Professional Documents
Culture Documents
Chevron Marking Length On Entry Exit PDF
Chevron Marking Length On Entry Exit PDF
Exit Lane
Merging Traffic Ahe
20
ad
SPEED LIMIT
COMPULSORY AHEAD
CH-592+900 to CH-592+975
U-TURN PROHIBITED
RUMBLE STRIP 10 25 40 10
25 25.64
45.15 20.33
3.25
SPEED LIMIT 4.6
36.57
20 17.10 22.88
10 20 33 10
Kerb Marker 20
Spacing-2m 60
XXXXXXX
XXXXXXX
RUMBLE STRIP SPEED LIMIT
CH-592+912 to CH-592+975
NO ENTRY
Merging Traffic
Ahead
SPEED LIMIT
Proposed Kerb- 0.3m U-TURN PROHIBITED
XXXXXXX
XXXXXXX
EXIT ONLY
0.2m
Dewas
Coarse Textured Rumble Strip made of
premix or any equivalent of 200-300mm
wide and 20-30mm Height and Spacing
0.3m
1000mm centre-to-centre.
DETAIL- B
0.3m
Kerb Cross-Section
DWG. NO.:NHAI/DRA/NNCS/NH3-IB/EEP SCALE:- N.T.S.
CLIENT:-
NATIONAL HIGHWAYS
AUTHORITY'S ENGINEER :- EPC CONTRACTOR :- DESIGN CONSULTANT :- PROOF CONSULTANT:- SAFETY CONSULTANT :- PROJECT:- TITLE : DATE : JULY-2020 1 REVISION:- R0
AUTHORITY OF INDIA LION ENGINEERING Dineshchandra R Agrawal Infracon NITYA NAYRA CIVIL Infrastructure Development Consultants RESOTECH CONSULTANCY
GOVERNMENT OF INDIA
CONSULTANTS Pvt. Ltd SERVICES PVT.LTD.
CONSTRUCTION OF BALANCE SERVICE ROADS IN Entry/Exit Lane Dedicated DRAWN DESIGNED CHECKED APPROVED
Corporate Office:- SOLUTIONS PVT.LTD. 141, Sahayog Vihar, Apex Bank Colony,
(Ministry of Road Transport & Plot No. 97, “Lion Tower”, Elegant Estate
401, The Grand Mall, S.M. Road, E- 8 Extension, Near Gulmohar Colony, 58, SHRI MANGAL NAGAR, THE SIX LANE SECTION OF NH-3 DEWAS - INDORE Plan of PUP at
ENGINEERING
Ambawadi, AHMEDABAD -380015, H.N.-104, INDUS EMPIRE PHASE-II, NEAR ELITE ANMOL,
Highways)
CONSULTANTS
Near Mother Teresa School, Kolar Road, Bhopal (M.P) – 462039, (KM 591.00 TO 610.00 & FROM KM 0.00 TO 12.60 )
Bhopal (M.P.) -462042 Gujrat, INDIA. E-8, BAWADIYA KALA BHOPAL (M.P.) Phone:0755-4252393,
BICHOLI HAPSI ROAD,
INDORE-452018 IN THE STATE OF MADHYA PRADESH
CH- 592+595 with
R0 JULY-2020 FOR INITIAL SUBMISSION Project Implementation Unit, Tel:- 0755-3246521 Ph: 91-79-30005789,30021789 PHONE:- 0755-4944349
Indore Fax:- 0755-2879499
Email: drainfra89@gmail.com
E-mail: idc@idc-india.com, idcbpl@gmail.com TEL.-0731-4006024
Thermoplastic Marking
REV DATE DESCRIPTION OF REVISIONS APPROVED E-mail: dprlec@rediffmail.com R.B. A.P. A.S. A.S.
