1000-101-4
31 Aug 95 / GFze
SERVICE MANUAL
FRAMO
CARGO PUMP
SD 125-5
SD 150-5
vuwaveinstuke/000-103nia)
SERVICE MANUAL
FRAMO CARGO PUMP
SD 125-5/SD 150-5
CONTENTS
RORLS
GENERAL DESCRIPTION
Top cover plate
Pipestack
Pump unit
Technical Data
2.0 OPERATING INFORMATION
24 Discharging
22 Stripping
23 Cleaning of pump / tank washing
24 Loading through pump
25 Purging of cofferdam
3.0 MAINTENANCE INFORMATION
34 Dismantling of impelleriwear rings
3.2 Dismantling of lip seal arrangement
33 Draining of pump
3.4 Dismantling of mechanical oil seal
3.5 Dismantling of bearing housing
36 Dismantling of hydraulic motor
37 Assembling sequence
3.8 Pressure test of pump
40 SPARE PARTS
5.0 SERVICE INTERVALS.
6.0 TROUBLE SHOOTING
7.0 SPECIAL TOOLS
APPENDIX
PURGING ROUTINE
SERVICE MANUAL STC-VALVE
TROUBLE SHOOTING PROCEDURE
INSTALLATION OF MECHANICAL OIL SEAL
SPECIAL TOOL
Uvurvaverinstruks/1000-101
1000-101-4
Date: 31Aug95
Sign.: GFae
Page: 2
Page
@wanae
43
45
16
18
19
22
25
26
29
32
34
36
37
38
39
40
1000-010-4
1375-027-4
1000-109-4
290-036-4
032-387-4FRAMO
1.0
SERVICE MANUAL 1000-101-4
FRAMO CARGO PUMP. Date: 31Aug95
‘SD 125-5/SD 150-5 Sign.: GFa
— Page: 3
GENERAL DESCRIPTION
The Framo cargo pump is a centrifugal, hydraulic driven, submerged cargo
pump in stainless steel
The pump consists of three main parts:
Top cover plate
- Pipe stack
- Pump unit.
Top Cover
Plate
Deck Trunk _
Pipestack
‘Support Rin
Pipe Stack
Pump
Support Ring
Pump Unit
Suction Well
Fig. 1
utvavenstruks/1000-101SERVICE MANUAL 1000-101-4
Ano FRAMO CARGO PUMP Date: 31Aug95
SD 125-5/SD 150-5 Sign.: GFee
' Page: 4
1.1 Top cover plate
The cargo pump rests on a deck trunk welded to the deck. A chemically
resistant gasket is fitted between the top cover plate and the deck trunk. All
the connections are on the top cover plate, to which a hydraulic control valve
is mounted for remote and local operation of the cargo pump. This specially
developed control valve regulates hydraulic pressure and oil flow to the
motor according to the given discharge situation
The hydraulic oil pressure gauge indicates the oil pressure to motor.
Non-retum Service
Valve Valve Hydraulic Control Valve
Venting
Local Control Valve
Plug
AiriNitrogene
Connection
for Cofferdam, Cofferdam Pipe
Hydr. Oil
Pressure
Vent.
1 \ Exhaust Trap
Drain
Pilot Pipe —
Hydraulic Ci
High Pressure
Hydraulic Oil
Low Pressure
Cofferdam
Cargo
AiriNitrogene
Pilot
Cargo Stripping
Valve
Stripping Pipe \Air/Nitrogene Connection’
{for stripping _
BO@B8 Oo @
|
|
/
Fig. 2
vurvavedtnstruke/1000-101eo SERVICE MANUAL 1000-101-4
oa FRAMO CARGO PUMP Date: 31Aug95
SD 125-5/SD 150-5 Sign: GFae
<=coN CR omnes
1.2 Pipestack
Between the top cover plate and the pump unit there is a pipestack.
The pipestack consists of pipes according to fig. 3.
' Ventilated to Aimosphere!
Low Pressure Pipe
Fig. 3
Uutvavesinetrukes1000-101eS SERVICE MANUAL, 1000-101-4
FRAMO FRAMO CARGO PUMP Date: 31Aug95
SD 125-5/SD 150-5 Sign.: GF
i Page: 6
4.3. Pump unit
The pump unit is welded or flanged to the pipe-stack, The hydraulic motor
which is of very compact design, is located inside the pump unit and is
surrounded by return hydraulic oil. A short, independent shaft, supported by
bearings lubricated by hydraulic oil, is connected to a single-stage, end-
suction centrifugal pump. The hydraulic section is surrounded by a cofferdam
that completely segregates the hydraulic oil from the cargo, with a manual
seal-condition monitoring system. Wear rings are fitted between the impeller
and the volute casing. The cargo seal is exposed only to static head from the
cargo. A back stop unit is fitted to the shaft, enabling cargo to be loaded
through the pump.
