Photo 1
Preparatory work
Preparatory operations can include cleaning of the
track ballast, horizontal and vertical subgrade and
track bed adjustment, fitting of fibrous web mats,
geo textiles, cable channels and similar measures.
The gauge must be checked..
The maximum permissible wear of the rail head is
5 mm (3 mm with additional wheel tyre wear)
Prerequisite for the installation is that the rail is in
its final/desired position Photo 1: The BODAN
materials can be deposited directly next to the
construction site. Please do not stack the pallets
on top of each other
Diagram 1
Diagram 1
Photo 2:
See Photo 2:
Photo 3 Photo 3:
Checking the sleeper spacing.
The centre distance of the rail fastenings must be
600 mm.
Care must be taken to insure that the sleepers are
positioned at a right angle to the rails.
Diagram 3 Diagram 3
A ..... Gauge
E ..... Sleeper length up to 2.60 m
F …. Foundation distance up to approx. 2.72 m
with AP 750 and up to 4.13m with AP 1470
G ....Height from upper rail head edge to upper
edge of foundation normally is 28 cm incl.
1 cm levelling layer min. C50/60.
Tolerance levelling layer –0.2/+0.5 cm
Photo 4 / Photo 5
Making use of the levelling gauge, and
compacting the subbase for the foundation beam
WUB.
G:\GMUNDNER-MANAGEMENT\WERBUNG - Fa GF\Einbauanleitung BODAN\Einbauanleitung ab 10.2009 de-e-fr\Englisch\Einbauanleitung Zusammenstellung für Wandlung engl\LOGOINSTALLATION GUIDE BODAN Level Crossing new 02.02.2011e.doc
Page 2 of 8
All rights reserved. Subject to technical modifications - in particular if implemented for the purpose of improvement.
Gmundner Fertigteile Ges.m.b.H & CoKG .
Werk: Unterthalham Straße 1, A - 4694 OHLSDORF
Tel.: +43 -(0)7612 – 63065-0 Fax.: +43 - (0)7612 - 63065-31 Level Crossing Systems
e-mail: office@gmundner-ft.at www.gmundner-ft.at Page 3 of 8
DOCUMENT:02/11 INSTALLATION GUIDE BODAN Level Crossing
Raising and lowering of the foundation beams WUB Drawing 2:
and bearing edge beams (AST):
Photo 8:
Levelling layer between foundation beam WUB
and bearing edge beam (AST/H, AST/HD, AST/HL):
Diagram 4: Diagram 4
G:\GMUNDNER-MANAGEMENT\WERBUNG - Fa GF\Einbauanleitung BODAN\Einbauanleitung ab 10.2009 de-e-fr\Englisch\Einbauanleitung Zusammenstellung für Wandlung engl\LOGOINSTALLATION GUIDE BODAN Level Crossing new 02.02.2011e.doc
Page 3 of 8
All rights reserved. Subject to technical modifications - in particular if implemented for the purpose of improvement.
Gmundner Fertigteile Ges.m.b.H & CoKG .
Werk: Unterthalham Straße 1, A - 4694 OHLSDORF
Tel.: +43 -(0)7612 – 63065-0 Fax.: +43 - (0)7612 - 63065-31 Level Crossing Systems
e-mail: office@gmundner-ft.at www.gmundner-ft.at Page 4 of 8
DOCUMENT:02/11 INSTALLATION GUIDE BODAN Level Crossing
Securing bolt and recess in the bearing edge beam Drawing 3:
See attachment:
Diagram 5: Diagram 5
I ..... a) Inserting of rubber profiles for the
external panels (1. PA300 + 2. PA600 + .)
b) Mounting external panel, as shown.
Diagram 6: Diagram 6
G:\GMUNDNER-MANAGEMENT\WERBUNG - Fa GF\Einbauanleitung BODAN\Einbauanleitung ab 10.2009 de-e-fr\Englisch\Einbauanleitung Zusammenstellung für Wandlung engl\LOGOINSTALLATION GUIDE BODAN Level Crossing new 02.02.2011e.doc
Page 4 of 8
All rights reserved. Subject to technical modifications - in particular if implemented for the purpose of improvement.
Gmundner Fertigteile Ges.m.b.H & CoKG .
