Professional Documents
Culture Documents
Compacted Filling As Per Geo Technical Sprcifications: Silchar - Hospital
Compacted Filling As Per Geo Technical Sprcifications: Silchar - Hospital
This drawing is the property of L&T Construction, B&F-EDRC and must not be passed on to any person or body not authorised by
us to receive it nor be copied or otherwise made use either in full or in part by such person or body without our prior permission
01 RAMP SLAB A in writing.
ARCHITECTURAL -0.050 -0.100
A FINISH (TYP) (TOC) $ -0.100 21 -0.050
150
(TOC)
150
# -0.100 -0.050 BRICK STEPS (TOC)
75
150
-0.050 SEISMIC JOINT 100 THK. -0.100 $ (TOC)
#GRADE SLAB (TYP) -0.100 (TOC) 200
(TOC)
150
(TOC) (FFL) (FRL) $ -0.600
150
H 01 01 H
(TYP)
-0.900 -0.600 (FRL)
(TYP)
200 200
50
2-Y10-01
50
(FGL) (FGL)
300
. 2-Y10-02
150
03
150
##
$ GF-B54
2L-Y8-03-250C/C
(TYP)
##
50
300 02 02
GF-B2b RC DROP
75
GF-B10
150
GF-B20
P.C.C (1:4:8)
RC WALL (TYP)
(TYP) RC WALL (TYP) RC WALL (TYP) ISOLATOR TYPICAL DETAIL OF GRADE SLAB THICKENING
##
ISOLATOR
##
(SCALE 1 : 25)
TAPERED RC WAL PEDESTAL
(250 THK AT BOTTOM PEDESTAL
TO 150THK AT TOP) (TYP)
RAFT
RAFT 01
BEAM IN ELEVATION
# SEISMIC JOINT
-0.100
500 225
G SECTION GF_S7 SLAB IN ELEVATION (TOC) G
#
SECTION GF_S4 SECTION GF_S6 (SCALE 1 : 40)
$ $
SEISMIC JOINT -0.650
(SCALE 1 : 40) SECTION GF_S5 21 (FGL)
110
(SCALE 1 : 40) WALL IN ELEVATION
(SCALE 1 : 40) RAMP SLAB LEVEL -0.050
150
SEISMIC JOINT #
50
VARIES (TOC)
(TYP)
J -0.600 250 $
-0.100 -0.050 (FRL)
-0.150
-0.350 (TOC) -0.300 (TOC)
RAMP 01 -0.350 250 (TOC)
##
(TOC)
(TYP)
SLAB
50
UP (TOC)
RC DROP
50
-0.850
150
(FRL) DRAIN
150
$
P.C.C (TYP) (REFER PHE DRAWING)
ISOLATOR
SECTION GF_S3
300
##
F STP COVER SLAB (SCALE 1 : 40) F
GF-B19 RC WALL (TYP)
150
-0.600
#
SEISMIC JOINT (TYP) (TOC) LEGEND :
UP # TOC - TOP OF CONCRETE GF-S - GROUND FLOOR SECTION
250 SEISMIC JOINT (TYP)
(FRL) $
-0.600 -0.550 J
ARCHITECTURAL FINISH
E (FRL) (TOC)
-0.050 01 -0.100 SHOWN INDICATIVELY (TYP) -0.050
FRL - FORMED ROAD LEVEL LPP - LIFT PIT PEDESTAL E
-0.100
SEISMIC JOINT#
150
(TOC) $
75
(TOC) 100 THK GRADE SLAB (TOC) (TOC) FGL - FORMED GROUND LEVEL POP - PHE OPENING
150 BRICK WORK
150
RC DROP GF-B54
150
DRAIN TYP - TYPICAL FOP - FPS OPENING
(REFER PHE DRAWING) 600
150
-0.850
150
(TYP)
150
450
$ THK - THICKNESS ELOP - ELV OPENING
50
DRAIN GF-B19
50
ISOLATOR
(REFER PHE DRAWING) (FRL)
GF-B20 IJ - ISOLATION JOINT GF-B - GROUND FLOOR BEAMS
RC WALL (TYP)
STP WALL
75
PEDESTAL RC WALL (TYP) RC WALL (TYP) LPW - LIFT PIT WALL GF-DB - GROUND FLOOR DUCT BEAMS
150
DRAIN TO SLOPE
NOTES :
1. ALL DIMENSIONS ARE IN MILLIMETRES AND LEVELS ARE IN METRES UNLESS STATED OTHERWISE.
SECTION GF_S13 SECTION GF_S14 2. FOR ALL OTHER NOTES REFER DRG. NO. O19035-C-HP-04-NU-0006.
SECTION GF_S12 (SCALE 1 : 40) (SCALE 1 : 40)
D SECTION GF_S11 (SCALE 1 : 40) D
(SCALE 1 : 40) B
-0.050 -0.100
(TOC)
150
(TOC)
-0.100 J -0.050 ARCHITECTURAL
$
-0.100 B A
J FINISH (TYP)
(TYP)
(TOC) $
150
(TOC) -0.650 (TOC)
700
-0.050 $ (FGL)
50
-0.100 #
-0.650 SEISMIC JOINT # 100 THK.
(TOC)
200
(TOC) GRADE SLAB (TYP)
150
(TYP)
(FGL)
150
150
-0.900
50
50
GF-B3 UP
(FGL)
LPW
300
110
GF-B19 P.C.C (1:4:8)
(TYP)
C C
RC WALL (TYP) RC WALL (TYP)
SECTION GF_S15 RAFT SECTION GF_S20 REV.NO. DESCRIPTION DESIGNED DRAWN CHECKED APPROVED
REVISIONS
(SCALE 1 : 40) SECTION GF_S16 (SCALE 1 : 40)
CHECKED BY SIGN DATE CHECKED BY SIGN DATE CHECKED BY SIGN DATE
(SCALE 1 : 40) SECTION GF_S19 ARCHITECTURE HVAC GIS
(SCALE 1 : 40) (LIFT PIT ARRANGEMENT CIVIL & STRUCTURAL FPS GEOTECH
AND LPP NOT SHOWN FOR CLARITY)
ELECTRICAL PIPING VHT
GF-B38 ( A Government of Assam and Tata Trusts Initiative). ARCHITECT: L&T Construction - Buildings & Factories.
1250
GF-B8
GF-B15 Larsen & Toubro Limited, Construction, Buildings & Factories
**
SUPPLIER / CONTRACTOR :
750
M50
1250
12 11 10 9 8 7 6 5 4 3 2 1