Hydraulic Oil
Pressure
Hydraulic Oil
Return
Cofferdam
Hydraulic Motor
Cotferdam
Checkpipe
Ball Bearing
Back Stop Unit
Roller Bearin
Mechanical
Oil Seal
Cargo Seal
Impeller
‘Wutvavdinstuks!1000-101eo SERVICE MANUAL 1000-101-4
FRAMO CARGO PUMP. Date: 31Aug95
SD 125-5/SD 150-5 Sign.: GFe
ve Page: 7
The shaft seal arrangement is developed to segregate the cargo and the
hydraulic oil. It consists of a mechanical cil seal, single cofferdam lip seal
and a double cargo lip seal.
Any leakage in cofferdam chamber will, by purging with compressed air or
nitrogen be blown through the cofferdam check pipe and collected in the
exhaust trap,
Hydraulic Return Oil
(3-10 bar)
Mech. cil seal
Single
Cofferdam lip seal
Cofferdam Chamber
(Atmospheric pressure)
Double
Cargo lip seal
Cargo
(0-3 bar static head)
Fig. 5
‘vurvaveinstruks/1000-101SERVICE MANUAL 1000-101-4
a FRAMO CARGO PUMP Date: 31Aug95
maM SD 125-5/SD 150-5 Sign.: GF
(aT Page: 8
1.4 TECHNICAL DATA SD 125
PUMP TYPE: SD 125-5D*-HH"**-
DISCHARGE FLANGE CONNECTION: DN 125 PN 25 DIN2634.
HYDRAULIC CONNECTIONS:
PRESSURE DN 30 PN320 FRAMO
RETURN DN 40 PNi6é FRAMO
PILOT: DN15 PN320 FRAMO.
AIR / INERT GAS CONNECTION:
FOR PURGING OF COFFERDAM: FRAMO QUICK COUPLING
MAX. CONSUMPTION, 10m PUMP. 0.3 Nw3
FOR PURGING OF CARGOPIPE, PUMP: FRAMO QUICK COUPLING
MAX. CONSUMPTION, 10M PUMP 1.0 Nw
HYDRAULIC OIL VOLUME IN 10M PUMP: 50 LITRE
RECOMMENDED HYDRAULIC OILS: = SEE FRAMO LUBRICATION CHART
DESIGN PRESSURE:
CARGO 25 BAR
HIGH PRESSURE, HYDRAULIC: 320 BAR
RETURN PRESSURE, HYDRAULIC: 16 BAR
COFFERDAM: 7BAR
WEIGHT OF PUMP AND PUMP PARTS:
PUMP COMPLETE: 10M: 460 KG
PUMP CASING: 290 KG
PUMP HEAD COMPLETE (without motor): 108 KG
BEARING HOUSING COMPLETE: 62 KG
HYDR. MOTOR: 30 KG
VOLUTE CASING: 30 KG
IMPELLER 10 KG
‘vurwaveintraks/1000-101in SERVICE MANUAL 1000-101-4
FRAMO FRAMO CARGO PUMP Date: 31Aug95
SD 125-5/SD 150-5 Sign.: GFee
, Page: 9
1.4 TECHNICAL DATA SD 150
PUMP TYPE: SD 150-5D*-HH***-"*7-"
DISCHARGE FLANGE CONNECTION: DN 150 PN 25 DIN2634
HYDRAULIC CONNECTIONS:
PRESSURE: DN 30 PN 320 FRAMO
RETURN DN 40 PN16 FRAMO
PILOT: DN15 PN320 FRAMO
AIR / INERT GAS CONNECTION:
FOR PURGING OF COFFERDAM: FRAMO QUICK COUPLING
MAX. CONSUMPTION, 20m PUMP. 0.3 Nxe
FOR PURGING OF CARGOPIPE, PUMP: FRAMO QUICK COUPLING
MAX. CONSUMPTION, 20M PUMP: 1.0 Nw
HYDRAULIC OIL VOLUME IN 10M PUMP:50 LITRE
RECOMMENDED HYDRAULIC OILS: SEE FRAMO LUBRICATION CHART
DESIGN PRESSURE:
CARGO. 25 BAR
HIGH PRESSURE, HYDRAULIC: 320 BAR
RETURN PRESSURE, HYDRAULIC: 16 BAR
COFFERDAM: 7 BAR
WEIGHT OF PUMP AND PUMP PARTS:
PUMP COMPLETE: 10M: 510 KG
PUMP CASING: 310 KG
PUMP UNIT COMPLETE (without motor): 125 KG
BEARING HOUSING COMPLETE: 63 KG
HYDR. MOTOR: 41KG
VOLUTE CASING: 40 KG
IMPELLER: 11 KG
\Vutvavesinstruks/1000-101co SERVICE MANUAL 1000-101-4
FRAMO. FRAMO CARGO PUMP. Date: 31Aug95
SD 125-5/SD 150-5 Sign.: Grae
! Page: 10
2.0 OPERATING INFORMATION
2.4 Discharging
When discharging, all valves at top cover plate should be in positions as
shown in fig. 6
Note that the ball valve at the hydraulic high pressure pipe is only to be
closed when carrying out service work on the pump
Local control valve
CLOSED.
