Project Name: LEGOLAND DUBAI - THEME PARK

LOAD SUMMARY (AREA 6 - ADVENTURE)


SP/ Fault
Circuit/ Feeder Rating - AMPS
S.
DB No. TP F/S MCB / Duty
No.
ISO ACB MCCB kA

1 MDB-6-601-MSB TP 2500 50

MDB connected to : DEWA Transformers Total connected loa

Contractor :
Type of meter (Rating of incomer): (1) Upto 60 A
(1 Phase)
LOAD DISTRIBUTION SCHEDULE
K
Owner: MERAAS ESTATES (LLC)
Consultants: EXP/KLING Consultants

PVC / XLPE Cable Size ECC Connected Load kW


2/3/4C Size-1C Y - Ph B - PH TOTAL
SWA / PVC 2/4 x 1C R - Ph DF
mm2 mm2 mm2 kW kW kW kW
390.89 398.34 391.24 1180.46

BY DEWA 390.89 398.34 391.24 1180.46 0.80

Total connected load per phase 390.89 398.34 391.24 1180.46

Total Connected Load :

Total of MDB Maximum Demands:

Tel : Fax :
(2) Upto 100 A (3) 125 - 160 A
(3 Phase)
Plot No. 513 - 0116 SAIH SHUAIB 1

Proposed Type & No of


Max. kWh meters
Demand 1 - Ph 3 - Ph 3 - Ph
LV/HV Remarks
kW (1) (2) (3) CT (4)
944.37

944.37 1 2400/5 A CT METER

944.37 1 Total

1180.46 kW

944.37 kW

(4) LV CT….../…... 5 A / HV CT……/…...A


S/N Main Distirbution board description PTCL PMDL ITCL IMD
1 MDB-6-601-MSB 1180.5 944.36 2132.32 1705.85
S/N Distirbution board description PTCL PMDL ITCL IMD
1 SMDB-6-601 171.1 136.84 308.98 247.18
2 SMDB-6-101-MDPA 212.99 170.392 384.74 307.79
3 SMDB-6-101-MDPB 194.5 155.6 351.34 281.07
4 SMDB-6-405-MDP 99.35 79.48 179.46 143.57
5 ESMDB-6-601-EMDPA 32.08 25.66 57.95 46.36
6 SMDB-0-601-1MDPA 319.98 255.98 578.00 462.40
7 SMDB-0-601-1MDPB 147.5 118 266.44 213.15
1177.5 941.96 1701.5173
3 3
1180.45 944.96
S/N Distirbution board description PTCL PMDL ITCL IMD
1 DB-6-601-SS 1.3 1.3 2.35 2.35
2 DB-6-601-A 41.48 41.48 74.93 74.93
3 6-601-CBS 0.23 0.23 0.42 0.42
4 6-601-LCP 32.7 32.7 59.07 59.07
5 DB-6-102-A 20 20 36.13 36.13
6 6-102-LCP 1.3 1.3 2.35 2.35
7 DB-6-402-A 25.58 25.58 46.21 46.21
8 6-402-CBS 0.47 0.47 0.85 0.85
9 6-402-LCP 3.5 3.5 6.32 6.32
10 DB-6-404-A 39.29 39.29 70.97 70.97
11 6-404-LCP 3.1 3.1 5.60 5.60
12 DB-6-406-A 34.99 34.99 63.20 63.20
13 6-406-LCP 12.2 12.2 22.04 22.04
14 DB-6-501-A 5.44 5.44 9.83 9.83
15 6-501-CBS 0.34 0.34 0.61 0.61
16 6-101-CBS 0.74 0.74 1.34 1.34
17 DB-6-101-A 26.48 26.48 47.83 47.83
18 DB-6-101-B 46.45 46.45 83.91 83.91
19 DB-6-101-C 29.25 29.25 52.84 52.84
20 DB-6-101-D 26.92 26.92 48.63 48.63
21 DB-6-101-E 24.2 24.2 43.71 43.71
22 6-101-LCP 31.95 31.95 57.71 57.71
23 6-405-CBS 0.77 0.77 1.39 1.39
24 DB-6-405-A 28.98 28.98 52.35 52.35
25 DB-6-405-B 12 12 21.68 21.68
26 DB-6-405-C 18 18 32.51 32.51
27 DB-6-405-LT 20.9 20.9 37.75 37.75
28 6-405-LCP 17.2 17.2 31.07 31.07
29 DB-6-401-A 34.79 34.79 62.84 62.84
30 DB-6-401-B 24.25 24.25 43.80 43.80
31 6-401-C 5 5 9.03 9.03
32 6-401-CBS 8.2 8.2 14.81 14.81
33 6-401-LCP 12.8 12.8 23.12 23.12
34 EDB-6-101-EA 15.19 15.19 27.44 27.44
35 EDB-6-401-EA 6.69 6.69 12.08 12.08
36 EDB-6-401-EB 5 5 9.03 9.03
37 EDB-6-405-EA 4.6 4.6 8.31 8.31
38 EDB-6-501-EA 0.6 0.6 1.083815 1.083815
S/N Distirbution board description PTCL PMDL ITCL IMD
1 DB-6-601-SS 1.3 1.3 2.35 2.35
2 DB-6-601-A 41.48 41.48 74.93 74.93
3 DB-6-102-A 20 20 36.13 36.13
4 DB-6-402-A 25.58 25.58 46.21 46.21
5 DB-6-404-A 39.29 39.29 70.97 70.97
6 DB-6-406-A 34.99 34.99 63.20 63.20
7 DB-6-501-A 5.44 5.44 9.83 9.83
8 DB-6-101-A 26.48 26.48 47.83 47.83
9 DB-6-101-B 46.45 46.45 83.91 83.91
10 DB-6-101-C 29.25 29.25 52.84 52.84
11 DB-6-101-D 26.92 26.92 48.63 48.63
12 DB-6-101-E 24.2 24.2 43.71 43.71
13 DB-6-405-A 28.98 28.98 52.35 52.35
14 DB-6-405-B 12 12 21.68 21.68
15 DB-6-405-C 18 18 32.51 32.51
16 DB-6-405-LT 20.9 20.9 37.75 37.75
17 DB-6-401-A 34.79 34.79 62.84 62.84
18 DB-6-401-B 24.25 24.25 43.80 43.80
19 EDB-6-101-EA 15.19 15.19 27.44 27.44
20 EDB-6-401-EA 6.69 6.69 12.08 12.08
21 EDB-6-401-EB 5 5 9.03 9.03
22 EDB-6-405-EA 4.6 4.6 8.31 8.31
23 EDB-6-501-EA 0.6 0.6 1.08 1.08
Emergency Distirbution board
S/N description PTCL PMDL ITCL IMD
1 EDB-6-101-EA 15.19 15.19 27.44 27.44
2 EDB-6-401-EA 6.69 6.69 12.08 12.08
3 EDB-6-401-EB 5 5.00 9.03 9.03
4 EDB-6-405-EA 4.6 4.60 8.31 8.31
5 EDB-6-501-EA 0.6 0.60 1.08 1.08
S/N CBS description PTCL PMDL ITCL
1 6-601-CBS 0.23 0.23 0.42
2 6-402-CBS 0.47 0.47 0.85
3 6-501-CBS 0.34 0.34 0.61
4 6-101-CBS 0.74 0.74 1.34
5 6-405-CBS 0.77 0.77 1.39
6 6-401-CBS 8.2 8.2 14.81
IMD S/N LCP description PTCL PMDL ITCL IMD
0.42 1 6-601-LCP 32.7 29.43 59.07 53.16
0.85 2 6-102-LCP 1.3 1.17 2.35 2.11
0.61 3 6-402-LCP 3.5 3.15 6.32 5.69
1.34 4 6-404-LCP 3.1 2.79 5.60 5.04
1.39 5 6-406-LCP 12.2 10.98 22.04 19.83
14.81 6 6-101-LCP 31.95 28.76 57.71 51.94
7 6-405-LCP 17.2 15.48 31.07 27.96
8 6-401-LCP 12.8 11.52 23.12 20.81
Project Name: LEGOLAND DUBAI - THEME PARK
MSB Ref : MDB-6-601-MSB
Fed From: SUBSTATION TRANSFORMER (TF-6-601-1)

SP/ Fault
Circuit/ Feeder Rating - AMPS
S.
DB No. TP F/S MCB / Duty
No.
ISO ACB MCCB kA
INCOMER: 4P 2500 50
MOB:GENERATOR 4P 2500 50
OUTGOINGS:
1 SMDB-6-601 TP 400 35
2 SMDB-6-101-MDPA TP 630 35
3 SMDB-6-101-MDPB TP 630 35
4 SMDB-6-405-MDP TP 400 35
5 ESMDB-6-601-EMDPA TP 80 35
6 SMDB-0-601-1MDPA TP 630 35
7 SMDB-0-601-1MDPB TP 400 35
8 DB-6-601-SS SP 40 35
9 CAPACITOR BANK TP 800 35

MDB connected to : 1500 KVA Transformer Total connect

Max demand (3 PH) : 1180.46 kW

Contractor :
Type of meter (Rating of incomer): (1) Upto 60 A
(1 Phase)
LOAD DISTRIBUTION SCHEDULE

Owner: MERAAS ESTATES (LLC)


Consultants: EXP/KLING Consultants

PVC / XLPE Cable Size ECC Connected Load kW


TOTAL
Size-1C
SWA / PVC 2/4 x 1C 2/3/4C R - Ph Y - Ph B - PH

mm2 mm2 mm2 kW kW kW kW


BY DEWA 390.89 398.34 391.24 1180.46
BY DEWA

XLPE/SWA/PVC 4c-300 1c-150 54.89 59.42 56.74 171.05


XLPE/SWA/PVC 2x4c-240 2x1c-120 70.03 73.81 69.15 212.99
XLPE/SWA/PVC 2x4c-240 2x1c-120 64.82 64.84 64.85 194.50
XLPE/SWA/PVC 3x4c-185 3x1c-95 31.23 33.17 34.95 99.35
FIRE RATED 4c-95 1c-50 11.56 10.97 9.56 32.08
XLPE/SWA/PVC 3x4c-240 3x1c-120 106.19 106.97 106.82 319.98
XLPE/SWA/PVC 2x4c-185 2x1c-95 49.17 49.17 49.17 147.50
XLPE/SWA/PVC 3C,10 3.00 3.00
XLPE/SWA/PVC 2x4cx300 2x4cx150 -- -- -- --

