PROJECT NAME & LOGOS

CHECK LIST FOR: Form No:


MV power cable and Accessories Installation Rev. No : 0
Page : 1 of 2
SUBCONTRACTOR X CONTRACTOR
SECTION OF WORK: Electrical LOCATION:
LEVEL: WIR No.:
STAGE ITEM Checked by Checked by Date

S/C CONT CONS.

SETTING Check the Approved shop drawings approval.


OUT
Check Level & depth of the excavation
Check for Services Clearances, and the same
approved by company site team (civil)
MEP/CIVIL
Check for Backfilling / Compaction for Outdoor
cables
1. Check all MV power cables are as per approved
material submittal.
2. Check all cables are clearly labelled at both end
with approved labels and at regular intervals

3. Check that approved material of crimping lugs


and accessories are used on all power cable
MV power cable Installation

4. Check that all MV power cables installations


shall be done as per approved shop drawings and
manufacturer's instruction.
5. Check that each MV power cable reaches its
correct destination, enough length is provided for
dressing, temporary marking is place for easy
identification and both ends are sealed with heat
shrink end caps to prevent the ingress of water.
6. Check that MV power cables are laid in an
orderly manner to avoid crossing, correct spacing
is observed, and the minimum bending radius of
12 times the diameter of the MV power cable is
kept.
7. Check that no cable joint is installed without the
agreement and approval of authority and
approved termination kit is used.

For S/C QA/QC: Date: FOR CONTRACTOR Date: For CONS. Rep.: Date:
QA/QC:

Name: Sign: Name: Sign: Name: Sign:

1. Adequate lights are provided in the Work


Area prior to installation.
PROJECT NAME & LOGOS

CHECK LIST FOR: Form No:


MV power cable and Accessories Installation Rev. No : 0
Page : 2 of 2
SUBCONTRACTOR X CONTRACTOR
SECTION OF WORK: Electrical LOCATION:
LEVEL: WIR No.:
STAGE ITEM Checked by Checked by Date

S/C CONT CONS.

2. All terminations cables have been checked


for any damage or improper connections.
3. Ensure that barricade & warning boards on
the area are available prior to installation.
4. Ensure no obstacles in the area. Maintain
proper housekeeping.
5. Ensure all personnel performing the
installation shall have proper training &
SAFETY PRECAUTIONS

experience.
6. Ensure all electrical tools to be used in the
installation are not damage.
7. Adequate lights are provided in the Work
Area prior to installation.
8. Ensure all Personal performing the
installation shall have necessary personal
protective equipment.
9. Check that LOTO procedure implemented
and followed.
10. Check that PTW applied and obtained prior
to start work.
11. Ensure that Necessary PPE to be worn while
working in energized circuits

For S/C QA/QC: Date: FOR CONTRACTOR Date: For CONS. Rep.: Date:
QA/QC:

Name: Sign: Name: Sign: Name: Sign: