KPI for Engineering Team for the period of July 2019 to September 2019

S.No Project number Project Description Work Details Schedule for Work by
Status

Down comer duct detail drawings 10/07/19

Drawings for feed pipes , Immersion tubes, Elbows 15.07.19


Refractory sketch for Cyclones, Feed pipes, Elbow,
Combustion chamber 15.07.19
1 Specifications for PH feed equipments & STD 16.07.19
components of Preheater
Coal piping schematic drawing & report 10/07/19

Review of civil & structural drawings -

Preheater stage modification detail drawings 25.07.19

Preheater & calciner layout drawings 29.07.19

Down comer duct detail drawings 19.07.19

Balancing bag house circuit preliminary layout 19.07.19

Balancing bag house circuit detail drawings 30.08.19

2 TAD layout 29.07.19

TAD Detail drawings 22.08.19

Calciner detail drawings 14.08.19

Specifications for all equipments related to modified


31.07.19
areas & Balancing bag house, Kiln feed system

Refractory sketch for Cyclones, Feed pipes, Elbow, TAD 31.07.19

Preliminary layout for preheater building 17.07.19

Layout, floor plans for preheater building 02/08/19


Detail drawings for PH Cyclone elbow, riser duct, feed 16.09.19
pipes, Recuperator duct, Kiln riser to cyclone
3
Detail drawings for PH feed section 15.09.19
Specifications for PH feed equipments, STD
components in Preheater area, Kiln ID fan. 31.07.19

Refractory sketch for cyclones, Riser ducts, feed pipes, 16.09.19


Elbows in preheater section

Preheater stage modification detail drawings

Down comer duct detail drawings


Under hold (30 days from
4 Refractory detail drawings for Preheater circuit date of customer
approval)
Elbow, feed pipe, riser duct detail drawings for
Preheater cyclones
Specifications for PH feed equipments, STD
components in Preheater area, PH fan.
Layout drawings for SP & AQC Boiler 16.07.19 12.07.19

Layout & floor plan drawings for PH Boiler circuit 16.08.19

Layout & floor plan drawings for AQC Boiler circuit 24.08.19
Detail drawings for inlet, out let ducts for PH Boiler
14.09.19
circuit
Detail drawings for inlet, out let ducts for AQC Boiler
circuit 05/10/19

Refractory detail drawings for Boiler ducts & Hoppers 13.10.19


5 Specifications for PH & AQC Boiler related equipments
viz. Dampers, Expansion joints, Chain conveyors, Flap 19.08.19
valves, Slide gates,RAL.
Detail drawings of chutes for SP & AQC Boiler circuits 21.11.19

Review of civil drawings for SP & AQC Boiler circuits -


Review of structural drawings for SP & AQC Boiler
-
circuits
DBR for equipments related to SP&AQC Boiler circuit 20.07.19

Insulation drawings related to SP& AQC Boiler ducts 20.10.19


Detail drawings for fresh air fan to damper duct -

6
Review of civil & structural drawings -

7 Review of civil & structural drawings -

8 Review of civil & structural drawings -

9 AQC duct detail drawings 18.07.19

Addition of Manual Slide Gates & Air Slides at Dry Fly


Ash Silo Extraction. 2 Work days.

Co-ordination with Customer / Site Erection Personnel,


10 for completion and commissioning of the system. N/A

As-Built Drawings as per Site Condition. 3 Weeks.

N/A N/A

Fabrication DWGS of:

Stringer, Short Posts & Deck Plate 10 Work days.

Drive Base Frame 4 Work days.

All Pulley Frames 4 Work days.

Skirt Board 7 Work days.

Discharge Hood 7 Work days.

Transfer Chute 7 Work days.


11
All Gantries 2 Weeks.

VGTU Detail drawings including Counter Weight 2 Work days.

Pipe Forming Idler Frames - Carrying & Return 2 Weeks.

Review & Scrutinizing Bought-out Equipment


Datasheets / GA Drawings (Idlers, Pulleys, Gearbox, 1 Month.
Couplings, Scrapers etc.)

