Elevator Masonry Wall Design Based on CBC 07 / CBC 01, Chapter A
ANALYSIS
0.4a p S DS I pW p z
Fp 1 2 0.411 Wp = 63 psf , ASD
1.4 R p h
Where : ap = 1.0 Rp = 3.0 Wp = 153.3 psf z=h
(ASCE Tab. 13.5-1) (ASCE Tab. 13.5-1) ( attachment height per ASCE 7-05 13.3.1,
horizontal bending, z dynamic)
2 12"
P 0.5 W car 40%W rat 1.85 kip / ft , ASD
3 b
Where : Factor 2/3 , 0.5 , & 40% from CBC 07 1614A.1.15 or CBC 01 1633A.2.13.1
b= 8.0 in, ACI 530-05 2.3.3.3.1 & CBC 2106A.3.8
F p L 2 PL
M max 5.52 ft-kip / ft , ASD (simple beam since wall cracked)
8 4
1 kd kd
M allowable MIN b wkd F b d , A s F s d 7.27 ft-kip / ft , ASD
2 3 3
> Mmax [Satisfactory]
ANALYSIS
DESIGN CRITERIA
1. Pilaster spacing less than one half the unsupported vertical span of out-of-plane wall. (MDG-3,page 11-8)
L= 10.17 ft < 0.5 h = 50 ft [Satisfactory]
2. Pilaster stiffness greater than that the tributary area of wall. (CBC 2106A.1.7)
beff = c1 + 12 t = 216 in, (ACI 530, 1.7.5.1 & 1.9.4.2.3)
y= 8.6 in
E Ipilaster = 100945 E ,(ACI 530, 1.9.2)
E Iwall = 33464 E ,(ACI 530, 1.9.2)
F b SF 0.33 f
'
m 660 psi
1 kd kd
M allowable MIN b wkd F b d , AsF s d 7267 ft-lbs/ft, (MDG-3, page 11-3)
2 3 3
w L c1
2
F v SF MIN f
'
m
, 50 52 psi > fv= 0.5 (L - c1) w / (bwd) = 0
[Satisfactory]
psi
Technical References: