12% 50 Minutes
VAT
212
97. Receiving of delivered goods from Supplier (Per Transaction)
213
98. Release of Check
214
99. Renewal of Airman License
Classification: Complex
2. Renewal
a. No. 1 requirement
b. Photocopy of SPA
c. Photocopy of Class II Aviation Medical
Certificate
d. NBI clearance
e. Notarized Consent form for Minor
(Applicants Below 18 years old)
1. Renewal
1.1 Nos 1,2,3,5,7 and 8 requirements
1.2 Photocopy of current Pilot license
1. Renewal
1.1 Nos. 1,2,3,5,7 and 8 requirements
215
1.2 Photocopy of current pilot license
1.4 Photocopy of Class I Aviation Medical
Certificate
1. Renewal
1.1 Nos. 1,2,3,5,7 and 8 requirements
1.2 Photocopy of current pilot license
1.3 Photocopy of current Medical
Certificate
1. Renewal
1.1 Nos. 1,2,3,5,6,7 and 8 requirements
1.2 Photocopy of current Pilot License
1.3 Photocopy of current Medical
Certificate
1.4 List of Students
1. Renewal
1.1 Nos. 1,2,3,5,7 and 8 requirements
1.2 Photocopy of current Commercial Pilot
License
1.3 Photocopy of current Medical
Certificate
1.4 Certificate of Employment
1. Renewal
1.1 Nos. 1,2 and 7 requirements
1.2 Photocopy of current ATC license
1.3 Photocopy of current Medical
Certificate
1.4 Certificate of Employment
1. Renewal
1.1 No. 1 requirement
1.2 Photocopy of current Medical
Certificate
216
1.3 Certificate of Employment
1. Renewal
1.1 Nos. 1 and 7 requirements
1.2 Photocopy of current license
1.3 Photocopy of current Medical
Certificate
1.4 Recurrent Training Certificate
1.5 Certificate of Employment
AMT/AMS:
For AMT/AMS
1. Renewal
1.1 Nos. 1 and 2 requirements
1.2 Photocopy of license
1. Renewal
1.1 Nos. 1 and 2 requirements
1.2 Photocopy of license
217
FSIS building
2. Proceed to 2. Receive payment, issue 10 Minutes Collection Officer,
Collection Unit Official Receipt (OR) 2nd floor, Annex
building
3. Proceed back to 3.1 Check OR and None 15 Minutes Licensing Officer
LCD window 1; attached it to the Ground floor,
submit OR application documents; FSIS building
log payment
3.2 Encode Applicant’s None 30 Minutes Licensing Staff
personal information in Ground floor,
the CASORT; issue FSIS building
control number
3.3 Encode applicant’s None 30 Minutes Licensing Officer
license information in Ground floor,
the CASORT FSIS building
3.4 Prepare transmittal of none 30 minutes Licensing Staff
application to Chief,
PCSTD
3.5 Sign and endorse none 30 minutes Chief,
application to Chief PCSTD/ALD
LCD
3.6 Sign and endorse the none 30 minutes Chief LCD
application to ADG II, Ground floor,
FSIS FSIS building
3.7 Sign and endorse none 1 day ADG II, FSIS; 2nd
application to the Floor FSIS
Deputy Director for building
Operations
2 days Deputy Director
3.8 Sign/approve the General for
application for the Operations or
issuance of license Authorized
Representative
3.9 Received signed none 30 minutes LCD Printing staff
application and print Ground floor,
license FSIS building
218
Minutes
Aviation Maintenance
Technician License
- Airframe Rating
only Php490.00 Php490.0 Php140.00 Php134.40
- Power plant 0
Rating only
- Airframe and Php490.0
Php490.00 Php140.00 Php134.40
Power plant
219
Rating 0
220
100. Request for AVSEC Courses (Company)
221
2. Confirm Final 7. Prepare and submit None One (1) to Two
Schedule Request for Billing (2) Working
Statement (for issuance Days
of the Accounting Office)
8. Prepare & submit request None
letter and requirements to
OTS (conduct of AVSEC
courses for approval of
OTS)
Five (5) days to
9. Prepare and submit None
Fifteen (15)
Reply Letter/
Days
Memorandum for
Instructors/ Details of
Expenditures (for
signature of the
DDGO/DDGA)
10. Prepare Travel Order, if None One (1) to CATC Admin
necessary (for Signature Three (3) Personnel and
of ADG I, CATC or Chief Working Days CAAP
of the Unit/Service where Service/Unit
the instructor is part of) concerned
11. Give reply letter & issue None One (1) CATC Admin
billing statement Working Day Personnel
(assigned to
coordinate for
AVSEC
Courses)
3. Settle Payment for 12. Receive payment to be 1 Hour CATC Admin
Course Fee & remitted to the CAAP for Personnel
Honorarium issuance of Official (assigned to
Receipt or receive copy coordinate for
of O.R. AVSEC
13. Release Official Receipt One (1) Courses)
and give copy of Working Day
customer feedback form
4. Fill up customer 14. Acknowledge None 10 Minutes CATC Focal
feedback form and accomplishment of Person
drop to drop box customer feedback form
TOTAL: 27 Days,
2 Hours,
10 Minutes
222
101. Request for AVSEC Courses (Individual)
223
1.6 Issue Order of Payment None One (1) Hour
or or
Billing Statement One (1)
(processed by the Acctg. Working Day
Office)
2. Settle Payment for 2.1 Receive payment to be ** One (1) Hour CATC Admin
Course Fee & remitted to the CAAP for Personnel
Honorarium issuance of Official
Receipt or receive copy
of O.R.