Total connected load per phase 390.89 398.34 391.24 1180.46

Total connected load (3 PH)

Tel : Fax :
(2) Upto 100 A (3) 125 - 160 A
(3 Phase)
Plot No. 513 - 0116 SAIH SHUAIB 1
MSB Location: BLDG 601 - Switchboard Room

Proposed Type & No of


kWh meters
1 - Ph 3 - Ph 3 - Ph LV/HV Remarks

(1) (2) (3) CT (4)


1 2400/5 A

6-601-ATS-EMDPA

SUB STATION-DB
350 kVAR

1 Total

1180.46 kW

(4) LV CT….../…... 5 A / HV CT……/…...A


LOAD
Project Name: LEGOLAND DUBAI - THEME PARK
MSB Ref : SMDB-6-601 Own
Fed From: MDB-6-601-MSB Cons

SP/ Fault
Circuit/ Feeder Rating - AMPS PVC / XLPE
S.
DB No. TP F/S MCB / Duty SWA / PVC
No.
ISO ACB MCCB kA
1 INCOMER: TP 400 N/A XLPE/SWA/PVC

OUTGOINGS:
1 DB-6-601-A TP 100 25 XLPE/SWA/PVC
2 DB-6-102-A TP 63 25 XLPE/SWA/PVC
3 DB-6-402-A TP 63 25 XLPE/SWA/PVC
4 DB-6-404-A TP 80 25 XLPE/SWA/PVC
5 DB-6-406-A TP 80 25 XLPE/SWA/PVC
6 DB-6-501-A TP 40 25 XLPE/SWA/PVC

MDB connected to : 1500 KVA Transformer Total connected load per pha

Max demand (3 PH) : 136.84 kW at 0.80 Diversity

Contractor :
Type of meter (Rating of incomer): (1) Upto 60 A
(1 Phase)
LOAD DISTRIBUTION SCHEDULE
Plot No. 513 - 0116 SAIH SHUA
Owner: MERAAS ESTATES (LLC)
Consultants: EXP/KLING Consultants

Proposed Type & No of


Cable Size ECC Connected Load kW
TOTAL kWh meters
2/4 x 1C 2/3/4C Size-1C R - Ph Y - Ph B - PH 1 - Ph 3 - Ph 3 - Ph
mm2 mm2 mm2 kW kW kW kW (1) (2) (3)
4c-300 1c-150 54.89 59.42 56.74 171.05

4c-35 1c-16 12.73 14.40 14.70 41.83


4c-70 1c-35 8.03 7.90 8.06 23.99
4c-70 1c-35 8.49 9.19 8.20 25.88
4c-70 1c-35 11.86 13.92 13.13 38.92
4c-35 1c-16 11.94 12.21 10.85 34.99
4c-35 1c-16 1.84 1.80 1.80 5.44

l connected load per phase 54.89 59.42 56.74 171.05

Total connected load (3 PH) 171.05 kW

Tel : Fax :
(2) Upto 100 A (3) 125 - 160 A (4) LV CT….../…... 5 A
(3 Phase)
513 - 0116 SAIH SHUAIB 1

No of
meters
LV/HV Remarks
CT (4)

Total

/ HV CT……/…...A
LOAD DISTRIBU
Project Name: LEGOLAND DUBAI - THEME PARK
Panel Ref : DB-6-601-A Owner:
Fed From: SMDB-6-601 Consultants: EXP

MCB CCT ECC


RATING OF

RATING OF
INCOMER

RTG. Wire Wire


ELCB

CIR.
SL NO.
NO. ROOM / AREA
(A) (mm2) (mm2)

1 R1 10 2.5 2.5 EXTERIOR


40A , 4P
100MA 2 Y1 SPACE
ELCB- 1
3 B1 10 2.5 2.5 L.V ROOM,GEN.ROOM & TELECOM ROOM

4 R2
40A , 4P
63A
300MA 5 Y2 16.0 16.0 6-601-LCP
TP
ELCB- 2
6 B2

7 R3 20 4.0 4.0 6-601-CBS


40A , 4P
100MA 8 Y3 20 4.0 4.0 TELECOM ROOM
ELCB-3
100A TPN ISOLATOR

9 B3 20 4.0 4.0 TELECOM ROOM

10 R4 20 4.0 4.0 L.V ROOM,GEN.ROOM & TELECOM ROOM


40A , 4P
30MA 11 Y4 20 4.0 4.0 D.D.C POWER. LV ROOM
ELCB- 4
12 B4 20 4.0 4.0 FM-200 POWER LV ROOM

13 R5 20 6.0 6.0 TELE. ROOM ROOM- ( A/C-2 )


40A , 4P
100MA 14 Y5 32 4.0 4.0 ACCESS PANEL
ELCB- 5
15 B5 20 SPARE

16 R6 20 4.0 4.0 FM-200 POWER TELE. ROOM


40A , 4P
30MA 17 Y6 32 6.0 6.0 L.V ROOM- ( A/C-1 )
ELCB- 6
18 B6 SPACE

R7
32A
Y7 10.0 10.0 SPD
TP
B7

CABLE SIZE : 4C,35mm² XLPE/SWA/PVC CABLE +1x1C,16mm2 PVC ECC.


LOAD DISTRIBUTION SCHEDULE
Plot No.
Owner: Panel Location: BLDG-ADVENTURE - 6-601 (SUBSTATION-LV R
Consultants: EXP

CONNECTED LOADS / POINTS LOAD (Watts)


Watt / Unit

PUMP
SPUR.
LTG 13A S.O.
OUTLET
15A S.O. FCU S/P AC EX. FAN R Y

4 100 400

7 100

9300

LIGHTING CONTROL PANEL 32700 11800

CENTRAL BATTERY SYSTEM 233 233

1 200 200

1 200

3 200 600

1 200 200

1 200

1 2000 2000

1 200 200

1 200 200

1 2000 2000

NO LOAD

TOTAL 12733 14400

GRAND TOTAL 41.83


NTURE - 6-601 (SUBSTATION-LV ROOM)

OAD (Watts)
Remarks
B

PHOTO CELL CONTROL

700

11600

200

200

UVR+TIMER+CONT.

1000

UVR+TIMER+CONT.

1000

SURGE PROTECTION DEVICE

14700 41833

41.83 kW
Project Name: LEGOLAND DUBAI - THEME PARK
MSB Ref : MDB-6-601-MSB
Fed From: SUBSTATION TRANSFORMER (TF-6-601-1)

SP/ Fault
Circuit/ Feeder Rating - AMPS
S.
DB No. TP F/S MCB / Duty
No.
ISO ACB MCCB kA
INCOMER: 4P 2500 50
MOB:GENERATOR 4P 2500 50
OUTGOINGS:
1 LPA Warehouse TP 100 35
2 LPB Warehouse TP 100 35
3 LPC Office TP 100 35
4 LPD Office TP 100 35
5 EPA Warehouse TP 600 35
6 Chiller 1 TP 275 35
7 Chiller 2 TP 275 35
8 Chiller 3 TP 275 35
9 DPA Warehouse TP 300 35

MDB connected to : 1500 KVA Transformer Total connect

Max demand (3 PH) : 965.80 kW

Contractor :
Type of meter (Rating of incomer): (1) Upto 60 A
(1 Phase)
LOAD DISTRIBUTION SCHEDULE

Owner: MERAAS ESTATES (LLC)


Consultants: EXP/KLING Consultants

PVC / XLPE Cable Size ECC Connected Load kW


TOTAL
Size-1C
SWA / PVC 2/4 x 1C 2/3/4C R - Ph Y - Ph B - PH

mm2 mm2 mm2 kW kW kW kW


BY DEWA 321.18 323.35 321.27 965.80
BY DEWA

XLPE/SWA/PVC 21.00 20.90 20.85 62.75


XLPE/SWA/PVC 15.48 16.50 15.46 47.45
XLPE/SWA/PVC 13.85 13.45 13.35 40.65
XLPE/SWA/PVC 14.63 15.78 14.88 45.30
FIRE RATED 78.84 79.34 79.34 237.52
XLPE/SWA/PVC 46.00 46.00 46.00 138.00
XLPE/SWA/PVC 46.00 46.00 46.00 138.00
XLPE/SWA/PVC 46.00 46.00 46.00 138.00
XLPE/SWA/PVC 39.38 39.38 39.38 118.14

Total connected load per phase 321.18 323.35 321.27 965.80

Total connected load (3 PH)

Tel : Fax :
(2) Upto 100 A (3) 125 - 160 A
(3 Phase)
Plot No. 513 - 0116 SAIH SHUAIB 1
MSB Location: BLDG 601 - Switchboard Room

Proposed Type & No of


kWh meters
1 - Ph 3 - Ph 3 - Ph LV/HV Remarks

(1) (2) (3) CT (4)


1 2400/5 A

6-601-ATS-EMDPA

SUB STATION-DB
350 kVAR

1 Total

965.80 kW

(4) LV CT….../…... 5 A / HV CT……/…...A


Project Name:
MSB Ref :
Fed From:

SP/ Fault
Circuit/ Feeder Rating - AMPS PVC / XLPE
S.
DB No. TP F/S MCB / Duty SWA / PVC
No.
ISO ACB MCCB kA
1 INCOMER: TP 400 XLPE/SWA/PVC

OUTGOINGS:
1 Chiller 1 TP 25 XLPE/SWA/PVC
2 Chiller 2 TP 25 XLPE/SWA/PVC
3 Chiller 3 TP 25 XLPE/SWA/PVC
4 CHWP 1 TP 25 XLPE/SWA/PVC
5 CHWP 2 TP XLPE/SWA/PVC
6 CHWP 3 TP XLPE/SWA/PVC
7 OBAHU1 TP XLPE/SWA/PVC
8 OBAHU2 TP XLPE/SWA/PVC
9 WHAHU1 TP XLPE/SWA/PVC
10 WHAHU2 TP XLPE/SWA/PVC
11 WHAHU3 TP XLPE/SWA/PVC
12 WHAHU4 TP XLPE/SWA/PVC
13
14
15