CLOSED) 7
Fig. 6
Starting of pump
a) Remote controlled
~ The local control valve at top cover plate must be in closed position.
+ Close the cargo discharge valve.
Increase the hydraulic system pressure to approximately 150 bar.
~ Start the cargo pump from cargo control panel (ICMS), and let it run
with hydraulic pressure 40-50 bar for minimum 1 minute
Uutvavasinsiniks!1000-101ia]
SERVICE MANUAL 1000-101-4
FRAMO CARGO PUMP Date: 31Aug95
SD 125-5/SD 150-5 Sign.: GFee
: Page: 11
- Raise the hydraulic pressure until the discharge pressure is above
manifold pressure
+ Open cargo discharge vaive.
- Raise the hydraulic pressure until required discharge pressure or
capacity is achieved
~ The hydraulic system pressure should be maximum 15 bar above the
highest consumer pressure in order to minimize energy consumption,
noise level, wear and tear.
~ When the cargo tank is empty the hydraulic motor pressure will fall to
about 50-100 bar. Close cargo discharge valve and stop the pump by
setting output signal to minimum from cargo control panel(ICMS)
Local controlled:
To run cargo pump by local control valve at top cover plate following
operations must be carried out
- Open local control valve (by turning counter clockwise).
~ Close remote control valve from control room by setting output signal to
maximum from cargo control panel(ICMS).
- Close cargo discharge valve.
~ Increase the hydraulic system pressure to approximately 150 bar
~ Start the cargo pump by closing the local control valve and let it run
with hydraulic pressure 40-50 bar for minimum 1 minute.
- Raise the hydraulic pressure until the cargo discharge pressure is
above cargo manifold pressure.
~ Open cargo discharge valve.
- Raise the hydraulic pressure until required discharge pressure or
capacity is achieved.
- The hydraulic system pressure should be
highest consumer pressure in order to mi
noise level, wear and tear.
ximum 15 bar above the
ize energy consumption
atvaveinstruks/1000-101SERVICE MANUAL 1000-101-4
FRAMO CARGO PUMP Date: 31Aug95
SD 125-5/SD 150-5 Sign.: GFee
' Page: 12
When the cargo tank is empty the hydraulic pressure will fall to about 50-
100 bar. Close cargo discharge valve and stop the pump by open the
local control valve.
Open the remote control valve from control room by setting output signal
to minimum from cargo control panel (ICMS),
Parallel pumping
- Start hydraulic system and the first cargo pump as described in starting
of pump,
- Open the cargo discharge valve for the running cargo pump.
- Start the next pump(s) following the same procedure. Ensure that
enough hydraulic power is available.
- _ Increase the hydraulic pressure (pump speed) until required discharge
pressure or capacity is achieved
- The hydraulic system pressure should be maximum 15 bar above the
highest consumer pressure (cargo pumps) in order fo minimize energy
consumption, noise level, and wear and tear.
- Pump capacity should be controlled by the pump hydraulic pressure, not
by throttling the cargo discharge valve or any other valve in cargo piping
system. This can be achieved easily by keeping all cargo pump
controllers in max. position and regulate the main hydraulic system
pressure until required discharge rate is achieved. If necessary each
cargo pump must be balanced individually by decreasing/increasing
cargo pump hydraulic pressure.
- Generally we recommend to run as many pumps in parallel as practical,
at a reduced hydraulic pressure, rather than just a few pumps at
maximum hydraulic pressure.
- Atthe end of the discharge, the cargo pump may run dry or suck air
through vortex, which will be indicated by vibration in pump and hunting
in the hydraulic pressure. This can easily be avoided by reducing the
cargo pump hydraulic pressure through this sequence
\vutvavdinstroks/1000-101aia)
2.2
SERVICE MANUAL 1000-1014
FRAMO CARGO PUMP Date: 31Aug95
SD 125-5/SD 150-5 Sign.: Gee
sa t ww Page: 13
Stripping
Step 4
Empty the cargo tank with reduced hydraulic pressure (100 bar’), and
throttle the cargo discharge valve
When the cargo tank is empty, close the cargo discharge valve and stop
the pump.