DEWAS MUMBAI
Detail-A Detail-B
Exit Lane
Mumbai
XXXXXXX
COMPULSORY AHEAD
CH-593+608 to CH-593+680 60 20 CH-594+349 to CH-594+402
XXXXXXX
XXXXXXX
U-TURN PROHIBITED
U-TURN PROHIBITED SPEED LIMIT SPEED LIMIT RUMBLE STRIP
10 18 25 10
EXIT ONLY
60 20 Merging Traffic Ahead
NO ENTRY
3.25
4.6
10 25 40 10
20
RUMBLE STRIP
SPEED LIMIT 60
XXXXXXX
XXXXXXX
40 25 10
10
CH-593+610 to CH-593+685 20 60 Merging Traffic Ahead
SPEED LIMIT
XXXXXXX
XXXXXXX
NO ENTRY
U-TURN PROHIBITED
RUMBLE STRIP
SPEED LIMIT SPEED LIMIT CH-594+355 to CH-594+430
Dewas
COMPULSORY AHEAD
Exit Lane
Merging Traffic Ahead
U-TURN PROHIBITED
EXIT ONLY
Mumbai
Exit Lane
XXXXXXX
XXXXXXX
CH-593+608 to CH-593+680
COMPULSORY AHEAD
Proposed Kerb- 0.3m
XXXXXXX
XXXXXXX
U-TURN PROHIBITED
60 20 CH-594+349 to CH-594+402
EXIT ONLY U-TURN PROHIBITED
30.32 13.07
22
25.68
42.16
18.73
4.6
25 25.58
20.32 45.15
25
25.88
10 25 40 10
20
25 10
RUMBLE STRIP
SPEED LIMIT 60
XXXXXXX
40
60
XXXXXXX
10
CH-593+610 to CH-593+685 20 Merging Traffic Ahead
SPEED LIMIT
XXXXXXX
XXXXXXX
NO ENTRY
Kerb Marker U-TURN PROHIBITED
RUMBLE STRIP
SPEED LIMIT SPEED LIMIT
CH-594+355 to CH-594+430
Dewas
Spacing-2m COMPULSORY AHEAD Kerb Marker
Exit Lane
DETAIL- B
Coarse Textured Rumble Strip made of wide and 20-30mm Height and Spacing
premix or any equivalent of 200-300mm 1000mm centre-to-centre.
0.3m
DETAIL- A
wide and 20-30mm Height and Spacing
1000mm centre-to-centre.
0.3m
Kerb Cross-Section
DWG. NO.:NHAI/DRA/NNCS/NH3-IB/EEP SCALE:- N.T.S.
CLIENT:- AUTHORITY'S ENGINEER :- EPC CONTRACTOR :- DESIGN CONSULTANT :- PROOF CONSULTANT:- SAFETY CONSULTANT :- PROJECT:- TITLE :
NATIONAL HIGHWAYS DATE : JULY-2020 2 REVISION:- R0
AUTHORITY OF INDIA LION ENGINEERING Dineshchandra R Agrawal Infracon NITYA NAYRA CIVIL Infrastructure Development Consultants RESOTECH CONSULTANCY
GOVERNMENT OF INDIA
CONSULTANTS Pvt. Ltd SERVICES PVT.LTD. CONSTRUCTION OF BALANCE SERVICE ROADS IN Entry/Exit Lane Dedicated DRAWN DESIGNED CHECKED APPROVED
Corporate Office:- SOLUTIONS PVT.LTD. 141, Sahayog Vihar, Apex Bank Colony,
THE SIX LANE SECTION OF NH-3 DEWAS - INDORE
(Ministry of Road Transport & ENGINEERING
Plot No. 97, “Lion Tower”, Elegant Estate 401, The Grand Mall, S.M. Road,
H.N.-104, INDUS EMPIRE PHASE-II,
E- 8 Extension, Near Gulmohar Colony, 58, SHRI MANGAL NAGAR,
NEAR ELITE ANMOL,
Plan of PUP at
CONSULTANTS
Near Mother Teresa School, Kolar Road, Ambawadi, AHMEDABAD -380015, Bhopal (M.P) – 462039, (KM 591.00 TO 610.00 & FROM KM 0.00 TO 12.60 )
Highways) E-8, BAWADIYA KALA BHOPAL (M.P.) BICHOLI HAPSI ROAD, CH- 594+010 with
Bhopal (M.P.) -462042 Gujrat, INDIA. Phone:0755-4252393,
R0 JULY-2020 FOR INITIAL SUBMISSION Project Implementation Unit, Tel:- 0755-3246521 Ph: 91-79-30005789,30021789 PHONE:- 0755-4944349
INDORE-452018 IN THE STATE OF MADHYA PRADESH
Indore Fax:- 0755-2879499
Email: drainfra89@gmail.com
E-mail: idc@idc-india.com, idcbpl@gmail.com TEL.-0731-4006024 Thermoplastic Marking
REV DATE DESCRIPTION OF REVISIONS APPROVED E-mail: dprlec@rediffmail.com R.B. A.P. A.S. A.S.