2.2 Release Official Receipt One (1)
and give copy of Working Day
customer feedback form
3. Fill up customer 3. Acknowledge None 10 Minutes CATC Focal
feedback form and accomplishment of Person
drop to drop box customer feedback form
TOTAL: 18 Days,
2 Hours,
10 Minutes
224
102. Request for Issuance of Notice to Airmen (NOTAM) Bravo and
Charlie Series- Planned Activities
225
2.3 Update NOTAM in the 5 Minutes AIS Officer
AIS website using the AIS-OPS Station
PAMS Log Sheet
TOTAL: none 67 Minutes or 1
hour, 7 minutes
226
103. Request for Issuance of Notice to Airmen (NOTAM) Bravo and
Charlie Series-Unplanned Activities
227
Access System
228
104. Request for Reconciliation of Flight Discrepancy
(For International and Domestic Flights) – Per Transaction
Office or Division:
Accounting Division
Classification: Complex
Type of Transaction:
G2B – Government to Business; G2C – Government to Citizen; G2G –
Government to Government
Who May Avail: Airline Operators, and Groundholders
CHECKLIST OF REQUIREMENTS WHERE TO SECURE
Forward documents to
229
Revenue Section
2. Receive the Result 6. Release the result of None 5 Minutes Revenue Staff
of Verification Verification
TOTAL: None 5 Days,
22 Minutes
230
105. Request for Regular Course (Company)
FEES:
**COURSE TITLE TOTAL FEES/CLASS
(Exclusive of 12% VAT)
Safety Management Systems Php95,000.00
Note:
1. Transportation, food, training venue, accommodation (outside of Manila) and other
incidental expenses thereto shall be shouldered by the requesting party.
CLIENT STEPS AGENCY ACTION FEES TO PROCESSING PERSON
BE PAID TIME RESPONSIBLE
1. Submit Letter of 1. Receive letter of None
Intent/request for intent/request for training
training 2.a Return receiving copy of None
request for training (if 1 Hour
submitted personally)
2.b Confirm receipt of letter
(if submitted thru email)
3. Request for CAAP None Three (3) to
Instructors Five (5)
Working Days
1.3.5 for (however,
concurrence of Service number of days CATC Admin
Chief/Dept./Division may vary due Personnel
Chief to the (assigned to
4. Coordinate with the None processing coordinate for
requesting party time of Regular
regarding final schedule respective Courses)
units)
2. Confirm Final 5. Prepare and submit None One (1) to Two
Schedule Request for Billing (2) Working
Statement (for issuance Days
of the Accounting Office)
6. Prepare & submit Reply None Five (5) days to
Letter/ Memorandum for Fifteen (15)
Instructors/ Details of Days
Expenditures (for
signature of the
DDGO/DDGA)
231
7. Prepare Travel Order, if None One (1) to CATC Admin
necessary (for Signature Three (3) Personnel and
of ADG I, CATC or Chief Working Days CAAP
of the Unit/Service where Service/Unit
the instructor is assigned) concerned
8. Give reply letter & issue None One (1)
billing statement Working Day
3. Settle Payment for 9. Receive payment to be ** 1 Hour
CATC Admin
Course Fee & remitted to the CAAP for
Personnel
Honorarium issuance of Official
Receipt or receive copy
of O.R.
10. Release Official Receipt None One (1) CATC Admin
and give copy of Working Day Personnel
customer feedback form (assigned to
coordinate for
Regular
courses)
4. Fill up customer 11. Acknowledge None 10 Minutes CATC Focal
feedback form and accomplishment of Person
drop to drop box customer feedback form
TOTAL: Php95,00 28 Days,
0.00 2 Hours,
tuition 10 Minutes
fee/class
232
106. Request for Regular Courses (Individual)
FEES:
**COURSE TITLE COURSE FEE/PARTICIPANT
(Exclusive of 12% VAT)
Safety Management Systems Php3,600.00
Aircraft Accident/ Incident Php3,600.00
Investigation & Prevention
Course
Advanced Instructors Training Php14,400.00
Note:
1. No certificate of completion or certifications of training shall be issued unless appropriate
fees have been paid.
