EGM 00062 SZW0 1203 - RevA
EGM 00062 SZW0 1203 - RevA
: EGM-00062-SZW0-1203
Project: Parnaiba Date: 31- Jul- 2019
Project No.: EGM-00062 Rev.: A
Document Type: N
TABLE OF CONTENTS
Revision History
Rev. Revision Date Created by Checked by Approved by Brief Description
A 19 Jul 2019 AP BC SD Initial issue.
Page 1 of 11
GE Power Item No.: EGM-00062-SZW0-1203
Project: Parnaiba Date: 31- Jul- 2019
Project No.: EGM-00062 Rev.: A
Document Type: N
1.2 Materials containing asbestos, PCBs, ceramic fiber, or any other hazardous materials are not
allowed. Material safety data sheets shall be submitted for all paint, insulation, and
lubricants.
1.3 All quotations and attachments submitted to the Purchaser shall be in the English language.
1.4 All quotations and inquiries to the Purchaser shall be routed through Purchasing.
1.5 Parts subject to wear, corrosion, deterioration or requiring adjustment, inspection or repair
shall be accessible and capable of reasonably convenient removal, replacement and repair.
1.6 All omissions or exceptions to the requirements of this specification must be included by the
SUPPLIER.
1.8 The SUPPLIER shall be governed by the regulations, codes, and standards, including their
respective addenda, amendments, and errata in attachment 21000_TECH SUPPLEMENTAL
SPEC – Site Meteorological and Seismic Data. For equipment other than of US origin, foreign
regulations, codes, and standards are subject to Purchaser’s approval.
1. General Codes
Mechanical Design of steel AISC Shapes w/ A992 or
AISC, AWS
structure and ducting A572 Gr. 50 or equivalent
Inspection and Tests AISC, AWS
2. Civil Works
Drum End Enclosure ASCE7-10 ASTM
Steel Structures AISC
Earthquake, seismic ASCE7-10
3. Others
Quality Assurance ISO 9001:2000
Page 2 of 11
GE Power Item No.: EGM-00062-SZW0-1203
Project: Parnaiba Date: 31- Jul- 2019
Project No.: EGM-00062 Rev.: A
Document Type: N
four (4) DRUM END ENCLOSURES per unit. The DRUM END ENCLOSURES shall include but
are not limited to the following equipment.
Page 3 of 11
GE Power Item No.: EGM-00062-SZW0-1203
Project: Parnaiba Date: 31- Jul- 2019
Project No.: EGM-00062 Rev.: A
Document Type: N
One end of each steam drum shall be enclosed with a single, insulated, weatherproof drum end
enclosure suitable for operating and maintenance personnel. The enclosure shall include electric
heaters and ventilation. The enclosure shall include all instrumentation and connecting lines that
require freeze protection. A 1-inch (25 mm) blowdown drain line connection shall be provided for
instrumentation in the designated instrumentation areas. The minimum distance between the drum
and the enclosure walls shall be 54-inches (1,372 mm). If the Supplier requires instrumentation on
both ends of the drums, insulated, weatherproof enclosures shall be provided on both ends.
The HVAC system is designed by others and is assumed to meet the following criteria:
• Offices, control room and locker rooms are based on the following design criteria:
- Winter Temperature 24°C (75°F)
- Summer Temperature 27°C (80°F)
• Ventilated areas are based on 8°C (14°F) rise above ambient
• HVAC equipment does not contain chlorofluorocarbons (CFCs)
• Batteries for the DC battery systems are located in a ventilated room or
compartment
• Electrical equipment ratings are based on job specific typical maxim um am bient
temperatures. Typical maximum is the ambient temperature that is exceeded
annually less than 2% of the time, as defined by the American Society of Heating,
Refrigerating and Air-conditioning Engineers (ASH RAE). Where the typical
maximum ambient exceeds 40°C (104°F), equipment shall be evaluated relative to
actual operating loads vs. nameplate rating to verify proper sizing.
2.2 LIGHTING
Supplier is to provide adequate fluorescent lighting to meet all industry standards and Ohio
Hannibal code. Lighting is to be complete scope including but not limited to: light fixtures,
bulbs, switches, cable trays/conduit, junction box, drawings, lighting plans, etc. All electric
connections are to terminate in a single junction box per enclosure along with the heating
and ventilation. Supplier’s proposal is to include as much detail as possible to be able to fully
describe the proposed design to the EPC/Owner.
2.3 HEATING/VENTILATION
Page 4 of 11
GE Power Item No.: EGM-00062-SZW0-1203
Project: Parnaiba Date: 31- Jul- 2019
Project No.: EGM-00062 Rev.: A
Document Type: N
Supplier’s proposal is to include as much detail as possible to be able to fully describe the proposed
design to the EPC/Owner.
Page 5 of 11
GE Power Item No.: EGM-00062-SZW0-1203
Project: Parnaiba Date: 31- Jul- 2019
Project No.: EGM-00062 Rev.: A
Document Type: N
4.0 DESIGN DATA AND PHYSICAL ATTRIBUTES FOR THE BUILDING ( By A&M)
4.1 SKETCHES
All dimensions from the following sketches are preliminary but should be within two (2) inches from
the final dimensions.
HP Right Side:
Page 6 of 11
GE Power Item No.: EGM-00062-SZW0-1203
Project: Parnaiba Date: 31- Jul- 2019
Project No.: EGM-00062 Rev.: A
Document Type: N
HP Left Side:
Page 7 of 11
GE Power Item No.: EGM-00062-SZW0-1203
Project: Parnaiba Date: 31- Jul- 2019
Project No.: EGM-00062 Rev.: A
Document Type: N
Page 8 of 11
GE Power Item No.: EGM-00062-SZW0-1203
Project: Parnaiba Date: 31- Jul- 2019
Project No.: EGM-00062 Rev.: A
Document Type: N
1. The supplier is to provide cost optimal solution for building layout. The following dimensions
are preliminary:
The minimum distance between the drum end and the opposite enclosure wall shall be 1,372 mm.
Page 9 of 11
GE Power Item No.: EGM-00062-SZW0-1203
Project: Parnaiba Date: 31- Jul- 2019
Project No.: EGM-00062 Rev.: A
Document Type: N
4.2 PENETRATIONS
4.3 DOORS
1. There will be a total of two (2) doors in each of the Drum End Enclosure.
Page 10 of 11
GE Power Item No.: EGM-00062-SZW0-1203
Project: Parnaiba Date: 31- Jul- 2019
Project No.: EGM-00062 Rev.: A
Document Type: N
Page 11 of 11