DEWAS MUMBAI
Detail-A
Detail-B
Mumbai
XXXXXXX
XXXXXXX
Exit Lane
XXXXXXX
XXXXXXX
U-TURN PROHIBITED Merging Traffic Ahead
60 20 EXIT ONLY
NO ENTRY
Merging Traffic Ahead COMPULSORY AHEAD
SPEED LIMIT CH-596+391 to CH-596+480
SPEED LIMIT
RUMBLE STRIP
CH-595+684 to CH-595+785 60 20 10
10 50 40 10 U-TURN PROHIBITED
49
10 30
SPEED LIMIT SPEED LIMIT RUMBLE STRIP
Existing Lane
Existing Lane Existing Lane Existing Lane
3.25
Existing Lane
4.6
Existing Lane
10 39.5 22 10 10 20
CH-595+688 to CH-595+760 60 10 35
46
SPEED LIMIT
60
RUMBLE STRIP RUMBLE STRIP
SPEED LIMIT
XXXXXXX
XXXXXXX
SPEED LIMIT
Merging Traffic Ahead
COMPULSORY AHEAD
Exit Lane
Merging Traffic Ahead
CH-596+381 to CH-596+474
U-TURN PROHIBITED
XXXXXXX
NO ENTRY
20
XXXXXXX
EXIT ONLY
Dewas
U-TURN PROHIBITED SPEED LIMIT
Mumbai
XXXXXXX
XXXXXXX
Exit Lane
XXXXXXX
XXXXXXX
60 20 EXIT ONLY
NO ENTRY
COMPULSORY AHEAD
CH-596+391 to CH-596+480
SPEED LIMIT SPEED LIMIT
Merging Traffic Ahead
60 20 10
RUMBLE STRIP
CH-595+684 to CH-595+785 U-TURN PROHIBITED
49
10 30
10 50 40 10 SPEED LIMIT SPEED LIMIT RUMBLE STRIP
27.95
31.23 40
30.00
23.92
25.46 65.98 53.75
Existing Lane
42.16
4.6
26.95
61.61 28.77
20.40 42.18
35
25.69 22
10 20
10 39.5 22 10 10 35
46
60
RUMBLE STRIP
SPEED LIMIT
60 SPEED LIMIT
XXXXXXX
XXXXXXX
CH-595+688 to CH-595+760
Merging Traffic Ahead
Kerb Marker
RUMBLE STRIP
XXXXXXX
COMPULSORY AHEAD NO ENTRY
XXXXXXX
Exit Lane
Dewas
20
U-TURN PROHIBITED SPEED LIMIT
0.3m
Detail-A Detail-B
Mumbai
Exit Lane
XXXXXXX
XXXXXXX
7+497
CH-597+444 to CH-59 Merging Traffic Ahead
XXXXXXX
XXXXXXX
U-TURN PROHIBITED 60 20 COMPULSORY AHEAD
EXIT ONLY
Merging Traffic Ahead NO ENTRY
SPEED LIMIT CH-598+175 to CH-598+243 60 20
60 20 10 25 18 10
SPEED LIMIT
RUMBLE STRIP
U-TURN PROHIBITED
SPEED LIMIT
4.6
10 20 38 10 SPEED LIMIT
SPEED LIMIT SPEED LIMIT RUMBLE STRIP
3.25
Existing Lane Existing Lane
Existing Lane Existing Lane Existing Lane Existing Lane Existing Lane
Existing Lane
STOP
10 40 26 10
20 60
7+497 10 57.5
CH-597+444 to CH-59 STOP RUMBLE STRIP
Sage College
Sage College
Merging Traffic Ahead
COMPULSORY AHEAD
Exit Lane
Merging Traffic Ahead
NO ENTRY RUMBLE STRIP
SPEED LIMIT
Indore City
Entry Road
RUMBLE STRIP
60
Indore City
Entry Road >>>
U-TURN PROHIBITED
SIDE ROAD-LEFT
XXXXXXX
XXXXXXX
EXIT ONLY
SPEED LIMIT
Dewas
FILLING STATION
T- INTERSECTION
MAJOR ROAD AHEAD
Mumbai
XXXXXXX
CH-597+444 to CH-597+497
XXXXXXX
XXXXXXX
Exit Lane
U-TURN PROHIBITED
Spacing-2m NO ENTRY
SPEED LIMIT SPEED LIMIT RUMBLE STRIP 10 25
60 20 COMPULSORY AHEA
D
18 10
60
4.6
19.26
RUMBLE STRIP
10 20 38 10 SPEED LIMIT SPEED LIMIT
18
11.64 29.54
3.25
18.47
Existing Lane
15.04 Existing Lane Existing Lane
23.95
40.55
26
Existing Lane Existing Lane
STOP
104.95
10 40
26 10 57.5 47.00
62.71
Merging Traffic
Sage College
Sage College
Ahead
XXXXXXX
XXXXXXX
EXIT ONLY
T- INTERSECTION
Coarse Textured Rumble Strip made of SPEED LIMIT
Dewas
MAJOR ROAD AHEAD premix or any equivalent of 200-300mm
0.3m
DETAIL- B
1000mm centre-to-centre.
DETAIL- A
0.3m
Kerb Cross-Section
DWG. NO.:NHAI/DRA/NNCS/NH3-IB/EEP SCALE:- N.T.S.
CLIENT:- AUTHORITY'S ENGINEER :- EPC CONTRACTOR :- DESIGN CONSULTANT :- PROOF CONSULTANT:- SAFETY CONSULTANT :- PROJECT:- TITLE :
NATIONAL HIGHWAYS DATE : JULY-2020 4 REVISION:- R0
AUTHORITY OF INDIA LION ENGINEERING Dineshchandra R Agrawal Infracon NITYA NAYRA CIVIL
CONSULTANTS Pvt. Ltd
Infrastructure Development Consultants RESOTECH CONSULTANCY
CONSTRUCTION OF BALANCE SERVICE ROADS IN Entry/Exit Lane Dedicated DRAWN DESIGNED CHECKED APPROVED
GOVERNMENT OF INDIA Corporate Office:- SOLUTIONS PVT.LTD. 141, Sahayog Vihar, Apex Bank Colony, SERVICES PVT.LTD.
(Ministry of Road Transport & ENGINEERING
Plot No. 97, “Lion Tower”, Elegant Estate 401, The Grand Mall, S.M. Road,
H.N.-104, INDUS EMPIRE PHASE-II,
E- 8 Extension, Near Gulmohar Colony, 58, SHRI MANGAL NAGAR,
NEAR ELITE ANMOL,
THE SIX LANE SECTION OF NH-3 DEWAS - INDORE Plan of PUP at
Near Mother Teresa School, Kolar Road, Ambawadi, AHMEDABAD -380015, Bhopal (M.P) – 462039, (KM 591.00 TO 610.00 & FROM KM 0.00 TO 12.60 ) CH- 597+844 with
CONSULTANTS
Highways) E-8, BAWADIYA KALA BHOPAL (M.P.) BICHOLI HAPSI ROAD,
Bhopal (M.P.) -462042 Gujrat, INDIA. Phone:0755-4252393,
R0 JULY-2020 FOR INITIAL SUBMISSION Project Implementation Unit, Tel:- 0755-3246521 PHONE:- 0755-4944349
INDORE-452018 IN THE STATE OF MADHYA PRADESH
Indore Fax:- 0755-2879499
Ph: 91-79-30005789,30021789 E-mail: idc@idc-india.com, idcbpl@gmail.com TEL.-0731-4006024 Thermoplastic Marking
DESCRIPTION OF REVISIONS APPROVED E-mail: dprlec@rediffmail.com Email: drainfra89@gmail.com R.B. A.P. A.S. A.S.
REV DATE
DEWAS MUMBAI
Mumbai
XXXXXXX
XXXXXXX
Proposed Kerb- 0.3m
Kerb Marker Coarse Textured Rumble Strip made of
Spacing-2m premix or any equivalent of 200-300mm
wide and 20-30mm Height and Spacing
XXXXXXX
XXXXXXX
1000mm centre-to-centre.
