Professional Documents
Culture Documents
Analysis of Rates 2
Analysis of Rates 2
NAME OF WORK:- Rejuvination of traditional, extinct, depleted water sources and water conservation in catchment of
Gaggar khad G.P Katli, Jamun Ki Ser Distt Sirmaur
Carriage of MS Flanges :-
Gaziabad/Delhi Road Head Site of work
BY Mechanical Transport By Head Load
292.00 KM 0.500 KM
Certified that the lead taken in the lead chart is shortest and economical routes by all means.
Executive Engineer,
Jal Shakti Vibhag
Nahan
** CARRIAGE OF MATERIALS **
NAME OF WORK :- Rejuvination of traditional, extinct, depleted water sources and water conservation in catchment of Gaggar khad G.P Katli, Jamun Ki
Ser Distt Sirmaur
Cement : Unit : Per Tonne. Steel : Unit : Per Tonne.
LEAD : By Mech. 42.00 Km. LEAD : By Mech. 42.00 Km.
By Head : 0.50 Km. By Head : 0.50 Km.
1) By Mech. Nos. Rate/ Km. 1) By Mech. Nos. Rate/ Km.
1 Km. 0 124.68 0.00 1 Km. 0 124.68 0.00
2 Km. 0 144.04 0.00 2 Km. 0 144.04 0.00
3 Km. 0 163.18 0.00 3 Km. 0 163.18 0.00
4 Km. 0 181.80 0.00 4 Km. 0 181.80 0.00
5 Km. 1 199.55 199.55 5 Km. 1 199.55 199.55
5- 10 Km. 5 16.42 82.10 5- 10 Km. 5 16.42 82.10
10-20 Km. 10 13.73 137.30 10-20 Km. 10 13.73 137.30
Beyond 20 Km. 22 11.55 254.10 Beyond 20 Km. 22 11.55 254.10
TOTAL : 673.05 TOTAL : 673.05
2) By Head load 2) By Head load
1st. 1 Km. 0 554.05 0.00 1st. 1 Km. 0 1169.72 0.00
1st. 100 Mtr 1 88.03 88.03 1st. 100 Mtr 1 185.84 185.84
Bey:1 Km.Per 1/2Km. 0 277.03 0.00 Bey:1 Km.Per 1/2Km. 0 584.86 0.00
Bey:100 Mtr Per 50 Mtr 8 25.89 207.12 Bey:100 Mtr Per 50 Mtr 8 54.66 437.28
Total : 295.15 Total : 623.12
Sand : Stone aggregate below 40mm :
Unit : Per Cum. Unit : Per Cum.
LEAD : By Mech. 89.00 Km. LEAD : By Mech. 89.00 Km.
By Head : 0.50 Km. By Head : 0.50 Km.
1) By Mech. Nos. Rate/ Km. 1) By Mech. Nos. Rate/ Km.
1 Km. 0 187.02 0.00 1 Km. 0 187.02 0.00
2km 0 216.06 0.00 2 Km. 0 216.06 0.00
3 Km. 0 244.77 0.00 3 Km. 0 244.77 0.00
4 Km. 0 272.70 0.00 4 Km. 0 272.70 0.00
5 Km. 1 299.32 299.32 5 Km. 1 299.32 299.32
5- 10 Km. 5 24.63 123.15 5- 10 Km. 5 24.63 123.15
10-20 Km. 10 20.59 205.90 10-20 Km. 10 20.59 205.90
Beyond 20 Km. 69 17.32 1195.08 Beyond 20 Km. 69 17.32 1195.08
TOTAL : 1823.45 TOTAL : 1823.45
2) By Head load 2) By Head load
1st. 1 Km. 0 940.32 0.00 1st. 1 Km. 0 940.32 0.00
1st. 100 Mtr 1 149.40 149.40 1st. 100 Mtr 1 149.40 149.40
Bey:1 Km.Per 1/2Km. 0 470.16 0.00 Bey:1 Km.Per 1/2Km. 0 470.16 0.00
Bey:100 Mtr Per 50 Mtr 8 43.94 351.52 Bey:100 Mtr Per 50 Mtr 8 43.94 351.52
Total : 500.92 Total : 500.92
Stone aggregate above 40mm : Building stone :
Unit : Per Cum. Unit : Per Cum.
LEAD : By Mech. 89.00 Km. LEAD : By Mech. 0.00 Km.
By Head : 0.50 Km. By Head : 0.50 Km.
1) By Mech. Nos. Rate/ Km. 1) By Mech. Nos. Rate/ Km.