Werk: Unterthalham Straße 1, A - 4694 OHLSDORF
Tel.: +43 -(0)7612 – 63065-0 Fax.: +43 - (0)7612 - 63065-31 Level Crossing Systems
e-mail: office@gmundner-ft.at www.gmundner-ft.at Page 5 of 8
DOCUMENT:02/11 INSTALLATION GUIDE BODAN Level Crossing
Photo 9:
Photo 9:
Diagram 7: Diagram 7:
Photo 10:
Photo 10
Diagram 8: Diagram 8
G:\GMUNDNER-MANAGEMENT\WERBUNG - Fa GF\Einbauanleitung BODAN\Einbauanleitung ab 10.2009 de-e-fr\Englisch\Einbauanleitung Zusammenstellung für Wandlung engl\LOGOINSTALLATION GUIDE BODAN Level Crossing new 02.02.2011e.doc
Page 5 of 8
All rights reserved. Subject to technical modifications - in particular if implemented for the purpose of improvement.
Gmundner Fertigteile Ges.m.b.H & CoKG .
Werk: Unterthalham Straße 1, A - 4694 OHLSDORF
Tel.: +43 -(0)7612 – 63065-0 Fax.: +43 - (0)7612 - 63065-31 Level Crossing Systems
e-mail: office@gmundner-ft.at www.gmundner-ft.at Page 6 of 8
DOCUMENT:02/11 INSTALLATION GUIDE BODAN Level Crossing
Diagram 9:
Diagram 9:
O ..... using the wedge mounting lever (KH) the
panel is pressed down in oder to laterally insert
the upper rubber profile (PIO).
G:\GMUNDNER-MANAGEMENT\WERBUNG - Fa GF\Einbauanleitung BODAN\Einbauanleitung ab 10.2009 de-e-fr\Englisch\Einbauanleitung Zusammenstellung für Wandlung engl\LOGOINSTALLATION GUIDE BODAN Level Crossing new 02.02.2011e.doc
Page 6 of 8
All rights reserved. Subject to technical modifications - in particular if implemented for the purpose of improvement.
Gmundner Fertigteile Ges.m.b.H & CoKG .
Werk: Unterthalham Straße 1, A - 4694 OHLSDORF
Tel.: +43 -(0)7612 – 63065-0 Fax.: +43 - (0)7612 - 63065-31 Level Crossing Systems
e-mail: office@gmundner-ft.at www.gmundner-ft.at Page 7 of 8
DOCUMENT:02/11 INSTALLATION GUIDE BODAN Level Crossing
Drawing 5:
Drawing 6:
G:\GMUNDNER-MANAGEMENT\WERBUNG - Fa GF\Einbauanleitung BODAN\Einbauanleitung ab 10.2009 de-e-fr\Englisch\Einbauanleitung Zusammenstellung für Wandlung engl\LOGOINSTALLATION GUIDE BODAN Level Crossing new 02.02.2011e.doc
Page 7 of 8
All rights reserved. Subject to technical modifications - in particular if implemented for the purpose of improvement.
Gmundner Fertigteile Ges.m.b.H & CoKG .
Werk: Unterthalham Straße 1, A - 4694 OHLSDORF
Tel.: +43 -(0)7612 – 63065-0 Fax.: +43 - (0)7612 - 63065-31 Level Crossing Systems
e-mail: office@gmundner-ft.at www.gmundner-ft.at Page 8 of 8
DOCUMENT:02/11 INSTALLATION GUIDE BODAN Level Crossing
Diag. 1 Diag. 1
Le-BODAN
The two panels are to be, as a pair,
● linked together and, as a folded pair,
● lowered down onto the rubber profiles, and then
● laid, as a folded pair, between the rails.
● Also see Photo 1 to Photo 6
Precautionary Measures
Safety regulations, directives, instructional leaflets etc. of the relevant railway companies must be complied with.
Safety regulations, ordinances, instructional leaflets etc. of the road traffic authorities must be complied with.
Prior to any maintenance work at the railway facilities safeguarding measures have to be taken in accordance with
the relevant regulations.
Maintenance Measures
The operator has to visually check the level crossings once a year. At level crossings with more than 15,000 load
cycles per day (1 load cycle = one vehicle axle) the frequency of this visual inspection has to be increased
accordingly (not less than twice a year
Rubber profiles are subject to wear and must therefore be replaced depending on traffic load and degree of wear
Damaged BODAN level crossing panels have to be exchanged resp. replaced depending on the extent of damage.
Check List
Initiate
Maintenance and Service Points Measures measures
Yes No
Visual check of the BODAN level crossing Damaged BODAN level crossing panels are to
panels for mechanical damage. be replaced.
Visual check of the BODAN level crossing Cracks of up to 0.3 mm width do not require any
panels for cracks measure, cracks of more the 0.3 mm width
should be filled and sealed with resin resp. be
pressed out.
Reprinting, any kind of reproduction, including excerpts or in other media or data carriers, require(s) the permission by the management of Gmundner Fertigteile Ges.m.b.H &
Co KG, Unterthalhamstrasse 1, A-4694 Ohlsdorf
G:\GMUNDNER-MANAGEMENT\WERBUNG - Fa GF\Einbauanleitung BODAN\Einbauanleitung ab 10.2009 de-e-fr\Englisch\Einbauanleitung Zusammenstellung für Wandlung engl\MAINTENANCE MANUAL Wartungsblatt (E)
10.08.2010.docCopyright:
Page 1 of 4
Gmundner Fertigteile Ges.m.b.H & Co KG
Werk: Unterthalham Straße 1, A - 4694 OHLSDORF BODAN
Gleiseindeckungssysteme
Tel.:++43 -(0)7612 – 63065-0 Fax.:++43 - (0)7612 - 63065-31 Level crossing systems
e-mail: gf.bodan@gmundner-ft.at www.gmundner-ft.at
Prepared by: GH
BODAN MAINTENANCE MANUAL Created on : 15 June.2010
Printed on: 07.02.2011 14:22:00
All rights reserved. Subject to technical modifications. Techn. status: 05/10
Initiate
Maintenance and Service Points Measures measures
Yes No
Note to Pos ago:
Visual check of the connection to the road: If the traffic has caused the asphalt surface to be
Joint asphalt – bearing edge beam lower with relation to the bearing edge beam,
repair work is required in that area (road
connection 10 mm higher than bearing edge
beam).
Visual check of the bearing edge beams for If the bearing edge beams have become lowered
height and level position and lateral due to traffic load or unfavourable ground
dislocation. conditions, the height differences in that area are
to be levelled out. If the lowering of the bearing
edge beams is not fixed in time that may cause
damage to the BODAN level crossing panels.
Visual check of the panel retainers and If necessary, the screws and/or nuts have to be
deflector plates for tight and secure seat of re-tightened.
the screws and nuts
Check of the BODAN level crossing panels If the BODAN level crossing panels move or are
for movements (tilting, lowering, rattling) by lowered considerably, the rubber profiles are to
walking over them. be checked for wear. Lowerings or considerable
movements of the internal panels can also be
caused by a widening of the gauge. The gauge is
to be checked.
Check of the rubber profiles for correct The position of the rubber profiles is to be
position (slow dislocation of the rubber corrected; damaged, worn rubber profiles are to
profiles) be replaced.
Reprinting, any kind of reproduction, including excerpts or in other media or data carriers, require(s) the permission by the management of Gmundner Fertigteile Ges.m.b.H &
Co KG, Unterthalhamstrasse 1, A-4694 Ohlsdorf
G:\GMUNDNER-MANAGEMENT\WERBUNG - Fa GF\Einbauanleitung BODAN\Einbauanleitung ab 10.2009 de-e-fr\Englisch\Einbauanleitung Zusammenstellung für Wandlung engl\MAINTENANCE MANUAL Wartungsblatt (E)
10.08.2010.docCopyright:
Page 2 of 4
Gmundner Fertigteile Ges.m.b.H & Co KG
Werk: Unterthalham Straße 1, A - 4694 OHLSDORF BODAN
Gleiseindeckungssysteme
Tel.:++43 -(0)7612 – 63065-0 Fax.:++43 - (0)7612 - 63065-31 Level crossing systems
e-mail: gf.bodan@gmundner-ft.at www.gmundner-ft.at
Prepared by: GH
BODAN MAINTENANCE MANUAL Created on : 15 June.2010
Printed on: 07.02.2011 14:22:00
All rights reserved. Subject to technical modifications. Techn. status: 05/10
Initiate
Maintenance and Service Points Measures measures
Yes No
Note to Pos ago:
Visual check of the distancing strips for correct If distancing strips show any deviations they are to be
height, dislocation or mechanical damage. fastened to the bearing edge beams or to be replaced.
A documentation of the maintenance measures carried out has to be produced and to be given to the operator.
Reprinting, any kind of reproduction, including excerpts or in other media or data carriers, require(s) the permission by the management of Gmundner Fertigteile Ges.m.b.H &
Co KG, Unterthalhamstrasse 1, A-4694 Ohlsdorf
G:\GMUNDNER-MANAGEMENT\WERBUNG - Fa GF\Einbauanleitung BODAN\Einbauanleitung ab 10.2009 de-e-fr\Englisch\Einbauanleitung Zusammenstellung für Wandlung engl\MAINTENANCE MANUAL Wartungsblatt (E)
10.08.2010.docCopyright:
Page 3 of 4
Gmundner Fertigteile Ges.m.b.H & Co KG
Werk: Unterthalham Straße 1, A - 4694 OHLSDORF BODAN
Gleiseindeckungssysteme
Tel.:++43 -(0)7612 – 63065-0 Fax.:++43 - (0)7612 - 63065-31 Level crossing systems
e-mail: gf.bodan@gmundner-ft.at www.gmundner-ft.at
Prepared by: GH
BODAN MAINTENANCE MANUAL Created on : 15 June.2010
Printed on: 07.02.2011 14:22:00
All rights reserved. Subject to technical modifications. Techn. status: 05/10
Reprinting, any kind of reproduction, including excerpts or in other media or data carriers, require(s) the permission by the management of Gmundner Fertigteile Ges.m.b.H &
Co KG, Unterthalhamstrasse 1, A-4694 Ohlsdorf
G:\GMUNDNER-MANAGEMENT\WERBUNG - Fa GF\Einbauanleitung BODAN\Einbauanleitung ab 10.2009 de-e-fr\Englisch\Einbauanleitung Zusammenstellung für Wandlung engl\MAINTENANCE MANUAL Wartungsblatt (E)
10.08.2010.docCopyright:
Page 4 of 4
Gmundner Fertigteile Ges.m.b.H & Co KG
Werk: Unterthalham Straße 1, A - 4694 OHLSDORF BODAN
Gleiseindeckungssysteme
Tel.:++43 -(0)7612 – 63065-0 Fax.:++43 - (0)7612 - 63065-31 Level crossing systems
e-mail: gf.bodan@gmundner-ft.at www.gmundner-ft.at
Prepared by: GH
SLEEPER SEPARATION Created on: 19.10.2009
Printed on: 07.02.2011 14:23:00
All rights reserved. Subject to technical modifications. Techn. status: 10/09
Basics
The centre distance of the rail fastening at straight rails tracks must be 600 mm (650 mm or so) in the case of standard
level crossings. At a curved track the sleeper spacings have to be calculated on the basis of the tables B2-Curved
Track AP 750 (Attachment 1) and B2 Curved Track AP 1470 (Attachment 2) according to the required radii.
Care must be taken to insure that the sleepers are positioned at a right angle to the rails. The sleeper separation should
be continued at both ends of the level crossings for at least three more sleepers.
The sleeper separation has to be measured on the running strip.
The tolerance of the sleeper separation depends on the width of the rail fastening (track superstructure fastening).
The individual tolerance values can be seen from Table 1.
The stated tolerance values refer to a single fastening and to a package of 5 sleepers.
Formula for 5 sleepers: 4 x sleeper separations ±.1 x tolerance = min./max. sleeper sum
(Formula for length of panel covering: Number of sleepers x separation ±.1 x tolerance = sleeper sum)
At a curved track the tolerance dimension is the same, the package dimension has to be increased by the package
value (4 x X1 x 0.5 from the Curvature Table).
Copyright: Reprinting, any kind of reproduction, including excerpts or in other media or data carriers, require(s) the
permission by the management of Gmundner Fertigteile Ges.m.b.H & Co KG, Unterthalhamstrasse 1, A-4694 Ohlsdorf.
G:\GMUNDNER-MANAGEMENT\WERBUNG - FA GF\EINBAUANLEITUNG BODAN\EINBAUANLEITUNG AB 10.2009 DE-E-FR\ENGLISCH\EINBAUANLEITUNG ZUSAMMENSTELLUNG
FÜR WANDLUNG ENGL\SLEEPER SEPARATION FOR BODAN LEVEL CROSSING E 15.06.2010 S2.DOC
Page 1 of 2
Gmundner Fertigteile Ges.m.b.H & Co KG
Werk: Unterthalham Straße 1, A - 4694 OHLSDORF BODAN
Gleiseindeckungssysteme
Tel.:++43 -(0)7612 – 63065-0 Fax.:++43 - (0)7612 - 63065-31 Level crossing systems
e-mail: gf.bodan@gmundner-ft.at www.gmundner-ft.at
Prepared by: GH
SLEEPER SEPARATION Created on: 19.10.2009
Printed on: 07.02.2011 14:23:00
All rights reserved. Subject to technical modifications. Techn. status: 10/09
Attachment 2
Attachment 1
Copyright: Reprinting, any kind of reproduction, including excerpts or in other media or data carriers, require(s) the
permission by the management of Gmundner Fertigteile Ges.m.b.H & Co KG, Unterthalhamstrasse 1, A-4694 Ohlsdorf.
G:\GMUNDNER-MANAGEMENT\WERBUNG - FA GF\EINBAUANLEITUNG BODAN\EINBAUANLEITUNG AB 10.2009 DE-E-FR\ENGLISCH\EINBAUANLEITUNG ZUSAMMENSTELLUNG
FÜR WANDLUNG ENGL\SLEEPER SEPARATION FOR BODAN LEVEL CROSSING E 15.06.2010 S2.DOC
Page 2 of 2