U-TURN PROHIBITED
60 20 EXIT ONLY
4.6
10 40 26 10
25.68 26.00
16.36 42.16
3.25
Existing Lane Existing Lane Existing Lane
27.76 72.41
31.21 45
20 10 54 45 10 60
RUMBLE STRIP
SPEED LIMIT CH-598+618 to CH-598727 RUMBLE STRIP
SPEED LIMIT
COMPULS
O RY AHEAD
60 0.2m SCHOOL AHEAD
XXXXXXX
Exit Lane
SPEED LIMIT
DETAIL- A
0.3m
0.3m
Kerb Cross-Section
DWG. NO.:NHAI/DRA/NNCS/NH3-IB/EEP SCALE:- N.T.S.
CLIENT:- AUTHORITY'S ENGINEER :- EPC CONTRACTOR :- DESIGN CONSULTANT :- PROOF CONSULTANT:- SAFETY CONSULTANT :- PROJECT:- TITLE :
NATIONAL HIGHWAYS DATE : JULY-2020 5 REVISION:- R0
AUTHORITY OF INDIA LION ENGINEERING Dineshchandra R Agrawal Infracon NITYA NAYRA CIVIL RESOTECH CONSULTANCY
GOVERNMENT OF INDIA
CONSULTANTS Pvt. Ltd
Infrastructure Development Consultants
SERVICES PVT.LTD. CONSTRUCTION OF BALANCE SERVICE ROADS IN Entry/Exit Lane Dedicated DRAWN DESIGNED CHECKED APPROVED
Corporate Office:- SOLUTIONS PVT.LTD. 141, Sahayog Vihar, Apex Bank Colony,
(Ministry of Road Transport & Plot No. 97, “Lion Tower”, Elegant Estate 401, The Grand Mall, S.M. Road, E- 8 Extension, Near Gulmohar Colony, 58, SHRI MANGAL NAGAR, THE SIX LANE SECTION OF NH-3 DEWAS - INDORE Plan of PUP at
ENGINEERING
Ambawadi, AHMEDABAD -380015, H.N.-104, INDUS EMPIRE PHASE-II, NEAR ELITE ANMOL,
Highways)
CONSULTANTS
Near Mother Teresa School, Kolar Road, Bhopal (M.P) – 462039, (KM 591.00 TO 610.00 & FROM KM 0.00 TO 12.60 )
Bhopal (M.P.) -462042 Gujrat, INDIA. E-8, BAWADIYA KALA BHOPAL (M.P.) Phone:0755-4252393,
BICHOLI HAPSI ROAD, CH- 599+045 with
R0 JULY-2020 FOR INITIAL SUBMISSION Project Implementation Unit, Tel:- 0755-3246521 PHONE:- 0755-4944349
INDORE-452018 IN THE STATE OF MADHYA PRADESH
Indore Fax:- 0755-2879499
Ph: 91-79-30005789,30021789 E-mail: idc@idc-india.com, idcbpl@gmail.com TEL.-0731-4006024 Thermoplastic Marking
DESCRIPTION OF REVISIONS APPROVED E-mail: dprlec@rediffmail.com Email: drainfra89@gmail.com R.B. A.P. A.S. A.S.
REV DATE
DEWAS MUMBAI
Exit Lane
Merging Tr
affic Ahea
d
4.6
3.25
35
25.45
61.24
26.49
Existing Lane
Existing Lane Existing Lane
Kerb Marker
0.2m Spacing-2m
0.3m
DETAIL- B
0.3m
Kerb Cross-Section
Mumbai
XXXXXXX
XXXXXXX
Exit Lane
Merging Traffic Ahead
Sage College
Sage College
U-TURN PROHIBITED
60 20
EXIT ONLY
Merging Traffic Ahead NO ENTRY
60 20 COMPULSORY AHEAD
4.6
SPEED LIMIT RUMBLE STRIP RUMBLE STRIP
10 40 25 10 47 10
10 30
3.25
Existing Lane Existing Lane Existing Lane Existing Lane Existing Lane Existing Lane
Existing Lane Existing Lane Existing Lane Existing Lane
Mumbai
XXXXXXX
XXXXXXX
Exit Lane
wide and 20-30mm Height and Spacing
1000mm centre-to-centre. Merging Traffic Ahead
Proposed Kerb- 0.3m
Sage College
Sage College
U-TURN PROHIBITED
COMPULSORY AHEAD
60 20
EXIT ONLY 60 20
Merging Traffic Ahead
NO ENTRY
CH-605+737 to CH-605+824
CH-605+005 to CH-605+080 SPEED LIMIT SPEED LIMIT U-TURN PROHIBITED
SPEED LIMIT SPEED LIMIT RUMBLE STRIP 47 10
4.6
RUMBLE STRIP
10 30
10 40 25 10
27.84
30
24.39 25.00
27.42
20.46 56.92
45.21
Existing Lane
3.25
Kerb Marker
Spacing-2m
0.3m
Kerb Cross-Section
DWG. NO.:NHAI/DRA/NNCS/NH3-IB/EEP SCALE:- N.T.S.