1 Km. 0 202.41 0.00 1 Km. 0 202.41 0.00
2 Km. 0 233.84 0.00 2 Km. 0 233.84 0.00
3 Km. 0 264.90 0.00 3 Km. 0 264.90 0.00
4 Km. 0 295.13 0.00 4 Km. 0 295.13 0.00
5 Km. 1 323.94 323.94 5 Km. 0 323.94 0.00
5- 10 Km. 5 26.65 133.25 5- 10 Km. 0 26.65 0.00
10-20 Km. 10 22.28 222.80 10-20 Km. 0 22.28 0.00
Beyond 20 Km. 69 18.75 1293.75 Beyond 20 Km. 0 18.75 0.00
TOTAL : 1973.74 TOTAL : 0.00
2) By Head load 2) By Head load
1st. 1 Km. 0 1016.70 0.00 1st. 1 Km. 0
1016.70 0.00
1st. 100 Mtr 1 161.52 161.52 1st. 100 Mtr 1
161.52 161.52
Bey:1 Km.Per 1/2Km. 0 508.35 0.00 Bey:1 Km.Per 1/2Km. 0
508.35 0.00
Bey:100 Mtr Per 50 Mtr 8 47.51 380.08 Bey:100 Mtr Per 50 Mtr 847.51 380.08
Total : 541.60 Total : 541.60
Soling Stone : Heavy material and pipe below 100 mm :
Unit : Per Cum. Unit : Per Tonne.
LEAD : By Mech. 0.00 Km. LEAD : By Mech. 42.00 Km.
By Head : 0.50 Km. By Head : 0.50 Km.
1) By Mech. Nos. Rate/ Km. 1) By Mech. Nos. Rate/ Km.
1 Km. 0 220.03 0.00 1 Km. 0 124.68 0.00
2 Km. 0 254.19 0.00 2 Km. 0 144.04 0.00
3 Km. 0 287.96 0.00 3 Km. 0 163.18 0.00
4 Km. 0 320.82 0.00 4 Km. 0 181.80 0.00
5 Km. 0 352.14 0.00 5 Km. 1 199.55 199.55
5- 10 Km. 0 28.97 0.00 5- 10 Km. 5 16.42 82.10
10-20 Km. 0 24.22 0.00 10-20 Km. 10 13.73 137.30
Beyond 20 Km. 0 20.38 0.00 Beyond 20 Km. 22 11.55 254.10
TOTAL : 0.00 TOTAL : 673.05
2) By Head load 2) By Head load
1st. 1 Km. 0 940.32 0.00 1st. 1 Km. 0 686.52 0.00
1st. 100 Mtr 1 149.40 149.40 1st. 100 Mtr 1 109.08 109.08
Bey:1 Km.Per 1/2Km. 0 470.16 0.00 Bey:1 Km.Per 1/2Km. 0 343.26 0.00
Bey:100 Mtr Per 50 Mtr 8 43.94 351.52 Bey:100 Mtr Per 50 Mtr 8 32.08 256.64
Total : 500.92 Total : 365.72
Bricks : Timber :
Unit : Per 1000.Nos. Unit : Per Cum.
LEAD : By Mech. 77.00 Km. LEAD : By Mech. 42.00 Km.
By Head : 0.50 Km. By Head : 0.50 Km.
1) By Mech. Nos. Rate/ Km. 1) By Mech. Nos. Rate/ Km.
1 Km. 0 467.56 0.00 1 Km. 0 187.02 0.00
2 Km. 0 540.16 0.00 2 Km. 0 216.06 0.00
3 Km. 0 611.93 0.00 3 Km. 0 244.77 0.00
4 Km. 0 681.74 0.00 4 Km. 0 272.70 0.00
5 Km. 1 748.30 748.30 5 Km. 1 299.32 299.32
5- 10 Km. 5 61.57 307.85 5- 10 Km. 5 24.63 123.15
10-20 Km. 10 51.48 514.80 10-20 Km. 10 20.59 205.90
Beyond 20 Km. 57 43.31 2468.67 Beyond 20 Km. 22 17.32 381.04
TOTAL : 4039.62 TOTAL : 1009.41
2) By Head load 2) By Head load
1st. 1 Km. 0 1755.43 0.00 1st. 1 Km. 0 751.99 0.00
1st. 100 Mtr 1 278.89 278.89 1st. 100 Mtr 1 119.47 119.47
Bey:1 Km.Per 1/2Km. 0 877.72 0.00 Bey:1 Km.Per 1/2Km. 0 376.00 0.00
Bey:100 Mtr Per 50 Mtr 8 82.03 656.24 Bey:100 Mtr Per 50 Mtr 8 35.14 281.12
Total : 935.13 Total : 400.59
MSERW Pipe:- MS Flange :-
Unit : MT Unit : MT
LEAD : By Mech. 292.00 Km. LEAD : By Mech. 292.00 Km.
By Head : 0.50 Km. By Head : 0.50 Km.
1) By Mech. Nos. Rate/ Km. 1) By Mech. Nos. Rate/ Km.