CLIENT STEPS AGENCY ACTION FEES TO PROCESSING PERSON
BE PAID TIME RESPONSIBLE
1. Submit Letter of 1. Receive letter of None
Intent/Request intent/request for training
reservation of slot 2.a Return receiving copy of None
request for training (if 1 Hour
submitted personally)
2.b Confirm receipt of letter
(if submitted thru email)
3. None One (1)
a. available slot – confirm Working Day
CATC Admin
reservation of slot within
Personnel
the day
(assigned to
b. no available slot – send
coordinate with
email informing that
Regular
there is no available slot
Courses)
and will be added in the
wait list
4. Issue Order of Payment None One(1) Hour
Or or
Issue Billing Statement One (1)
(processed by the Acctg. Working Day
Office)
2. Settle Payment for 5. Receive payment to be ** 1 Hour
Course Fee & remitted to the CAAP for
Honorarium issuance of Official
233
Receipt or receive copy
of O.R.
6. Release Official Receipt None One (1)
and give copy of Working Day
customer feedback form
3. Fill up customer 7. Acknowledge None 10 Minutes CATC Focal
feedback form and accomplishment of Person
drop to drop box customer feedback form
TOTAL: 3 Days,
2 Hours,
10 Minutes
234
107. Request for Specialized Courses (Company)
FEES:
**COURSE TITLE TOTAL FEES/ CLASS TOTAL FEES/ CLASS
Manila Outside of Manila
(Exclusive of 12% VAT) (Exclusive of 12% VAT)
Regular Indcoctrination Course Php66,000.00 Php71,000.00
Executive Safety Management Php46,400.00 Php48,400.00
Systems Course
Train-the-Trainer Course Php 165,600.00 Php175,600.00
Note:
1. Transportation, food, training venue, accommodation (outside of Manila) and other incidental
expenses thereto shall be shouldered by the requesting party.
CLIENT STEPS AGENCY ACTION FEES TO PROCESSING PERSON
BE PAID TIME RESPONSIBLE
1. Submit Letter of 1. Receive letter of None
CATC Admin
Intent/request for intent/request for training
Personnel
training 2.a Return receiving copy of None
(assigned to
request for training (if 1 Hour
coordinate for
submitted personally)
Specialized
2.b Confirm receipt of letter
Courses)
(if submitted thru email)
3. Special Regular Course None Five (5) Working Chief,
Days TRAINAIR-CDU
/ Course
Developer
4. Check availability of None
instructors and confirm
Three (3) to Five
final schedule
(5) Working Days
5. Prepare Invitation for None CATC Admin
(however,
Guest Lecturers/ Request Personnel
number of days
for CAAP Instructors (for (assigned to
may vary due to
concurrence of coordinate for
the processing
Service/Dept./Div. Chief) Specialized
time of
6. Coordinate with the None Courses)
respective units)
requesting party
regarding final schedule
2. Confirm Final 7. Prepare and submit None One (1) to Two
235
Schedule Request for Billing (2) Working Days
Statement (for issuance
of the Accounting Office)
8. Prepare & submit Reply None Five (5) Days to
Letter/ Memorandum for Fifteen (15) Days
Instructors/ Details of
Expenditures (for
signature of the
DDGO/DDGA)
9. Prepare Travel Order, if None One (1) to Three CATC Admin
necessary (for Signature (3) Working Days Personnel and
of ADG I, CATC or Chief CAAP
of the Unit/Service where Service/Unit
the instructor is assigned) concerned
10. Give reply letter & issue None One (1) Working
billing statement Day
3. Settle Payment for 11. Receive payment to be ** 1 Hour CATC Admin
Course Fee & remitted to the CAAP for Personnel
Honorarium issuance of Official (assigned to
Receipt or receive copy coordinate for
of O.R. Specialized
12. Release Official Receipt None One (1) Working Courses)
and give copy of Day
customer feedback form
4. Fill up customer 13. Acknowledge None 10 Minutes CATC Focal
feedback form and accomplishment of Person
drop to drop box customer feedback form
TOTAL: 32 Days,
2 Hours,
10 Minutes
236
108. Submission of Advance Copy of Procurement Documents
(Goods Only) to COA
237
109. Subscription of the Copy of AANSOO’s Regulations
c. MOS-AIS –
P9,807.90
d. MOS-MET –
P1,042.00
e. MOS-ATS –
P6,406.62
1.4 Billing Process 3 Days Accounting Staff
2. Proceed to 2.1 Release Order 10 Minutes Accounting Staff
Accounting Payment Slip
Division
3. Proceed to 3.1 Receive payment 15 Minutes Collection Staff
Collection On-duty
238
MOS Aeronautical
Charts – P6,726.90
MOS-AIS –
P9,807.90
MOS-MET –
P1,042.00
MOS-ATS –
P6,406.62
239
110. Supplier Signing of Contract
240
111. Telegraphic Transfer Preparation
241