MDB connected to : 1500 KVA Transformer Total connected load per pha

Max demand (3 PH) : 537.34 kW at 0.80 Diversity

Contractor :
Type of meter (Rating of incomer): (1) Upto 60 A
(1 Phase)
MCC LOAD SCHEDULE
Plot No. 513 - 0116 SAIH SHUA
Owner:
Consultants:

Proposed Type & No of


Cable Size ECC Connected Load kW
TOTAL kWh meters
2/4 x 1C 2/3/4C Size-1C R - Ph Y - Ph B - PH 1 - Ph 3 - Ph 3 - Ph
mm2 mm2 mm2 kW kW kW kW (1) (2) (3)
4c-300 1c-150 223.89 223.89 223.89 671.67

4c-70 1c-35 68.00 68.00 68.00 204.00


4c-35 1c-25 68.00 68.00 68.00 204.00
4c-35 1c-25 68.00 68.00 68.00 204.00
4c-35 1c-25 3.73 3.73 3.73 11.19
3.73 3.73 3.73 11.19
3.73 3.73 3.73 11.19
1.87 1.87 1.87 5.61
1.87 1.87 1.87 5.61
1.24 1.24 1.24 3.72
1.24 1.24 1.24 3.72
1.24 1.24 1.24 3.72
1.24 1.24 1.24 3.72

l connected load per phase 223.89 223.89 223.89 671.67

Total connected load (3 PH) 671.67 kW

Tel : Fax :
(2) Upto 100 A (3) 125 - 160 A (4) LV CT….../…... 5 A
(3 Phase)

T.C.L. 671.67 KW
Diversity Factor (DF) = 0.9 (90% used) 0.8
Max Demand = 537.336 KW

Calculation of Main Isolator and Main Feeder Cable of LPA Warehouse


Current = P / Sqrt (3) x Cos Ø x V
= 537.336 x 1.732 x 0.8 x 400
= 969.5006 Amps
Plus 25% as safety factor
= 969.5006 x 1.25
= 1211.876 Amps

Standard Main Isolator Size = 400A, 4P


Main Feeder Cable = 1 x 4C x 300mm^2, XLPE/SWA/P
1 x 1C x 150mm^2 PVC/PVC, Y/G
HP KW
513 - 0116 SAIH SHUAIB 1 Chiller 1 204 68.00
Chiller 2 204 68.00
Chiller 3 204 68.00
CHWP 1 15 11.19 3.73
CHWP 2 15 11.19 3.73
No of
meters
CHWP 3 15 11.19 3.73
LV/HV Remarks OBAHU1 7.5 5.595 1.87
CT (4) OBAHU2 7.5 5.595 1.87
WHAHU1 5 3.73 1.24
WHAHU2 5 3.73 1.24
WHAHU3 5 3.73 1.24
WHAHU4 5 3.73 1.24

Total

/ HV CT……/…...A

3) x Cos Ø x V
x 1.732 x 0.8 x 400
300mm^2, XLPE/SWA/PVC, Cu
150mm^2 PVC/PVC, Y/G Earth Cable
LOAD
Project Name: LEGOLAND DUBAI - THEME PARK
MSB Ref : SMDB-6-601 Own
Fed From: MDB-6-601-MSB Cons

SP/ Fault
Circuit/ Feeder Rating - AMPS PVC / XLPE
S.
DB No. TP F/S MCB / Duty SWA / PVC
No.
ISO ACB MCCB kA
1 INCOMER: TP 400 N/A XLPE/SWA/PVC

OUTGOINGS:
1 TP 100 25 XLPE/SWA/PVC
2 TP 63 25 XLPE/SWA/PVC
3 TP 63 25 XLPE/SWA/PVC
4 TP 80 25 XLPE/SWA/PVC
5 TP 80 25 XLPE/SWA/PVC
6 TP 40 25 XLPE/SWA/PVC

MDB connected to : 1500 KVA Transformer Total connected load per pha

Max demand (3 PH) : 0.00 kW at 0.80 Diversity

Contractor :
Type of meter (Rating of incomer): (1) Upto 60 A
(1 Phase)
LOAD DISTRIBUTION SCHEDULE
Plot No. 513 - 0116 SAIH SHUA
Owner: MERAAS ESTATES (LLC)
Consultants: EXP/KLING Consultants

Proposed Type & No of


Cable Size ECC Connected Load kW
TOTAL kWh meters
2/4 x 1C 2/3/4C Size-1C R - Ph Y - Ph B - PH 1 - Ph 3 - Ph 3 - Ph
mm2 mm2 mm2 kW kW kW kW (1) (2) (3)
4c-300 1c-150 0.00 0.00 0.00 0.00

4c-35 1c-16 0.00


4c-70 1c-35 0.00
4c-70 1c-35 0.00
4c-70 1c-35 0.00
4c-35 1c-16 0.00
4c-35 1c-16 0.00

l connected load per phase 0.00 0.00 0.00 0.00

Total connected load (3 PH) .00 kW

Tel : Fax :
(2) Upto 100 A (3) 125 - 160 A (4) LV CT….../…... 5 A
(3 Phase)
513 - 0116 SAIH SHUAIB 1

No of
meters
LV/HV Remarks
CT (4)

Total

/ HV CT……/…...A
LIGHTING CONTROL PANEL SCHE
Project name: DUBAI PETROLEUM JAOSB
Panel Ref : 6WHLPA1 Owner:
Fed From: SMDB-6-101-MDP Consultants: EXP

MCB CCT ECC


RATING OF
RATING OF
INCOMER

RTG. Wire Wire


ELCB

SL NO. CIR. NO. AREA / LOAD SERVED


(A) (mm2) (mm2)

1 R1 20 4 2.5 Warehouse - Storage Rack "C" Bin Shelves

2 Y1 20 4 2.5 Warehouse - Storage Rack "C" Bin Shelves

3 B1 20 4 2.5 Warehouse - Storage Rack "C" Bin Shelves

4 R2 20 4 2.5 Warehouse - Storage Rack "C" Bin Shelves


40A 4P
100MA 5 Y2 20 4 2.5 Warehouse - Storage Rack "C" Bin Shelves
ELCB-1
6 B2 20 4 2.5 Warehouse - Storage Rack "C" Bin Shelves

7 R3 20 4 2.5 Warehouse - Storage Rack "C" Bin Shelves

8 Y3 20 4 2.5 Warehouse - Storage Rack "C" Bin Shelves

9 B3 20 4 2.5 Warehouse - Storage Rack "C" Bin Shelves

10 R4 20 4 2.5 Warehouse - Storage Rack "C" Bin Shelves

11 Y4 20 4 2.5 Warehouse - Storage Rack "C" Bin Shelves

12 B4 20 4 2.5 Warehouse - Storage Rack "C" Bin Shelves

13 R5 20 4 2.5 Warehouse - Cool Storage Room Bin Shelves


40A 4P
100MA 14 Y5 20 4 2.5 Warehouse - Cool Storage Room Bin Shelves
ELCB-2
15 B5 20 4 2.5 Warehouse - Cool Storage Room Bin Shelves

16 R6 20 4 2.5 Warehouse - Cool Storage Room Bin Shelves


63A TPN ISOLATOR

17 Y6 20 4 2.5 Warehouse - Cool Storage Room Bin Shelves

18 B6 20 4 2.5 Warehouse - Cool Storage Room Bin Shelves

19 R4 20 10 2.5 Lighting Outdoor Street Lights

20 Y4 20 4 2.5 Lighting Elect Rm and Chiller Yard

21 B4 20 10 2.5 Lighting Outdoor Street Lights

22 R5 20 4 2.5 Receptacle Warehouse


40A 4P
100MA 23 Y5 20 4 2.5 Receptacle Warehouse Cool Storage Room
ELCB-2
24 B5 20 4 2.5 Receptacle Maintenance

25 R6 20 10 2.5 Lighting Outdoor Street Lights

26 Y6 20 4 2.5 Lighting Outdoor Street Lights

27 B6 20 2.5 2.5 Extract Fans PV 2 and 7


28 R4 20 4 2.5 Receptacle Maintenance Corridor

29 Y4 20 4 2.5 Receptacle Safety Office

30 B4 20 4 2.5 Receptacle Telephone Room

31 R5 20 4 2.5 Spare
40A 4P
100MA 32 Y5 20 4 2.5 Spare
ELCB-2
33 B5 20 2.5 2.5 Lightng Warehouse Office

34 R6 20 4 2.5 Receptacle EWC

35 Y6 20 2.5 2.5 Lightng Warehouse Office

36 B6 20 2.5 2.5 Lightng Warehouse Office

CABLE SIZE : 1X4C-25mm2 XLPE/SWA/CU/PVC CABLE + 1X1C-16mm2 PVC ECC Y/G


G CONTROL PANEL SCHEDULE
Plot No.
Owner: Panel Location: LINK BLDG ELECTRICAL ROOM
ultants: EXP Panel Type:

CONNECTED
LOADS LOAD (Watts)
/ POINTS WATT/
ZONE TYPE
UNIT
Remarks
LTG R Y B

F 24 100 2400

F 24 100 2400

F 22 100 2200

F 20 100 2000

F 19 100 1900

F 19 100 1900

F 19 100 1900

F 19 100 1900

F 19 100 1900

F 18 100 1800

F 18 100 1800

F 18 100 1800

F 24 100 2400

F 27 100 2700

F 24 100 2400

F 24 100 2400

F 27 100 2700

F 24 100 2400

31 100 3100

F 17 100 1700

21 100 2100

10 125 1250

8 125 1000

10 125 1250

21 100 2100

11 100 1100

4 125 500
10 125 1250

12 125 1500

F 0 100 0

F 1 150 150

F 0 100 0

F 20 100 2000

F 2 125 250

F 22 100 2200

F 24 100 2400

VC ECC Y/G 21000 20900 20850 62750


TOTAL 62.75 kW

T.C.L. 62.75 KW
Diversity Factor (DF) = 0.9 (90% used) 0.9
Max Demand = 56.475 KW

