SOUNDNESS OF AGGREGATE BY USE OF SODIUM SULFATE

PROJECT NAME:Chancho-Derba-Becho
EMPLOYER CONSULTANT CONTRACTOR
E.R.A CORE E.R.C.C

(Retained on 4.75 mm Sieve)


TEST METHOD : (AASHTO DESIGNATIONE: T - 104 )
SAMPLING STATION: 5+400 RHS (Crusher 2)

SOURCE Stock pile DATE SAMPLE: 10/12/2013

PUROPSE: Concrte Work DATE TESTED: 15/12/2013

VISUAL DESCRIPTION : Crushed Aggregete Lab No.

Type Of Solution used Na2SO4 Mg SO4

Specific Gravity Of the Solution 1.154 < Na2SO4 < 1.171 1.297 < MgSO4 < 1.306

Beginning of Immersion Ending of Immersion Total


Hour of
Cycle Sp.Gravity of Solution
Date Time Date Time immersion

1. Immersion 12/15/2013 11:00a.m 12/16/2013 4:00p.m 17 1.161


2. Immersion 12/16/2013 11:00a.m 12/17/2013 4:00p.m 17 1.152
3. Immersion 12/17/2013 11:00a.m 12/18/2013 4:00p.m 17 1.156
4. Immersion 12/18/2013 11:00a.m 12/19/2013 4:00p.m 17 1.165
5. Immersion 12/19/2013 11:00a.m 12/20/2013 4:00p.m 17 1.157

Wt. of sample % Passing Weighted


Grading of Mass of Test
Designated Sieve Percentage loss
original Sample Fractions
Sieve Size(mm) After test
W
Before After test(g)=
test(g)= Y Z
to be used Mass ( g) (%) = X V = ((Y-Z)/Y)*100 = (V*X)/100
300-μm to 150-μm
600-μm to 300-μm
Fine Aggregate

1.18-mm to 600-μm
2.36-mm to 1.18-mm
4.75-mm to 2.36-mm
9.5-mm to 4.75-mm
Total
63.0-mm to 50.0-mm 3000 + 300
50.0-mm to 37.5-mm 2000 + 200
Coarse Aggregate

37.5-mm to 25.0-mm 1000 + 50


27.8 489 2.20 0.61
25.0-mm to 19.0-mm 500 + 30 500.0 500
19.0-mm to 12.5-mm 670 + 10 670.0 670
55.6 951 4.90 2.72
12.5-mm to 9.5-mm 330 + 5 330.0 330
9.5-mm to 4.75-mm 300 + 5 300.0 16.7 300 269 11.52 1.92
Total 1800.0 1800 5

Sieve Sizes used to determine loss For Different Aggregate Size


Size of Aggregate Sieve used to Determine Loss Size of Aggregate Sieve used to Determine Loss
63.0 mm to 37.5 mm 31.5mm 19.0mm to 9.5mm 8.0mm
37.5 mm to 19.0 mm 16.0mm 9.5mm to 4.75mm 4.0mm

Remark :

Tested by:___________________________ Chacked by: ____________________ Approved by :_____________________


3
Contractor: _________________________ Consultant: ____________________ Consultant _____________________
A

(
A

+A
B
)
-
C(
A

B
)

3
0.152
0.023104
0.005776 0.018146 0.004155 18233 19617
6077.666667 6539

1462.595853 1573.616