CLIENT:- AUTHORITY'S ENGINEER :- EPC CONTRACTOR :- DESIGN CONSULTANT :- PROOF CONSULTANT:- SAFETY CONSULTANT :- PROJECT:- TITLE :
NATIONAL HIGHWAYS DATE : JULY-2020 7 REVISION:- R0
AUTHORITY OF INDIA LION ENGINEERING Dineshchandra R Agrawal Infracon NITYA NAYRA CIVIL
GOVERNMENT OF INDIA
CONSULTANTS Pvt. Ltd
Infrastructure Development Consultants RESOTECH CONSULTANCY
SERVICES PVT.LTD. CONSTRUCTION OF BALANCE SERVICE ROADS IN Entry/Exit Lane Dedicated DRAWN DESIGNED CHECKED APPROVED
Corporate Office:- SOLUTIONS PVT.LTD. 141, Sahayog Vihar, Apex Bank Colony,
(Ministry of Road Transport & ENGINEERING
Plot No. 97, “Lion Tower”, Elegant Estate 401, The Grand Mall, S.M. Road,
H.N.-104, INDUS EMPIRE PHASE-II,
E- 8 Extension, Near Gulmohar Colony, 58, SHRI MANGAL NAGAR,
NEAR ELITE ANMOL,
THE SIX LANE SECTION OF NH-3 DEWAS - INDORE Plan of VUP at
CONSULTANTS
Near Mother Teresa School, Kolar Road, Ambawadi, AHMEDABAD -380015, Bhopal (M.P) – 462039, (KM 591.00 TO 610.00 & FROM KM 0.00 TO 12.60 )
Highways) E-8, BAWADIYA KALA BHOPAL (M.P.) BICHOLI HAPSI ROAD, CH- 605+455 with
Bhopal (M.P.) -462042 Gujrat, INDIA. Phone:0755-4252393,
R0 JULY-2020 FOR INITIAL SUBMISSION Project Implementation Unit, Tel:- 0755-3246521 PHONE:- 0755-4944349
INDORE-452018 IN THE STATE OF MADHYA PRADESH
Indore Fax:- 0755-2879499
Ph: 91-79-30005789,30021789 E-mail: idc@idc-india.com, idcbpl@gmail.com TEL.-0731-4006024 Thermoplastic Marking
DESCRIPTION OF REVISIONS APPROVED E-mail: dprlec@rediffmail.com Email: drainfra89@gmail.com R.B. A.P. A.S. A.S.
REV DATE
DEWAS MUMBAI
Detail-B
Detail-A
Exit Lane
Merging Traffic
Ahead
Mumbai 60 20 COMPULSOR
Y AHEAD
SPEED LIMIT
XXXXXXX
XXXXXXX
10 25 46 10
Sage
XXXXXXX
XXXXXXX
U-TURN PROHIBITED
Existing Lane
College
60 20 EXIT ONLY
SPEED LIMIT
Merging Traffic Ahead
NO ENTRY
Existing Lane Existing Lane
SPEED LIMIT Existing Lane
4.6
CH-607+244 to CH-607+
RUMBLE STRIP
320 Existing Lane
10 40 26 10
Existing Lane
Existing Lane
3.25
Existing Lane Existing Lane Existing Lane Existing Lane
Mumbai
XXXXXXX
XXXXXXX
of
Coarse Textured Rumble Strip made
Exit Lane
00mm
premix or any equivalent of 200-3
ng
wide and 20-30mm Height and Spaci Merging Traffic Ahead
1000mm centre-to-centre.
