DELIVERABLE LIST

ALINDO HYDROGEN TRANSFER LINE FACILITY PROJECT

CLIENT : PT. Candra Asri Petrochemical


LOCATION : Cilegon
UPDATE : 22-Nov-18
CONT'R : PT.MATRA ENGINEERING & CONSTRUCTION
SUBMIT
REVISI
NO. DOC/NO. TITLE DOC. NUMBER/DRW NO SHEET
DATE SUBMIT
0 1 2

I PIPING
A Drawing
1 Piping Isometric 6"FW-90079-A15A 1 of 1 P 16 NOVEMBER 2018
4"DF-19104-A27A 1 of 1 P 16 NOVEMBER 2018
2 Piping MTO
3 Piping Plan
5 Type Of Support
II INSTRUMENT
A Drawing
1 Instrument Schematic Diagram
2 Instrument Wiring Diagram
3 Instrument Cable Layout
4 Instrument Loop Diagram
5 Instrument Hook up
6 Instrument Cable Schedule
7 Connection Drawing (Control VALVE) MEC-INST-003 1 OF 6 P 13 NOVEMBER 2018
MEC-INST-003 2 OF 6 P 13 NOVEMBER 2018
MEC-INST-003 3 OF 6 P 13 NOVEMBER 2018
MEC-INST-003 4 OF 6 P 13 NOVEMBER 2018
MEC-INST-003 5 OF 6 P 13 NOVEMBER 2018
MEC-INST-003 6 OF 6 P 13 NOVEMBER 2018

B MTO
1 MTO / Bill of Material
III ELECTRICAL
A Drawing
1 Single Line Diagram
2 Connection Diagram
3 Wiring Diagram
4 Grounding Layout
5 Lighting layout
6 Lighting Panel Schedule
7 Electrical Cable Layout
8 Electrical Cable Schedule
9 Detail DB Lighting (TBC) MEC-PKU-CAP-LPTBC (TBC) 1 OF 1 P 13 NOVEMBER 2018

B MTO
1 MTO / Bill of Material
IV CIVIL & STRUCTURE
Drawing
1 Foundation Pipe Bridge
Foundation Pipe Bridge ED-00-CST-DWG-001 1 OF 1 P 15 NOVEMBER 2018
Bore Pile Pipe Bridge ED-00-CST-DWG-002 1 OF 1 P 15 NOVEMBER 2018
2 Foundation MRS
3 Sleeper Faundation & Local Support
4 Pipe Bridge Structure ED-D-PP-C-420-17-001-003 1 OF 3 P 13 NOVEMBER 2018
ED-D-PP-C-420-17-001-003 2 OF 3 P 13 NOVEMBER 2018
ED-D-PP-C-420-17-001-003 3 OF 3 P 13 NOVEMBER 2018
5 Platform
6 Fance MRS
7 Material Approval
- Mill Test Certificate ( PT. ISPAT BUKIT BAJA ) QCMEC-CAP-1811-1008 1 OF 1 P 15 NOVEMBER 2018
- Mill Test Certificate ( PT. GUNAWAN DIANJAYA STEEL Tbk ) QCMEC-CAP-1811-1008 1 OF 1 P 15 NOVEMBER 2018
- Mill Test Certificate ( PT. GUNUNG RAJA PAKSI ) QCMEC-CAP-1811-1008 1 OF 1 P 15 NOVEMBER 2018
- Mill Test Certificate ( PT. GUNUNG RAJA PAKSI ) QCMEC-CAP-1811-1008 1 OF 1 P 15 NOVEMBER 2018
- Mill Test Certificate ( PT. GUNUNG RAJA PAKSI ) QCMEC-CAP-1811-1008 1 OF 1 P 15 NOVEMBER 2018
- Bohler S EMK 6 QCMEC-CAP-1811-1009 1 OF 1 P 15 NOVEMBER 2018
- Bohler Fox S SEV 50 QCMEC-CAP-1811-1009 1 OF 1 P 15 NOVEMBER 2018

V OTHER
1 PROCEDURE :
BLASTING PAINTING PROCEDURE ENGMEC-CAP-1811-001 P 02 NOVEMBER 2018
PAINTING FORMULA STEEL STRUCTURE ENGMEC-CAP-1811-002 P 16 NOVEMBER 2018
PAINTING FORMULA PIPING ENGMEC-CAP-1811-003 P 16 NOVEMBER 2018
BORE PILE METHOD STATEMENT ENGMEC-CAP-1811-006 P 14 NOVEMBER 2018
PIPING FABRICATION AND ERRECTION PROCEDURE ENGMEC-CAP-1811-007 P 02 NOVEMBER 2018
QUALITY CONTROL PLAN OVERAL QCMEC-CAP-1811-001 P 02 NOVEMBER 2018
COMPANY PROFILE RADIOGRAPHI QCMEC-CAP-1811-004 P 02 NOVEMBER 2018
2 GENERAL SCHEDULE ENGMEC-CAP-1811-004 P 09 NOVEMBER 2018
3 ORGANISATION CHART ENGMEC-CAP-1811-005 P 14 NOVEMBER 2018
4 JOHAN
PIPING P 02 NOVEMBER 2018
* REQUEST MATERIAL PIPE 19-Nov-18
CIVIL & STEEL STRUCTURE P 06 NOVEMBER 2018
ELECTRICAL & INSTRUMENT
TESTING
5 ITP
ITP CONCRETE WORK & STEEL STRUCTURE QCMEC-CAP-1811-005 P 12 NOVEMBER 2018
ITP SANBLAST AND PAINTING QCMEC-CAP-1811-006 P 02 NOVEMBER 2018
ITP PIPING WORK QCMEC-CAP-1811-007 P 02 NOVEMBER 2018
6 WPS & PQR QCMEC-CAP-1811-002 P 02 NOVEMBER 2018
7 Certificat Welder And List Welder QCMEC-CAP-1811-003 P 02 NOVEMBER 2018
8

Prepared by ;
PT.MATRA ENGINEERING & CONSTRUCTION

______________________________
UBMIT
DOC.
REMARK
DATE RETURN POSITION

11/22/2018 MEC REVISI


11/22/2018 MEC REVISI
11/22/2018 MEC REVISI
11/22/2018 MEC REVISI
11/22/2018 MEC REVISI
11/22/2018 MEC REVISI

CAP

11/22/2018 MEC REVISI


11/22/2018 MEC REVISI

11/22/2018 MEC REVISI


11/22/2018 MEC REVISI
11/22/2018 MEC REVISI

11/22/2018 MEC REVISI


11/22/2018 MEC REVISI
11/22/2018 MEC REVISI
11/22/2018 MEC REVISI
11/22/2018 MEC REVISI
11/22/2018 MEC REVISI
11/22/2018 MEC REVISI

CAP
15 NOVEMBER 2018 CAP Approve as Noted
15 NOVEMBER 2018 CAP Approve as Noted
06 NOVEMBER 2018 CAP REVISI
CAP
CAP
CAP
06 NOVEMBER 2018 CAP
06 NOVEMBER 2018 CAP REVISI

09 NOVEMBER 2018 CAP APPROVED


CAP
09 NOVEMBER 2018 CAP APPROVED

06 NOVEMBER 2018 CAP REVISI


CAP
CAP
CAP
CAP