1 Km. 0 124.68 0.00 1 Km. 0 124.68 0.00
2 Km. 0 144.04 0.00 2 Km. 0 144.04 0.00
3 Km. 0 163.18 0.00 3 Km. 0 163.18 0.00
4 Km. 0 181.80 0.00 4 Km. 0 181.80 0.00
50 Km. 1 199.55 199.55 5 Km. 1 199.55 199.55
5- 10 Km. 5 16.42 82.10 5- 10 Km. 5 16.42 82.10
10-20 Km. 10 13.73 137.30 10-20 Km. 10 13.73 137.30
Beyond 20 Km. 272 11.55 3141.60 Beyond 20 Km. 272 11.55 3141.60
TOTAL : 3560.55 TOTAL : 3560.55
2) By Head load 2) By Head load
1st. 1 Km. 0 1169.72 0.00 1st. 1 Km. 0 686.52 0.00
1st. 100 Mtr 1 185.84 185.84 1st. 100 Mtr 1 109.08 109.08
Bey:1 Km.Per 1/2Km. 0 584.86 0.00 Bey:1 Km.Per 1/2Km. 0 343.26 0.00
Bey:100 Mtr Per 50 Mtr 8 54.66 437.28 Bey:100 Mtr Per 50 Mtr 8 32.08 256.64
Total : 623.12 Total : 365.72
Heavy material i.e Valves etc. From Solan:
Unit : Per Tonne.
LEAD : By Mech. 60.00 Km.
By Head : 0.50 Km.
1) By Mech. Nos. Rate/ Km.
1 Km. 0 124.68 0.00
2 Km. 0 144.04 0.00
3 Km. 0 163.18 0.00
4 Km. 0 181.80 0.00
5 Km. 1 199.55 199.55
5- 10 Km. 5 16.42 82.10
10-20 Km. 10 13.73 137.30
Beyond 20 Km. 40 11.55 462.00
TOTAL : 880.95
2) By Head load
1st. 1 Km. 0 686.52 0.00
1st. 100 Mtr 1 109.08 109.08
Bey:1 Km.Per 1/2Km. 0 343.26 0.00
Bey:100 Mtr Per 50 Mtr 8 32.08 256.64
Total : 365.72
Carriage of Prepainted Sheet:- DI Pipes 150 mm f :
Unit : Cum Unit : Per 100.Rmt.
LEAD : By Mech. 0.00 Km. LEAD : By Mech. 292.00 Km.
By Head : 0.50 Km. By Head : 0.50 Km.
1) By Mech. Nos. Rate/ Km. 1) By Mech. Nos. Rate/ Km.
1 Km. 0 124.68 0.00 1 Km. 0 510.99 0.00
2 Km. 0 144.04 0.00 2 Km. 0 590.34 0.00
3 Km. 0 163.18 0.00 3 Km. 0 668.77 0.00
4 Km. 0 181.80 0.00 4 Km. 0 745.07 0.00
5 Km. 0 199.55 0.00 5 Km. 1 817.81 817.81
5- 10 Km. 0 16.42 0.00 5- 10 Km. 5 67.28 336.40
10-20 Km. 0 13.73 0.00 10-20 Km. 10 56.26 562.60
Beyond 20 Km. 0 11.55 0.00 Beyond 20 Km. 272 47.33 12873.76
TOTAL : 0.00 TOTAL : 14590.57
2) By Head load 2) By Head load
1st. 1 Km. 0 1169.72 0.00 1st. 1 Km. 0 2614.44 0.00
1st. 100 Mtr 1 185.84 185.84 1st. 100 Mtr 1 415.38 415.38
Bey:1 Km.Per 1/2Km. 0 584.86 0.00 Bey:1 Km.Per 1/2Km. 0 1307.22 0.00
Bey:100 Mtr Per 50 Mtr 8 54.66 437.28 Bey:100 Mtr Per 50 Mtr 8 122.17 977.36
Total : 623.12 Total : 1392.74
DI Pipes 200 mm f : DI Pipes 250 mm f :
Unit : Per 100.Rmt. Unit : Per 100.Rmt.
LEAD : By Mech. 292.00 Km. LEAD : By Mech. 292.00 Km.
By Head : 0.50 Km. By Head : 0.50 Km.
1) By Mech. Nos. Rate/ Km. 1) By Mech. Nos. Rate/ Km.
1 Km. 0 851.66 0.00 1 Km. 0 1161.35 0.00
2 Km. 0 983.90 0.00 2 Km. 0 1341.68 0.00
3 Km. 0 1114.62 0.00 3 Km. 0 1519.93 0.00
4 Km. 0 1241.79 0.00 4 Km. 0 1693.34 0.00
5 Km. 1 1363.01 1363.01 5 Km. 1 1858.66 1858.66
5- 10 Km. 5 112.14 560.70 5- 10 Km. 5 152.92 764.60
10-20 Km. 10 93.76 937.60 10-20 Km. 10 127.86 1278.60
Beyond 20 Km. 272 78.89 21458.08 Beyond 20 Km. 272 107.58 29261.76
TOTAL : 24319.39 TOTAL : 33163.62
2) By Head load 2) By Head load
1st. 1 Km. 0 3923.27 0.00 1st. 1 Km. 0 6895.73 0.00
1st. 100 Mtr 1 623.33 623.33 1st. 100 Mtr 1 1095.59 1095.59
Bey:1 Km.Per 1/2Km. 0 1961.64 0.00 Bey:1 Km.Per 1/2Km. 0 3447.87 0.00
Bey:100 Mtr Per 50 Mtr 8 183.33 1466.64 Bey:100 Mtr Per 50 Mtr 8 322.23 2577.84
Total : 2089.97 Total : 3673.43