Connect the air/nitrogene supply to the cargo pipe, upstream the cargo
discharge valve.
Start the pump in local control mode and increase pressure to
approximately 80 bar*
Open the cargo stripping valve.
Open valve for air/nitrogene supply (Max. 7 bar) and continue pumping
until cargo pipe is empty (detected by increasing speed).
AiriNitrogene Fig. 7
for Strip
Step 2
Purge cargo deck line to minimize back pressure during stripping of
cargo pump (The best stripping result is obtained with lowest possible
back pressure.)
Adjust air/nitrogene pressure to 1 bar + static height, normally 2-3 bar.
Continue this stripping phase until the time between dropping pump
speed is increasing (i.e. between the times the impeller is lifting cargo
from the pump well). The stripping time can be reduced by closing air/
nitrogene supply during high speed periods.
utvaveinstruks/1000-101cy SERVICE MANUAL 1000-101-4
AND. FRAMO CARGO PUMP Date: 31Aug95
SD 125-5/SD 150-5 Sign.: GFae
oe Page: 14
- _ Increased stripping time improves the stripping result. Appproximately
10 min, is recommended to obtain a good result.
- Close cargo stripping valve
- Close air/nitrogene supply, and disconnect flexible hose.
- Stop the pump.
- Purge the pump cofferdam
"Note: Optimum pump speed(Hydraulic pressure) depends on discharge head,
specific gravity and viscosity of the cargo, and differs from ship to ship
Optimum speed must be based upon experience onboard.
Fig, 8
\tvaveinstukss1000-1012.3
SERVICE MANUAL 1000-101-4
FRAMO CARGO PUMP Date: 31Aug95
SD 125-5/SD 150-5 Sign.: Grae
: Page: 15
Cleaning of pump/tank washing
Different cleaning procedures are to be followed depending on type of cargo
cartied,
Viscous / Solidifying cargoes
During tank washing the pump is to be run slowly in order to discharge
with approximately the same flow rate as cleaning water / liquid supply
When the estimated tank washing time is halfway completed, the pump
should be stopped enabling the cleaning water level to build up in tank,
When a dept of 5 to 10 cm of cleaning water is stored in the tank, the
pump’s cargo discharge valve should be closed and the pump operated
at full speed for 3-5 minutes. In this manner max. cargo pressure is
achieved giving maximum flow over the wear rings and hence a good
cleaning of seal arrangement and pump parts not easily flushed during
regular washing.
To get a good cleaning of stripping pipe, open the cargo stripping valve
and run the pump at full speed 2-3 min. Close the cargo stripping valve
After this flushing, the cargo valve is opened and the pump runs at full
speed until tank is empty. In this manner a good cleaning of pump and
piping is achieved,
Cleaning water left in pump’s cargo pipe is to be purged out as.
described under Chapter 2.2.
Corrosive cargoes
Tanks to be cleaned should be flushed with a large amount of cleaning water
at the shortest possible time to neutralise the remaining cargo and to expose
the pump to "bad corrosive cargo concentrations” for the shortest period as
possible. After tank flushing the same cleaning procedure as for viscous /
solidifying cargoes should be followed.
CAUTION:
Cleaning water must never remain in the tank - this may result in severe
corrosion of tank and pump.
If steam is used to clean the pump, the steaming out period must not be too
long to avoid damage of seals or hydraulic motor.
Remember to flush the pump and tank with fresh water if sea water has been
used for tank cleaning.
‘Vuwavdnstrks/1000-101co SERVICE MANUAL 1000-101-4
ran FRAMO CARGO PUMP Date: 31Aug95
SD 125-5/SD 150-5 Sign.: GFze
Page: 16
2.4 Loading through pump
The pump is equipped with a back stop unit enabling the pump to be used as.
a drop line.
Hydr Oil
PressureGauge
CLOSED,
Fig. 9
Procedure for loading through the cargo pump
* Take cargo sample upstream of manifold valve
Open manifold valve partly, to fill cargo line on deck.
* Take sample upstream of cargo pump discharge valve
Open cargo pump discharge valve. Keep manifold valve in throttle position
until the 1-foot sample is taken
Open manifold valve slowly until required pressure/capacity is reached.
Note: Maximum acceptable loading pressure is 8 bar at the pump top
cover plate.
Ifa separate drop line is installed, start loading through the pump only until the
1-foot sample is taken, and the cargo tank level is above the drop line outlet.
Then open valve to drop line and continue loading through both the pump and
the drop line.
Note: * For sampling procedures, ref. charterer's requirements.