Sage
XXXXXX
XXXXXXX
60 20 COMPULSORY AHEAD
College
U-TURN PROHIBITED
CH-608+410 to CH-608+491
X
EXIT ONLY
60 20 Merging Traffic Ahead NO ENTRY SPEED LIMIT SPEED LIMIT U-TURN PROHIBITED
10 25 46 10
4.6
RUMBLE STRIP
10 40 26 10
Kerb Marker
0.2m Spacing-2m
0.3m
DETAIL- A DETAIL- B
0.3m
Kerb Cross-Section
DWG. NO.:NHAI/DRA/NNCS/NH3-IB/EEP SCALE:- N.T.S.
CLIENT:- AUTHORITY'S ENGINEER :- EPC CONTRACTOR :- DESIGN CONSULTANT :- PROOF CONSULTANT:- SAFETY CONSULTANT :- PROJECT:- TITLE :
NATIONAL HIGHWAYS DATE : JULY-2020 8 REVISION:- R0
AUTHORITY OF INDIA LION ENGINEERING Dineshchandra R Agrawal Infracon NITYA NAYRA CIVIL Infrastructure Development Consultants RESOTECH CONSULTANCY
GOVERNMENT OF INDIA
CONSULTANTS Pvt. Ltd SERVICES PVT.LTD. CONSTRUCTION OF BALANCE SERVICE ROADS IN Entry/Exit Lane Dedicated DRAWN DESIGNED CHECKED APPROVED
Corporate Office:- SOLUTIONS PVT.LTD. 141, Sahayog Vihar, Apex Bank Colony,
(Ministry of Road Transport & Plot No. 97, “Lion Tower”, Elegant Estate 401, The Grand Mall, S.M. Road, E- 8 Extension, Near Gulmohar Colony, 58, SHRI MANGAL NAGAR, THE SIX LANE SECTION OF NH-3 DEWAS - INDORE Plan of Flyover at
ENGINEERING
Ambawadi, AHMEDABAD -380015, H.N.-104, INDUS EMPIRE PHASE-II, NEAR ELITE ANMOL,
Highways)
CONSULTANTS
Near Mother Teresa School, Kolar Road, Bhopal (M.P) – 462039, (KM 591.00 TO 610.00 & FROM KM 0.00 TO 12.60 )
Bhopal (M.P.) -462042 Gujrat, INDIA. E-8, BAWADIYA KALA BHOPAL (M.P.) Phone:0755-4252393,
BICHOLI HAPSI ROAD,
INDORE-452018 IN THE STATE OF MADHYA PRADESH
CH- 607+940 with
R0 JULY-2020 FOR INITIAL SUBMISSION Project Implementation Unit, Tel:- 0755-3246521 Ph: 91-79-30005789,30021789 PHONE:- 0755-4944349
Indore Fax:- 0755-2879499
Email: drainfra89@gmail.com
E-mail: idc@idc-india.com, idcbpl@gmail.com TEL.-0731-4006024 Thermoplastic Marking
REV DATE DESCRIPTION OF REVISIONS APPROVED E-mail: dprlec@rediffmail.com R.B. A.P. A.S. A.S.
DEWAS MUMBAI
Mumbai
XXXXXXX
XXXXXXX
Coarse Textured Rumble Strip made of
premix or any equivalent of 200-300mm
wide and 20-30mm Height and Spacing
1000mm centre-to-centre.
XXXXXXX
XXXXXXX
U-TURN PROHIBITED
60 20 EXIT ONLY
NO ENTRY
Kerb Marker Merging Traffic Ahead
4.6
10 45 25 10
42.16
3.25
Existing Lane Existing Lane Existing Lane Existing Lane
DETAIL- A
0.3m
0.3m
Kerb Cross-Section
DWG. NO.:NHAI/DRA/NNCS/NH3-IB/EEP SCALE:- N.T.S.
