Download as docx, pdf, or txt
Download as docx, pdf, or txt
You are on page 1of 1

 Curing:

 The concrete block need to be kept in the mold for 24 hours for drying. Then remove the concrete block from the mold and
put it in a water tank for curing. The curing process will provide the required compressive strength and will take around two
weeks.
 Publicity and selling: Once you have sufficient numbers of concrete block you can place a small local newspaper ad
and build a website regarding your service.

You might also like