Ldurvavdinstnks!1000-101EA SERVICE MANUAL
FRAMO FRAMO CARGO PUMP
SD 125-5/SD 150-5
wasn
Loading through pump
‘vuwwavdlinstruks/1 000-101
1000-101-4
Date: 31Aug95
Sign.: GFae
Page: 17
Fig. 105 SERVICE MANUAL 1000-101-4
FRAMO FRAMO CARGO PUMP Date: 31Aug95,
SD 125-5/SD 150-5 Sign.: GFee
Page: 18
2.5 Purging of cofferdam
See FRAMO Instruction no. 1000-010.
\ulvaveinstnke/1000-101co SERVICE MANUAL 1000-101-4
Loa FRAMO CARGO PUMP Date: 31Aug95
SD 125-5/SD 150-5 Sign.: GFze
Page: 19
3.0 MAINTENANCE INFORMATION
NB! Before entering cargo tank for doing service it is essential to become
familiar with the ship's safety rules and requirements regarding cargo
handling equipment.
3.1 Dismantling of impeller / wear rings
Standard tools (Too! List: 32-357-4) Special tool (Too! List: 32-387-4)
tom] Name tano. | {tem| Name [iaino.
Allen key 10mm 15 | Bolt M12. x 45 69021
Spanner 13mm
Spanner 16 mm
Spanner 17mm
‘Spanner 18mm
Spanner 19mm
Spanner 24mm
Plastic hammer
Slide
NB! Before doing service on pump,
always close the hydraulic
pressure inlet valve, and purge
cofferdam.
Dismantle the pump support
Lift and secure the support to pipe
stack.
\vuvavelinstukes1 000-101SERVICE MANUAL 1000-101-4
FRAMO CARGO PUMP Date: 31Aug95
SD 125-5/SD 150-5 Sign.: GF
: . Page: 20
Dismantle upper wear ring support.
Loosen bolts for impeller hub two tums. Knock carefully on (or press down)
all bolts, When impeller is loose remove alll bolts. Remove bolts between
volute casing and cargo leg. Replace one bolt between volute casing and
pump unit on each side of the pump with lifting bolts. Remove remaining
bolts between volute casing and pump unit.
Lower volute casing, suction cover, impeller and wear ring in one piece,
Cargo ley Pump Unit Lifting bolts
Guiding pin
Upper wear
U ring support
Weight ca Bolt for
35 ky Impeller Hu!
8 Volute Casing impeller Hyp
Fig. 12
Slide/litt volute casing together with impeller and suction cover out of well
(fig.13). To avoid damage on suction well coating, volute casing must be
placed upon slide . Wear rings can now be replaced. Suction cover and
impeller can now be dismantled from the volute casing
c 1
meats Wear Ring
eam
Slide
Fig. 13
‘vavavcinstruks/1000-1014 SERVICE MANUAL 1000-101-4
FRAMO CARGO PUMP Date: 31Aug95
FRAMO SD 125-5/SD 150-5 Sign.: GF
— Page: 21
Exploded view of wear rings/impellerivolute casing
Hexagon bolt
with washer
Wear ring
a Support
Suction cover
with stud bolt
Hexagon bot with # teartnge
locking washer
kK =
—
Suction cover
Hexagon nut
“3 —_ with washer
4% Typical spare parts
Fig. 14
\Vorveweingtuke/1000-101co SERVICE MANUAL 1000-101-4
FRAMO CARGO PUMP Date: 31Aug9s
FRAMO SD 125-5/SD 150-5 Sign.: GFee
revemten Page: 22
3.2 Dismantling of lip seal arrangement
Standard tools (Tool List: 32-357-4) Special tools (Tool List: 32-387-4)
ton] Mare vane | [nem] nome vane. |
Spanner 10mm 3 | Extractor for impeller hub | A13306
Spanner 43mm 5. |Assembiing cylinder | A13315
Spanner 18mm
‘Spanner 17mm.
Spanner 18mm
Spanner 19mm
Spanner 24 mm
Loosen lock washer and remove impeller hub bolt. Impeller hub is pulled out
by using extractor (A13306). Be very careful not to damage o-rings and
ceramic sleeve.
a
Lower part of
Cofferdam pipe
vuvaveinstrks/1000-101
Fig. 15eo SERVICE MANUAL 1000-101-4
FRAMO CARGO PUMP Date: 31Aug95
SD 125-S/SD 150-5 Sign.: GFee
noone Page: 23
Install assembling cylinder (A13315) to keep ceramic sleeve in place
See fig. 16
Remove bolts in flange connection at check pipe and dismantle seal ring
housing. Dismantle support ring and FRAMO double cargo seal if necessary
If necessary FRAMO single cargo seal may be dismantled. Check ceramic
sleeve, change lip seal and sleeve if necessary.
with connection to
cofferdam chek pipe
NB! Red Spring
Assembling cylinder
Sensitive lips
Fig. 16
NB! The ceramic sleeve must be handled very carefully as it is very brittle
and may crack if dropped.
\vutvaveinstrks/1000-101Ga SERVICE MANUAL 1000-101-8
FRAMO CARGO PUMP Date: 31Aug95
FRAMO SD 125-5/SD 150-5 Sign.; GFee
Page: 24
Exploded view of lip seal arrangement.
Single cofferdam#
lip Seat
Support nng #
Hexagon bolt Bh Ceramic sleeve #
‘Support ring
Spring marked red
Hexagon bot
Double Cargo lipseal
Lower part of
cofferdam pi
ne
oe
E Retainer nng#
Fi
Bole
Impeller hubs
<= ———___ washer #
Bolt with
locking washer #
4 Typical spare parts
Fig.17
Uuwvavenstvks1 000-101eS SERVICE MANUAL
Fan FRAMO CARGO PUMP
‘SD 125-5/SD 150-5
3.3 Draining of pump
1000-101-4
Date: 31Aug95
Sign.: Grae
Page: 25
Before further dismantling, close hydraulic valves on top cover plate and drain the
pump's hydraulic section.
Standard tools (Tool List: 32-357-4)
Special tools (Tool List: 32-387-4)
item| Name Id.no. Htem| Name dno.
Allen key S mm 14 [Drain toot 13331
Spanner 13mm.
Drain pump
Drain Pump
Air
Connection
eo =H
To storage tank
Drain Too!
Unscrew plug
Fig. 18
Vutvaveinstruks! 1000-101SERVICE MANUAL
FRAMO CARGO PUMP,
‘SD 125-5/SD 150-5
3.4 Dismantling of mechanical oil seal
Standard tools (Tool List: 32-357-4)
1000-101-4
Date: 31Aug95
Sign.: GFee
Page: 26
Special tools (Tool List: 32-387-4)
io ham
la.no. tem | Name Ia.n0.
Allen key 6 mm 3 [Extractor for impeller [413306
Spanner 24mm 4. | Exractor for sleeve 13302
(to be used with 13306)
5 [Assembling cylinder | A13315
{for protection)
9. | Assembting too! 10738
12 |Bott stud M10x50 100594
Remove the bearing housing from the pump casing. Use extractor bolts M10.
Uvuvavainstuks/1000-105,
Extractor Bolts
Assembling cylider
for protection
Fig. 19ca SERVICE MANUAL 1000-1014
FRAMO CARGO PUMP Date: 31Aug95
FRAMO SD 125-5/SD 150-5 Sign.: GFee
0 Page: 27
Remove upper seal ring housing,
Remove stationary part of mechanical seal
Mechanical Seal
Fig. 20
‘Assembling tool for
mechanical seal
Fig. 21
‘vutvavdinstruks/1000-101co SERVICE MANUAL 1000-101-4
FRAMO CARGO PUMP Date: 31Aug95
SD 125-5/SD 150-5 Sign.: GF
Page: 28
Exploded view of mechanical oil seal.
Tso
= Upper Seal Ring Housing
FRAMO Seal Element #
* Bott wih => Stationary pat) Mechanical #
“e TD wowing par f OFSeeH
Blind flange =
& FRAMO Seal
element"
ean ——
Sleeve for mech. oil seal
‘% Typical spare parts
Fig.22
LWuvavainstuks/1000-101SERVICE MANUAL
FRAMO CARGO PUMP
SD 125-5/SD 150-5
3.5 Dismantling of bearing housing
Standard tools (Tool List: 32-357-4)
1000-101-4
Date: 31Aug95
Sign.: GFae
Page: 29
Special tools (Tool List: 32-387-4)
‘tem | Namo
Id.no. tem | Name {a.no.
Snap Ring Plier Jd 3 | Extractor forimpetier 13306 |
Snap Ring Plier A 4 Extractor forsieeve | A13302
(to be used with 13306)
Pull out the shaft, ball-bearing, rotating part of back-stop unit, and roller
bearing as a unit
= citips
Rotating part of
Back Stop Unt
Rotating part of
Roller Bearing
Sleeve for mech
Fig. 23
If the back-stop unit or the cylindrical roller bearing is to be replaced, always
change both rotating and stationary parts.
wutvaveinstruks/1000-101oA SERVICE MANUAL 1000-101-4
FRAMO CARGO PUMP Date: 31Aug95
oe SD 125-5/SD 150-6 Sign.: GFae
onsen Page: 30
Remove if necessary shaft sleeve for mechanical seal by use of extractor
A13302,
Extractor for
shaft sleeve
Fig, 24
Replace if necessary the complete mechanical seal, and shaft sleeve. the
shaft sleeve must be heated to approximately 90°C prior to assembling. See
instruction 290-036-4 for installation of mechanical seal.
otvavainatks/1000-101SERVICE MANUAL 1000-101-4
FRAMO CARGO PUMP Date: 31Aug95
FRAMO SD 125-5/SD 150-5 Sign.: GFae
: Page: 31
Exploded view of bearings.