Review of Strucon Drawings 2 Work days.

N/A N/A

Follow-up with Cubiz N/A

Review of Vendor Datasheets / GA Drawings by Cubiz &


LNVT. 1.5 Months.
12

Follow-up with Cubiz 5 Months.

Fabrication Drawings of Pet Coke Bin 7 Work days.

Fabrication Drawings of Inter-connecting Chutes 2 Work days.


13
Venting Scheme Drawings 2 Work days.

Review & Scrutinizing Bought-out Equipment GA


Drawings (Diverting Gate, Screw Conveyor, RAL, 2 Weeks.
Schenck DWGS)
All jobs completed and Commissioning activity on-
going at site. N/A
14
N/A N/A
Revised Layout DWGS with Equipment Plan, Floor Plan
2 Weeks.
and Load Data for Civil Design
15
Fabrication DWGS of Ducts, Chutes, Bins, Venting. 1 Month.
WHRS- PROCESS ENGINEERING TEAM

Plot plan submission and finalization 1.7.2019 to 31.8.2019

P&ID submission and finalization 8.7.2019 to 9.9.2019

DBR submission and finalization 8.7.2019 to 30.7.2019

Boiler GA & Load data submission and finalization 1.7.2019 to 31.7.2019

1 Boiler Non pressure parts drawing review 19.8.2019 to 30.9.2019

RFQ & offer review for the following items:


1. Main Cooling Tower
2. BFP
3. WTP 22.7.2019 to 30.9.2019
4. EOT Crane
5. Piping Engineering
6. Cooling water pumps

Piping Support drawing release 31.7.2019


Pipe rack (Existing rack extension) fabrication drawing
to be released 31.7.2019

2 P&V Ducting layout drawing review and approval 15.7.2019 to 20.8.2019

AC Ducting layout drawing review and approval 15.7.2019 to 20.8.2019

Fire Fighting system revised drawing submission 10.7.2019 to 10.8.2019


Boiler auxiliary equipment floor plan and civil input
10.7.2019 to 19.7.2019
release
3
Spring Hanger offer review and clearance 10.7.2019 to 25.7.2019

4 P&V Ducting layout drawing review and approval 10.7.2019 to 30.7.2019

5 PH Boiler Hopper liner plate drawing and fixing details 10.7.2019 to 19.7.2019

CIVIL / STRUCTURAL ENGINEERING TEAM

Review of civil & structural design document and


1 -
drawings

Review of civil & structural design document and


2 -
drawings
Review of civil & structural design document and
3 drawings, Design and detailing of cable tray supporting -
structure
Review of civil & structural design document and
4 -
drawings
Review of civil & structural design document and
5 -
drawings

Review of civil & structural design document and


6 -
drawings

Review of civil & structural design document and


7 -
drawings

Review of civil & structural design document and


8 -
drawings
Review of civil & structural design document and
9 -
drawings
Review of civil & structural design document and
10 -
drawings

Review of civil & structural design document and


11 -
drawings

Review of civil & structural design document and


12 -
drawings
Review of civil & structural design document and
13 -
drawings
Review of civil & structural design document and
14 drawings, Design and detailing of Dryer foundation -
structure

15 Preparation of BOQ and cost Estimation -


16 -
gineering Team for the period of July 2019 to September 2019

Remarks

Existing equipment drawings from customer to be received


by 12.07.19

Customer scope of drawings. To be reviewed subject to


receipt from customer with in 3 days from receipt of
drawings.

Subject to finalizing preheater-calciner option by customer


on 16.07.19

subject to receipt of drawing from customer by 15.08.19

subject to finalizing TAD option by customer on 16.07.19

subject to finalizing TAD option by customer on 16.07.19

subject to receipt of drawings from customer

Awaiting customer approval for Preheater cyclones


modification option

Subject to availability of all equipment drawings by


15.10.19
Subject to receipt of drawing from projects

To be reviewed subject to receipt from customer with in 3


days from receipt of drawings.

