Professional Documents
Culture Documents
Curing
Curing
The concrete block need to be kept in the mold for 24 hours for drying. Then remove the concrete block from the mold and
put it in a water tank for curing. The curing process will provide the required compressive strength and will take around two
weeks.
Publicity and selling: Once you have sufficient numbers of concrete block you can place a small local newspaper ad
and build a website regarding your service.