Calculation of Main Isolator and Main Feeder Cable of LPA Warehouse


Current = P / Sqrt (3) x Cos Ø x V
= 56.475 x 1.732 x 0.8 x 400
= 101.8963 Amps
Plus 25% as safety factor
= 101.8963 x 1.25
= 127.3704 Amps

Standard Main Isolator Size = 160A, 4P


Main Feeder Cable = 1 x 4C x 70mm^2, XLPE/SWA/PVC, Cu
1 x 1C x 35mm^2 PVC/PVC, Y/G Earth Cable
LIGHTING CONTROL PANEL SCH
Project name: DUBAI PETROLEUM JAOSB
Panel Ref : 6WHLPB Owner:
Fed From: SMDB-6-101-MDP Consultants: EXP

MCB CCT ECC


RATING OF
RATING OF
INCOMER

RTG. Wire Wire


ELCB

SL NO. CIR. NO. AREA / LOAD SERVED


(A) (mm2) (mm2)

1 R1 20 4 2.5 Lighting Warehouse Storage Rack "I"

2 Y1 20 4 2.5 Lighting Warehouse Storage Rack "I"

3 B1 20 4 2.5 Lighting Warehouse Storage Rack "I"

4 R2 20 2.5 2.5 Lighting Warehouse Storage Rack "I"


40A 4P
100MA 5 Y2 20 2.5 2.5 Lighting Warehouse Storage Rack "I"
ELCB-1
6 B2 20 2.5 2.5 Lighting Warehouse Storage Rack "I"

7 R3 20 4 2.5 Lighting Warehouse Storage Rack "I"

8 Y3 20 4 2.5 Lighting Warehouse Storage Rack "I"

9 B3 20 4 2.5 Lighting Warehouse Storage Rack "I"

10 R4 20 4 2.5 Lighting Warehouse Storage Rack "I"

11 Y4 20 4 2.5 Lighting Warehouse Storage Rack "I"

12 B4 20 4 2.5 Lighting Warehouse Storage Rack "I"

13 R5 20 4 2.5 Lighting Warehouse Storage Rack "I"


40A 4P
100MA 14 Y5 20 4 2.5 Lighting Warehouse Storage Rack "I"
ELCB-2
15 B5 20 4 2.5 Lighting Warehouse Storage Rack "I"

16 R6 20 2.5 2.5 Lighting Warehouse Storage Rack "I"


63A TPN ISOLATOR

17 Y6 20 2.5 2.5 Warehouse - Cool Storage Room Bin Shelves

18 B6 20 2.5 2.5 Warehouse - Cool Storage Room Bin Shelves

19 R4 20 4 2.5 Lighting Outdoor Street Lights

20 Y4 20 4 2.5 Lighting Elect Rm and Chiller Yard

21 B4 20 4 2.5 Lighting Outdoor Street Lights

22 R5 20 4 2.5 Receptacle Warehouse


40A 4P
100MA 23 Y5 20 4 2.5 Receptacle Warehouse Cool Storage Room
ELCB-2
24 B5 20 4 2.5 Receptacle Maintenance

25 R6 20 2.5 2.5 Lighting Outdoor Street Lights

26 Y6 20 2.5 2.5 Lighting Outdoor Street Lights

27 B6 20 2.5 2.5 Extract Fans PV 2 and 7


28 R4 20 2.5 2.5 Receptacle Maintenance Corridor

29 Y4 20 2.5 2.5 Receptacle Safety Office

30 B4 20 2.5 2.5 Receptacle Telephone Room

31 R5 20 2.5 2.5 Spare


40A 4P
100MA 32 Y5 20 2.5 2.5 Spare
ELCB-2
33 B5 20 2.5 2.5 Lightng Warehouse Office

34 R6 20 2.5 2.5 Receptacle EWC

35 Y6 20 2.5 2.5 Lightng Warehouse Office

36 B6 20 2.5 2.5 Lightng Warehouse Office

CABLE SIZE : 1X4C-25mm2 XLPE/SWA/CU/PVC CABLE + 1X1C-16mm2 PVC ECC Y/G


G CONTROL PANEL SCHEDULE
Plot No.
Owner: Panel Location: LINK BLDG ELECTRICAL ROOM
ultants: EXP Panel Type:

CONNECTED
LOADS LOAD (Watts)
/ POINTS WATT/
ZONE TYPE
UNIT
Remarks
LTG R Y B

DL 9 207 1863

F 8 207 1656

F 8 207 1656

F 7 207 1449

F 8 207 1656

F 9 207 1863

F 7 207 1449

F 8 207 1656

F 8 207 1656

F 8 207 1656

F 8 207 1656

F 8 207 1656

F 8 207 1656

F 8 207 1656

F 7 207 1449

F 20 100 2000

F 21 100 2100

F 16 100 1600

4 207 828

F 5 207 1035

10 125 1250

1 1333 1333

1 1333 1333

1 1333 1333

12 125 1500

8 125 1000

10 125 1250
1 50 50

15 100 1500

F 2 125 250

F 1 1700 1700

F 10 125 1250

F 12 125 1500

F 0 125 0

F 0 125 0

F 0 125 0

VC ECC Y/G 15484 16498 15463 47445


TOTAL 47.45 kW

T.C.L. 47.45 KW
Diversity Factor (DF) = 0.9 (90% used) 0.9
Max Demand = 42.7005 KW

Calculation of Main Isolator and Main Feeder Cable of LPA Warehouse


Current = P / Sqrt (3) x Cos Ø x V
= 42.7005 x 1.732 x 0.8 x 400
= 77.043339 Amps
Plus 25% as safety factor
= 77.043339 x 1.25
= 96.304173 Amps

Standard Main Isolator Size = 100A, 4P


Main Feeder Cable = 1 x 4C x 35mm^2, XLPE/SWA/PVC, Cu
1 x 1C x 25mm^2 PVC/PVC, Y/G Earth Cable
LOAD DISTRIBUTION SCHEDULE
Project name: DUBAI PETROLEUM
Panel Ref : LPC Gfloor Office Bldg Owner:
Fed From: SMDB-6-601 Consultants: EXP

MCB CCT ECC


RATING OF

RATING OF
INCOMER

RTG. Wire Wire


ELCB

SL NO. CIR. NO. ROOM / AREA


(A) (mm2) (mm2)

1 R1 20 2.5 2.5 Lighting O - (153, 155, 161, 167)

2 Y1 20 2.5 2.5 Lighting O - (118, 119, 120, 144, 148, 151, 152, 167, 175)

3 B1 20 2.5 2.5 Lighitng O - 101

4 R2 20 2.5 2.5 Lighting O - (102, 103, 104, 105, 146)


40A 4P
100MA 5 Y2 20 2.5 2.5 Lighting O - (106, 107, 108, 145, 147, 150)
ELCB-1
6 B2 20 2.5 2.5 Lighting O - (109, 110, 111, 112)

7 R3 20 2.5 2.5 Lighting O - (113, 172, 173, 175)

8 Y3 20 2.5 2.5 Lighitng O - (115, 168, 169, 171)

9 B3 20 2.5 2.5 Lighting O - (116, 117, 151)

10 R4 20 4 4 Receptacle O - (101, 144)

11 Y4 20 4 4 Receptacle O - (102, 103, 104)

12 B4 20 4 4 Receptacle O - (105, 106, 107)

13 R5 20 4 4 Receptacle O - (118, 119, 120)


40A 4P
100MA 14 Y5 20 4 4 Receptacle O - (116, 117, 151)
ELCB-1
15 B5 20 4 4 Receptacle O - (115, 151, 168)
40A TPN ISOLATOR

16 R3 20 4 4 Receptacle O - (144, 145)

17 Y3 20 4 4 Receptacle O - (146, 147, 148)

18 B3 20 4 4 Receptacle O - (108, 109, 110)

19 R4 20 4 4 Receptacle O - 149

20 Y4 20 4 4 Receptacle O - (111, 150, 152)

21 B4 20 4 4 Receptacle O - (112, 113, 173)

22 R5 30 6 6 Receptacle O - 146
40A 4P
100MA 23 Y5 20 4 4 Receptacle O - 147
ELCB-1
24 B5 20 4 4 Receptacle O - 150

25 R3 20 4 4 Receptacle O - 172

26 Y3 20 4 4 Receptacle O - 172

27 B3 20 4 4 Lighting Office 2nd Floor


28 R4 30 6 6 Receptacle 1st Floor

29 Y4 20 4 4 Receptacle O - 147

40A 4P 30 B4 20 4 4 Temp. Contr. VAV 1-4, 13-17


100MA
ELCB-2 31 R5 Spare

32 Y5 Spare

33 B5 20 4 4 Extract Fans PV 4 & 6

CABLE SIZE : 1X4C-35mm2 XLPE/SWA/CU/PVC CABLE + 1X1C-16mm2 PVC ECC Y/G


RIBUTION SCHEDULE
Plot No.
Owner: Panel Location:
nsultants: EXP

CONNECTED LOADS / POINTS LOAD (Watts)


Watt /
Unit

PUMP
Outlet
13A 15A EX.