To be reviewed subject to receipt from customer with in 3


days from receipt of drawings.

To be reviewed subject to receipt from customer with in 3


days from receipt of drawings.

As per Site Requirement.

N/A

After complete review and study of different sections, as


per Site Condition
Bought-out Manuals of all equipment from Projects
Management.

From the date of receipt of Idler DWGS from Projects


Management.
From the date of receipt of Input / Ouput Coupling DWGS
from Projects Management.
From the date of receipt of FINAL Pulley GA DWGS from
Projects Management.
From the date of receipt of Skirt Side Plate DWG from
Projects Management.
From the date of receipt of Scrapers DWGS from Projects
Management.
After completion of Skirt Board Fabrication DWG.
After receipt of Gantry Profile & Trestle Structural
Drawings from Strucon.
After completion of all Pulley Frame DWGS.

Based on receipt of FINAL Techical Datasheets, GA


Drawings of all Equipment from Projects Management.

From the date of receipt of Structural DWGS from Strucon.


Bought-out Manuals of Pipe Conveyor components from
Projects Management.
Revised Spec. for BO Items like Idlers, Brakes, Air Blasters,
Safety Switches, Belt, HGTU Components, Counter
Weight, Safety Switches from Cubiz.

Based on receipt of FINAL Techical Datasheets, GA


Drawings of all Equipment from Projects Management.

All Fabrication drawings of conveyors from Cubiz as per


DWG Schedule. (Stringers, Short Posts & Deck Plate, All
Pulley Frames, Drive Base Frame, Discharge Hood, Chute,
Take-up Detail DWGS of VGTU, HGTU, All Safety Guards,
Nip Guards etc.)

From the date of receipt of Schenck extraction system


detail DWGS by Projects Management.
From the date of receipt of RAL GA Dwg from Projects
Management.
After completion of Iner-connection Chutes

Based on receipt of FINAL GA Drawings of Equipment from


Projects Management.
Balance Bought-out manuals awaited. (Winch, Geared
Motors, Drag Chain System, Gates, Skirt Board, Belt
feeders, Hoist, Motor & Gearbox received) from Projects
Management.
Tripper Conveyor Operational Procedure & Working
Manuals from VRK Consultant.

Details from SMEL for complete balance Bought-out GA


drawings awaited.
WHRS- PROCESS ENGINEERING TEAM
Considering Maximum 2 revisions upto approval from
client/consultant
Considering Maximum 2 revisions upto approval from
client/consultant
Progressive submission of individual equipment/system
DBRs
Considering Maximum 1 revision upto approval from
client/consultant
On receipt of input drawing from Nantong

Progressive submission of individual equipment/system


RFQs

Considering approval from Client/consultant also

Considering approval from Client/consultant also

CIVIL / STRUCTURAL ENGINEERING TEAM

Subject to receipt of drawings from customer,


approval/comments will be provided with in 4 days

Subject to receipt of drawings from customer,


approval/comments will be provided with in 4 days

Subject to receipt of drawings from customer,


approval/comments will be provided with in 4 days

Subject to receipt of drawings from customer,


approval/comments will be provided with in 4 days
Subject to receipt of drawings from customer,
approval/comments will be provided with in 4 days

Subject to receipt of drawings from customer,


approval/comments will be provided with in 4 days

Subject to receipt of drawings from customer,


approval/comments will be provided with in 4 days

Subject to receipt of drawings from customer,


approval/comments will be provided with in 4 days
Subject to receipt of drawings from customer,
approval/comments will be provided with in 4 days
Subject to receipt of drawings from customer,
approval/comments will be provided with in 4 days

Subject to receipt of drawings from customer,


approval/comments will be provided with in 4 days

Subject to receipt of drawings from customer,


approval/comments will be provided with in 4 days
Subject to receipt of drawings from customer,
approval/comments will be provided with in 4 days

Subject to receipt of drawings from customer,


approval/comments will be provided with in 4 days

Based on requirement from BD


Subject to receipt of drawings from customer,
approval/comments will be provided with in 4 days