————-_ came
Shaft
|
Nut
__s——_Crcipse
Backstop Unit ®
Circlips®
mech, seal
with o-rings
Seal Ring#
ao
4% Typical spare parts
Fig.25
Uurvavernstruks/1000-101ad
SERVICE MANUAL 1000-101-4
FRAMO CARGO PUMP Date: 31Aug95
SD 125-5/SD 150-5 Sign.: GFae
Page: 32
3.6 Dismantling of hydraulic motor
Standard tools (Tool List: 32-357-4) Special tools (tool List: 32-387-4)
Item | Namo Id.no. Item | Name Id.no.
Spanner 18mm. 7 | Extractor 3030590,
Spanner 17mm 8 | Jack 3030608
| 12 |Bolt Stud M10x50 | 100594
Prior to dismantling of hydraulic motor, steps in section 3.1 and 3.3 has to be
made
Remove the complete bearing housing by use of extractor bolts M10
(100594)
\Vutvavdsinstruks/1000-101
Extractor bolts
Fig. 26SERVICE MANUAL 1000-101-4
FRAMO CARGO PUMP Date: 31Aug95
FRAMO SD 125-5/SD 150-5 Sign.: GFae
Page: 33,
Install the jack (3030608). Remove bolts on intermediate motor flange. If
necessary use extractor (3030590) to loosen the hydraulic motor from the
high pressure pipe. Lower the hydraulic motor with the jack
Fig. 27
Uvutvavalinteuks/1000-109,in)
FRAMO
3.7
SERVICE MANUAL 1000-101-4
FRAMO CARGO PUMP Date: 31Aug95
SD 125-5/SD 150-5 Sign.: GFee
" Page: 34
Assembling sequence
CHECK ALL SEAL ELEMENTS, BACK-UP RINGS, SEAL ELEMENT
GROOVES, AND SEAL FACES. PAY SPECIAL ATTENTION TO THE
TEFLON RINGS AND BE ABSOLUTE SURE OF NO DEFORMATION
NOR RADIAL GROOVES. NEVER INSTALL DAMAGED O-RINGS.
CHECK SEAL FACES ON PUMP AND BE SURE OF NO.
CORROSION, CRACKS, DIRT ETC.
-- USE ONLY GENUINE SPARE PARTS ----
ALL SCREWS AND NUTS HAVE TO BE ASSEMBLED WITH
SPECIFIED TORQUE. IF NO TORQUE IS SPECIFIED, USE TORQUE
ACCORDING TO FOLLOWING TABLE:
ACID RESISTANT BOLTS AND NUTS, QUALITY A4-80
M6 M8. M10 M12 M16 M20
92Nm = 22.3Nm = 44.2Nm_—76.2Nm = 190Nm_—.370. Nm
All bolts and nuts are to be fastened using a torque wrench, and acid
resistant bolts are to be coated with "Molybdenum disculphide" (Molycote)
on threads and under bolt heads / nuts prior to assembling.
All assembling has to be done in reversed way according to the dismantling
sequence.
PAY SPECIAL ATTENTION TO THE FOLLOWING POINTS:
Check direction of back stop unit.
(Counter clockwise, seen from threaded end of the shaft.)
Ball mounting slot pointing downwards against the back stop unit when
mounting ball bearing,
Assemble mechanical seal according to instruction 290-36-4E.
Clean seal faces with clean rags wetted with denaturated alcohol
Assembling of lip seal arrangement
Use assembling cylinder (A13315) to assemble ceramic sleeve. Do not remove
the cylinder before all FRAMO shaft seals has been installed. When assembling
lip seals be sure that support ring is tightened up until metallic contact. This to
avoid screws to loosen. The spring marked with red colour on the double lip seal
shall be mounted against mechanical seal
yuvaveinstrke/1000-109cH
SERVICE MANUAL 1000-1014
FRAMO CARGO PUMP Date: 31Aug95
SD 125-5/SD 150-5 Sign.: GFae
Page: 35
THE CERAMIC SLEEVE MUST BE HANDLED VERY
CAREFULLY AS IT IS VERY BRITTLE AND MAY CRACK IF DROPPED.
When assembling impeller hub, be careful not to damage o-rings
Be sure to lock the impeller hub bolt properly. Check the shaft alignment
according to fig. 28.
The retainer ring has to be fitted in the fight position at the end of the ceramic
sleeve, by using some grease.