Flex.
LTG
S.O.
IK
S.O.
FCU
FAN
R Y B

6 150 900

12 150 1800

15 150 2250

12 150 1800

14 150 2100

12 150 1800

9 150 1350

9 150 1350

10 150 1500

8 200 1600

8 200 1600

8 200 1600

8 200 1600

8 200 1600

8 200 1600

4 200 800

4 200 800

4 200 800

4 200 800

6 200 1200

4 200 800

4 1000 4000

1 200 200

1 200 200

5 200 600

3 200 1000

4 150 600
9 200 400

2 200 1800

8 200 1600

2 300 600

13850 13450 13350

TOTAL 40.65

T.C.L. 40.65 KW
Diversity Factor (DF) = 0.9 (90% used) 0.9
Max Demand = 36.585 KW

Calculation of Main Isolator and Main Feeder Cable of LPA Warehouse


Current = P / Sqrt (3) x Cos Ø x V
= 36.585 x 1.732 x 0.8 x 400
= 66.00931 Amps
Plus 25% as safety factor
= 66.00931 x 1.25
= 82.51164 Amps

Standard Main Isolator Size = 100A, 4P


Main Feeder Cable = 1 x 4C x 35mm^2, XLPE/SWA/PVC, Cu
1 x 1C x 25mm^2 PVC/PVC, Y/G Earth Cable
Remarks
40650

kW

Cable of LPA Warehouse


(3) x Cos Ø x V
x 1.732 x 0.8 x 400

35mm^2, XLPE/SWA/PVC, Cu
25mm^2 PVC/PVC, Y/G Earth Cable
LOAD DISTRIBUTION SCHEDULE
Project name: DUBAI PETROLEUM
Panel Ref : LPD Machine Shop Owner:
Fed From: SMDB-6-601 Consultants: EXP

MCB CCT ECC


RATING OF

RATING OF
INCOMER

RTG. Wire Wire


ELCB

SL NO. CIR. NO. ROOM / AREA


(A) (mm2) (mm2)

1 R1 20 2.5 2.5 Lighting O - (133, 134, 135)

2 Y1 20 2.5 2.5 Lighting O - (130, 131, 132, 157)

3 B1 20 2.5 2.5 Lighting O - (156, 162)

4 R2 20 2.5 2.5 Lighting O - (128, 128, 154, 159, 160)


40A 4P
100MA 5 Y2 20 2.5 2.5 Lighting O - (125, 126, 127)
ELCB-1
6 B2 20 2.5 2.5 Lighting O - (123, 124, 158, 163, 164, 165)

7 R3 20 2.5 2.5 Lighting O - (137, 138, 139)

8 Y3 20 2.5 2.5 Lighitng O - (140, 141, 142, 143)

9 B3 20 2.5 2.5 Lighting O - (121, 122)

10 R4 20 2.5 2.5 Lighting Stairway

11 Y4 20 2.5 2.5 Lighting Office 1st Floor

12 B4 20 2.5 2.5 Lighting Corridor

13 R5 20 4 4 Receptacle O - (121, 122)


40A 4P
100MA 14 Y5 20 4 4 Receptacle O - (123, 124, 125)
ELCB-2
15 B5 20 4 4 Receptacle O - (126, 127, 128)
40A TPN ISOLATOR

16 R6 20 4 4 Receptacle O - (137, 138, 139)

17 Y6 20 4 4 Receptacle O - (139, 140, 141)

18 B6 20 4 4 Receptacle O - (142, 160, 161)

19 R7 20 4 4 Receptacle O - (129, 130, 131)

20 Y7 20 4 4 Receptacle O (135, 155)

21 B7 20 4 4 Receptacle O - (132, 133, 134)

22 R8 20 4 4 Receptacle O - (143, 164, 165, 167)


40A 4P
100MA 23 Y8 20 4 4 Receptacle O - 166 EWC
ELCB-3
24 B8 20 4 4 Receptacle O - (156, 157)

25 R9 20 4 4 Receptacle O - (162, 163)

26 Y9 20 4 4 Extract Fans PV 1, 3 & 5

27 B9 20 4 4 Temp. Contr. VAV O - 7, 8, 9, 10


28 R10 20 4 4 Receptacle Telephone Room

29 Y10 20 6 6 Receptacle O - 157 Xerox

63A 4P 30 B10 20
100MA
ELCB-4 31 R11 20 6 6

32 Y11 20 6 6 Water Heater

33 B11 20 6 6
CABLE SIZE : 1X4C-35mm2 XLPE/SWA/CU/PVC CABLE + 1X1C-16mm2 PVC ECC Y/G
RIBUTION SCHEDULE
Plot No.
Owner: Panel Location:
nsultants: EXP

CONNECTED LOADS / POINTS LOAD (Watts)


Watt /
Unit

PUMP
Outlet
13A 15A EX.

Flex.
LTG
S.O.
IK
S.O.
FCU
FAN
R Y B

9 150 1350

9 150 1350

14 150 2100

8 150 1200

8 150 1200

11 150 1650

11 150 1650

11 150 1650

8 150 1200

10 150 1500

3 150 450

12 150 1800

6 200 1200

8 200 1600

8 200 1600

6 200 1200

6 200 1200

8 200 1600

8 200 1600

5 200 1000

8 200 1600

8 200 1600

7 200 1400

5 200 1000

8 200 1600

2 300 600

5 200 1000
2 200 400

4 1000 4000

1333

4000 1333

1333

14633 15783 14883

TOTAL 45.30

T.C.L. 45.30 KW
Diversity Factor (DF) = 0.9 (90% used) 0.9
Max Demand = 40.7691 KW

Calculation of Main Isolator and Main Feeder Cable of LPA Warehouse


Current = P / Sqrt (3) x Cos Ø x V
= 40.7691 x 1.732 x 0.8 x 400
= 73.55857 Amps
Plus 25% as safety factor
= 73.55857 x 1.25
= 91.94821 Amps

Standard Main Isolator Size = 100A, 4P


Main Feeder Cable = 1 x 4C x 35mm^2, XLPE/SWA/PVC, Cu
1 x 1C x 25mm^2 PVC/PVC, Y/G Earth Cable
Remarks
45299

kW

Cable of LPA Warehouse


(3) x Cos Ø x V
x 1.732 x 0.8 x 400

35mm^2, XLPE/SWA/PVC, Cu
25mm^2 PVC/PVC, Y/G Earth Cable
LOAD DISTRIBUTION SCHEDULE
Project name: DUBAI PETROLEUM
Panel Ref : LPD Machine Shop Owner:
Fed From: SMDB-6-601 Consultants: EXP

MCB CCT ECC


RATING OF

RATING OF
INCOMER

RTG. Wire Wire


ELCB

SL NO. CIR. NO. ROOM / AREA


(A) (mm2) (mm2)

1 R1 20 4 4 Lighting Warehouse & Office

2 Y1 20 4 4 Lighting Warehouse & Office

3 B1 20 4 4 Lighting Warehouse & Office

4 R2 20 4 4 Lighting Warehouse Cool Storage Rm


40A 4P
100MA 5 Y2 20 4 4 Lighting Warehouse Cool Storage Rm
ELCB-1
6 B2 20 2.5 2.5 Lighting Warehouse Cool Storage Rm

7 R3 20 2.5 2.5 Lighting O - (136, 153, 161)

8 Y3 20 2.5 2.5 Lighting O - (155, 166, 167, 172, 173)

9 B3 20 2.5 2.5 Lighting O - (101, 114, 144, 148, 151, 152)


40A TPN ISOLATOR

10 R3 20 2.5 2.5 Chiller Control Panel


63A 4P
100MA 11 Y3 20 2.5 2.5 Fuel Pump
ELCB-2
12 B3 20 2.5 2.5 Spare

13 R5 20 4 4

14 Y5 20 4 4 LPE Radion Room

15 B5 20 4 4

52 R5 20 4 4

53 Y5 20 4 4 Chilled Water System

54 B5 20 4 4

55 R5 20 4 4

56 Y5 20 4 4 AHU 3 Cool Room

57 B5 20 4 4

58 R5 20 4 4

59 Y5 20 4 4 Spare

60 B5 20 4 4

CABLE SIZE : 1X4C-35mm2 XLPE/SWA/CU/PVC CABLE + 1X1C-16mm2 PVC ECC Y/G


RIBUTION SCHEDULE
Plot No.
Owner: Panel Location:
nsultants: EXP

CONNECTED LOADS / POINTS LOAD (Watts)


Watt /
Unit

PUMP
Outlet
13A 15A EX.

Flex.
LTG
S.O.
IK
S.O.
FCU
FAN
R Y B

5 207 1035

6 207 1242

6 207 1242

8 150 1200

8 150 1200

8 150 1200

4 150 600

6 150 900

6 150 900

1 200 200

1 200 200

1 200 200

4000

4000

4000

46000

46000

46000

2800

2800

2800

23000

23000

23000

78835 79342 79342

TOTAL 237.52
Remarks

237519

kW
LOAD DISTRIBUTION SCHEDULE
Project name: LEGOLAND DUBAI - THEME PARK
Panel Ref : DB-6-501-A Owner:
Fed From: SMDB-6-601 Consultants: EXP

MCB CCT ECC


RATING OF

RATING OF
INCOMER

RTG. Wire Wire


ELCB

SL NO. CIR. NO. ROOM / AREA


(A) (mm2) (mm2)

1 R1 20 4 4

2 Y1 20 4 4 CRAC 1 & 1A

3 B1 20 4 4

4 R2 20 4 4 UPS
63A 4P
40A TPN ISOLATOR

100MA 5 Y2 20 4 4 UPS
ELCB-1
6 B2 20 4 4 UPS

7 R3 20 4 4 Battery Charger

8 Y3 20 4 4 Battery Charger

9 B3 20 4 4 Data Equipment

10 R4 20 4 4 Radio Tower Lights


40A 4P
100MA 11 Y4 20 4 4
ELCB-1
12 B4 20 4 4

CABLE SIZE : 1X4C-35mm2 XLPE/SWA/CU/PVC CABLE + 1X1C-16mm2 PVC ECC Y/G


RIBUTION SCHEDULE
Plot No.
Owner: Panel Location: BLDG 501 ELECTRICAL ROOM
nsultants: EXP

CONNECTED LOADS / POINTS LOAD (Watts)


Watt /
Unit

PUMP
Outlet
13A 15A EX.

