Nonconformance Report (NCR) Log
Nonconformance Report (NCR) Log
QA Dept
TA-NCR-
45
accepting NCR
Initial of
Pers on
Response
Received
Date
T (NCR) LOG
Response
Required
Date
esponse
equired
Dept
Initial o
Pers o
accepting
Response
Received
NONCONFORMANCE REPORT (NCR) LOG Maintained by
Date
QA Dept
Response
PROJECT NCR NO. Initial of Person
Required
NO. WO NO. Required Dept Required Received Date
NAME accepting NCR (AR No, CAR No etc.)
Date
Close Date Date
Response
Required
Dept
Conditions Adverse to Quality
Clos e Date
Open Date
TA-NCR-
NCR NO.
45
PROJECT
NAME
NL-21 Rev . 0
WO NO.
Clos e Date
Open Date
NONCONFORMANCE REPORT (NCR) LOG Maintained by
TA-NCR-
NCR NO.
QA Dept
45
Open Date Response Response
Remarks
Conditions Adverse to Quality Response
PROJECT NCR NO. Initial of Person
NO. WO NO. Required Dept Required Received Date
PROJECT
NAME accepting NCR (AR No, CAR No etc.)
Close Date Date
NAME
F-QANL-21 Rev . 0
WO NO.
NO.
NONCONFORMANCE REPORT (NCR) LOG
Open Date Response Response
Response
Conditions Adverse to Quality or Safety
NO. WO NO. PROJECT NAME NCR NO. Required Dept Required Received Date
Close Date Date
1/3/2017
1 - - TA-NC-HSE-01 No calibration (Load test ) was performed for overhead Cranes Maintenance 4/3/2017 2/3/2017
13/3/2017
12/2/2018 Production(post
2 TA-NC-HSE-02 Fire hose repeately used for cleaning purposes 14/2/2018 13/2/2018
13/2/2018 fabrication)
4/10/2018 Production(post
2 TA-NC-HSE-03 Welder was became fainting because of illness and fatigue 7/10/2018 6/10/2018
7/10/2018 fabrication)
21/11/2018 Fabricator was walking inside the vessel and slipped. Minor hit on Production(post
2 TA-NC-HSE-04 24/11/2018 24/11/2018
24/11/2018 his left hip fabrication)
NONCONFORMANCE REPORT (NCR) LOG
Open Date Response Response
Response
Conditions Adverse to Quality or Safety
NO. WO NO. PROJECT NAME NCR NO. Required Dept Required Received Date
Close Date Date
F-QANL-21 Rev.1
Maintained by
QA Dept
Remarks
Initial of Person
accepting NCR (AR No, CAR No etc.)
GNK
Joel
Salim
Nehab
Maintained by
QA Dept
Remarks
Initial of Person
accepting NCR (AR No, CAR No etc.)
TSM ARABIA