710.04
0.05
Retainer Ring
Fig. 28
When mounting new wear rings be sure that support ring is tighten until metallic
contact
Ifa new hydaulic motor is installed, check that both drain connections are plugged
with steel plugs.
Check that the shaft seal is removed
Fig. 29
Check position of hydraulic motor and motor flange according to assembly
drawing
Check misalignment, and runout according to assembly drawing.
Uutvaveinstnks/1000-101AR SERVICE MANUAL 4000-101-4
FRAMO CARGO PUMP Date: 31Aug95
FRAMO SD 125-5/SD 150-5 Sign.: GFae
: Page: 36
3.8 Pressure test of pump
The cofferdam must be pressure tested by blinding off the exhaust trap vent
pipe. Connect the air/nitrogen connection on top cover plate and increase
pressure to max. 3 bar,
Flush all parts, connections, seals etc., which have been dismantled, with soapy
water to be sure of no static leakage.
Remember to remove blind plug from exhaust trap vent connection and
assemble the pipe afterwards.Also remove the plug in the relief valve.
Air pressure
oF nitrogene
Fig. 30
\uvaveinstruks!1000-101E5 SERVICE MANUAL 41000-1014
FRAMO CARGO PUMP Date: 31Aug95
aa SD 128-5/SD 150-5 Sign.: Gee
venue Page: 37
4.0 SPARE PARTS
\votvavainstroks/1000-101f SERVICE MANUAL. 1000-101-4
FRAMO FRAMO CARGO PUMP. Date: 31Aug95
SD 125-5S/SD 150-5 Sign.: GF
' Page: 38,
5.0 SERVICE INTERVALS
Shaft seals
The condition of the shaft seal system is to be controlled by purging the cofferdam.
Purging intervals
LOADING VOYAGE DISCHARGE
1, Immediately before |1. 1-2 days after loading. |1. Immediately before
loading discharging
2. Ifno leakage at step 1, |2. Immediately after
purge every fortnight. discharging.
3. Ifleakage is detected
at step 1, or at a later
stage during the
voyage, purge this
pump every day.
4. If pumps are used for
cargo circulation during
the voyage, the
cofferdam must be
purged before start and
after stop.
For further information see FRAMO instruction no. 1000-010.
‘Vutvavdlnstruks!1000-101SERVICE MANUAL
FRAMO
6.0 TROUBLE SHOOTING
FRAMO CARGO PUMP
SD 125-5/SD 150-5
1000-101-4
Date: 31Aug95
Sign.: GFae
Page: 39
Symptom:
Possible reason:
The cargo pump will not start,
the hydraulic control valve is
checked and found in good
order, and pressure gauge on
hydraulic control valve
indicates system pressure.
Pump impeller stuck
Empty the tank by means of a
portable pump. After tank
leaning and gas freeing
dismantle the impeller for
inspection
The pump is vibrating heavily
during discharge, and it is
NOT due to variations caused
by the hydraulic control valve.
Rotating parts out of
balance. (Impurities
stuck in the impeller).
Worn out hydr. motor
Loose support ring at
pumphead.
Empty the tank and check
impeller.
Change hydr. motor
Contact FM Services.
Tighten up all bolts for
support ring,
‘The capacity is too low.
A rag (cloth) in the
impeller.
Worn out wear-rings,
Faulty hydraulic control
valve,
Leaking pilot tine
Dismantle the pump impeller for
inspection,
Dismantle the pump, check,
eventually renew the wear rings.
a)Test run pump with another
hydraulic control valve with same
max. flow setting, see routine
1000-109-4.
bjSee trouble shooting
concerning hydraulic contral
valve, see instruction
1375-027-4.
Cargo-stripping insufficient.
‘Wrong airinitrogen
pressure
Check stripping procedure
Cargo in cofferdam.
Damaged / worn out
cargo lip seal,
Leaking pipe stack
and/or pumphead
seals,
Cracks in pipes.
Change cargo lip seal
Check o-ring grooves and
replace damaged seals by
genuine seals.
Contact FM Services AS.
Hydraulic oil in
cotferdam,
Damaged / worn out,
mech. oil seal,
Change mech. oil seal
Contact FM Services
Noise, heat generation when
loading through pump,
Vacuum in LP-pipe detected
by opening venting plug on
the non-return valve
(ref. fig. 2)
Damaged / worn out
backstop unit.
‘Change backstop unit
Contact FM Services,
\Votvaveinstrks/1000-101SERVICE MANUAL,
FRAMO CARGO PUMP
FRAMO ‘SD 125-5/SD 150-5
7.0 SPECIAL TOOLS
Tool List: 32-387-4
‘vutvavelinstruks/1000-101,
1000-101-4
Date: 31Aug95
Sign.: GFee
Page: 40