Flex.
LTG
S.O.
IK
S.O.
FCU
FAN
R Y B

6116

18348 6116

6116

4840

4840

4840

11440

11440

4400

700

23096 22396 15356

TOTAL 60.85
01 ELECTRICAL ROOM

Remarks

60848

kW
Project Name: DPE JAOSB
MDP Ref : SMDB-DPA WAREHOUSE
Fed From: MS 1

SP/ Fault
Circuit/ Feeder Rating - AMPS
S.
No.
DB No. TP F/S MCCB MCB Duty

ISO kA
1 INCOMER: TP 400 N/A

OUTGOINGS:
1 6OBAHU1 TP 63 25
2 6OBAHU2 TP 63 25
3 6OBAHU4 TP 40 25
4 6OBWH1 TP 80 25
5 6OBWH2 TP 80 25
6 WAREHOUSE DB TP 100 25
7 SPARE TP 40
7 SPARE TP 40 25

MDP connected to : MDB-6-601-MSBA Total connected load

Max demand (3 PH) : 94.51 kW at 0.80 Diversity

Contractor :
Type of meter (Rating of incomer): (1) Upto 60 A
(1 Phase)
LOAD DISTRIBUTION SCHEDULE

Owner: DUBAI PETROLEUM


Consultants:

LOAD
Proposed Type &
DISTRIBUTION Cable Size ECC Connected Load kW
kW
SCHEDULE TOTAL
Size-1C
SWA / PVC 2/4 x 1C 2/3/4C R - Ph Y - Ph B - PH 1 - Ph

mm2 mm2 mm2 kW kW kW kW (1)


XLPE/SWA/PVC 1x4c-400 1x1c-240 39.38 39.38 39.38 118.14

XLPE/SWA/PVC 1x4c-6 1x1c-6 3.73 3.73 3.73 11.19


XLPE/SWA/PVC 1x4c-6 1x1c-6 3.73 3.73 3.73 11.19
XLPE/SWA/PVC 1x4c-10 1x1c-10 0.25 0.25 0.25 0.75
XLPE/SWA/PVC 1x4c-25 1x1c-16 11.67 11.67 11.67 35.01
XLPE/SWA/PVC 1x4c-35 1x1c-16 15.00 15.00 15.00 45.00
XLPE/SWA/PVC 1x4c-25 1x1c-16 5.00 5.00 5.00 15.00
XLPE/SWA/PVC 1x4c-10 1x1c-10
XLPE/SWA/PVC 1x4c-16 1x1c-16

Total connected load per phase 39.38 39.38 39.38 118.14

Diversity Total connected load (3 PH) 118.14 kW

Tel : Fax :
(2) Upto 100 A (3) 125 - 160 A (4) LV CT….../…... 5
(3 Phase)

59.83348
Plot No.
MDP Location: Link Building Electrical Room

Proposed Type & No of


kWh meters
Remarks
3 - Ph 3 - Ph
LV/HV

(2) (3) CT (4)

ELCB TO BE PROVIDED IN THE DB

ELCB TO BE PROVIDED IN THE DB


ELS + SHT
ELS + SHT
ELS + SHT

Total

118.14 kW

(4) LV CT….../…... 5 A / HV CT……/…...A


LIGHTING CONTROL PANEL SCHE
Project name: DUBAI PETROLEUM JAOSB
Panel Ref : 6WHLPB Owner:
Fed From: SMDB-6-101-MDP Consultants: EXP

MCB CCT ECC


RATING OF
RATING OF
INCOMER

RTG. Wire Wire


ELCB

SL NO. CIR. NO. AREA / LOAD SERVED


(A) (mm2) (mm2)

1 R1 30 25 10 High Mast Light No. 1

2 Y1 30 25 10 High Mast Light No. 1

3 B1 30 25 10 High Mast Light No. 1

4 R2 30 16 16 High Mast Light No. 2


40A 4P
100MA 5 Y2 30 16 16 High Mast Light No. 2
ELCB-1
6 B2 30 16 16 High Mast Light No. 2

7 R3 30 10 10 High Mast Light No. 3

8 Y3 30 10 10 High Mast Light No. 3

9 B3 30 10 10 High Mast Light No. 3

10 R4 30 16 16 High Mast Light No. 4

11 Y4 30 16 16 High Mast Light No. 4

12 B4 30 16 16 High Mast Light No. 4

13 R5 30 10 10 High Mast Light No. 5


40A 4P
100MA 14 Y5 30 10 10 High Mast Light No. 5
ELCB-2
15 B5 30 10 10 High Mast Light No. 5

16 R6 30 4 4 High Mast Light No. 6


63A TPN ISOLATOR

17 Y6 30 4 4 High Mast Light No. 6

18 B6 30 4 4 High Mast Light No. 6

19 R4 30 4 4 High Mast Light No. 7

20 Y4 30 4 4 High Mast Light No. 7

21 B4 30 4 4 High Mast Light No. 7

22 R5 30 10 10 High Mast Light No. 8


40A 4P
100MA 23 Y5 30 10 10 High Mast Light No. 8
ELCB-2
24 B5 30 10 10 High Mast Light No. 8

25 R6 30 16 16 High Mast Light No. 9

26 Y6 30 16 16 High Mast Light No. 9

27 B6 30 16 16 High Mast Light No. 9


28 R4 30 10 10 High Mast Light No. 10

29 Y4 30 10 10 High Mast Light No. 10

30 B4 30 10 10 High Mast Light No. 10

31 R5 30 16 16 High Mast Light No. 11


40A 4P
100MA 32 Y5 30 16 16 High Mast Light No. 11
ELCB-2
33 B5 30 16 16 High Mast Light No. 11

34 R6 30 25 16 High Mast Light No. 12

35 Y6 30 25 16 High Mast Light No. 12

36 B6 30 25 16 High Mast Light No. 12

CABLE SIZE : 1X4C-25mm2 XLPE/SWA/CU/PVC CABLE + 1X1C-16mm2 PVC ECC Y/G


G CONTROL PANEL SCHEDULE
Plot No.
Owner: Panel Location: Pipe Yard
ultants: EXP Panel Type:

CONNECTED
LOADS LOAD (Watts)
/ POINTS WATT/
ZONE TYPE
UNIT
Remarks
LTG R Y B

FL 2 1000 2000

FL 2 1000 2000

FL 2 1000 2000

FL 2 1000 2000

FL 2 1000 2000

FL 2 1000 2000

FL 2 1000 2000

FL 2 1000 2000

FL 2 1000 2000

FL 2 1000 2000

FL 2 1000 2000

FL 2 1000 2000

FL 2 1000 2000

FL 2 1000 2000

FL 2 1000 2000

FL 2 1000 2000

FL 2 1000 2000

FL 2 1000 2000

FL 2 1000 2000

FL 2 1000 2000

FL 2 1000 2000

FL 2 1000 2000

FL 2 1000 2000

FL 2 1000 2000

FL 2 1000 2000

FL 2 1000 2000

FL 2 1000 2000
FL 2 1000 2000

FL 2 1000 2000

FL 2 1000 2000

FL 2 1000 2000

FL 2 1000 2000

FL 2 1000 2000

FL 2 1000 2000

FL 2 1000 2000

FL 2 1000 2000

VC ECC Y/G 24000 24000 24000 72000


TOTAL 72.00 kW

104.34783
Project name: LEGOLAND DUBAI - THEME PARK
Panel Ref : DB-6-406-A
Fed From: SMDB-6-601

MCB CCT ECC


RATING OF
RATING OF
INCOMER

RTG. Wire Wire


ELCB
SL NO. CIR. NO.
80A TPN ISOLATOR

(A) (mm2) (mm2)

1 R1 20 4 4

2 Y1 20 4 4

3 B1 20 4 4
40A 4P 100MA
ELCB-1
4 R2 20 4 4

5 Y2 20 4 4

6 B2 20 4 4

7 R3
63A 4P 100MA 40A
8 Y3 16 16
ELCB-3 TP
9 B3

10 R4
63A 4P 100MA 40A
11 Y4 16 16
ELCB-3 TP
12 B5

13 R6
63A 4P 100MA 40A
14 Y6 16 16
ELCB-4 TP
15 B6

CABLE SIZE : 1X4C-35mm2 XLPE/SWA/CU/PVC CABLE + 1X1C-16mm2 PVC ECC Y/G


LOAD DISTRIBUTION SCHEDULE
PARK Plot No.
Owner: Panel Location:
Consultants: EXP

CONNECTED LOADS / POINTS


ROOM / AREA

PUMP
Outlet
13A 13A T/W 15A EX.

Flex.
LTG FCU
S.O. S.O. S.O. FAN

Parking Lights 6

Windsock Lights 8

Perimeter Flood Lights 10

Plant Room Lights 5

Plant Room Lights 5

Plant Room Lights

Receptacle 1

Receptacle 2

Receptacle 3

2 XLPE/SWA/CU/PVC CABLE + 1X1C-16mm2 PVC ECC Y/G

TOTAL
Plot No.
Panel Location: BLDG 406 ELECTRICAL ROOM

LOAD (Watts)
Watt /
Unit
Remarks
R Y B

175 1050

175 1400

250 2500

175 875

100 500

250

7666

13854 7666

7666

7666

13854 7666

7666

7666

13854 7666

7666

24923 24898 25498 75319

TOTAL 75.32 kW
Project Name: LEGOLAND DUBAI - THEME PARK
MSB Ref : MDB-6-601-MSB
Fed From: SUBSTATION TRANSFORMER (TF-6-601-1)

SP/ Fault
Circuit/ Feeder Rating - AMPS
S.
DB No. TP F/S MCB / Duty
No.
ISO ACB MCCB kA
INCOMER: 4P 2500 50
MOB:GENERATOR 4P 2500 50
OUTGOINGS:
1 LPA Vehicle Maintenanc TP 100 35
2 LPB Valve Shop TP 100 35
3 LPC System Shop TP 100 35
4 LPD System Shop TP 100 35
5 LPE Mech Shop TP 600 35
6 MCC TP 275 35
7 Chiller 4
8 Chiller 5
9

MDB connected to : 1500 KVA Transformer Total connect

Max demand (3 PH) : 477.96 kW

Contractor :
Type of meter (Rating of incomer): (1) Upto 60 A
(1 Phase)
LOAD DISTRIBUTION SCHEDULE

Owner: MERAAS ESTATES (LLC)