CLIENT:- AUTHORITY'S ENGINEER :- EPC CONTRACTOR :- DESIGN CONSULTANT :- PROOF CONSULTANT:- SAFETY CONSULTANT :- PROJECT:- TITLE :
NATIONAL HIGHWAYS DATE : JULY-2020 9 REVISION:- R0
AUTHORITY OF INDIA LION ENGINEERING Dineshchandra R Agrawal Infracon NITYA NAYRA CIVIL
CONSULTANTS Pvt. Ltd
Infrastructure Development Consultants RESOTECH CONSULTANCY
CONSTRUCTION OF BALANCE SERVICE ROADS IN Entry/Exit Lane Dedicated DRAWN DESIGNED CHECKED APPROVED
GOVERNMENT OF INDIA Corporate Office:- SOLUTIONS PVT.LTD. 141, Sahayog Vihar, Apex Bank Colony, SERVICES PVT.LTD.
(Ministry of Road Transport & Plot No. 97, “Lion Tower”, Elegant Estate 401, The Grand Mall, S.M. Road, E- 8 Extension, Near Gulmohar Colony, 58, SHRI MANGAL NAGAR, THE SIX LANE SECTION OF NH-3 DEWAS - INDORE Plan of PUP at
ENGINEERING
Ambawadi, AHMEDABAD -380015, H.N.-104, INDUS EMPIRE PHASE-II, NEAR ELITE ANMOL,
Highways)
CONSULTANTS
Near Mother Teresa School, Kolar Road, Bhopal (M.P) – 462039, BICHOLI HAPSI ROAD, (KM 591.00 TO 610.00 & FROM KM 0.00 TO 12.60 ) CH- 609+820 with
Bhopal (M.P.) -462042 Gujrat, INDIA. E-8, BAWADIYA KALA BHOPAL (M.P.) Phone:0755-4252393,
R0 JULY-2020 FOR INITIAL SUBMISSION Project Implementation Unit, INDORE-452018 IN THE STATE OF MADHYA PRADESH
Indore
Tel:- 0755-3246521
Fax:- 0755-2879499
Ph: 91-79-30005789,30021789 PHONE:- 0755-4944349 E-mail: idc@idc-india.com, idcbpl@gmail.com TEL.-0731-4006024 Thermoplastic Marking
DESCRIPTION OF REVISIONS APPROVED E-mail: dprlec@rediffmail.com Email: drainfra89@gmail.com R.B. A.P. A.S. A.S.
REV DATE
DEWAS MUMBAI
0.2m
Coarse Textured Rumble Strip made of
premix or any equivalent of 200-300mm
0.3m
wide and 20-30mm Height and Spacing
1000mm centre-to-centre.
COMPULSORY AHEAD
CH-0+124 to CH-0+217 0.3m
10 35 48 10 Kerb Cross-Section
30.47
35
54.22 19.42
4.6
3.25
Kerb Marker
Spacing-2m
DETAIL- B
Proposed Kerb- 0.3m
0.2m
0.3m
To Colony >>>
Mumbai
0.3m
XXXXXXX
T- INTERSECTION
XXXXXXX
MAJOR ROAD AHEAD
Kerb Cross-Section
Coarse Textured Rumble Strip made of
premix or any equivalent of 200-300mm
wide and 20-30mm Height and Spacing
1000mm centre-to-centre.
20 RUMBLE ST
RIP
U-TURN PROHIBITED
SPEED LIMIT
To Colony
EXIT ONLY
60 RUMBLE STRIP
FT
STOP NO ENTRY
4.6
STOP
50 29 10
30.17
23.04 29.00
51.90
3.25
Existing Lane
Existing Lane Existing Lane Existing Lane
Kerb Marker
Spacing-2m
0.2m
0.3m
Coarse Textured Rumble Strip made of
0.3m
premix or any equivalent of 200-300mm
wide and 20-30mm Height and Spacing
Kerb Cross-Section 1000mm centre-to-centre.
Kerb Marker
XXXXXXX
NO ENTRY
XXXXXXX
U-TURN PROHIBITED Spacing-2m
EXIT ONLY
Proposed Kerb- 0.3m
60 20 Merging Traffic Ahead
CH-11+702 to CH-11+770
SPEED LIMIT SPEED LIMIT RUMBLE STRIP 10 40 18 10
27.74 18
22.30 40.18
3.25
4.6
Existing Lane Existing Lane Existing Lane
DETAIL- A