Consultants: EXP/KLING Consultants

PVC / XLPE Cable Size ECC Connected Load kW


TOTAL
Size-1C
SWA / PVC 2/4 x 1C 2/3/4C R - Ph Y - Ph B - PH

mm2 mm2 mm2 kW kW kW kW


BY DEWA 160.17 160.51 157.28 477.96
BY DEWA

XLPE/SWA/PVC 5.98 6.08 6.13 18.18


XLPE/SWA/PVC 8.43 8.46 8.23 25.12
XLPE/SWA/PVC 17.76 17.42 15.11 50.29
XLPE/SWA/PVC 9.97 10.57 10.17 30.71
FIRE RATED 18.08 18.03 17.68 53.78
XLPE/SWA/PVC 7.96 7.96 7.96 23.87
XLPE/SWA/PVC 46.00 46.00 46.00 138.00
XLPE/SWA/PVC 46.00 46.00 46.00 138.00
XLPE/SWA/PVC 0.00

Total connected load per phase 160.17 160.51 157.28 477.96

Total connected load (3 PH)

Tel : Fax :
(2) Upto 100 A (3) 125 - 160 A
(3 Phase)
Plot No. 513 - 0116 SAIH SHUAIB 1
MSB Location: BLDG 601 - Switchboard Room

Proposed Type & No of


kWh meters
1 - Ph 3 - Ph 3 - Ph LV/HV Remarks

(1) (2) (3) CT (4)


1 2400/5 A

6-601-ATS-EMDPA

SUB STATION-DB
350 kVAR

1 Total

477.96 kW

(4) LV CT….../…... 5 A / HV CT……/…...A


LOAD DISTRIBUTION SCHEDULE
Project name: LEGOLAND DUBAI - THEME PARK
Panel Ref : DB-6-501-A Owner:
Fed From: SMDB-6-601 Consultants: EXP

MCB CCT ECC


RATING OF

RATING OF
INCOMER

RTG. Wire Wire


ELCB

SL NO. CIR. NO. ROOM / AREA


(A) (mm2) (mm2)

1 R1 20 4 4 Lighting Valve Shop Office Ground Floor

2 Y1 20 4 4 Lighting Valve Testing Area

3 B1 20 4 4 Lighitng Valve Shop Office 1st Floor

4 R2 20 4 4 Lighting Exit
40A 4P
100MA 5 Y2 20 4 4 Lighting Tire Repair Shop
ELCB-1
6 B2 20 4 4 Lighting Fence Area

7 R3 20 4 4 Outdoor Lighting

8 Y3 20 4 4 Outdoor Lighting

9 B3 20 4 4 Outdoor Lighting

10 R4 20 4 4 Receptacle Ground Floor


40A TPN ISOLATOR

11 Y4 20 4 4 Receptacle Ground Floor

12 B4 20 4 4 Receptacle Valve Testing Area

13 R5 20 4 4 Receptacle 1st Floor


63A 4P
100MA 14 Y5 20 4 4 Receptacle Tire Repair Shop
ELCB-1
15 B5 20 4 4 Receptacle Valve Testing Area

16 R6 20 4 4 Temp. Controller & VAV

17 Y6 20 4 4 Fume Detector and Sensor

18 B6 20 4 4 Fuel Pump 1

19 R7 20 Fuel Pump 2

20 Y7 20 Extract Fans PV 13

40A 4P 21 B7 20 Wash Machine


100MA
ELCB-2 22 R8

23 Y8 20 4.0 4.0 Extract Fans PV 17

24 B8

CABLE SIZE : 1X4C-35mm2 XLPE/SWA/CU/PVC CABLE + 1X1C-16mm2 PVC ECC Y/G


RIBUTION SCHEDULE
Plot No.
Owner: Panel Location: BLDG 501 ELECTRICAL ROOM
nsultants: EXP

CONNECTED LOADS / POINTS LOAD (Watts)


Watt /
Unit

PUMP
Outlet
13A 15A EX.

Flex.
LTG
S.O.
IK
S.O.
FCU
FAN
R Y B

10 115 1150

8 207 1656

7 115 805

1 100 100

10 100 1000

5 150 750

4 207 828

3 207 621

10 207 2070

5 200 1000

4 200 800

4 200 800

8 200 1600

4 200 800

4 200 800

2 200 400

1 500

1 500 500

4 200 800

1 500 500

400

1200 400

400

5978 6077 6125

TOTAL 18.18
01 ELECTRICAL ROOM

Remarks

18180

kW
LOAD DISTRIBUTION SCHEDULE
Project name: DPE JAOSB
Panel Ref : DB-6-501-A Owner:
Fed From: SMDB-6-601 Consultants: EXP

MCB CCT ECC


RATING OF

RATING OF
INCOMER

RTG. Wire Wire


ELCB

SL NO. CIR. NO. ROOM / AREA


(A) (mm2) (mm2)

1 R1 20 4 4 Lighting Valve Shop Office Ground Floor

2 Y1 20 4 4 Lighting Valve Workshop

3 B1 20 4 4 Lighting Valve Workshop

4 R2 20 4 4 Lighting Exit
40A 4P
100MA 5 Y2 20 4 4 Lighting Valve Workshop
ELCB-1
6 B2 20 4 4 Receptacle G101 (1) Telephone
40A TPN ISOLATOR

7 R3 20 4 4 Receptacle G112 (6)

8 Y3 20 4 4 Receptacle G112 (6)

9 B3 20 4 4 Receptacle G112 (6)

10 R4
63A 4P
100MA 11 Y4 40 4 4 Overhead Crane 10T
ELCB-1
12 B4

19 R5 20 Extract Fans PV1 & PV2


40A 4P
100MA 20 Y5 20 Extract Fans PV 13
ELCB-2
21 B5 20 Spare

CABLE SIZE : 1X4C-35mm2 XLPE/SWA/CU/PVC CABLE + 1X1C-16mm2 PVC ECC Y/G


RIBUTION SCHEDULE
Plot No.
Owner: Panel Location: BLDG 501 ELECTRICAL ROOM
nsultants: EXP

CONNECTED LOADS / POINTS LOAD (Watts)


Watt /
Unit

PUMP
Outlet
13A 15A EX.

Flex.
LTG
S.O.
IK
S.O.
FCU
FAN
R Y B

4 207 828

4 207 828

4 207 828

1 100 100

4 207 828

1 250 250

5 200 1000

8 200 1600

8 207 1656

5000

15000 5000

5000

2 750 1500

1 200 200

1 500 500

8428 8456 8234

TOTAL 25.12
01 ELECTRICAL ROOM

Remarks

25118

kW
LOAD DISTRIBUTION SCHEDULE
Project name: DUBAI PETROLEUM
Panel Ref : LPC System Shop Owner:
Fed From: SMDB-6-601 Consultants: EXP

MCB CCT ECC


RATING OF

RATING OF
INCOMER

RTG. Wire Wire


ELCB

SL NO. CIR. NO. ROOM / AREA


(A) (mm2) (mm2)

1 R1 20 4 4 Lighting G - 123

2 Y1 20 4 4 Lighting G - 123

3 B1 20 4 4 Lighting G - 123

4 R2 20 4 4 Lighting G -(113, 114, 114a, 115, 115a 116, 117, 118, 119)
40A 4P
100MA 5 Y2 20 4 4 Lighting G - (116, 118, 119, 121, 122)
ELCB-1
6 B2 20 4 4 Lighting G - (125, 126, 127)

7 R3 20 4 4 Lighting G - (202, 203, 206)

8 Y3 20 4 4 Lighitng G - (204, 205, 208)

9 B3 20 4 4 Lighting Exit

10 R4 20 4 4 Lighting G -(128, 130, 130a, 131, 131a, 132, 133, 134, 135)

11 Y4 20 4 4 Lighting G - (209, 214, 215)

12 B4 20 4 4 Lighting G - (211, 212, 213)

13 R5 20 4 4 Receptacle G - (113, 114, 115, 119)


40A 4P
40A TPN ISOLATOR

100MA 14 Y5 20 4 4 Receptacle G - (117, 118, 119)


ELCB-2
15 B5 20 4 4 Receptacle G - 116

16 R6 20 4 4 Receptacle G - 123

17 Y6 20 4 4 Receptacle G - 123

18 B6 20 4 4 Receptacle G - (202, 203, 204)

19 R7 20 4 4 Receptacle G - (125, 126, 133, 134)

20 Y7 20 4 4 Receptacle G - (128, 130, 131, 135)

21 B7 20 4 4 Receptacle G - 132 (EWC)

22 R8 20 4 4 Receptacle G - (204, 205, 208)


40A 4P
100MA 23 Y8 20 4 4 Receptacle G - (211, 212, 213)
ELCB-3
24 B8 20 4 4 Receptacle G - (209, 214, 215)

25 R9 20 4 4 Receptacle G - (121, 122)

26 Y9 20 4 4 Extract Fans PV 18 & 19

27 B9 20 4 4 Temp. Contr. VAV 1-4, 13-17


28 R10 20 16 16
63A 4P
100MA 29 Y10 20 16 16 Sewage Treatment Plant Panel
ELCB-4
30 B10 20 16 16

CABLE SIZE : 1X4C-35mm2 XLPE/SWA/CU/PVC CABLE + 1X1C-16mm2 PVC ECC Y/G


RIBUTION SCHEDULE
Plot No.
Owner: Panel Location:
nsultants: EXP

CONNECTED LOADS / POINTS LOAD (Watts)


Watt /
Unit

PUMP
Outlet
13A 15A EX.

Flex.
LTG
S.O.
IK
S.O.
FCU
FAN
R Y B

4 207 828

5 207 1035

4 207 828

14 150 2100

12 150 1800

12 150 1800

12 150 1800

12 150 1800

2 150 300

15 150 2250

12 150 1800

12 150 1800

5 200 1000

6 200 1200

6 200 1200

8 200 1600

6 200 1200

6 200 1200

6 200 1200

8 200 1600

6 200 1200

6 200 1200

8 200 1600

6 200 1200

5 200 1000

2 300 600

4 200 800
4784

14352 4784

4784

17762 17419 15112

TOTAL 50.29
Remarks
50293

kW
LOAD DISTRIBUTION SCHEDULE
Project name: DUBAI PETROLEUM
Panel Ref : LPD System Shop Owner:
Fed From: SMDB-6-601 Consultants: EXP

MCB CCT ECC


RATING OF

RATING OF
INCOMER

RTG. Wire Wire


ELCB

SL NO. CIR. NO. ROOM / AREA


(A) (mm2) (mm2)

1 R1 20 4 4 Lighting G - 124

2 Y1 20 4 4 Lighting G - 124

3 B1 20 4 4 Lighting G - 124

4 R2 20 4 4 Lighting G - (142, 143, 144)


40A 4P
100MA 5 Y2 20 4 4 Lighting G - 141
ELCB-1
6 B2 20 4 4 Lighting G - (136, 137, 137a, 138, 139, 140, 151, 153)

7 R3 20 4 4 Lighitng G - 226

8 Y3 20 4 4 Lighitng G - 224

9 B3 20 4 4 Lighitng G - 223

10 R4 20 4 4 Lighitng G - (221, 222)

11 Y4 20 4 4 Lighting G - (217, 218, 219, 220, 235)

12 B4 20 4 4 Lighting G - 236
40A TPN ISOLATOR

13 R5 20 4 4 Lighting Emergency
40A 4P
100MA 14 Y5 20 4 4 Receptacle G - (141, 142, 143, 144)
ELCB-2
15 B5 20 4 4 Receptacle G - (136, 137, 141, 151)

16 R6 20 4 4 Receptacle G - (223, 224, 225)

17 Y6 20 4 4 Receptacle G - (220, 221, 222, 223)

18 B6 20 4 4 Receptacle G - (217, 218, 220, 236)

19 R7 20 4 4 Receptacle G - 124

20 Y7 20 4 4 Receptacle G - 124

21 B7 20 4 4 Receptacle G - (121, 122)

22 R8 20 4 4 Receptacle G - 140 EWC


40A 4P
100MA 23 Y8 20 4 4 Temp. Contr. VAV 1, 2, 5, 6
ELCB-3
24 B8 20 4 4 Lighting Exit

25 R9 20 4 4 Extract Fans PV 3, 4, 11, 14

26 Y9 20 4 4

27 B9 20 4 4
CABLE SIZE : 1X4C-35mm2 XLPE/SWA/CU/PVC CABLE + 1X1C-16mm2 PVC ECC Y/G
RIBUTION SCHEDULE
Plot No.
Owner: Panel Location:
nsultants: EXP

CONNECTED LOADS / POINTS LOAD (Watts)


Watt /
Unit

PUMP
Outlet
13A 15A EX.

Flex.
LTG
S.O.
IK
S.O.
FCU
FAN
R Y B

3 207 621

3 207 621

3 207 621

11 150 1650

11 150 1650

13 150 1950

11 150 1650

8 150 1200

8 150 1200

14 150 2100

14 150 2100

16 150 2400

1 150 150

8 200 1600

8 200 1600

8 200 1600

8 200 1600

6 200 1200

6 200 1200

6 200 1200

5 200 1000

1 200 200

3 200 600

1 200 200

4 200 800
9971 10571 10171

TOTAL 30.71
Remarks
30713

kW
LOAD DISTRIBUTION SCHEDULE
Project name: DUBAI PETROLEUM
Panel Ref : LPD System Shop Owner:
Fed From: SMDB-6-601 Consultants: EXP

MCB CCT ECC


RATING OF

RATING OF
INCOMER

RTG. Wire Wire


ELCB

SL NO. CIR. NO. ROOM / AREA


(A) (mm2) (mm2)

1 R1 20 4 4 Lighting G - 158

2 Y1 20 4 4 Lighting G - 158

3 B1 20 4 4 Lighting G - 158

4 R2 20 4 4 Lighting G - (145, 146, 147, 148, 150)


40A 4P
100MA 5 Y2 20 4 4 Lighting G - (149, 156)
ELCB-1
6 B2 20 4 4 Lighting G - (154, 155)

7 R3 20 4 4 Lighitng G - (229, 230)

8 Y3 20 4 4 Lighitng G - (231, 232)

9 B3 20 4 4 Lighitng G - (233, 234)

10 R4 20 4 4 Lighitng G - (228, 236, 237)

11 Y4 20 4 4 Lighting G - (238, 301)

12 B4 20 4 4 Lighting Exit

13 R5 20 4 4 Receptacle G - (146, 148, 151)


40A 4P
40A TPN ISOLATOR

100MA 14 Y5 20 4 4 Receptacle G - (147, 149, 150, 156)


ELCB-2
15 B5 20 4 4 Receptacle G - (154, 155, 156)

16 R6 20 4 4 Receptacle G - 158

17 Y6 20 4 4 Receptacle G - 158

18 B6 20 4 4 Receptacle G - 158

19 R7 20 4 4 Receptacle G - 158

20 Y7 20 4 4 Receptacle G - (228, 229, 230)

21 B7 20 4 4 Receptacle G - (231, 232, 233)

22 R8 20 4 4 Receptacle G - 301
40A 4P
100MA 23 Y8 20 4 4 Receptacle G - 301
ELCB-3
24 B8 20 4 4 Receptacle G - (234, 235)

25 R9 20 4 4 Temp. Contr. VAV 1, 2, 5, 6

26 Y9 20 4 4 Lighting Exit

27 B9 20 4 4 Extract Fans PV 3, 4, 11, 14


28 R10 20 16 16
63A 4P
100MA 29 Y10 20 16 16 LPA Tech Services
ELCB-4
30 B10 20 16 16

CABLE SIZE : 1X4C-35mm2 XLPE/SWA/CU/PVC CABLE + 1X1C-16mm2 PVC ECC Y/G


RIBUTION SCHEDULE
Plot No.
Owner: Panel Location:
nsultants: EXP

CONNECTED LOADS / POINTS LOAD (Watts)


Watt /
Unit

PUMP
Outlet
13A 15A EX.

Flex.
LTG
S.O.
IK
S.O.
FCU
FAN
R Y B

4 207 828

4 207 828

4 207 828

12 150 1800

11 150 1650

11 150 1650

11 150 1650

11 150 1650

11 150 1650

8 150 1200

14 150 2100

1 150 150

8 200 1600

5 200 1000

6 200 1200

6 200 1200

6 200 1200

6 200 1200

6 200 1200

8 200 1600

8 200 1600

5 200 1000

4 200 800

8 200 1600

3 200 600

1 200 200

4 200 800
7000

21000 7000

7000

18078 18028 17678

TOTAL 53.78
Remarks
53784

kW
LOAD DISTRIBUTION SCHEDULE
Project name: DUBAI PETROLEUM
Panel Ref : LPD Machine Shop Owner:
Fed From: SMDB-6-601 Consultants: EXP

MCB CCT ECC


RATING OF

RATING OF
INCOMER

RTG. Wire Wire


ELCB

SL NO. CIR. NO. ROOM / AREA


(A) (mm2) (mm2)

1 R1 20 2.5 2.5 Lighting Security Office

2 Y1 20 2.5 2.5 Lighting Guard Room

3 B1 20 2.5 2.5 Lighting Spot and Canopy

4 R2 20 4 4 Receptacle Toilet
40A 4P
100MA 5 Y2 20 4 4 Receptacle Guard Room
ELCB-1
6 B2 20 2.5 2.5 Extract Fans 15
40A TPN ISOLATOR

7 R3 20 2.5 2.5 Fire Alarm Panel

8 Y3 20 2.5 2.5 Spare

9 B3 20 2.5 2.5 Spare

10 R4 20 2.5 2.5

11 Y4 20 2.5 2.5 Package AC

63A 4P 12 B4 20 2.5 2.5


100MA
ELCB-2 13 R5 20 4 4

14 Y5 20 4 4 Water Heater

15 B5 20 4 4

CABLE SIZE : 1X4C-35mm2 XLPE/SWA/CU/PVC CABLE + 1X1C-16mm2 PVC ECC Y/G


RIBUTION SCHEDULE
Plot No.
Owner: Panel Location:
nsultants: EXP

CONNECTED LOADS / POINTS LOAD (Watts)


Watt /
Unit

PUMP
Outlet
13A 15A EX.

Flex.
LTG
S.O.
IK
S.O.
FCU
FAN
R Y B

6 150 900

6 150 900

6 150 900

6 200 1200

4 200 800

1 200 200

1 200 200

150 0

150 0

746

2238 746

746

1333

4000 1333

1333

4379 3779 3179

TOTAL 11.34
Remarks

11337

kW
2500 2 1250
2500 3 833.3333
2500 4 625
2500 5 500
2500 6 416.6667
2500 7 357.1429
2500 8 312.5
2500 9 277.7778
2500 10 250
2500 11 227.2727
2500 12 208.3333
2500 13 192.3077
2500 14 178.5714
2500 15 166.6667
2500 16 156.25
2500 17 147.0588
2500 18 138.8889
2500 19 131.5789
2500 20 125

1400 2 700 1200 2 600


1400 3 466.6667 1200 3 400
1400 4 350 1200 4 300
1400 5 280 1200 5 240
1400 6 233.3333 1200 6 200
1400 7 200 1200 7 171.4286
1400 8 175 1200 8 150
1400 9 155.5556 1200 9 133.3333
1400 10 140 1200 10 120
1400 11 127.2727 1200 11 109.0909
1400 12 116.6667 1200 12 100
1400 13 107.6923 1200 13 92.30769
1400 14 100 1200 14 85.71429
1400 15 93.33333 1200 15 80
1400 16 87.5 1200 16 75
1400 17 82.35294 1200 17 70.58824
1400 18 77.77778 1200 18 66.66667
1400 19 73.68421 1200 19 63.15789
1400 20 70 1200 20 60
1670 2 835
1670 3 556.6667
1670 4 417.5
1670 5 334
1670 6 278.3333
1670 7 238.5714
1670 8 208.75
1670 9 185.5556
1670 10 167
1670 11 151.8182
1670 12 139.1667
1670 13 128.4615
1670 14 119.2857
1670 15 111.3333
1670 16 104.375
1670 17 98.23529
1670 18 92.77778
1670 19 87.89474
1670 20 83.5

You might also like